HomeMy WebLinkAbout2015 CON Downstream Services - Culvert Barrier Project CIP No 14-06 - Change Order #1NOTE TO FILE 01-29-18 IN THE MATTER OF: Resolution 2015-72, of the City of National City authorizing the Mayor to execute Change Order No. 1 to the National City Culvert Barrier Project Contract (CIP NO. 14-06). Please note the following: A FULLY EXECUTED ORIGINAL CHANGE ORDER WAS NEVER FILED WITH THE OFFICE OF THE CITY CLERK. ORIGINATING DEPARTMENT: NTF CDC Housing & Grants City Attorney Human Resources City Manager MIS _ Community Svcs. Planning X Engineering Police Finance X Public Works Fire RESOLUTION NO. 2015 — 72 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NATIONAL CITY AUTHORIZING THE MAYOR TO EXECUTE CHANGE ORDER NO. 1 TO THE NATIONAL CITY CULVERT BARRIER PROJECT CONTRACT (CIP NO. 14-06) WITH DOWNSTREAM SERVICES, INC., FOR THE LUMP SUM AMOUNT OF $14,995.00 TO PROCURE, FABRICATE, AND INSTALL A PORTLAND CEMENT CONCRETE HEADWALL AND ADDITIONAL INLET GRATE WHEREAS, on January 20, 2015, City Council adopted Resolution No. 2015-3 awarding a contract in the amount of $79,000.00 to Downstream Services, Inc., for the National City Culvert Barrier Project; and WHEREAS, after the original award of the contract, an additional culvert inlet that is a part of the culvert (tunnel) drainage system was identified; and WHEREAS, the contractor's lump sum change order proposal is $14,995.00 to procure, fabricate, and install an additional culvert barrier and a regional standard headwall to properly fasten and secure the inlet grate; and WHEREAS, staff recommends executing the change order with Downstream Services, Inc., based on the quality of the barrier grates they have been installing for the project, and to take advantage of their competitive prices while they are still under contract; and WHEREAS, since this change order would slightly exceed the pre -approved 15% contingency amount of $11,850.00 by $3,145.00, City Council action is required. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of National City hereby authorizes the Mayor to execute Change Order No. 1 to the National City Culvert Barrier Project contract (CIP No. 14-06) with Downstream Services, Inc., for the lump sum amount of $14,995 to procure, fabricate, and install a Portland cement concrete headwall and additional inlet grate. PASSED and ADOPTED this 19th day of May, 201 ATTEST: ael R. Dalla, Cify Clerk TPPROVED AS TO F 4' M: Claudia Gac City Attor e on Morrison, Mayor Passed and adopted by the Council of the City of National City, California, on May 19, 2015 by the following vote, to -wit: Ayes: Councilmembers Mendivil, Morrison, Rios, Sotelo-Solis. Nays: None. Absent: Councilmember Cano. Abstain: None. AUTHENTICATED BY: RON MORRISON Mayor of the City of National City, California City Clerk of the City bf National City, California By: Deputy I HEREBY CERTIFY that the above and foregoing is a full, true and correct copy of RESOLUTION NO. 2015-72 of the City of National City, California, passed and adopted by the Council of said City on May 19, 2015. City Clerk of the City of National City, California By: Deputy CITY OF NATIONAL CITY, CALIFORNIA COUNCIL AGENDA STATEMENT MEETING DATE: May 19, 2015 TEM TITLE: Resolution of the City Council of the City of National City authorizing the Mayor to execute Change Order No. 1 to the National City Culvert Barrier Project contract (CIP No. 14-06) with Downstream Services, Inc. for the lump sum amount of $14,995.00 to procure, fabricate, and install a Portland cement concrete headwall and additional inlet grate. GQO\S -1 AGENDA ITEM NO. 17 PREPARED BY: Kenneth Fernandez, P.E. PHONE: 336-4388 EXPLANATION: See attached. DEPARTMENT: Engineering & Public Works APPROVED BY: J FINANCIAL STATEMENT: ACCOUNT NO. APPROVED: LaKt6. Finance APPROVED: MIS 001-416-030-299-0000 (Environmental Compliance): $14,995.00 ENVIRONMENTAL REVIEW: N/A ORDINANCE: INTRODUCTION: FINAL ADOPTION: STAFF RECOMMENDATION: Adopt the Resolution. BOARD / COMMISSION RECOMMENDATION: N/A ATTACHMENTS: 1. Explanation 2. Project Location Map 3. Change Order No. 1 4. Resolution EXPLANATION On January 20, 2015, City Council adopted Resolution No. 2015-3 awarding a contract in the amount of $79,000.00 to Downstream Services, Inc. for the National City Culvert Barrier Project (CIP No. 14-06.) After the original award of the contract, it was brought to Engineering Staff's attention that an additional culvert inlet is a part of the culvert (tunnel) drainage system that this project is addressing. This particular culvert section is in the form of the letter "Y" with two inlets and one outlet. Under the original scope of work, one of the inlets and the outlet was being covered. However, this 66-inch nominal - diameter inlet was not originally requested, allowing an access point for debris and unauthorized personnel. This proposed seventh barrier location is in a grassy-swale canyon behind the residences of the East 13th Street and South Lanoitan Avenue intersection just west of Palmer Elementary School as shown on the attached location map. Staff requested a quote from the contractor to procure, fabricate, and install an additional culvert barrier and a regional standard headwall to properly fasten and secure the inlet grate. The contractor's lump sum change order proposal is for $14,995.00. Since this change order would slightly exceed the pre -approved 15% contingency amount of $11,850.00 by $3,145.00, City Council action is required. Staff recommends executing the change order with Downstream Services, Inc. based on the quality of the barrier grates they have been installing for the project, and to take advantage of their competitive prices while they are still under contract. Project Location Map (Seven Culvert Openings) Box Culvert Inlet #4 Family House of Pancakes McDonald's Box Culvert Outlet #3 (Excluded from Scope of Work; In CalTrans R.O.W.) Box Culvert Inlet #3 Box Culvert Outlet #2 Box Culvert Inlet #2 Palmer Elementary School Box Culvert Inlet #1 Save A Lot 4= • • � n� ery.I;116°I 1 4 hd_37"�10'44 T 04 1 4 W Letter of Transmittal To: Attn: From: Date: RE: City of National City Sean Gill, Clark Roberts, PM 04-24-2015 Contract #14-06 National City Culvert Barrier Project Subject: Add - on Barrier Details. Contents: Headwall Specs (See Notes for Contents). Submittal #: 6 Revision #: N/A Spec. Sect. #: N/A Plan Sheet #: N/A Notes: Add on Culvert at 13`1' and S. Lenoitan Street specifacations, per proposal. Included is the SRSD detail for headwalls (See 72", Single Pipe, U-type Headwall) as well as concrete design mix (See D35B, Note 3). Deviations: None. (If any) We have reviewed in detail and certify that the material, equipment or construction procedure(s) contained in this submittal meet all the requirements specified in or shown on the Contract Documents, Construction Specifications and Construction Plans with (if) noted exceptions. ❑ Urgent ✓ For Review ❑ Please Comment ❑ Reply Signature: Signature: Clad% l oberts - Project Manager Downstream Services, Inc. Date: Corporate Office 2855 Progress Place Escondido CA 92029 ph 760 746 2544 ph 800 262 0999 fax 760 746 2667 downstreamservices.com -2- t rnrnStream Proposal Downstream Services, Inc. (DSI) Contractor's License #A807953 2855 Progress Place, Escondido, CA 92029 ph. (760) 746-2544 fax (760) 746-2667 www.downstreamservices.com To: National City Engineering and P.W. Date: 4/3/2015 Page(s): 1 Attn: Sean Gill Job Name: Culvert Barrier Add -On Address: 1243 National City Blvd. National City, CA, 91950 Email: sgill@iccsinc.net We hereby submit the following: 48" CMP Culvert Outlet Headwall and Culvert Barrier Install Quantity Unit Description Unit Price Total Price Taxable (Y/n) Project Located at 13th and S. Lenoitan St, National City CA 1 ea Fabricate and galvanize steel grate per project specifications provided in the "National City Culvert Barrier Project" for existing culvert inlet. $ 2,000.00 $ 2,000.00 1 ea Prepare culvert face perimiter, construct culvert U-headwall per San Diego Regional Standard Drawings D-35A and D-35B including cut down of existing pipe to culvert face. $ 12,000.00 $ 12,000.00 1 ea Install fabricated grate per specs included in Contract 14-06 $ 995.00 $ 995.00 Addendum 1, Exhibit B DSI will need 10 additional days for fabrication, preperation and and installtion of this grate Total Sales Tax: $ 8% Assumptions: Exclusions: Prevailing rate of pay. Owner to provide clear unobstructed access to pipeline segment(s) free of hindrance from others, and small laydown area during contruction. Delays beyond our control will be invoiced at listed hourly rates for men and equipment. Excludes removal or relocation of conflicting utilities Bonds, permits or agency fees. Excavation or removal of rock larger than 24" We propose to furnish material and labor - complete in accordance with the above specifications, for the sum of: $14,995.00 In the event a lawsuit is instigated to enforce payment, the vendor/contractor/owner agrees to pay reasonable attorney and collection fees together with the legal interest and costs of lawsuit. A service charge of 1% per month (12% per annum) will be charged on all past due accounts. All work to be completed in a workmanlike manner according to standard practices. Any alteration or deviation from above specifications or changes in plans shall constitute a "change order" at the rate of time and materials, plus 15% overhead. See contract insert for rates. Acceptance of Proposal - The above prices, specifications and conditions are satisfactory and are hereby accepted. Downstream Services, Inc. (DSI) is authorized to do the work as specified. I agree to notify DSI In writing of any disputes within 30 days of the date the work was performed. Otherwise such disputes are considered negligible. Payment will be made as outlined above Net 30 days with Monthly Progress Payments. Victor Roberts - Vice President Authorized By: [Please print name] Date: 4/3/2015 Date: / /2015 Authorized Signature -3- 8"--I I -- U TYPE PLAN WING TYPE 1 �. Alt Detail`C #5 0 12" (both ways) 0 #5 ® 12" (both ways) WING WALL REINFORCING See D-61 for rounded pipe end Elev shown on plans NOTE See D-35B for Dimension Table and General Notes. SECTION B—B LEGEND ON PLANS Revision ORIGINAL Add Metric By Approved Kercheval T. Stanton Date 12/75 03/03 Reformatted T. Stanton 04/06 Edited T. Stanton 02/09 Edited S.S. T. Regello 03/11 SAN DIEGO REGIONAL STANDARD DRAWING WING AND U TYPE HEADWALLS FOR 42" TO 84" PIPE RECOMMENDED BY THE SAN DIEGO REGIONAL STANDARDS COMMITTEE 7/Z6(ZOIZ Chairperson R.C.E. 19246 Dote DRAWING D-35A NUMBER -4- TABLE OF DIMENSIONS AND QUANTITIES FOR HEADWALLS SHOWN ON D-35A DIA OF PIPE DIMENSIONS SINGLE PIPE DOUBLE PIPE W U TYPE WING TYPE U TYPE WING TYPE L E F CONC. (CY) STEEL (LBS) CONC. (cy) STEEL (LBS) W CONC. (CY) STEEL (LBS) CONC. (Cy) STEEL (LBS) 42" 3'-7 1/4" 2' 3' 4' 1.57 117 1.90 135 10' 2.69 190 3.16 214 48" 4'-6" 2'-6" 3'-9" 4'-6" 1.97 153 2.48 184 11'-4" 3.43 252 4.06 288 54" 5'-4 7/8" 3' 4'-6" 5' 2.41 190 3.07 246 12'-8' 4.24 319 5.06 368 60" 6'-3 3/4" 3'-6" 5'-3" 5'-6" 2.88 239 3.75 294 14' 5.13 386 6.17 442 66" 7'-2 1/2" 4' 6' 6' 3.38 294 4.52 356 15'-4" 6.08 454 7.20 516 72" 8'-1 3/8" 4'-6" 6'-9" 6'-6" 3.93 368 5.52 417 16'-8" 7.11 522 8.30 588 78" 9' 5' 7'-6" 7' 4.50 444 6.70 503 18' 8.20 595 9.50 693 84" 9'-10 3/4" 5'-6" 8'-3" 7'-6" 5.21 540 8.15 619 19'-4" 9.50 687 10.80 786 Note: Dimensions E and L apply to wing type only. NOTES 1. Skewed Pipes: Dimension W to be increased to take care of increased width or length due to skew of multiple pipes. 2.Top of headwall shall be placed approximately parollel to profile grade when the grade is 3% or more. 3. Concrete shall be 560-C-3250. 4. Exposed corners shall be 3/4" chamfered. 5. Multiple pipes shall be set a distance of D/2, with a 1' minimum, between outside diameters of pipes. 6. For pipe wall thickness greater than 3" use Alternate Detail C. LEGEND ON PLANS Revision By Approved Date SAN DIEGO REGIONAL STANDARD DRAWING RECOMMENDED BY THE SAN DIEGO REGIONAL STANDARDS COMMITTEE 7/26720J2 ORIGINAL Kerchevall2/75 Add Metric T. Stanton 03/03 WING AND U TYPE HEADWALLS FOR 42" TO 84" PIPE Reformatted T. Stanton 04/06 Chairperson R,C.E. 19246 Dote Edited T. Stanton 02/09 DRAWING D-35B NUMBER Edited S.S. T. Regello 03/11 -5- RESOLUTION NO. 2015 — RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NATIONAL CITY AUTHORIZING THE MAYOR TO EXECUTE CHANGE ORDER NO. 1 TO THE NATIONAL CITY CULVERT BARRIER PROJECT CONTRACT (CIP NO. 14-06) WITH DOWNSTREAM SERVICES, INC. FOR THE LUMP SUM AMOUNT OF $14,995.00 TO PROCURE, FABRICATE, AND INSTALL A PORTLAND CEMENT CONCRETE HEADWALL AND ADDITIONAL INLET GRATE WHEREAS, on January 20, 2015, City Council adopted Resolution No. 2015-3 awarding a contract in the amount of $79,000.00 to Downstream Services, Inc., for the National City Culvert Barrier Project; and WHEREAS, after the original award of the contract, it was discovered (determined?) that an additional culvert inlet is a part of the culvert (tunnel) drainage system that this project is addressing; and WHEREAS, the contractor's lump sum change order proposal is $14,995.00 to procure, fabricate, and install an additional culvert barrier and a regional standard headwall to properly fasten and secure the inlet grate; and WHEREAS, staff recommends executing the change order with Downstream Services, Inc., based on the quality of the barrier grates they have been installing for the project, and to take advantage of their competitive prices while they are still under contract; and WHEREAS, since this change order would slightly exceed the pre -approved 15% contingency amount of $11,850.00 by $3,145.00, City Council action is required. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of National City hereby authorizes the Mayor to execute Change Order No. 1 to the National City Culvert Barrier Project contract (CIP No. 14-06) with Downstream Services, Inc., for the lump sum amount of $14,995 to procure, fabricate, and install a Portland cement concrete headwall and additional inlet grate. PASSED and ADOPTED this 19th day of May, 2015. ATTEST: Michael R. Dalla, City Clerk APPROVED AS TO FORM: Claudia Gacitua Silva City Attorney Ron Morrison, Mayor