Loading...
HomeMy WebLinkAbout2017 CON Palm Engineering - Westside Mobility Improvements CIP No. 17-04 - Change Orders #10 through #12 and #15Working days added: 0 e-+'CALIFORNIA �++ N%TION cmr NCO ,pop, WESTSIDE MOBILITY IMPROVEMENTS CIP NO. 17-04 Contractor: Palm Engineering Construction Company, Inc. CHANGE ORDER NO. 10 December 14, 2017 Reason/Purpose for this Change Order. The City directed the installation of a concrete sign wall reading "Old Town National City" within the roundabout at West 14th Street and Harding Avenue. Under direction of the Engineer the Contractor proceeded with procuring and installing a concrete sign wall. The City of National City and Contractor agree to the following change to the original Contract: The City and the Contractor agree that the Contractor shall proceed with procuring and installing a concrete sign wall within the roundabout at West 14th Street and Harding Avenue. The agreed upon price for all costs associated with this work is as stated on this Change Order. See Attachment for cost breakdown. Original Contract Amount.. Net change by previously authorized Change Orders Subtotal Amount of this change order New contract amount $ Percent change in Contract to date 3.59% Working days subtracted: 0 1,780,325:57 39,570.86 1,819,896.23 24,3352,43 1,844,248.86 Submitted by: P ect ana r 17,4 714 Date _ y Approved by:. . Cit ngineer / /4/4•Ir Date City Manager, required for change Orders>su,999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Accepted an agreed to by Palm Engineering Construction Company, Inc. Name: ra/ /(- Date Note to Contractor: if you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to pmtect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager Telephone (619) 336-4380 1243 National City Boulevard, National City, CA 91950 ;Pic, 7 1:D WESTSIDE MOBILITY IMPROVEMENTS CTP NO. 17-04 CHANGE ORDER NO. 10 DATE: November 30, 2017 WORK PERFORMED BY: Palm Engineering DESCRIPTION OF WORK: Procure and install Precast Concrete Sign (Old Town National City) ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT Unit Qty Rate Total : 1) Relocate two (2) boulders LS 1.00 495.00 495.00 2) Remove and replace mulch LS 1.00 195.00 195.00 3) Dig out 3' W x 18' L x 2' D LS 1.00 1,200.00 650.00 1,200.00 650.00 4) Place base/gravel into bottom of dig out LS 1.00 5) Unload sign and set sign LS 1.00 3,500.00 450.00 3,500.00 450.00 6) Backfill 1.5' W x 18' L x 1' D. LS 1.00 7) Precast concrete sign wall LS 1.00 17,384.93 17,384.93 TOTAL; SUB TOTAL: $ 23,874,9; BOND AND INSURANCE (2%): GRAND TOTAL: $24, $477.50 4 aA�r 1 I I fir rU;: IN9onlpoRATSP WESTSIDE MOBILITY IMPROVEMENTS CIP NO. 17-04 Contractor: Palm Engineering Construction Company, Inc. CHANGE ORDER NO. 11 December 14, 2017 Reason/Purpose for this Change Order: An unforeseen water line was discovered in conflict with a Type 1A pole foundation on the Northwest corner of 18th Street and West Avenue. Under direction of the Engineer the Contractor proceeded under time and materials with relocating the water line. The City of National City and Contractor agree to the following change to the original Contract: The City and the Contractor agree that the Contractor shall proceed with relocating the water line on the Northwest corner of 18th Street and West Avenue. The agreed upon price for all costs associated with this work is as stated on this Change Order. See Attachments for cost breakdown. Original Contract Amount ...... •................... Net change by previously authorized Change Orders Subtotal. Amount of this change order New contract amount Working days added: 0 Working days subtracted: 0 1,780,325.57 63,923.09 1,844,248.66 749.09 Percent change in Contract to date 3.63% 1,844,997.75 Submitted by: iJ%.1/116Date Approved by: 2 City ngineer • . .../1.1/1.? Date City Manager, required for cha eorde►s>s24.999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Acceptagreed to by Palm En ineering Construction Company, Inc. IP 42i/i-,' Name. Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your daim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager Telephone (619) 336-4380 1243 National City Boulevard, National City, CA 91950 CALIFORNIA = , N&flOJNAL C1ip' xNCORPORA`I'ED WESTSIDE MOBILITY IMPROVEMENTS CIP NO. 17-04 DATE: October 17, 2017 CHANGE ORDER NO. 11 WORK PERFORMED BY: Palm Engineering DESCRIPTION OF WORK: West Ave and 18th Street NW corner water service relocation ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT LABO Unit Qty Wage Total 1) Stacey. Kearns - Labor G1 Hour 5.00 52.53 262.65 Sub -Total Labor: Labor surcharge (29.45%): Labor Markup (20%): TOTAL LABOR: 77.35 $ 68.00 4GYEtOOO` MATE 'KIS. Unit Qty Rate Total 1) Sub -Total Materials: Materials Markup (15%): TOTAL MATERIALS: EQUIPMENT Unit Qty Rate Total 1) Sub -Total Equipment: Equipment Markup (15%): TOTAL EQUIPMENT: SUB TOTAL: BOND AND INSURANCE (2%): 408.00 $8.16 GRAND TOTAL: $ 262.65 WESTSIDE MOBILITY IMPROVEMENTS CIP NO. 17-04 DATE: October 25, 2017 CHANGE ORDER NO. 11 WORK PERFORMED BY: Palm Engineering DESCRIPTION OF WORK: West Ave and 18th Street NW corner water service relocation ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT Unit Qty Wage Total 1) 2) Stacey Kearns - Labor G1 Edgar Carrilo Labor G1 Hour Hour 2.00 2.00 52.53 52.53 Sub -Total Labor: Labor surcharge (29.45%): Unit 105.06 105.06 $ 210.12 $ 61.88 Labor Markup (20%): $ 54.40 TOTAL LABOR: Qty Rate Sub -Total Materials: Total Materials Markup (15%): $ - TOTAL MAT--ES:71111111111.1 EQUIPMENT Unit Qty Rate Total 1) Sub -Total Equipment: Equipment Markup (15%): TOTAL EQUIPMENT: SUB TOTAL: BOND AND INSURANCE (2%): 326.40 $6.53 GRAND TOTAL: WESTSIDE MOBILITY IMPROVEMENTS CIP NO. 17-04 Contractor: Palm Engineering Construction Company, Inc. CHANGE ORDER NO. 12 December 14, 2017 Reason/Purpose for. this Change Order: During the demolition of the street section for the bulbout at West Avenue the markedelectrical conduit was 6" below grade and encased within the asphalt. The conduit and wire were damaged during sawcutting for the removal of the asphalt. Under direction of the Engineer the Contractor proceeded under time and materials with repairing the damaged electrical conduit and wire at West Avenue. The City of National City and Contractor agree to the following change to the original Contract: The City and the Contractor agree that the Contractor shall proceed with repairing the damaged electrical conduit and wire at West Avenue. The agreed upon price for all costs associated with this work is as stated on this Change Order. See Attachments for cost breakdown. Original Contract Amount...... Net change by previously authorized Change Orders 1,780,325.57 64,672.18 Subtotal . 1,844,997.75 Amount of this change order 1,760.56 New contract amount ,. • $ : 1,846,758.31 Working days added: 0 Working days subtracted: 0 Percent change in Contradlodaltis 3.7396. Submitted by: 1,67' Arpproved by: City ngineer i 4./ii Date .: : City Managerrequlred for Change Orders >$24.999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Acce•ted a d a•reed to /a: f.26f( 7 Name. Date Note to Contractor. If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You tnust comply with the contract requirements of submitting a written protest to protect your claim. Originals City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, NationarCity, CA 919S0 Te e hone (619) 336-4380 400 NATIONAL fartitonfko4far. WESTSIDE MOBILITY IMPROVEMENTS CIP NO. 17-04 CHANGE ORDER NO. 12 DATE: October 21, 2017 WORK PERFORMED BY: Palm Engineering DESCRIPTION OF WORK: SC Valley replace cut signal conductors & disconnect temp signals ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT SUBCONTRACTOR Dates/ Desc. Total 1) SC VALLEY 10/4/17, 10/6/17, 10/10/17 1,643.85 $ 1,643.85 Sub -Total Equipment: Subcontractor Markup (5%): TOTAL EQUIPMENT: $ 82.19 SUB TOTAL: BOND AND INSURANCE (2%): $ 1,726.04 1,726.04 $34.52 GRAND TOTAL: WESTSIDE MOBILITY IMPROVEMENTS CIP NO. 17-04 DATE: October 4, 2017 CHANGE ORDER NO. 12 WORK PERFORMED BY: Palm Engineering DESCRIPTION OF WORK: Replace cut signal cables and disconnect temp signal ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT LABOR Unit Qty Wage Total 1) 2) P Vaughan (SLT) G Chobot (SLT) 12c Signal Cable (150 LF) Hour Hour Unit LS 4.00 2.00 47.21 41.01 Sub -Total Labor: Labor Markup (20%): TOTAL LABOR: 188.84 82.02 Qty 1.00 Rate 195.57 $ 270.86 $ 54.17 Total 195.57 $ 195.57 Sub -Total Materials: Materials Markup (15%): $ 29.34 TOTAL MATERIALS: EQUIPMENT Unit Qty Rate Total 1) 2) TRUON TRUN 2AXL Hour 2.00 42.84 85.68 TRUCK T&TT Hour 4.00 20.29 81.16 $ 166.84 Sub -Total Equipment: Equipment Markup (15%): TOTAL EQUIPMENT: $ 25.03 $ 191.87 GRAND TOTAL: SOLDTO: ,,rtXA ELECTRIC SUPPLY — CHULA VISTA BAY BLVD. ,dULA VISTA, CA 91911 T1619 427-2370 F:619 427-5416 SC VALLEY ENGINEERING 656 FRONT STREET FL CAJON, CA 92020 ACCOUNTflO. KY-90500 SHOP ACCOUNT ***ORIGINAL*** JOB NAME AND ADDRESS 0& J y , 79, cry , ***EMAILED*** SHIP TO: INVOICE NO ! INVOICE 0A1E PLEASE SHOW INVOICE NO. AND REMIT T0: P.O. BOX 509079 SAN DIEGO, CA 92150 T:856 451-7090 F:655 451-7094 SC ENGINEING 0 BA BLVD. HULA vISrA, CA 919 RD 7 SALESPERSON 1450 JKM OUAHTITY OROEREO PRODUCTCODE OFSCRIPTION 2500 WIRE 14-12C CALTRANS 00 0 SHIPPING INFORMATION PREPAID ° AUAIHNY ° BHIPP£0 SHIP VIA WILL CALL PRICE DISC. CALTRANS CAL1412 ON 1500/2500' C 1500 1211.62 I M ,1"101f (;}s- - 1 i trot, SHIP DATE 02/24/17 EXTE}IS€ON Ct0 1,817.73 2.0 TITLE AND RISE OF LOSS OR DAMAGE TO MERCHANNDISE PASSER AT POIN2 00 5NIFHEN2, CLAMS FOR 050RT OR DAMAGED MERCNAMDISE 5HOOT.A SE MADE TO CARRIER. MERCDANDI5E RETURNED 'WITHOUT OOR CONSHNT WILL NOT DE ACCEPTED. A RESTOCRINO CHARGE WILL BE MADE ON RETURNED GOODS ONLSRS DEFECTIVE OR TRIM ERR011 ON OUR PART. A SERVICE CHARGE OF 1.5♦ PER MONTH, HVT NOT YO EXCEED THE HIGHEST ANOMIE LANITiLLY ALLOWED SY CONTRACT IN THIS STATE, NITS. B8 MADE ON ALE. PART DOE ACCOUNTS. THIS SALC IS SOHJECT TO OUR TERMS LOCATED A2 9ALES.OUR-'rERHS.COM, WHICH WE MAT CHANGE FROM TIME 20 TIME WITHOUT PRIOR NOTICE. CODS: TO ADVISE YOU PROMPTLY CONCERNING YOUR ORDER, THIS CODS IS GELD OH 00R INVOICES. S - BACK ORDERED. HILL SHIP A3 60ON AS RECEIVED CNLESS INSTRUCTED TO CANCEL. C - CMSCEI-LZD. NOT Iti STOCK. UNABLE TO PURCHASE LOCALLY. MERCHAl1015E SALES TAX 7.750 SHIPPING CHARGE 1817.73 140.87 .00 NET PAYMENT TS DUE BY THE 15TH OF THE MONTH FOLLOWING PURCHASE TOTAL DUE 1958.60 WESTSIDE MOBILITY IMPROVEMENTS CIP NO. 17-04 DATE: October 6, 2017 CHANGE ORDER NO. 12 WORK PERFORMED BY: Palm Engineering DESCRIPTION OF WORK: Disconnect temp signal cable for concrete pour 1) ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT P Vaughan (SLT) MATERIALS 1 N/a Unit Hour Qty 3.00 Wage 47.21 Total 141.63 141.63 Sub -Total Labor: Labor Markup (20%): TOTAL LABOR: $ 28.33 Sub -Total Materials: $ - Materials Markup (15%): TOTAL MATERIALS: EQUIPMENT 1) Unit Qty Rate Total TRUCK T&TT 06-12 Hour 3.00 20.29 60.87 $ 60.87 Sub -Total Equipment: Equipment Markup (15%)t TOTAL EQUIPMENT: $ 9.13 $ 70.00 4-4 CALIFORNIA *-{+- ATIONAL car ,N o a ED -� CORPORAT WESTSIDE MOBILITY IMPROVEMENTS CIP NO. 17-04 DATE: October 10, 2017 WORK PERFORMED BY: Palm Engineering CHANGE ORDER NO. 12 DESCRIPTION OF WORK: Disconnect temp signal cable to repair conduit for curb ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT LABOR 1) 2) P Vaughan (SLT) J Salazar (SLT) Unit Hour Hour Unit Sunbelt Rentals/Air Compresso Ls Qty 3.00 3.00 Wage Total 141.63 121.53 Sub -Total Labor: $ 263.16 Labor Markup (20%): $ 52.63 TOTAL LABOR: 1.00 47.21 40.51 Rate 240.25 Total 240.25 $ 240.25 Sub -Total Materials: Materials Markup (15%): 36.04 TOTAL MATERIALS: EQUIPMENT Unit Qty Rate Total 1) TRUCK T&TT 06-12 Hour 3.00 20.29 60.87 Sub -Total Equipment: Equipment Markup (15%): $ 60.87 9.13 TOTAL EQUIPMENT: 70.00 5UMSTM EguIpment Co, ** COPY ** BRANCH LOCATION SAN DIEGO 858-545--1010 AFTER HRf:(619) 572-4615 PLEASE REMIT TO: P.O. BOX 52581 PHOENIX, AZ 85072-2581 CUSTOMER # 21736 PHONE#619-444-2366 S.C. VALLEY ENGINEERING INC. 656 FRONT STREET EL CAJON, CA 92020 CONTRACT TYPE: RENTAL RETURN INVOICE # 7234477-001 PO # JOB## 2011 JOB NAME: OTAY ORDERED BY: /CMARTINEZ/06:17 DATEITIME OUT: 10/25/17 6:17AM DATETf1ME IN: 10/25/17 4:01 PM CONTACT: PAT 619-733-1117 TERRITORY:123 PROCESSED BY: TODDM DRIVER LICENSE: LICENSE PLATE: RETURN LOC: SND JOB ADDRESS: OCEAN VIEW HILLS PKWY & SEA FI SAN DIEGO CA 92154 DEL. INSTRUCTIONS: ITEM QTY RENTAL RATES AREFOR EACH ,ITEM AND CEO NO INCLUDE FUEL OR DELIVERY EQUIPMENT DESCRIPTION EQUIP. # DAY RATES WEEK PAG E : 1 EXTENDED 4 WEEK PRICE 1 AIR COMPRESSOR-185CFM TOWABLE DIESEL 136187 C185 HR OUT: 629.10 HR IN: 632.10 S/N: 466217UHYF23 155.00 450.00 1100.00 SALES ITEMS: Qty Item number Unit Price 1 ENV EA 11.000 ENVIRONMENTAL CHARGE 5 DIESEL DIESEL FUEL EA 7.250 SUB TOTAL: DAMAGE WAIVER: TAX: TOTAL AMOUNT DUE: 155.00 11.00 36.25 202.25 21.70 16.30 240.25 RENT CONTINUES UNTIL YOU CALL,; TO HAVE EQUIPMENT PICKED UP. CUSTOMER SIGNATURE PRINT CUSTOMER'S FULL NAME DE ::TVE F,D'BY • TERMS: NET 30 UPON ISSUANCE OF INVOICE (INVOICE DATE). SERVICE CHARGES AT THE LESSER RATE OF 1.5% PER MONTH OR THE MAXIMUM RATE . PERMITTED BY LAW ON PAST DUE ACCOUNTS. • CUSTOMER AGREES THAT DAMAGE AND THEFT WAIVER IS VOIDED IF EQUIPMENT IS NOT KEPT IN A LOCKED ENCLOSURE OR PROTECTED EYA SECURITY GUARD WHEN NOT IN USE. • A SERVICE/CLEANING CHARGE MAY RESULT DUE TO EQUIPMENT BEING RETURNED DAMAGED OR IN NEED OF EXCESSIVE CLEANING. • THE ENVIRONMENTAL FEE IS NOT REGULATED NOR COLLECTED BY OR FOR ANY GOVERNMENTAL AGENCY. • WARNING: UNLAWFUL FAILURE TO RETURN RENTED PROPERTY MAY BE A FELONY. FINES, CRIMINAL. PROSECUTION, AND/OR IMPRISONMENT COULD RESULT. • BY SIGNING ABOVE I AGREE TO TERMS ON FRONT AND BACK OF THIS CONTRACT. I ALSO ACKNOWLEDGE RECEIVING INSTRUCTIONS AS TO THE SAFE AND PROPER USE OF THE EQUIPMENT, Revised 4/15 WESTSIDE MOBILITY IMPROVEMENTS CIP NO. 17-04 Contractor: Palm Engineering Construction Company, Inc. CHANGE ORDER NO. 15 December 14, 2017. Reason/Purpose for this Change Order: During demolition of the street section for the bulbouts on West Avenue an unforeseen 12"-14" of asphalt was discovered. The expected asphalt section per contract was 6", therefore additional asphalt removal was required. Under direction of the Engineer the Contractor proceeded with removing and disposing of the additional asphalt. The City of National City and Contractor agree to the following change to the original Contract: The City and the Contractor agree that the Contractor shall proceed with removing and disposing the additional asphalt on West Avenue. The agreed upon price for all costs associated with this work is as stated on this Change Order. See Attachment for cost breakdown. Original Contract Amount $ 1,780,325.57 77,021.62 1,857,347.19 Amount of this change order 14,043.87 Net change by previously authorized Change Orders Subtotal New contract amount .. $ 1,871,391.06 Working days added: 0 Working days subtracted: 0 Percent cherve in Contract to date 5.12% Submitted by: r -ct Man .• -r. Approved by: f., City'Engineer / /ifl Z Date City Manager, required for Change Orders>$24,999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are Incorporated herein. Accepted and agre,; d to b Palm En • ineering Construction Company, Inc. Nam ► � Na% . Date Date Note to Contracto. I you o not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager Telephone (619) 336-4380 1243 National City Boulevard, National City, CA 91950 -0,-Y CALIFORNIA NATIONAL Clair N IP c E CCti ORPORAZ WESTSIDE MOBILITY IMPROVEMENTS CIP NO. 17-04 DATE: November 28, 2017 CHANGE ORDER NO. 15 WORK PERFORMED BY: Palm Engineering DESCRIPTION OF WORK: Remove and dispose of additional asphalt on West Avenue ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT Unit Qty Wage Total 1) Remove and dispose of asphalt Ton 205.50 67.00 13,768.50 TOTAL: SUB TOTAL: $ 13,768.50 BOND AND INSURANCE (2%): $275.37 GRAND TOTAL: +. OALIJ'OwNiA «+. WESTSIDE MOBILITY IMPROVEMENTS CIP NO. 17-04 Contractor: Palm Engineering Construction Company, Inc. CHANGE ORDER NO. 14 December 14, 2017 Reason/Purpose for this Change Order: The storm drain inlet deck and entrance at the Northeast corner of National City Blvd and 18th Street was deteriorated and falling apart created a safety issue. Under direction of the Engineer the Contractor proceeded with removing and replacing the top 4" of the deck of the type "C" inlet. The City of National City and Contractor agree to the following change to the original Contract: The City and the Contractor agree that the Contractor shall proceed with removing and replacing the top 4" of the deck of the type "C" inlet at the Northeast corner of National City Blvd and 18th Street. The agreed upon price for all costs associated with this work is as stated on this Change Order. See Attachment for cost breakdown. Original Contract Amount •• • ,.., $ 1,780,325.57 Net change by previously authorized Change Orders... 69,218.62 Subtotal ...... Amount of this change order New contract amount...:.:... ;..:..... $ 1,857,347.19 Working days added: 0 Working days subtracted: 0 Percent change In Contract to date 4.33% 1,849,544.19 7,803.00 Submitted by: Approved by: Cit ngineer Data City Manager, required for Change Orders>$24,999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Acce • : • and reed to b Palm En ineerin a Construction Com Inc. 1-3 L'L. Name: Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager NM!, 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 � CALIFORNIA` +- - Spa'I o NAL, Gar voov XNCORPORA'TEO WESTSIDE MOBILITY IMPROVEMENTS CIP NO. 17-04 DATE: December 6, 2017 CHANGE ORDER NO.14 WORK PERFORMED BY: Palm Engineering DESCRIPTION OF WORK: Remove and replace top 4" of the deck of type "C" inlet Northeast corner of NCB and 18th St ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT Unit Qty Wage Total 1) Sawcut, Demo, Rebuild Deck LS 1.00 7,650.00 7,650.00 TOTAL: 7,650M001 SUB TOTAL: $ 7,650.00 BOND AND INSURANCE (2%): GRAND TOTAL: $1 5 3.00 ___ 1 CALIFORNIA NATIONAL CIT , INCdR!lersD WESTSIDE MOBILITY IMPROVEMENTS CIP NO. 17-04 Contractor: Palm Engineering Construction Company, Inc. Reason/Purpose for this Change Order: The pedestrian ramp at the Southwest corner of Civic Center Drive and Harding Avenue required a pedestrian railing to meetADA. Under direction of the Engineer the Contractor proceeded with procuring and installing a pedestrian railing. CHANGE ORDER NO. 13 December 14, 2017 The City of National City and Contractor agree to the following change to the original Contract: The City and the Contractor agree that the Contractor shall proceed with procuring and installing a pedestrian railing for the curb ramp at the Southwest corner of Civic Center Drive and Harding Avenue. The agreed upon price for all costs associated with this work is as stated on this Change Order. See Attachment for cost breakdown. Original Contract Amount Net change by previously authorized Change Orders Subtotal... Amount of this change order New contract amount... Working days added: 0 Working days subtracted: 0 1,780, 325.57 66,432.74 1,846,758.31 2,785.88 Percent change in Contract to date 3.89% 1,849,544.19 Submitted by: • /(1 lg -,,,ectMa ••r Da .• Approved by:2 r dil.Ap Cit ngineer Date City Manager, required for Change Orders>$24,999 Date :. By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Accepted mad agreed to by Palm Engineering Construction Company, Inc. Name: 12 Date 1 Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager Telephone (619) 336-4380 1243 National City Boulevard, National City, CA 91950 ...4_,ALL INCORPORATED WESTSIDE MOBILITY IMPROVEMENTS CHANGE ORDER NO.:13 CIP NO. 17-04 DATE: November 30, 2017 WORK PERFORMED BY: Palm Engineering DESCRIPTION OF WORK: Procure and install pedestrian railing at the SW corner of Civic Center Drive and Harding Ave ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT Pedestrian Railing M-24 Unit Qty Wage Total LF 25.00 109.25 2,731.25 lip TOTAL: 731.25 SUB TOTAL: BOND AND INSURANCE (2%): GRAND TOTAL: 2,731.25 $54.63 CITY OF NATIONAL CITY Office of the City Clerk 1243 National City Blvd., National City, California 91950-4397 619-336-4228 Michael R. Dalla, CMC - City Clerk PALM ENGINEERING CONSTRUCTION COMPANY, INC. Change Orders #10 through #12, and #15 Westside Mobility Improvements Project CIP No. 17-04 Judy Hernandez (Engineering/Public Works) Forwarded Copy of Change Orders to Palm Engineering Construction Company, Inc.