Loading...
HomeMy WebLinkAbout2018 CON San Diego County Water Authority - Integrated Regional Water Management IRWM Program - Storm Water Quality Paradise ValleyLOCAL PROJECT SPONSOR AGREEMENT FOR THE INTEGRATED REGIONAL WATER MANAGEMENT PROGRAM RELATED TO 2016 PROPOSITION 1 INTEGRATED REGIONAL WATER MANAGEMENT (IRWM) DISADVANTAGED COMMUNITY INVOLVEMENT (DACI) GRANT BETWEEN SAN DIEGO COUNTY WATER AUTHORITY AND CITY OF NATIONAL CITY PROJECT NO. 9-80062 (AGREEMENT NO. 1-DACI-9-80062) This Agreement between the San Diego County Water Authority, a county water authority (Water Authority), and City of National City, a Local Project Sponsor (LPS), sets forth the understanding of the Water Authority and the LPS (collectively Parties) for distribution of a grant award from the State of California D a� of Water Ree rces (State). The Effective Date of this Agreement is rRd' RECITALS: 1. WHEREAS, in November 2014, California voters approved Proposition 1, Water Quality, Supply, and Infrastructure Improvement Act of 2014, to assist in financing projects associated with the Integrated Regional Water Management (IRWM) Plan pursuant to Chapter 8 (commencing with Section 79560 Division 26.5 of the California Water Code (CWC)), collectively referred to as IRWM Program. 2. WHEREAS, in September 2013, the IRWM Plan was adopted by the San Diego Regional Water Management Group. 3. WHEREAS, in September 2011, an MOU signed among the City of San Diego, County of San Diego, and Water Authority for the San Diego Regional Water Management Group (RWMG), and the Parties' roles regarding the San Diego IRWM Plan and the division of responsibilities for administration of IRWM grant monies through June 2016. 4. WHEREAS, in May 2016, an amendment to the MOU executed in September 2011 was approved to extend the San Diego Regional Water Management Group (RWMG), and the Parties' roles regarding the San Diego IRWM Plan and the division of responsibilities for administration of IRWM grant monies through June 2019. The Recitals are incorporated herein, and the Parties do agree as follows: 1. DEFINITIONS: The following words and terms, unless otherwise defined, shall mean: a) LPS means Local Project Sponsor. An LPS is a proponent of individual projects that will be funded as part of the IRWM Program grant from the State. The role of an LPS could be performed by entities such as the Water Authority, County of San Diego, City of San Diego, Water Authority member agency, a municipality, a joint Page 2 of 49 Agreement no. 1-DACI-9-80062 powers authority, a local public agency, a non-profit 501(c) (3) or a Native American tribe. The LPS for this Agreement is City of National City. b) Grant Agreement means the Grant Agreement no. 4600012233 between the San Diego County Water Authority and the State of California for the disbursement of $5,551,350 in grant funds. See Exhibit I, for a copy of the agreement. c) Project (9— 80062): Storm Water Quality for Paradise Valley DACs d) LPS Agreement (Agreement): This agreement between the Water Authority and the Local Project Sponsor for the performance of the project and receipt of the grant funds allocated for that project. 2. TERM OF AGREEMENT: The term of this Agreement begins on the Effective date and terminates on November 30, 2018 or when all Parties' obligations under this Agreement have been fully satisfied, whichever occurs earlier. 3. TOTAL PROJECT COSTS: The reasonable total cost of the Project is estimated to be $365,000. These costs are summarized in Exhibit B, Budget. The LPS is required to maintain all financial records associated with the project in accordance with Exhibit G (State and Water Authority Audit Document Requirements and Cost Share Guidelines for Local Project Sponsor). 4. GRANT AMOUNT: The maximum amount payable by the State under the LPS Agreement for this Project shall not exceed $365,000. 5. COST SHARE: The amount to be funded by the LPS. It is the difference between the Total Project Cost and the Grant Amount. 6. LPS RESPONSIBILITIES: a) Faithfully and expeditiously perform or cause to be performed all project work as described in Exhibit A (Work Plan) and in accordance with Exhibit B (Budget) and Exhibit C (Schedule). b) Accept and agree to comply with all terms, provisions, conditions, and written commitments of this Agreement, including all incorporated documents, and to fulfill all assurances, declarations, representations, and statements made by LPS in the grant application, documents, amendments, and communications filed in support of its request for Proposition 1, Water Quality, Supply, and Infrastructure Improvement Act of 2014. c) Comply with all applicable California laws and regulations. d) Implement the project(s) in accordance with applicable provisions of the law. Page 3 of 49 Agreement no. 1-DACI-9-80062 e) Fulfill its obligations under the LPS and the DWR Agreements, and be responsible for the performance of the project. f) Perform the scope of work for this project including individual project management, oversight, and implementation associated with the project. LPS shall also be solely responsible for work and for persons or entities engaged in work, including, but not limited to, subcontractors, suppliers, and all providers of services under this Agreement. LPS shall fulfill its obligations in a manner that is consistent with this Agreement, the Grant Agreement (4600012233) and the IRWM Program. g) Be responsible for all disputes arising out of its contracts for work including, but not limited to, bid disputes and payment disputes with its contractors and consultants or other entities. State or Water Authority will not mediate disputes between the LPS and any other entity regarding performance of work. h) LPS or its representatives shall perform regular inspections of any construction work in progress. i) LPS is solely responsible for design of project identified in Exhibit A. Review or approval of plans, specifications, bid documents, or other construction documents by State or the Water Authority is solely for proper administration of grant funds and shall not relieve or limit responsibilities of LPS regarding its contractual obligations. j) LPS shall reimburse the Water Authority for grant administration services costs as provided in Exhibit I, if the project's completion date extends beyond the original program termination date provided in the Agreement. 7. GENERAL CONDITIONS: Water Authority shall have no obligation to disburse money for a project under this agreement until LPS has satisfied the following conditions (if applicable): a) LPS shall demonstrate the availability of sufficient funds to complete the project, as stated in the Audited Financial Statement Summary submitted to the Water Authority, as part of the grant agreement conditional requirements. b) LPS must demonstrate the groundwater compliance options set forth on pages 11 and 12 of the IRWM Program Guidelines, dated July 2016 are met. c) For the term of this agreement, LPS submits timely Quarterly Progress Reports as required by Paragraph 18, Submission of Reports. d) LPS submits deliverables as specified in Paragraph 18, Submission of Reports of this Agreement and in Exhibit A, Work Plan. Page 4 of 49 Agreement no. 1-DACI-9-80062 e) Prior to the beginning of construction or implementation activities, LPS shall submit the following to the Water Authority: 1. Final plans and specifications certified by a California Registered Civil Engineer or Geologist as applicable, for the approved project listed in Exhibit A, Work Plan of this Agreement. 2. Environmental Documentation i. LPS submits to the Water Authority, to be submitted to the State, all applicable environmental permits, ii. Documents that satisfy the CEQA process are received by the Water Authority and the State, iii. State has completed its CEQA compliance review as a Responsible Agency, and iv. LPS receives written concurrence from the State of Lead Agency's CEQA documents and State notice of verification of environmental permit submittal. State's concurrence of Lead Agency's CEQA documents is fully discretionary and shall constitute a condition precedent to any work (i.e., construction or implementation activities) for which it is required. Once CEQA documentation has been completed, State will consider the environmental documents and decide whether to continue to fund the projects or to require changes, alterations or other mitigation. LPS must also demonstrate that it has complied with all applicable requirements of the National Environmental Policy Act (NEPA) by submitting copies of any environmental documents, including environmental impact statements, Finding of No Significant Impact, and mitigation monitoring program as may be required prior to beginning construction/implementation. LPS shall submit environmental documentation listed on the IRWM Environmental Documentation Submittal Requirements provided by the Water Authority from DWR, as applicable. 8. DISBURSEMENT BY STATE AND PAYMENT BY WATER AUTHORITY: Following the review of each invoice, the Water Authority will approve the invoice and disburse payment subject to the availability of funds through normal State and Water Authority processes. Funds will be disbursed by the Water Authority in response to each approved invoice within forty-five (45) days of receipt of funds from the State. No disbursement shall be required at any time in any manner which is in violation of, or in conflict with federal or state laws, or regulations or which may require any rebates to the federal government or any loss of tax-free status on state bonds, pursuant to any federal statute or regulation. Any and all money disbursed by the Water Authority under this Agreement and all interest earned by LPS shall be used solely to pay eligible costs. Page 5 of 49 Agreement no. 1-DACI-9-80062 9. ELIGIBLE PROJECT COSTS: Costs as described in Exhibit A, Work Plan and in accordance with Exhibit B, Budget and Exhibit C, Schedule. LPS shall apply State funds received only to Eligible Project Costs in accordance with applicable provisions of the law and Exhibit B, Budget. Work performed on the projects after January 22, 2016 shall be eligible for reimbursement with State grant funds. Costs that are not eligible for reimbursement with State funds cannot be counted as Cost Share. Costs that are not eligible for reimbursement include, but are not limited to the following items: a) Operation and maintenance costs. b) Purchase of equipment not an integral part of a project. c) Establishing a reserve fund. d) Purchase of water supply. e) Replacement of existing funding sources for ongoing programs. f) Support of existing agency requirements and mandates (i.e., punitive regulatory agency requirement). g) Purchase of land in excess of the minimum required acreage necessary to operate as an integral part of a project, as set forth and detailed by engineering and feasibility studies. h) Payment of principal or interest of existing indebtedness or any interest payments unless the debt is incurred after execution of this Agreement, unless the Water Authority and the State agrees in writing to the eligibility of the costs for reimbursement before the debt is incurred, and the purposes for which the debt is incurred are otherwise eligible costs. However, this will only be allowed as LPS cost share (i.e., Funding Match). i) Payment of stipends. j) Application preparation of costs for other funding opportunities not consistent with IRWM. k) Meals not directly related to travel. 1) Acquisition of real property (land or easements). m) Overhead not directly related to project costs. 10. METHOD OF PAYMENT: Submit a copy of invoice for costs incurred and supporting documentation to the IRWM Grant Administrator via the IRWM Grants Website (webtool) or another electronic means as directed by the Water Authority's Grant Administrator. Invoices submitted via the webtool shall include the following information: Page 6 of 49 Agreement no. 1-DACI-9-80062 a) Reimbursement 1. Costs incurred for work performed during the period identified in the invoice. 2. Invoices shall be submitted on forms provided by the Water Authority and shall meet the following format requirements: (i) Invoices must contain the date of the invoice, the period covered by the invoice, and the total amount due. (ii) Invoices must be itemized based on the categories (i.e., tasks) specified in Exhibit B. The amount claimed for salaries/wages/consultant fees must list the classification or title of each staff/consultant claiming labor costs and include a calculation formula (i.e., hours or days worked times the hourly or daily rate = the total amount claimed). (iii) Sufficient and appropriate evidence as determined by the Water Authority and the State must be provided for all costs included in the invoice. (iv) Each invoice shall clearly delineate those costs claimed for reimbursement from the State's Grant Amount, as depicted in Paragraph 4, Grant Amount. (v) If LPS submits an invoice with unpaid costs, the unpaid costs must be paid in full within 30 days of Water Authority disbursement of funds. The LPS shall submit proof of payment with its next progress report. The Water Authority will notify the LPS, in a timely manner, when, upon review of an invoice, the Water Authority or the State determines that any portion or portions of the costs claimed are not eligible costs or are not supported by documentation or receipts acceptable to the Water Authority or the State. LPS may, within fifteen (15) calendar days of the date of receipt of such notice, submit additional documentation to the Water Authority to cure such deficiency(ies). If LPS fails to submit adequate documentation curing the deficiency(ies), the Water Authority will adjust the pending invoice by the amount of ineligible, unsupported or unapproved costs. After the disbursement requirements in Paragraph 7, General Conditions, are met and approved by the Water Authority and the State, the Water Authority will disburse the whole or portions of State funding to the LPS, following receipt from LPS via US mail, express mail delivery, or from IRWM Grants Website (webtool) of an invoice for costs incurred, including the Required Local Cost Share, and timely Quarterly Progress Reports as required by Paragraph 18, Submission of Reports. Invoices shall be submitted no more frequently than quarterly, unless approved in advance by the Water Authority, in arrears, bearing the Grant Agreement, LPS Agreement and the Project Numbers. Invoices submitted beyond the quarterly invoicing schedule must be accompanied by a Progress Report. All invoices must be certified to be true and accurate and submitted by an official representative of the project. b) Advanced Payment Page 7 of 49 Agreement no. 1-DACI-9-80062 Water Code § 10551 authorizes advance payment by State for projects which are sponsored by a nonprofit organization; a disadvantaged community (DAC); or, the proponent of a project that benefits a DAC. If these projects are awarded less than $1,000,000 in grant funds, the project proponent may receive an advanced payment of 50% of the grant award; the remaining 50% of the grant award will be reimbursed in arrears. Water Code § 10551 further authorizes DWR to adopt additional requirements regarding the use of the advanced payment to ensure that the funds are used properly. Within sixty (60) calendar days of execution of the Grant Agreement, the LPS shall provide the Water Authority an Advanced Payment Request. The Advanced Payment Request must contain the following: 1. Documentation demonstrating that each Local Project Sponsor was notified about their eligibility to receive an advanced payment and a response from the Local Project Sponsor stating whether it wishes to receive the advanced payment or not, if applicable. 2. If Local Project Sponsor is requesting the advanced payment, the request must also include: (i) Specification of those projects listed in Exhibit B for which Advanced Payment will be requested and how those projects are consistent with the adopted IRWM Plan. (ii) A funding plan which shows by project: the budget and anticipated schedule, the amount of advanced funding requested, and how the advanced funds will be expended within 18 months of this Grant Agreement's execution. (i.e., for what, how much, and when. (iii) A discussion of Local Project Sponsor's financial capacity to complete the project once the advance funds have been expended. 3. If a Local Project Sponsor is requesting advanced payment, the LPS shall also submit a single Advance Payment Invoice that is itemized for each qualified project and submitted via the webtool. Within sixty (60) calendar days of the State receiving the Advanced Payment Invoice and subject to the availability of funds, State will authorize payment of the advanced funds sought of fifty percent (50.0%) of the grant award for the qualified project. The Water Authority shall be responsible for the timely distribution of the advanced funds to the individual Local Project Sponsors, estimated to be within 3 weeks of receipt from the State. The Advance Payment Invoice shall be submitted on forms provided by the Water Authority and shall meet the following format requirements: (i) Invoice must contain the date of the invoice, the period covered by the invoice, and the total amount due. (ii) Invoice must be itemized based on the budget categories specified in Exhibit B, Budget. Page 8 of 49 Agreement no. 1-DACI-9-80062 (iii) Water Authority's Grants Administrator will notify the LPS, in a timely manner, when, upon review of an Advance Payment Invoice, the State determines that any portion or portions of the costs claimed are not eligible costs. LPS may, within fifteen (15) calendar days of the date of receipt of such notice, submit additional documentation to cure such deficiency(ies). After the disbursement requirements in Paragraph 7, General Conditions (7a and 7b) only are met, State, via the Water Authority, will disburse the whole or portions of State funding to the LPS. 4. On a quarterly basis, the LPS will submit an Accountability Report to the Water Authority that demonstrates how actual expenditures compare with the scheduled budget. The Accountability Report shall include the following information: (i) An itemization of how advanced funds have been expended to date (Expenditure Summary), including documentation that supports the expenditures (e.g., contractor invoices, receipts, personnel hours, etc.). Invoices must be itemized based on the categories (i.e., tasks) specified in Exhibit B. (ii) A funding plan, itemized by budget category shows how the remaining advanced funds will be expended. (iii) Documentation that the funds were placed in a non -interest -bearing account, including the dates of deposits and withdrawals from that account. The Water Authority's Grants Administrator will notify the LPS in a timely manner when, upon review of the Expenditure Summary and notification from the State, that it determines that any portion or portions of the expenditures claimed are not eligible costs. LPS may, within fifteen (15) calendar days of the date of receipt of such notice, submit additional documentation to cure such deficiency(ies). If costs are not consistent with the tasks in Exhibit B, Budget, the Water Authority will reject the claim and remove the costs from the Expenditure Summary. Once the LPS has expended all advanced funds, then the method of payment will revert to the reimbursement process specified in Paragraph 10.a), Method of Payment, Reimbursement, and any remaining requirements of Paragraph 7, General Conditions. 11. REPAYMENT OF ADVANCES: The Water Authority may demand repayment from the LPS of all or any portion of the advanced State funding along with interest at the California general obligation bond interest rate at the time the State notifies the Water Authority, as directed by State, and take any other action that it deems necessary to protect its interests for the following conditions: a) A project is not being implemented in accordance with the provisions of this Agreement. Page 9 of 49 Agreement no. 1 DACI-9-80062 b) LPS has failed in any other respect to comply with the provisions of this Agreement, and if Agreement does not remedy any such failure to Water Authority and State's satisfaction. Repayment amounts may also include: c) Advance funds which have not been expended within 18 months of the Grant Agreement's execution by the Local Project Sponsor. d) Actual costs incurred are not consistent with the Exhibit A (Work Plan) activities, not supported, or are ineligible. e) At the completion of the project, the funds have not been expended. For conditions 11 c) and 11 d), repayment may consist of deducting the amount from future reimbursement invoices. The Water Authority may consider the LPS's refusal to repay the requested advanced amount a substantial breach of this Agreement subject to the default provisions in Paragraph 13, "Default Provisions." If the Water Authority notifies the LPS of its decision to demand repayment or withhold the entire funding amount from the LPS pursuant to this paragraph, this Agreement shall terminate upon receipt of such notice by the Water Authority and the State, through the Water Authority, shall no longer be required to provide funds under this Agreement and the Agreement shall no longer be binding on either party. 12. WITHHOLDING OF GRANT REIMBURSEMENT BY THE WATER AUTHORITY: If the Water Authority determines that a project is not being implemented in accordance with the provisions of this Agreement, or that LPS has failed in any other respect to comply with the provisions of this Agreement, and if LPS does not remedy any such failure to the Water Authority or State's satisfaction, the Water Authority may withhold from LPS all or any portion of the State funding and take any other action that it deems necessary to protect its interests. Where a portion of the State funding has been disbursed to the LPS and the Water Authority notifies the LPS of its decision not to release funds that have been withheld pursuant to Paragraph 13, Default Provisions, the portion that has been disbursed shall thereafter be repaid immediately with interest at the California general obligation bond interest rate at the time the Water Authority notifies the LPS, as directed by State. The Water Authority may consider the LPS's refusal to repay the requested disbursed amount a contract breach subject to the default provisions in Paragraph 13, Default Provisions. If the Water Authority notifies the LPS of its decision to withhold the entire funding amount from LPS pursuant to this paragraph, this Agreement shall terminate upon receipt of such notice by LPS and the Water Authority shall no longer be required to provide funds under this Agreement and the Agreement shall no longer be binding on either party. Page 10 of 49 Agreement no. 1-DACI-9-80062 13. DEFAULT PROVISIONS: LPS will be in default under this Agreement if any of the following occur: a) Substantial breaches of this Agreement, or any supplement or amendment to it, or any other agreement between LPS and the Water Authority evidencing or securing LPS's obligations. b) Making any false warranty, representation, or statement with respect to this Agreement or the application filed to secure this Agreement. c) Failure to operate or maintain projects in accordance with this Agreement. d) Failure to make any remittance required by this Agreement. e) Failure to comply with Labor Compliance Program requirements, as required by Paragraph 17, Labor Compliance. f) Failure to submit timely progress reports. g) Failure to routinely invoice the Water Authority. h) Failure to meet any of the requirements set forth in Paragraph 14, Continuing Eligibility. If an event of default occurs, the Water Authority shall provide a notice of default to the LPS and shall give LPS at least five (5) calendar days to cure the default from the date the notice is sent via first-class mail to the LPS. If the LPS fails to cure the default within the time prescribed by the Water Authority, the Water Authority may do any of the following: a) Declare the funding be immediately repaid with interest, at the California general obligation bond interest rate at the time of the default. b) Terminate any obligation to make future payments to LPS. c) Terminate the Agreement. d) Take any other action that it deems necessary to protect its interests. If the Water Authority finds it necessary to enforce this provision of this Agreement in the manner provided by the law, the LPS agrees to pay all costs incurred by the Water Authority including, but not limited to, reasonable attorneys' fees, legal expenses, and costs. 14. CONTINUING ELIGIBILITY: LPS must meet the following ongoing requirement(s), as applicable to remain eligible to receive State funds. a. An urban water supplier that receives grant funds governed by this Local Project Sponsor Agreement shall maintain compliance with the Urban Water Management Planning (UWMP) Act (Water Code §10610 et seq.) and Sustainable Water Use and Page 11 of 49 Agreement no. 1-DACI-9-80062 Demand Reduction, Part 2.55 of Division 6 (Water Code § 10608 et seq.) by doing the following: 1. Have submitted their 2015 UWMP and had it deemed consistent by DWR. For more information, visit the following website: http://www.water.ca.govkirbanwatermanagement. 2. By July 1, 2016, all urban water suppliers must have submitted documentation that demonstrates they are meeting the 2015 interim GPCD target. If not meeting the interim target, also include a schedule, financing plan, and budget for achieving the gallons per capita per day (GPCD) target, as required pursuant to Water Code § 10608.24. Starting June 30, 2017, those urban water suppliers that did not meet their 2015 GPCD target must also submit, by June 30, annual reports that include a schedule, financing plan, and budget for achieving the GPCD target (Water Code § 10608.24). b. An agricultural water supplier receiving grant funding must: 1. Comply with Sustainable Water Use and Demand Reduction requirements outlined in Part 2.55 (commencing with § 10608) of Division 6 of the Water Code. 2. Have their Agricultural Water Management Plan (AWMP) deemed consistent by DWR. For more information, visit the following website: http://www.water.ca.gov/wateruseefficiency/agricultural/agmgmt.cfm. c. Grantees diverting surface water must maintain compliance with diversion reporting requirements as outlined in Part 5.1 of Division 2 of the Water Code. d. Local Project Sponsors must demonstrate compliance with the groundwater compliance options set forth on pages 11 and 12 of the 2016 IRWM Program Guidelines, dated July 2016. Local Project Sponsors that have been designated as monitoring entities under the California Statewide Groundwater Elevation Monitoring (CASGEM) Program must maintain reporting compliance, as required by Water Code §10920 and the CASGEM Program. 15. PERMITS, LICENSES, APPROVALS, AND LEGAL OBLIGATIONS: LPS shall be responsible for obtaining any and all permits, licenses, and approvals required for performing any work under this Agreement, including those necessary to perform design, construction, or operation and maintenance of the Projects. LPS shall be responsible for observing and complying with any applicable federal, state, and local laws, rules or regulations affecting any such work, specifically those including, but not limited to, environmental, procurement, and safety laws, rules, regulations, and ordinances. LPS shall provide copies of permits and approvals to the Water Authority. Page 12 of 49 Agreement no. 1-DACI-9-80062 16. RELATIONSHIP OF PARTIES: LPS is solely responsible for design, construction, and operation and maintenance of projects within Exhibit A, Work Plan. Review or approval of plans, specifications, bid documents, or other construction documents by the Water Authority and the State is solely for proper administration of funds by the Water Authority or the State and shall not be deemed to relieve or restrict responsibilities of the LPS under this Agreement. 17. LABOR COMPLIANCE: The LPS agrees to be bound by all the provisions of the Labor Code regarding prevailing wages and shall monitor all contracts subject to reimbursement from this Agreement to assure that the prevailing wage provisions of the Labor Code are being met. Current Department of Industrial Relations (DIR) requirements may be found at: http://www.dir.ca.gov/lcp.asp. For more information, please refer to DIR's Public Works Manual at: http://www.dir.ca.gov/dlse/PWManualCombined.pdf. At the Water Authority's request, LPS must promptly provide proof of LPS compliance with this requirement. 18. SUBMISSION OF REPORTS: The submittal and approval of all reports is a requirement for the successful completion of this Agreement. Reports shall meet generally accepted professional standards for technical reporting and shall be proofread for content, numerical accuracy, spelling, and grammar prior to submittal to the Water Authority. All reports shall be submitted to the Water Authority's Grants Administrator, and shall be submitted via the Water Authority's IRWM Grants Website (webtool), or as directed by the Grants Administrator. If requested, LPS shall promptly provide any additional information deemed necessary by the Water Authority for the approval of reports. Reports shall be presented in the formats described in the applicable portion of Exhibit E, Report Formats and Requirements. The timely submittal of reports is a requirement for initial and continued disbursement of State funds. Submittal and subsequent approval by the Water Authority and by the State, of a Project Completion Report is a requirement for the release of any funds retained for such projects. a) Progress Reports: LPS shall submit progress reports on a quarterly basis to meet the State's requirement for disbursement of funds. The reporting period shall not exceed one quarter in length. The report must be submitted by the due date as set by the Water Authority. The progress reports shall be uploaded to the Water Authority's IRWM Grants Website (webtool) or as directed by the Water Authority's Grants Administrator fifteen (15) calendar days after the end of the previous quarter. Quarter period cycle will be determined after execution of this Agreement by the Water Authority. The progress reports shall provide, at a minimum, a brief description of the work performed during the reporting period, milestones achieved, any accomplishments, deliverables submitted, costs incurred during the period and to date, upcoming work and any problems encountered in the performance of the work under this Agreement. Reporting issues must be resolved within the deadline specified by the Water Authority or an invoice associated with a progress report may Page 13 of 49 Agreement no. 1-DACI-9-80062 not be processed. Reporting format is specified in Exhibit E, Report Formats and Requirements. b) Accountability Report: LPS shall submit, on a quarterly basis, an Accountability Report containing at a minimum: i. An itemization of how advanced funds have been expended to date (Expenditure Summary), including documentation that supports the expenditures (i.e., contractor invoices, receipts, personnel hours, etc.). Invoices must be itemized based on the categories (i.e., tasks) specified in Exhibit B. ii. A funding plan which shows how the remaining advanced funds will be expended. iii. Accounting of distributing the advanced funds to the appropriate Local Project Sponsor. iv. Documents that the funds were spent on eligible reimbursable costs. v. Documentation that the funds were placed in a non -interest -bearing account, including the dates of deposits and withdrawals from that account. c) Project Completion Report: LPS shall prepare and submit to the Water Authority a separate Project Completion Report for each project. LPS shall submit a Project Completion Report within sixty (60) calendar days of project's completion. Project Completion Report(s) shall include a stakeholder summary; description of involvement activities, total project costs at completion and needs assessment findings, ongoing barriers and recommendation for future activities. Retention will not be disbursed until the Final Grant Completion Report is submitted by the Water Authority for approval by the State. d) Post -Performance Reports: LPS shall submit Post -Performance Reports, if applicable. Post -Performance Reports shall be submitted to the Water Authority within sixty (60) calendar days after the first operational year of a project has elapsed. This record keeping and reporting process shall be repeated annually for a total of 10 years after the completed project begins operation. 19. OPERATION AND MAINTENANCE OF PROJECT: For the useful life of construction and implementation projects and in consideration of the funding made by the State, LPS agrees to ensure or cause to be performed the commencement and continued operation of each project, and shall ensure or cause each project to be operated in an efficient and economical manner; shall ensure all repairs, renewals, and replacements necessary to the efficient operation of the same are provided; and shall Page 14 of 49 Agreement no. 1-DACI-9-80062 ensure or cause the same to be maintained in as good and efficient condition as upon its construction, ordinary and reasonable wear and depreciation excepted. The State and Water Authority shall not be liable for any cost of such maintenance, management, or operation. LPS or their successors may, with the written approval of the Water Authority, transfer this responsibility to use, manage, and maintain the property. For purposes of this Agreement, "useful life" means period during which an asset, property, or activity is expected to be usable for the purpose it was acquired or implemented; "operation costs" include direct costs incurred for material and labor needed for operations, utilities, insurance, and similar expenses, and "maintenance costs" include ordinary repairs and replacements of a recurring nature necessary for capital assets and basic structures and the expenditure of funds necessary to replace or reconstruct capital assets or basic structures. Refusal of LPS to ensure operation and maintenance of the projects in accordance with this provision may, at the option of the Water Authority, be considered a breach of this Agreement and may be treated as default under Paragraph 13, Default Provisions. 20. STATEWIDE MONITORING REQUIREMENTS: LPS shall ensure that all groundwater projects and projects that include groundwater monitoring requirements are consistent with the Groundwater Quality Monitoring Act of 2001 (Part 2.76 (commencing with Section 10780) of Division 6 of California Water Code) and, where applicable, that projects that affect water quality shall include a monitoring component that allows the integration of data into statewide monitoring efforts, including where applicable, the Surface Water Ambient Monitoring Program carried out by the State Water Resources Control Board. See Exhibit F, Requirements for Statewide Monitoring and Data Submittal, for web links and information regarding other State monitoring and data reporting requirements. 21. INDEMNIFICATION: a) To the fullest extent permitted by law, the LPS shall: 1. Immediately defend, and 2. Indemnify the Water Authority, the State, and their directors, officers, and employees from and against all liabilities including, regardless of nature or type arising out of or resulting from LPS's performance of services under this contract including but not limited to any claims or damages arising from planning, design, maintenance and/or any negligent or wrongful act or omission of the LPS or LPS's officers, employees, agents, or subcontractors and in any breach of this Agreement. Liabilities subject to the duties to defend and indemnify include, without limitation, all claims, losses, damages, penalties, fines, and judgments; associated investigation and administrative expenses; defense costs, including but not limited to reasonable attorneys' fees; court costs; and costs of alternative dispute resolution. The LPS's obligation to indemnify applies unless it is adjudicated that its liability was caused by the sole negligence or willful Page 15 of 49 Agreement no. 1-DACI-9-80062 misconduct of an indemnified party. If it is finally adjudicated that liability is caused by the comparative active negligence or willful misconduct of an indemnified party, the LPS indemnification obligation shall be reduced in proportion to the established comparative liability of the indemnified party. b) The duty to defend is a separate and distinct obligation from the LPS's duty to indemnify. The LPS shall be obligated to defend, in all legal, equitable, administrative, or special proceedings, with counsel approved by the Water Authority and State, the Water Authority and State, their directors, officers, and employees, immediately upon tender to the LPS of the claim in any form or at any stage of an action or proceeding, whether or not liability is established. An allegation or determination of comparative active negligence or willful misconduct by an indemnified party does not relieve the LPS from its separate and distinct obligation to defend Water Authority and State. The obligation to defend extends through final judgment, including exhaustion of any appeals. c) The review, acceptance or approval of the LPS's work or work product by any indemnified party shall not affect, relieve or reduce the LPS's indemnification or defense obligations. This Section survives completion of the services or the termination of this contract. The provisions of this Section are not limited by and do not affect the provisions of this contract relating to insurance. d) LPS shall require its contractors or subcontractors to name the Water Authority and the State, its officers, agents and employees as additional insured on their liability insurance for activities undertaken pursuant to this Agreement. 22. TERMINATION, IMMEDIATE REPAYMENT, INTEREST: The Agreement may be terminated by written notice at any time before completion of the IRWM Program at the option of Water Authority or State if LPS breaches the Agreement and has been asked to cure the breach within a reasonable time and fails to do so. If the Agreement is terminated, LPS shall, upon demand, immediately repay to State an amount equal to the amount of grant funds disbursed to LPS. Interest shall accrue on all amounts due at the legal rate of interest allowed by law from the date that notice of termination is mailed to LPS to the date of full repayment. 23. GRANT FUNDING REALLOCATION: Grant funding awarded to the project may be reallocated to one or more projects if one of the conditions stated in the IRWM Administrative Policy and Procedures for Reallocation of Grant Funding has been met. The policy is available here: http://www.sdirwmp.org/agreements-policies 24. INSURANCE: a) The LPS shall procure and maintain during the period of performance of this Agreement insurance from insurance companies admitted doing business in the State Page 16 of 49 Agreement no. 1-DACI-9-80062 of California, as set forth in this Section or as additionally required by supplemental condition. An approved combination of pooled and self-insurance coverage is an acceptable alternative for General Liability coverage. This policy shall be primary insurance as to the Water Authority so that any other coverage held by the Water Authority shall not contribute to any loss under the LPS' insurance. Coverage may be provided by a combination of primary and excess insurance policies, provided all insurers meet the requirements of this Section. b) All insurance shall cover occurrences during the coverage period. c) The coverage amount of each policy of insurance shall be as required by the Water Authority. 1. The following insurance and limits are required for the agreement: Commercial General Liability: Coverage at least as broad as ISO form GC 00 01 10 01. Limit per occurrence and aggregate: $2,000,000. d) The insurance policies shall be endorsed as follows: 1. For the general commercial liability as well as excess or umbrella insurance covering risks within the scope of that type insurance, the San Diego County Water Authority, its directors, officers, employees and agents and the State of California, its directors, officers, employees and agents are included as additional insureds with regards to liability and defense of suits or claims arising from the operations, products and activities performed by or on behalf of the Named Insured. The LPS's insurance applies separately to each insured, including insureds added pursuant to this paragraph, against whom claim is made or suit is brought except with respect to the policy limits of liability. The inclusion of any person or entity as an insured shall not affect any right which the person or entity would have as a claimant if not so included. Any failure of the named insureds to comply with reporting provisions of the policy or breaches or violations of warranties shall not affect coverage provided to the insureds added pursuant to this paragraph. The additional insured endorsement shall provide coverage at least as broad as ISO form CG 20 10 11 85. 2. The LPS's insurance shall be primary. Any other insurance or self-insurance available to the Water Authority or persons stated in paragraph (1) shall be in excess of and shall not contribute to the Contractor's insurance. 3. The insurance shall not be canceled or materially reduced in coverage except after 30 days prior written notice receipted delivery has been given to the Water Authority, except 10 days' notice shall be allowed for non-payment of premium. Page 17 of 49 Agreement no. 1-DACI-9-80062 e) Unless otherwise specified, the insurance shall be provided by an acceptable insurance provider, as determined by the Water Authority, which satisfies the following minimum requirements: An insurance carrier admitted doing business in California and maintaining an agent for process within the state. Such insurance carrier shall maintain a current A.M. Best rating classification of "A- (A minus)" or better and a financial size of $10 million to $24 million (Class V) or better, or a Lloyds of London program provided by syndicates of Lloyds of London and other London insurance carriers, providing all participants are qualified to do business in California and the policy provides for an agent for process in the state and the program assures a financial capability at least equal to the required classification and size for admitted insurers. f) Certificates of insurance and endorsements shall be provided by the LPS and approved by the Water Authority before execution of the Agreement. Endorsements may be provided on forms provided by the Water Authority, or substantially equivalent forms provided by the insurer. Additional Insured: All Consultants/Contractors performing the scope of work on behalf of the LPS shall name the Water Authority and State (including their directors, officers, employees, and agents) as an additional insured on their Commercial General Liability policy and the policy shall be endorsed with use of an ISO form CG 20 10 10 93 or equivalent. 25. LAWS VENUE: This Agreement shall be interpreted in accordance with the laws of the state of California. If any action is brought to interpret or enforce any term of this Agreement the action shall be brought in a state or federal court in San Diego County. 26. ASSIGNMENT: A Party shall not assign, sublet, or transfer this Agreement or any rights or interest in this Agreement without the written consent of the Water Authority, which may be withheld for any reason. 27. INTEGRATION: This Agreement represents the entire understanding of the Parties as to those matters contained herein. No prior oral or written understanding should be of any force or effect with respect to those matters covered hereunder. This Agreement may not be modified or altered except in writing signed by the Parties. 28. NOTIFICATION OF WATER AUTHORITY: LPS shall promptly notify the Water Authority in writing of the following occurrences: Events or proposed changes that could affect the scope, budget, or work performed under this Agreement. LPS agrees that no substantial change in the scope of a project will be undertaken until written notice of the proposed change has been provided to the Water Authority and the State and the Water Authority has given written approval for such change. Substantial changes generally include changes to the work plan, schedule or term, and budget. Page 18 of 49 Agreement no. 1-DACI-9-80062 a. Any public or media event publicizing the accomplishments and/or results of this Agreement and provide the opportunity for attendance and participation by the Water Authority and State's representatives. LPS shall make such notification at least twenty-one (21) calendar days prior to the event. b. Final inspection of the completed work on a project by a California Registered Professional (Civil Engineer or Geologist, as appropriate), in accordance with Standard Condition D.19 in Exhibit D. LPS shall notify the Water Authority of the inspection date at least twenty-one (21) calendar days prior to the inspection in order to provide the Water Authority and the State the opportunity to participate in the inspection. 29. NOTICES: Any notice, demand, request, consent, or approval that either party desires or is required to give to the other party under this Agreement shall be in writing. Notices may be transmitted by any of the following means: a) By delivery in person. b) By certified U.S. mail, return receipt requested, postage prepaid. c) By "overnight" delivery service; provided that next -business -day delivery is requested by the sender. d) By electronic means. Notices delivered in person will be deemed effective immediately on receipt (or refusal of delivery or receipt). Notices sent by certified mail will be deemed effective given five (5) calendar days after the date deposited with the U. S. Postal Service. Notices sent by overnight delivery service will be deemed effective one business day after the date deposited with the delivery service. Notices sent electronically will be effective on the date of transmission, which is documented in writing. Notices shall be sent to the addresses set forth in Paragraph 31. Either Party may, by written notice to the other, designate a different address that shall be substituted for the one below. 30. PROJECT MANAGERS: Any Party may change its Project Manager upon written notice to the other parties. a) Water Authority's Project Manager shall be Mark Stadler, Principal Water Resources Specialist. Water Authority's Project Manager shall be its representative for the administration of this Agreement and shall have full authority to act on behalf of the Water Authority, including authority to execute all payment requests. b) LPS's Project Manager is Stephen Manganiello, Director Public Works/City Engineer, and shall be its representative for the administration of this Agreement and shall have full authority to act on behalf of LPS, including authority to execute all payment requests. Demand, request, consent, or approval that either party desires or is required to give to the other party under this Agreement shall be in writing. Page 19 of 49 Agreement no. 1-DACI-9-80062 31. PROJECT REPRESENTATIVES: The Project Representatives during the term of this Agreement are as follows: City of National City Luca Zappiello Junior Engineer- Civil 1243 National City Boulevard National City, CA 91950 Phone: 619-336-4380 e-mail: LZappiello@nationalcityca.gov San Diego County Water Authority Loisa Burton Grants Administrator 4677 Overland Avenue San Diego CA 92123 Phone: (858) 522-6739 e-mail: lburtonr@sdcwa.org Either Party may change its Project Representative or Project Manager upon written notice to the other Party. 32. STANDARD PROVISIONS. The following Exhibits are attached and made a part of this Agreement by this reference: Exhibit A — Work Plan Exhibit B — Budget Exhibit C — Schedule Exhibit D — Standard Conditions Exhibit E — Report Formats and Requirements Exhibit F — Requirements for Statewide Monitoring and Data Submittal Exhibit G — State and Water Authority Audit Document and Cost Share Guidelines for Local Project Sponsor Exhibit H — Reimbursement to the Water Authority for Grant Administration Costs Incurred Beyond the Agreement Term Exhibit I — Grant Agreement (Agreement no. 4600012233) Page 20 0 Li Agreement no. 1-DACI-9-80062 33. SIGNATURES: The individuals executing this Agreement represent and warrant that they have the legal capacity and authority to do so on behalf of their respective legal entities. IN WITNESS WHEREOF, the parties have executed this Agreement as of the last date below: SAN DIEGO COUNTY WATER AUTHORITY Robert Rada Director ' ater Resources Date: 3/2 /4 S CITY OF NATIONAL CITY Approved as to form and legality: By: (?(Z.1.1,(124--) osann Gallien Assistant General Counsel Date: ai Dia Approved as to form and legality: By: 2 ,,.4L ,. Stephen Manganiello Director of Public Works/City Engineer Date: ,364 $ Leslie Deese City Manager Date: 'J11/)% Page 21 of 49 Agreement no. 1-DACI-9-80062 EXHIBIT A WORK PLAN PROJECT 9: STORM WATER QUALITY FOR PARADISE VALLEY DACS PROJECT SPONSOR: City of National City Project Partner: City of San Diego PROJECT DESCRIPTION: Project 9 will involve a dual process that will treat and direct storm water runoff along Paradise Valley Road from Paradise Avenue to 700 feet east of East Plaza Boulevard. The system will address pollutants and direct storm water runoff towards a dry extended basin located along Paradise Valley Road, east of East Plaza Boulevard. Runoff will be collected in the basin that will eventually discharge through an outflow tying back into an existing storm drain system. A bioswale will be incorporated east of East Plaza Boulevard that will collect runoff from the adjacent roadways and direct the flow across E Plaza Boulevard toward the detention basin. The bioswale will assist in collecting low flows and treating the storm water through granular filtration and recharge groundwater, while providing flood conveyance for large storm events across East Plaza Boulevard and areas further west. Modifications of the existing curb inlets will allow for diversion of the street runoff to flow into the proposed storm water treatment area. The detention basin will assist with peak flow rate control, water quality improvements, and flow volume reduction. The system will provide incidental infiltration and be designed to detain storm water to allow additional particulates and associated pollutants to settle. A new inlet will be installed to the north of the detention basin that is systematically located to capture the 100-year storm event, but designed to allow for low flow attenuation for additional groundwater recharging. Water quality sampling will determine the specific point -source pollutants in the flow so that the biofiltration features associated with the dry detention basin and creek can target those specific pollutants (e.g., bacteria, nitrogen, iron, sulfur, aluminum, zinc, etc.) that exceed the thresholds set by the R9-2015-0100 San Diego Regional MS4 Permit and the Water Quality Improvement Plan for the City of National City. Project 9 addresses the 2013 San Diego IRWM Plan's Urban DAC issues of flooding, poor surface water quality, illegal dumping and trash, high volume surface runoff, lack of recreational space, and education and outreach. • Flooding. The existing creek does not have the capacity to efficiently convey the 100-year storm event without resulting in potential flood damage or hazard to over 30 properties within the DAC. Project 9 will increase the capacity of the creek and will add an inlet to efficiently convey the 100-year peak flow. The creek and detention basin will control the storm water runoff flow, further reducing potential Page 22 of 49 Agreement no. 1-DACI-9-80062 flooding risks. This Project will also include a recreational path along the bank of the creek, which will be lined with a fence to prevent trash and other debris from being illegally deposited into the waterway. • Poor Surface Water Quality. Project 9 will include a bioswale and a dry extended detention basin in order to improve surface water quality and flood conveyance. The bioswale creek will filter out small levels of pollutants and the dry extended detention basin will provide flow -through treatment. It will detain storm water for an extended period to allow for sedimentation. Some dissolved pollutants will be removed via biofiltration, uptake by vegetation, and/or through infiltration. It will be sized to completely drain between storm events and to accommodate the 100-year peak flow. The creek will be improved to reduce the impacts caused by hydromodification from areas upstream. Improvements will reduce the scour potential along the creek, protect the creek banks, and reduce the amount of additional sediment that is transported downstream. • Illegal Dumping and Trash. Project 9 will include a sidewalk/recreational path along the south side of the creek. The path will be lined with a fence to prevent trash and other debris from being illegally deposited into the creek. It will also include signage prohibiting littering as well as ample trash/recycle bins. • High Volume Surface Runoff. Project 9 will include a bioswale and a dry detention basin. The creek will have a low flow channel that will help to slow down surface runoff flow and better direct it toward the detention basin. The detention basin will detain runoff volumes and will collect and convey storm water into the existing storm drain system. The educational path will also be composed of gravel or other permeable material that is graded towards the swale and detention basin in order to minimize surface runoff outside of the proposed BMPs. • Lack of Recreational Space. Project 9 will include an educational path along the creek for pedestrians and bicyclists. The path will be safe and well -lit for dog walkers, runners, and bicyclists, particularly because it will be exposed along a street. It will help preserve and restore the existing open space while providing an aesthetically pleasing solution for the community. • Education and Outreach. Project 9 will include an outreach program consisting of mailers and flyers which will notify residents of the new improvements to the creek, focusing on the added recreational opportunities. The project includes a walking path that will have educational signage teaching users about native plants and wildlife along the path and creek, as well as information about water quality, surface water, and groundwater. It will inform residents about the goals of the IRWM Program and will provide contact information for those seeking more information on how to assist in the collaborative effort to identify and implement water management solutions that increase regional self-reliance, reducing conflict, and managing water to concurrently achieve social, environmental, and economic objectives. Page 23 of 49 Agreement no. 1-DACI-9-80062 Task 9.1: Project Management This task includes activities required for grant administration, reporting, and invoicing for the work that will be completed under Task 9. Subtask 9.1.a: Reporting and Invoicing This subtask involves entering into an LPS agreement with SDCWA, and preparation of any required documentation for grant agreement execution with DWR. It includes quarterly reporting and invoicing to SDCWA and DWR on project progress, as well as reporting from the Consultant team. This subtask also includes development of the Targeted DAC Needs Assessment for the DACs targeted by this Project. A Project Completion Report will be completed under this subtask. Subtask 9.1.b: Monthly Status Meetings This subtask involves tracking the monthly status of the overall project. It is estimated that monthly status meetings will be held with the project team. Deliverables: o Quarterly Invoices o Quarterly Progress Reports o Targeted DAC Needs Assessment for Project 9 o Project Completion Report Task 9.2: DAC Outreach Outreach activities are focused on engaging DAC community members on the design of the creek improvements, along with developing a long-term watershed ethic that will result in greater care for the creek and less direct trash and pollution. Subtask 9.2.a: Mailing Notices This subtask involves generating mailing notices in order to inform the public of the creek and quality of life improvements to be made and how it will benefit the community. Notices will include information on the creek, the project, benefits to the community, and how to provide input and feedback on the project. Subtask 9.2.b: Community Meetings This subtask involves working with the project partners to plan community meetings. The intent of these community meetings will be to provide informal education on the importance of storm water management while explaining how the improvements to the Paradise Valley Creek will enhance the community and provide educational value to its community members with the proposed learning path. Community meetings will help the coordinate creek cleanups and engage community involvement in maintaining the proposed improvements. Subtask 9.2.c: Focus Groups Page 24 of 49 Agreement no. 1-DACI-9-80062 This subtask involves meeting with specific groups, either a community group or local business group, to receive their input on the creek improvements. Subtask 9.2.d: Community Groups Supplies for Creek Clean-ups This subtask involves gathering the supplies needed in order to successfully coordinate a volunteer led creek cleanup. Trash bins will be rented and supplies such as gloves, bags, and trash grabbers will be purchased for volunteers. Deliverables: o Mailers o Community Meeting notes o Focus group(s) meeting materials and notes Task 9.3: Planning Planning subtasks include field surveys, geotechnical investigations, and hydrology and hydraulics modeling to support the basin design. Subtask 9.3.a: Aerial and Field Survey This subtask involves gathering aerial photography of the project site. This will also include field surveying to develop 1-foot contours across the project site and will involve identifying existing creek geometry. Subtask 9.3.b: Geotechnical Evaluation This subtask involves performing below -ground investigation by boring, sampling, and testing the soil in order to establish its characteristics that would influence the construction of the project. A report will be developed in order to provide the design team and contractors with subsurface information and design parameters during the initial planning stages. Subtask 9.3.c: Hydrology and Hydraulics Modeling This subtask involves providing a representation of the hydrologic process that occurs on the project site, while providing a solution to control and improve the existing conditions. Hydrology will be conducted for the 2-year, 5-year, 10-year, 50-year, 100-year, and 500-year storm events. Hydraulics analysis will be conducted using US Army Corps of Engineers (USACE) software GEO-RAS or HEC-RAS 5.0 to develop the existing and proposed creek alternatives. The modeling will incorporate methods established by the San Diego Municipal Stormwater Permit. Subtask 9.3.d: Basis of Design Report with Alternatives This subtask involves developing a design intent that will provide the explanation of the ideas, concepts and criteria that are considered to be very important to the City of National City, coming out of the programming and conceptual design phases. The basis of design, developed from the design intent, is the documentation of the Page 25 of 49 Agreement no. 1-DACI-9-80062 primary thought processes and assumptions behind design decisions that will be made to meet the design intent. Subtask 9.3.e: FEMA CLOMR A Conditional Letter of Map Revision (CLOMR) is FEMA's formal review on whether a proposed project is in compliance with the minimum National Flood Insurance Program (NFIP) floodplain management criteria. The CLOMR helps to describe any eventual revision that will be made on the NFIP maps when the project has been completed. A CLOMR is required only for those projects that will result in a 1-percent annual chance water surface elevation increase of greater than 1.00 foot for streams with base flood elevations (BFEs) specified, but no floodway designated, or any 1% annual chance water surface elevation increase for proposed construction within a regulatory floodway. Deliverables: o Aerial and Field Survey Reports o Geotechnical Evaluation Report o Hydrologic Study Report o Basis of Design Report o CLOMR letter with GIS Map Exhibits Task 9.4: Design Design subtasks include preliminary and final design packages, along with construction cost estimates. Subtask 9.4.a: Preliminary Design This subtask involves the development of base mapping for the project using collected survey data, as -built data, field data, and utility information. Subtask 9.4.b: Construction Cost Estimate This subtask involves preparing the construction cost estimate from the design recommendations to include quantity detail and verification of unit cost. Construction cost estimates will be prepared at the 60% design stage and the 100% design stage. Subtask 9.4.c: Final Design and Specifications This subtask involves plan preparation and various stages of design for the proposed detention basin and bioswale, as well as improved grading in the Paradise Creek. 100% design plans and specifications will be produced. Deliverables: o Preliminary Design Drawing Set o Construction Cost Estimate o Final Plans, Specifications, and Estimates Page 26 of 49 Agreement no. 1-DACI-9-80062 Task 9.5: Environmental Compliance and Permitting Environmental subtasks include preparation of CEQA compliance documentation and regulatory permits. Subtask 9.5.a: Initial Study/Mitigated Negative Declaration (IS/MND) This subtask includes performing an IS to determine if the proposed project would have a significant environmental impact. The MND is appropriate when the IS has determined that no significant environmental effects will occur since the project implementation will have improved mitigation measures and will be implemented to reduce all potentially significant impacts. The IS/MND will address the potential for construction or operation of the Paradise Valley detention basin to result in potential environmental impacts, per CEQA Guidelines. Subtask 9.5.b: Biological Technical Report This subtask involves the preparation of a Biological Technical Report based on project information and analysis. The report will include a description of existing resources and an impact analysis of the biological resources resulting from project implementation. Cumulative impacts will be qualitatively assessed. Mitigation measures will also be determined. Subtask 9.5.c. Regulatory Permitting (401/404/1602) This subtask involves the preparation of the USACE 404 Permit Application, Regional Water Quality Control Board (RWQCB) 401 Certification Form, and California Department of Fish and Wildlife (CDFW) 1602 Streambed Alteration Agreement Form based on the information in the IS/MND and Biological Technical Report (BTR). Electronic copies of each shall be sent to the County of San Diego, USACE, RWQCB, and CDFW respectively. Deliverables: o Initial Study/Mitigated Negative Declaration (IS/MND) o Biological Technical Report o Permit Applications Page 27 of 49 Agreement no. 1-DACI-9-80062 EXHIBIT B BUDGET Project 9 (8-80062) Storm Water Quality for Paradise Valley DACs Budget Category Loll Cost Share Grant tegpest Total Task 9.1: Project Management $0 $18,720 $18,720 Task 9.2: DAC Outreach $0 $11,380 $11,380 Task 9.3: Planning $0 $134,900 $134,900 Task 9.4: Design $0 $120,000 $120,000 Task 9.5: Environmental Compliance and Permitting $0 $80,000 $80,000 Project 9 Total $0 $365,000 $365,000 Page 28 of 49 Agreement no. 1-DACI-9-80062 EXHIBIT C SCHEDULE Project 9 (8-80062) Storm Water Quality for Paradise Valley DACs Atia§tart Storm Water Quality for Paradise Valley DACs 05/19/17 11/30/18 Task 11.1: Project Management 05/19/17 11/30/18 Task 11.2: Outreach 01 / 15/ 18 09/29/18 Task 11.3: Planning 08/28/17 05/04/18 Task 11.4: Design 10/23/17 10/5/18 Task 11.5: Environmental Compliance and Permitting 01/29/18 10/17/18 Page 29 of 49 Agreement no. 1-DACI-9-80062 EXHIBIT D STANDARD CONDITIONS 1. ACCOUNTING AND DEPOSIT OF FUNDING DISBURSEMENT: a) Separate Accounting of Funding Disbursements and Interest Records: Local Project Sponsor shall account for the money disbursed pursuant to this Local Project Sponsor Agreement separately from all other LPS funds. LPS shall maintain audit and accounting procedures that are in accordance with generally accepted accounting principles and practices, consistently applied. LPS shall keep complete and accurate records of all receipts, disbursements, and interest earned on expenditures of such funds. LPS shall require its contractors or subcontractors to maintain books, records, and other documents pertinent to their work in accordance with generally accepted accounting principles and practices. Records are subject to inspection by the Water Authority and the State at any and all reasonable times. b) Fiscal Management Systems and Accounting Standards: The LPS agrees that, at a minimum, its fiscal control and accounting procedures will be sufficient to permit tracing of grant funds to a level of expenditure adequate to establish that such funds have not been used in violation of state law, this Agreement or the Proposition 1, Integrated Regional Water Management (IRWM) Disadvantaged Community Involvement Grant Agreement (4600012233). c) Disposition of Money Disbursed: All money disbursed pursuant to this Agreement shall be deposited, administered, and accounted for pursuant to the provisions of applicable law and be placed in a non -interest -bearing account. d) Remittance of Unexpended Funds: LPS shall remit to the Water Authority any unexpended funds that were disbursed to the LPS under this Agreement and were not used to pay Eligible Project Costs within a period of thirty (30) calendar days from the final disbursement from the Water Authority to the LPS of funds or, within fifteen (15) calendar days of the expiration of the Agreement, whichever comes first. 2. ACKNOWLEDGEMENT OF CREDIT: LPS shall include appropriate acknowledgement of credit to the State and to all cost -sharing partners for their support when promoting the Project or using any data and/or information developed under this Agreement. During construction of the project, LPS shall install a sign at a prominent location, which shall include a statement that the project is financed under the Water Quality, Supply and Infrastructure Improvement Act of 2014, administered by State of California, Department of Water Resources. LPS shall notify the Water Authority that the sign has been erected by providing a site map with the sign location noted and a photograph of the sign. 3. AIR OR WATER POLLUTION VIOLATION: Under State laws, the LPS shall not be: Page 30 of 49 Agreement no. 1-DACI-9-80062 a) In violation of any order or resolution not subject to review promulgated by the State Air Resources Board or an air pollution control district; b) Subject to cease and desist order not subject to review issued pursuant to Section 13301 of the Water Code for violation of waste discharge requirements or discharge prohibitions; or c) Finally determined to be in violation of provisions of federal law relating to air or water pollution. 4. AMENDMENT: This Agreement may be amended at any time by agreement of the Parties, except insofar as any proposed amendments are in any way contrary to applicable law. Requests by the LPS for amendments must be in writing, in the form provided by the Water Authority including the requested changes and the reason for the request. The Water Authority and the State shall have no obligation to agree to an amendment. 5. AMERICANS WITH DISABILITIES ACT: By signing this Agreement, LPS assures the Water Authority and the State that it complies with the Americans with Disabilities Act (ADA) of 1990, (42 U.S.C. 12101 et seq.), which prohibits discrimination on the basis of disability, as well as all applicable regulations and guidelines issued pursuant to the ADA. 6. APPROVAL: This Agreement is of no force or effect until signed by all Parties to the agreement. LPS may not submit invoices or receive payment until all required signatures have been obtained. 7. AUDITS: The State or the Water Authority reserves the right to conduct an audit at any time between the execution of this Agreement and the completion of Project, with the costs of such audit borne by the Water Authority or the State. After completion of the Project, the State or the Water Authority may require LPS to conduct a final audit to State's specifications at LPS expense, such audit to be conducted by and a report prepared by an independent Certified Public Accountant. For post completion audits initiated by the Water Authority, costs of independent auditor firm will be borne by the Water Authority provided that no misappropriation of funds is discovered as a result of such audit. Failure or refusal by LPS to comply with this provision shall be considered a breach of this Agreement, and the Water Authority or the State may elect to pursue any remedies provided in Paragraph 12, Withholding of Grant Reimbursement by the Water Authority (or take any other action it deems necessary to protect its interests). Pursuant to Government Code Section 8546.7, the LPS shall be subject to the examination and audit by the California State Auditor and the Water Authority for a period of three years after completion of Grant Agreement no. 4600012233. All records of Local Project Sponsor and its subcontractors shall be preserved for at least three (3) Page 31 of 49 Agreement no. 1-DACI-9-80062 years after Grant Agreement No. 4600012233 between the State and the Water Authority is completed or after final billing or by June 30, 2023, whichever is later. Please see Exhibit G (State and Water Authority and State Audit Document Requirements and Cost Share Guidelines), for a listing of documents/records that the State Auditors and the Water Authority will need to review in case of an audit. 8. BUDGET CONTINGENCY: If the State's Budget Act of the current year covered under this Agreement does not appropriate sufficient funds for the Proposition 1 Implementation Grant Program, this Agreement shall be of no force and effect. This provision shall be construed as a condition precedent to the obligation of State and the Water Authority to make any payments under this Agreement. In this event, the Water Authority shall have no liability to pay any funds whatsoever to the LPS or to furnish any other considerations under this Agreement and LPS shall not be obligated to perform any provisions of this Agreement. Nothing in this Agreement shall be construed to provide LPS with a right of priority for payment over any other LPS. If funding for any fiscal year after the current year covered by this Grant Agreement is reduced or deleted by the State of California Budget Act, by Executive Order, or by order of the California State Department of Finance, the Water Authority shall have the option to either cancel this Agreement with no liability occurring to the Water Authority, State, or offer a LPS Agreement amendment to LPS to reflect the reduced amount. The Water Authority will not make payments of any kind, including advances or reimbursements, until State funding is made available by the State Treasurer. If the State ceases payment, the Water Authority has no obligation to make payments for any work done and not reimbursed by the State. 9. CALIFORNIA CONSERVATION CORPS: As required in Water Code Section 79038(b), LPS shall examine the feasibility of using the California Conservation Corps or community conservation corps to accomplish the habitat restoration, enhancement and protection activities listed in the Exhibit A, Work Plan, and shall use the services of one of these organizations whenever feasible. 10. CEOA: Activities funded under this Agreement, regardless of funding source, must be in compliance with the California Environmental Quality Act (CEQA) (Public Resources Code §21000 et seq.). Information on CEQA may be found at the following links: Environmental Information: http://resources.ca.gov/cegal California State Clearinghouse Handbook: https://www.opr.ca.gov/docs/SCH Handbook 2012.pdf http://www.opr.cagov/planning/sch/ Page 32 of 49 Agreement no. 1-DACI-9-80062 11. CHILD SUPPORT COMPLIANCE ACT: For any Agreement in excess of $100,000, the LPS acknowledges in accordance with Public Contract Code 7110, that: a) The LPS recognizes the importance of child and family support obligations and shall fully comply with all applicable state and federal laws relating to child and family support enforcement, including, but not limited to, disclosure of information and compliance with earnings assignment orders, as provided in Chapter 8 (commencing with Section 5200) of Part 5 of Division 9 of the Family Code; and b) The LPS, to the best of its knowledge is fully complying with the earnings assignment orders of all employees and is providing the names of all new employees to the New Hire Registry maintained by the California Employment Development Department. 12. CLAIMS DISPUTE: Any claim that LPS may have regarding performance of this Agreement including, but not limited to, claims for additional compensation or extension of time, shall be submitted to the IRWM San Diego Program Manager, within fifteen (15) days of the LPS's knowledge of the claim. The Water Authority and the LPS shall then attempt to negotiate a resolution of such claim and process an amendment to this Agreement to implement the terms of any such resolution. 13. COMPETITIVE BIDDING AND PROCUREMENTS: LPS shall comply with all applicable laws and regulations regarding securing competitive bids and undertaking competitive negotiations in LPS's contracts with other entities for acquisition of goods and services and construction of public works with funds provided by State, via the Water Authority, under this Agreement. 14. COMPUTER SOFTWARE: LPS certifies that it has appropriate systems and controls in place to ensure that state funds will not be used in the performance of this Agreement for the acquisition, operation, or maintenance of computer software in violation of copyright laws. 15. CONFLICT OF INTEREST: All participants are subject to State and Federal conflict of interest laws. Failure to comply with these laws, including business and financial disclosure provisions, will result in the application being rejected and any subsequent contract being declared void. Other legal action may also be taken. Applicable statutes include, but are not limited to, Government Code, Section 1090 and Public Contract Code, Sections 10410 and 10411, for State conflict of interest requirements. a) Current State Employees: No State officer or employee shall engage in any employment, activity, or enterprise from which the officer or employee receives compensation or has a financial interest and which is sponsored or funded by any State agency, unless the employment, activity, or enterprise is required as a condition of regular State employment. No State officer or employee shall contract Page 33of49 Agreement no. 1-DACI-9-80062 on his or her own behalf as an independent contractor with any State agency to provide goods or services. b) Former State Employees: For the two-year period from the date he or she left State employment, no former State officer or employee may enter into a contract in which he or she engaged in any of the negotiations, transactions, planning, arrangements, or any part of the decision -making process relevant to the contract while employed in any capacity by any State agency. For the twelve-month period from the date he or she left State employment, no former State officer or employee may enter into a contract with any State agency if he or she was employed by that State agency in a policy -making position in the same general subject area as the proposed contract within the twelve-month period prior to his or her leaving State service. c) Employees of the LPS: Employees of the LPS shall comply with all applicable provisions of law pertaining to conflicts of interest, including but not limited to any applicable conflict of interest provisions of the California Political Reform Act, Cal. Gov't Code § 87100 et seq. d) Employees and Consultants to the LPS: Individuals working on behalf of a LPS may be required by the Department to file a Statement of Economic Interests (Fair Political Practices Commission Form 700) if it is determined that an individual is a consultant for Political Reform Act purposes. 16. DELIVERY OF INFORMATION, REPORTS, AND DATA: LPS agrees to expeditiously provide throughout the term of this Agreement, such reports, data, information, and certifications as may be reasonably required by the Water Authority and the State. 17. DISPOSITION OF EQUIPMENT: LPS shall provide to the Water Authority, not less than forty-five (45) calendar days prior to submission of the final invoice, an itemized inventory of equipment purchased with funds provided by the State, via the Water Authority. The inventory shall include all items with a current estimated fair market value of more than $5,000.00 per item. Within seventy-five (75) calendar days of receipt of such inventory the Water Authority shall provide the LPS with a list of the items on the inventory that the State will take title to. All other items shall become the property of the LPS. The Water Authority shall arrange for delivery from the LPS to the State, the items for which the State will take title. Cost of transportation, if any, shall be borne by the State. 18. DRUG -FREE WORKPLACE CERTIFICATION: Certification of Compliance: By signing this Agreement, LPS, its contractors or subcontractors hereby certify, under penalty of perjury under the laws of State of California, compliance with the requirements of the Drug -Free Workplace Act of 1990 (Government Code 8350 et seq.) and have or will provide a drug -free workplace by taking the following actions: Page 34 of 49 Agreement no. 1-DACI-9-80062 a) Publish a statement notifying employees, contractors, and subcontractors that unlawful manufacture, distribution, dispensation, possession, or use of a controlled substance is prohibited and specifying actions to be taken against employees, contractors, or subcontractors for violations, as required by Government Code Section 8355(a)(1). b) Establish a Drug -Free Awareness Program, as required by Government Code Section 8355(a)(2) to inform employees, contractors, or subcontractors about all of the following: a. The dangers of drug abuse in the workplace. b. LPS's policy of maintaining a drug -free workplace. c. Any available counseling, rehabilitation, and employee assistance programs, and d. Penalties that may be imposed upon employees, contractors, and subcontractors for drug abuse violations. c) Provide, as required by Government Code Sections 8355(a)(3), that every employee, contractor, and/or subcontractor who works under this Agreement: a. Will receive a copy of the LPS's drug -free policy statement, and b. Will agree to abide by terms of LPS's condition of employment, contract or subcontract. 19. FINAL INSPECTIONS AND CERTIFICATION OF REGISTERED PROFESSIONAL: Upon completion of the Project, LPS shall provide for a final inspection and certification by the appropriate registered professional (California Registered Civil Engineer or Geologist) that the project has been completed in accordance with submitted final plans and specifications and any modifications thereto and in accordance with this Agreement. LPS shall notify the Water Authority of the inspection date at least twenty-one (21) calendar days prior to the inspection to provide the Water Authority and the State the opportunity to participate in the inspection. 20. LPS COMMITMENTS: LPS accepts and agrees to comply with all terms, provisions, conditions and commitments of this LPS Agreement, including all incorporated documents, and to fulfill all assurances, declarations, representations, and statements made by the LPS in its application, documents, amendments, and communications filed in support of its request for funding. 21 LPS NAME CHANGE: Water Authority's approval is required to change the LPS's name as listed on this Agreement. Upon receipt of legal documentation of the name change the Water Authority will process an amendment to the Agreement after receipt Page 35 of 49 Agreement no. 1-DACI-9-80062 of State approval. Payment of invoices presented with a new name cannot be paid prior to approval by the Water Authority and the State of said amendment. 22. GOVERNING LAW: This Agreement is governed by and shall be interpreted in accordance with the laws of the State of California. 23. INDEPENDENT CAPACITY: LPS, its agents and employees in the performance of this Agreement, shall act in an independent capacity and not as officers, employees, or agents of the Water Authority or the State. 24. INSPECTION OF BOOKS, RECORDS, AND REPORTS: During regular office hours, each Party and their duly authorized representatives shall have the right to inspect and to make copies of any books, records, or reports of either party pertaining to this Agreement or matters related hereto. Each Party shall maintain and shall make available at all times for such inspection accurate records of all its costs, disbursements, and receipts with respect to its activities under this Agreement. Failure or refusal by LPS to comply with this provision shall be considered a breach of this Agreement, and the Water Authority or the State may withhold disbursements to LPS or take any other action it deems necessary to protect its interests. 25. INSPECTIONS OF PROJECT BY STATE: State and the Water Authority shall have the right to inspect the work being performed at any and all reasonable times during the term of the Agreement. This right shall extend to any subcontracts, and LPS shall include provisions ensuring such access in all its contracts or subcontracts entered into pursuant to its Agreement with the Water Authority. 26. INVOICE DISPUTES: In the event of an invoice dispute, payment will not be made until the dispute is resolved and a corrected invoice submitted. Failure to use the webtool or the physical address exactly as directed or provided may result in return of the invoice to the LPS. Payment shall be deemed complete upon deposit of the payment, properly addressed, postage prepaid, in the United States mail. Any claim that LPS may have regarding the performance of this Agreement including, but not limited to claims for additional compensation or extension of time, shall be submitted to the IRWM Project Manager within thirty (30) calendar days of LPS's knowledge of the claim. The Water Authority and LPS shall then attempt to negotiate a resolution of such claim and process an amendment to the Agreement to implement the terms of any such resolution. 27. NO DISCRIMINATION AGAINST DOMESTIC PARTNERS: For contracts over $100,000 executed or amended after January 1, 2007, the LPS certifies by signing this Local Project Sponsor Agreement, under penalty of perjury under the laws of State of California that LPS is in compliance with Public Contract Code § 10295.3. Page 36 of 49 Agreement no. 1-DACI-9-80062 28. OPINIONS AND DETERMINATIONS: Where the terms of this Grant Agreement provide for action to be based upon, judgment, approval, review, or determination of either party hereto, such terms are not intended to be and shall never be construed as permitting such opinion, judgment, approval, review, or determination to be arbitrary, capricious, or unreasonable. 29. PERFORMANCE AND ASSURANCES: LPS agrees to faithfully and expeditiously perform or cause to be performed all Project work as described in Exhibit A (Work Plan) and to apply State funds received only to Eligible Project Costs in accordance with applicable provisions of the law. 30. PRIORITY HIRING CONSIDERATIONS: If this Agreement includes services in excess of $200,000, the LPS shall give priority consideration in filling vacancies in positions funded by the Agreement to qualified recipients of aid under Welfare and Institutions Code §11200 in accordance with Public Contract Code §10353. 31. PROHIBITION AGAINST DISPOSAL OF PROJECT WITHOUT STATE PERMISSION: The LPS shall not sell, abandon, lease, transfer, exchange, mortgage, hypothecate, or encumber in any manner whatsoever all or any portion of any real or other property necessarily connected or used in conjunction with the Projects, or with LPS's service of water, without prior permission of State. LPS shall not take any action, including but not limited to actions relating to user fees, charges, and assessments that could adversely affect the ability of LPS to meet its obligations under this Agreement, without prior written permission of State. State may require that the proceeds from the disposition of any real or personal property be remitted to State. 32. REMEDIES NOT EXCLUSIVE: The use by either party of any remedy specified herein for the enforcement of this Agreement is not exclusive and shall not deprive the party using such remedy of, or limit the application of, any other remedy provided by law. 33 RETENTION: Notwithstanding any other provision of this Agreement, State may, for each project, withhold five percent (5.0%) of the funds requested by the LPS for reimbursement of Eligible Costs. Each project in this Agreement will be eligible to release its respective retention when that project is completed and LPS has met requirements of Paragraph 18, "Submissions of Reports", except in the case of the last project to be completed under this Agreement, in which case retention for such project will not be disbursed until the "Program's Completion Report" is submitted to and approved by the Water Authority and the State. State shall disburse retained funds to the LPS. 34. RIGHTS IN DATA: LPS agrees that all data, plans, drawings, specifications, reports, computer programs, operating manuals, notes and other written or graphic work produced in the performance of this Agreement shall be made available to the State Page 37 of 49 Agreement no. 1-DACI-9-80062 and shall be in the public domain to the extent to which release of such materials is required under the California Public Records Act., Government Code §6250 et seq. LPS may disclose, disseminate and use in whole or in part, any final form data and information received, collected and developed under this Agreement, subject to appropriate acknowledgement of credit to State for financial support. LPS shall not utilize the materials for any profit -making venture or sell or grant rights to a third party who intends to do so. The State shall have the right to use any data described in this paragraph for any public purpose. 35. SEVERABILITY: Should any portion of this Agreement be determined to be void or unenforceable, such shall be severed from the whole and the Agreement shall continue as modified. 36. STATE REVIEWS: The parties agree that review or approval of project applications, documents, permits, plans, and specifications or other project information by the State is for administrative purposes only and does not relieve the LPS of their responsibility to properly plan, design, construct, operate, maintain, implement, or otherwise carry out the projects. 37. SUSPENSION OF PAYMENTS: This Agreement may be subject to suspension of payments or termination, or both, and LPS may be subject to debarment if the State determines that: a. LPS, its contractors, or subcontractors have made a false certification, or b. LPS, its contractors, or subcontractors violates the certification by failing to carry out the requirements noted in this Agreement. 38. SUCCESSORS AND ASSIGNS: This Agreement and all of its provisions shall apply to and bind the successors and assigns of the parties. No assignment or transfer of this Agreement or any part thereof, rights hereunder, or interest herein by the LPS shall be valid unless and until it is approved by State and made subject to such reasonable terms and conditions as State may impose. 39. TERMINATION BY LPS: Subject to State approval which may be reasonably withheld, LPS may terminate this Agreement and be relieved of contractual obligations. In doing so, LPS must provide a reason(s) for termination. LPS must submit all progress reports summarizing accomplishments up until termination date. 40. TERMINATION FOR CAUSE: Subject to the right to cure under Paragraph 10, the State may terminate this Agreement and be relieved of any payments should LPS fail to perform the requirements of this Agreement at the time and in the manner herein, provided including but not limited to reasons of default under Paragraph 13. Page 38 of 99 Agreement no. 1-DACI-9-80062 41. TERMINATION WITHOUT CAUSE: The State may terminate this Agreement without cause on 30 calendar days advance written notice. The LPS shall be reimbursed for all reasonable expenses incurred up to the date of termination. 42. THIRD PARTY BENEFICIARIES: The parties to this Agreement do not intend to create rights in, or grant remedies to, any third party as a beneficiary of this Agreement, or any duty, covenant, obligation or understanding established herein. 43. TIMELINESS: Time is of the essence in this Agreement. 44. TRAVEL: Travel includes the reasonable and necessary costs of transportation, subsistence, and other associated costs incurred by personnel during the term of this Agreement. Travel and per diem expenses to be reimbursed under this Agreement shall be at the same rates the State provides for unrepresented employees in accordance with the provisions of Title 2, Chapter 3, of the California Code of Regulations and shall be reimbursed consistent with the rates current at the time of travel. These rates are published at: http://www.calhr.ca.gov/employees/Pages/travel- meals.aspx, or its successor website. For the purpose of computing such expenses, LPS's designated headquarters shall be: 1243 National City Boulevard, National City, CA 91950. No travel outside the San Diego Funding Area shall be reimbursed unless prior written authorization is obtained from the Water Authority and State's Project Manager. 45. VENUE: The State and the LPS hereby agree that any action arising out of this Agreement shall be filed and maintained in the Superior Court in and for the County of Sacramento, California, or in the United States District Court in and for the Eastern District of California. The LPS hereby waives any existing sovereign immunity for the purposes of this Agreement. 46. WAIVER OF RIGHTS: None of the provisions of this Agreement shall be deemed waived unless expressly waived in writing. It is the intention of the parties hereto that from time to time either party may waive any of its rights under this Agreement unless contrary to law. Any waiver by either party of rights arising regarding the Agreement shall not be deemed to be a waiver with respect to any other rights or matters, and such provisions shall continue in full force and effect. 47. WORKERS' COMPENSATION: LPS affirms that it is aware of the provisions of §3700 of the Labor Code, which requires every employer to be insured against liability for workers' compensation or to undertake self-insurance in accordance with the provisions of that code, and LPS affirms that it will comply with such provisions before commencing the performance of the work under this LPS Agreement and will make its contractors and subcontractors aware of this provision. Page 39 of 49 Agreement no. 1-DACI-9-80062 EXHIBIT E REPORT FORMATS AND REQUIREMENTS The following reporting formats should be utilized. Please obtain the Water Authority's approval before submitting a report in an alternative format. QUARTERLY PROGRESS REPORT Progress Reports shall use the following format as reflected on the IRWM Grants Webtool. This format may be modified as necessary to effectively communicate information. Local Project Sponsor shall submit Quarterly Progress Reports on a consistent basis to meet the Water Authority's and State's requirements for disbursement of funds. The quarterly progress report should describe the work performed during the reporting period. For each project, discuss the following at the task level, as organized in Exhibit A, Work Plan. Project Information Describe the work performed during the period covered by the report, organized by Exhibit A, "Work Plan" tasks/subtasks/categories, including but not limited to: • Estimate of percent (%) work complete. • Milestones or deliverables completed/submitted during the reporting period. • Discussion of work accomplished during the reporting period and submission of deliverables per Exhibit A. • Scheduling concerns and issues encountered that may delay completion of the task. • Work anticipated for the next reporting period. • Updated schedule or budget inclusive of any changes that have occurred. Labor Compliance • Describe labor compliance status for the project, if applicable. Insurance Certificate • Certification that required insurance is updated and available upon request. Cost Information For each project provide the following: • Costs -to -date categorized by Grant and "Cost Share", as applicable. • Percent (%) of total project costs completed. Page 40 of 49 Agreement no. 1-DACI-9-80062 • If billing prior costs, a certification that costs have never been billed previously must be stated and reason for the cost billing delay. EQUIPMENT INVENTORY Description of item purchased, quantity and total amount of any equipment purchased over $5,000. Schedule Information A list of any approved changes to the Schedule in accordance with Local Project Sponsor Agreement and a revised schedule if changed from latest reported schedule. Anticipated Activities Next Quarter Discuss the following at the project level, as organized in Exhibit A, Work Plan: • Description of anticipated activities for the next reporting period. • Anticipated billing (invoice/billing) to the Water Authority next reporting period. ACCOUNTABILITY REPORT (as applicable) LPS shall submit, on a quarterly basis, an Accountability Report containing at a minimum: • An itemization of how advanced funds have been expended to date (Expenditure Summary), including documentation that supports the expenditures (i.e., contractor invoices, receipts, personnel hours, etc.). Invoices must be itemized based on the categories (i.e., tasks) specified in Exhibit B. o A funding plan which shows how the remaining advanced funds will be expended. o Includes a funding plan which shows how the remaining advance funds will be expended. o Provides an accounting of distributing the advanced funds to the appropriate Local Project Sponsor. o Documents that the funds were spent on eligible reimbursable costs. o Documentation that the funds were placed in a non -interest -bearing account, including the dates of deposits and withdrawals from that account. o Any other information, required in the Accountability Form provided by the State, via the Water Authority. PROJECT COMPLETION REPORT Project Completion Reports shall generally use the following format. This report should consist of a maximum of 15 pages. This format, which may be modified as necessary to effectively communicate information about the project, includes the following: Page 91 of 49 Agreement no. 1-DACI-9-80062 EXECUTIVE SUMMARY The Executive Summary contains information summarizing the project that includes: • Brief description of the work accomplished as described in the workplan. • Work plan deviations, such as amendments, if any. • Schedule deviations, if any. Stakeholder Summary • General description of water management needs of DACs, Economically Distressed Areas (EDAs), and underrepresented communities learned from the activities performed in this project. • Map(s) identifying all DACs, EDAs, and underrepresented communities within the project area learned from the activities performed in this project. Involvement Activity Summary • General description of involvement activities performed in this project, including both successful and unsuccessful involvement activities. • Identification of projects developed from the DAC involvement activities, if applicable. Findings • Identification of ongoing barriers for DAC involvement as a result of the project. • Benefits to DAC, EDAs and or unrepresented community areas as a result of the project. • Recommendations for water managers on future DAC involvement activities in IRWM efforts. Costs: Total project costs, grant and cost share and other unbudgeted costs, if any. Looking into the Future • Next steps for the project to continue DAC involvement efforts. Page 42 of 49 Agreement no. 1-DACI-9-80062 EXHIBIT F REQUIREMENTS FOR STATEWIDE MONITORING AND DATA SUBMITTAL Surface and Groundwater Quality Data Groundwater quality and ambient surface water quality monitoring data that include chemical, physical, or biological data shall be submitted to the State as described below, with a narrative description of data submittal activities included in project reports, as described in Exhibit E. Surface water quality monitoring data shall be prepared for submission to the California Environmental Data Exchange Network (CEDEN). The CEDEN data templates are available on the CEDEN website. Inclusion of additional data elements described on the data templates is desirable. Data ready for submission should be uploaded to your CEDEN Regional Data Center via the CEDEN website. CEDEN website: http://www.ceden.org. If a project's Work Plan contains a groundwater ambient monitoring element, groundwater quality monitoring data shall be submitted to the State for inclusion in the State Water Resources Control Board's Groundwater Ambient Monitoring and Assessment (GAMA) Program Information on the GAMA Program can be obtained at: http://www.waterboards.ca.gov/gama/geotrackergama.shtml. If further information is required, the Grantee can contact the State Water Resources Control Board (SWRCB) GAMA Program. Groundwater Level Data Grantee shall submit to DWR groundwater level data collected as part of this grant. Water level data must be submitted using the California Statewide Groundwater Elevation Monitoring (CASGEM) online data submission system. Grantee should use their official CASGEM Monitoring Entity or Cooperating Agency status to gain access to the online submittal tool and submit data. If the data is from wells that are not part of the monitoring network, the water level measurements should be classified as voluntary measurements in the CASGEM system. If the grantee is not a Monitoring Entity or Cooperating Agency, please contact your DWR grant project manager for further assistance with data submittal. The activity of data submittal should be documented in appropriate progress or final project reports, as described in Exhibit E. Information regarding the CASGEM program can be found at http://www.water.ca.gov/groundwater/casgem/. Page 43 of 49 Agreement no. 1-DACI-9-80062 EXHIBIT G STATE AND WATER AUTHORITY AUDIT DOCUMENT REQUIREMENTS AND COST SHARE GUIDELINES FOR LOCAL PROJECT SPONSOR The list below details the documents/records that State Auditors typically review if an Agreement is being audited. Local Project Sponsor should ensure that such records are maintained for each State -funded Program/Project. Where applicable, this list of documents also includes documents relating to the Local Project Sponsor's cost share, which will be required for audit purposes. Internal Controls: 1. Organization chart (i.e., Agency's overall organization chart and organization chart for this Agreement's funded project). 2. Written internal procedures and flowcharts for the following: a) Receipts and deposits. b) Cash disbursements. c) State reimbursement requests. d) State funding expenditure tracking. e) Guidelines, policies, and procedures on State -funded Program/Project. 3. Audit reports of the Local Project Sponsor's internal control structure and/or financial statements within the last two (2) years. 4. Prior audit reports on State -funded Program/Project. 5. Advance payment request, Accountability Report and other documents supporting advance payment expenditures, as applicable. State Funding: 1. Original Local Project Sponsor's Agreement, any approved amendment(s), including budget modification documents. 2. A list of all bond -funded grants, loans or subventions received from the State. 3. A list of all other funding sources for each Program/Project. Contracts: 1. All subcontractor and consultant contracts and related, if applicable. 2. Contracts between the Water Authority and the Local Project Sponsor, member agencies, and project partners as related to the State -funded Program/Project. Page 44 of 49 Agreement no. 1-DACI-9-80062 Invoices: 1. Invoices from vendors and subcontractors for expenditures submitted to the Water Authority and the State, for payments under the Agreement. 2. Documentation supporting subcontractor invoices to the Water Authority and the State reimbursement requests and related Local Project Sponsor Agreement budget line items. 3. Reimbursement requests submitted to the State, via the Water Authority, for the Agreement. 4. Agency personnel billing support letter(s) used to support personnel rates. Cash Documents: 1. Receipts (copies of warrants) showing payments received from the State, via the Water Authority. 2. Deposit slips and bank statements showing deposit of the payments received from the Water Authority. 3. Cancelled checks or disbursement documents showing payments made to vendors, subcontractors, consultants, and/or agents under the Local Project Sponsor's Agreement. Accounting Records: 1. Ledgers showing receipts and cash disbursement entries for State funding. 2. Ledgers showing receipts and cash disbursement entries of other funding sources. 3. Bridging documents that tie the general ledger to reimbursement requests submitted to the Water Authority and for the Agreement. Administration Costs: 1. Provide Cost Allocation model and methodology, if applicable, for allocating administration and overhead costs. 2. Supporting documents showing the calculation of administration costs. Personnel: 1. List of all contractors and Local Project Sponsor's staff that worked on the State -funded Program/Project. 2. Payroll records including timesheets and ledgers for staff of the local project sponsor. 3. Supporting documentation showing labor rates and indirect labor rate methodology. Project Files: 1. All supporting documentation maintained in the Program/Project files. 2. All Agreement -related correspondence. Page 45 of 49 Agreement no. 1-DACI-9-80062 Cost Share Guidelines: Cost Share consists of non -State funds including in -kind services. In -kind services are defined as work performed or items contributed (i.e., dollar value of non -cash contributions) by the Local Project Sponsor (and potentially other parties involved) directly related to the execution of the scope of work (i.e., volunteer services, equipment use, and facilities). The cost of in -kind service can be counted as cost share in -lieu of actual funds (or revenue) provided by the local project sponsor. Other cost share and in -kind service eligibility conditions may apply. Provided below is guidance for documenting funding match with and without in -kind services. a) Although tracked separately, in -kind services shall be documented and, to the extent feasible, supported by the same methods used by the Local Project Sponsor for its own employees. Such documentation should include the following: I . Detailed description of the contributed item(s) or service(s). 2. Purpose for which the contribution was made (tied to Local Project Sponsor's Work Plan). 3. Name of contributing organization and date of contribution. 4. Real or approximate value of contribution. Who valued the contribution and how the value was determined (i.e., actual, appraisal, fair market value, etc.), and justification of rate (See item #2, below). 5. For contributed labor, the person's name, the work performed, the number of hours contributed, and the pay rate applied. 6. If multiple sources exist, these should be summarized on a table with a summation of cumulative charges. 7. Source of contribution and whether it was provided by, obtained with, or supported by government funds. b) Rates for volunteer or in -kind services shall be consistent with those paid for similar work in the Local Project Sponsor's organization. For example, volunteer service of clearing vegetation performed by an attorney shall be valued at a fair market value for clearing vegetation, not the rate for professional legal services. In those instances, in which the required skills are not found in the recipient organization, rates shall be consistent with those paid for similar work in the labor market. Paid fringe benefits that are reasonable, allowable and allocable may be included in the valuation. c) Cost share contribution (including in -kind services) shall be for costs and services directly attributed to activities included in the Local Project Sponsor's Agreement Work Plan. These services, furnished by professional and technical personnel, consultants, and other skilled and unskilled labor may be counted as in -kind if the Page 46 of 49 Agreement no. 1-DACI-9-80062 activities are an integral and necessary part of the State -funded Program/Project under the Agreement. d) Cash contributions made to a Program/Project shall be documented as revenue and in -kind services as expenditure. These costs should be tracked separately in the Local Project Sponsor's accounting systems. Page 47 of 49 Agreement no. 1-DACI-9-80062 EXHIBIT H REIMBURSEMENT TO THE WATER AUTHORITY FOR GRANT ADMINISTRATION COSTS INCURRED BEYOND THE GRANT AGREEMENT TERM The Water Authority is responsible for administering and processing the Proposition 1 DACI Grant Agreement, including tasks associated with compiling and submitting project invoices, quarterly reports, grant amendment requests, retention release requests and completion reports to DWR. Below is the scope of work, estimated hourly billing rates and billing and payment method for costs beyond the Agreement termination date. 1. Scope of Work Task 1 Project Administration: Budget Category A • Contract Administration: This task includes administering the IRWM grant agreement with DWR as it relates to this project. This also includes processing any grant agreement amendment with DWR. This task contains work related to compliance tracking and monitoring of agreement requirements such as equipment inventory, deliverables and reports. • Invoice and Report Processing: The program is the lead in reviewing project invoices to ensure project costs eligibility and contract compliance. The program submits an overall report of the grant administration efforts quarterly, summarizing all activities of the previous quarter; grant program completion report and post - performance reports (as submitted by the projects). This also includes packaging, review and submittal of the reports (quarterly and completion) to DWR. • Budget Updating and Monitoring: This task includes updating and monitoring of the grant administration budget through the life of the grant. This task also includes monitoring and tracking of reported project expenditures and costs reimbursements received from DWR and disbursements to the LPS. • Grant Web Tool Site Monitoring and Maintenance: This task includes monitoring and maintaining the Water Authority's webtool site for this grant program and uploading and maintaining the deliverables and reports on the State of California's GRanTs website. This website is the official grant -records repository for the State of California's grant -funded grants • Coordination: This task involves grant administration progress reporting on grant financial status, project progress, agreements and amendments to the Regional Water Management Group, California Department of Water Resources (DWR) and Regional Advisory Group, as necessary. This also includes facilitating Local Project Sponsor (LPS) meetings and providing any other coordination needs as needed. Page 48 of 49 Agreement no. 1-DACI-9-80062 2. Billing Rate Costs for Grant Administration Services will be based on the following estimated loaded hourly rate -ranges: Senior Management Analyst Management Analyst Assistant Management Analyst 3. Billing and Payment Method: $80- $93 per hour $70- $82 per hour $60- $74 per hour a. The Water Authority shall invoice the LPS on a quarterly basis. Invoice will include the number of labor hours charged by classification, a brief description of work performed, and the total costs incurred. b. All invoices will be sent to the attention of the project manager. c. Invoices must be paid to the Water Authority within 30 calendar days of invoice date. Invoice payment shall be sent to the address indicated on the invoice, and must include the Project Number. d. If an LPS fails to make timely payment, a delinquent charge of two percent (2%) of the delinquent invoice amount for each month, or portion thereof that the payment remains delinquent, shall apply. If the delinquency does not exceed five (5) business days, the charge shall be equal to one percent (1) of the delinquent invoice amount. Page 49 of 49 Agreement no. 1-DACI-9-80062 EXHIBIT I GRANT AGREEMENT EXHIBIT I Page 49 of 49 GRANT AGREEMENT Agreement no. 1-DACI-9-80062 GRANT AGREEMENT BETWEEN THE STATE OF CALIFORNIA (DEPARTMENT OF WATER RESOURCES) AND SAN DIEGO COUNTY WATER AUTHORITY AGREEMENT NUMBER4600012233 2016 PROPOSITION 1 INTEGRATED REGIONAL WATER MANAGEMENT (IRWM) DISADVANTAGED COMMUNITY INVOLVEMENTGRANT CALIFORNIA WATER CODE §79740 ET SEQ. THIS GRANT AGREEMENT is entered into by and between the Department of Water Resources of the State of California, herein referred to as the "State" or "DWR" and San Diego County Water Authority, a public agency, in the State of California, duly organized, existing, and acting pursuant to the laws thereof, herein referred to as the "Grantee", which parties do hereby agree as follows: 1. PURPOSE. State shall provide funding from the Water Quality, Supply and Infrastructure Improvement Act of 2014 (Proposition 1) to Grantee to assist in financing projects associated with the San Diego Funding Area pursuant to Chapter 7 (commencing with §79740) of Division 26.7 of the California Water Code, hereinafter collectively referred to as "IRWM Program." A "project" is defined as a group of activities as set forth in Exhibit A (Work Plan). 2. TERM OF GRANT AGREEMENT. The term of this Grant Agreement begins on the date this Grant Agreement is executed by State, and terminates on September 30, 2020, or when all of the Parties' obligations under this Grant Agreement are fully satisfied, whichever occurs earlier. Execution date is the date the State signs this Grant Agreement. 3. GRANT AMOUNT. The maximum amount payable by the State under this Grant Agreement shall not exceed $5,551,350. 4. GRANTEE'S RESPONSIBILITY. Grantee and its representatives shall: a) Faithfully and expeditiously perform or cause to be performed all project work as described in Exhibit A (Work Plan) and in accordance with Exhibit B (Budget) and Exhibit C (Schedule). b) Accept and agree to comply with all terms, provisions, conditions, and written commitments of this Grant Agreement, including all incorporated documents, and to fulfill all assurances, declarations, representations, and statements made by Grantee in the application, documents, amendments, and communications filed in support of its request for Water Quality, Supply and Infrastructure Improvement, Act of 2014 financing. c) Comply with all applicable California laws and regulations. d) Implement the projects in accordance with applicable provisions of the law. e) Fulfill its obligations under the Grant Agreement, and be responsible for the performance of the projects. 5. LOCAL PROJECT SPONSOR'S RESPONSIBILITY. Grantee shall assign Local Project Sponsors to act on behalf of Grantee for the purposes of individual project management, oversight, compliance, and operations and maintenance. Local Project Sponsors shall be assigned in accordance with the participating agencies identified in the Disadvantaged Community Involvement grant proposal. Exhibit F identifies Local Project Sponsors. Local Project Sponsors shall also act on behalf of Grantee in the fulfillment of Grantee responsibilities where specifically specified in this Grant Agreement. 6. BASIC CONDITIONS. State shall have no obligation to disburse money for projects under this Grant Agreement until Grantee has satisfied the following conditions (if applicable): a) Grantee must demonstrate the groundwater compliance options set forth on pages 11 and 12 of the IRWM Program Guidelines, dated July 2016 are met. b) Grantee submits deliverables as specified in Paragraph 17(Submission of Reports) of this Grant Agreement and in Exhibit A. Grant Agreement No. 4600012233 Page 2 of 71 c) Prior to the commencement of construction or implementation activities, Grantee shall submit the following to the State for each project: 1) Final plans and specifications certified by a California Registered Professional (Civil Engineer or Geologist, as appropriate) for the approved projects as listed in Exhibit A of this Grant Agreement. 2) Environmental Documentation: i) Grantee submits to the State all applicable environmental permits, ii) Documents that satisfy the CEQA process are received by the State, iii) State has completed its CEQA compliance review as a Responsible Agency, and iv) Grantee receives written concurrence from the State of Lead Agency's CEQA documents and State notice of verification of environmental permit submittal. State's concurrence of Lead Agency's CEQA documents is fully discretionary and shall constitute a condition precedent to any work (i.e., construction or implementation activities) for which it is required. Once CEQA documentation has been completed, State will consider the environmental documents and decide whether to continue to fund the projects or to require changes, alterations or other mitigation. Grantee must also demonstrate that it has complied with all applicable requirements of the National Environmental Policy Act by submitting copies of any environmental documents, including environmental impact statements, Finding of No Significant Impact, and mitigation monitoring programs as may be required prior to beginning construction/implementation. 7. DISBURSEMENT OF FUNDS. State will disburse to Grantee the amount approved, subject to the availability of funds through normal State processes. Notwithstanding any other provision of this Grant Agreement, no disbursement shall be required at any time or in any manner which is in violation of, or in conflict with, federal or state laws, rules, or regulations, or which may require any rebates to the federal government, or any loss of tax-free status on state bonds, pursuant to any federal statute or regulation. 8. ELIGIBLE PROJECT COST. Grantee shall apply State funds only to Eligible Project Costs in accordance with applicable provisions of the law. Work performed on the projects after January 22, 2016, shall be eligible for reimbursement. Costs that are not eligible for reimbursement include, but are not limited to the following items: a) Operation and maintenance costs. b) Purchase of equipment that is not an integral part of a project. c) Establishing a reserve fund. d) Purchase of water supply. e) Replacement of existing funding sources for ongoing programs. f) Support of existing agency requirements and mandates (e.g., punitive regulatory agency requirement). g) Purchase of land in excess of the minimum required acreage necessary to operate as an integral part of a project, as set forth and detailed by engineering and feasibility studies. h) Payment of principal or interest of existing indebtedness or any interest payments unless the debt is incurred after execution of this Grant Agreement, the State agrees in writing to the eligibility of the costs for reimbursement before the debt is incurred, and the purposes for Grant Agreement No. 4600012233 Page 3 of 71 which the debt is incurred are otherwise eligible costs. However, this will only be allowed as Grantee Cost Share (i.e., Funding Match). i) Payment of stipends j) Application preparation costs for other funding opportunities not consistent with IRWM. k) Meals not directly related to travel. I) Acquisition of real property (land or easements). m) Overhead not directly related to the project. 9. METHOD OF PAYMENT. a) Reimbursement - Submit a copy of invoice for costs incurred and supporting documentation to the DWR Project Manager via Grant Review and Tracking System (GRanTS). Additionally, the original invoice form with signature and date (in ink) of Grantee's Project Representative, as indicated in Paragraph 23of this Grant Agreement, must be sent to the DWR Project Manager for approval. Invoices submitted via GRanTS shall include the following information: 1) Costs incurred for work performed during the period identified in the particular invoice. 2) Invoices shall be submitted on forms provided by State and shall meet the following format requirements: i) Invoices must contain the date of the invoice, the time period covered by the invoice, and the total amount due. ii) Invoices must be itemized based on the projects (i.e., tasks) specified in Exhibit B. The amount claimed for salaries/wages/consultant fees must include a calculation formula (i.e., hours or days worked times the hourly or daily rate = the total amount claimed). iii) Sufficient evidence (e.g., receipts, copies of checks, time sheets) as determined by the State must be provided for all costs included in the invoice. iv) DWR Project Manager will notify Grantee, in a timely manner, when, upon review of an invoice, the State determines that any portion or portions of the costs claimed are not eligible costs or are not supported by documentation or receipts acceptable to State. Grantee may, within thirty (30) calendar days of the date of receipt of such notice, submit additional documentation to State to cure such deficiency(ies).After the disbursement requirements in Paragraph 5 "Basic Conditions" are met, State will disburse the whole or portions of State funding to Grantee, following receipt from Grantee via U.S. mail or Express mail delivery of a "wet signature" invoice for costs incurred, and timely Quarterly Progress Reports as required by Paragraph 17"Submission of Reports. "Payment will be made no more frequently than monthly, in arrears, upon receipt of an invoice bearing the Grant Agreement number. b) Advanced Payment - Water Code § 10551 authorizes advanced payment by the State for projects which are sponsored by a nonprofit organization; a disadvantaged community (DAC);or, the proponent of a project that benefits a DAC. If these projects are awarded less than $1,000,000 in grant funds, the project proponent may receive an advanced payment of 50% of the grant award; the remaining 50% of the grant award will be reimbursed in arrears. Water Code § 10551 further authorizes DWR to adopt additional requirements regarding the use of the advanced payment to ensure that the funds are used properly. Within 90 calendar days of execution of the Grant Agreement, the Grantee shall provide DWR an Advanced Payment Request. The Advanced Payment Request must contain the following: Grant Agreement No. 4600012233 Page 4 of 71 1) Documentation demonstrating that each Local Project Sponsor was notified about their eligibility to receive an advanced payment and a response from the Local Project Sponsor stating whether it wishes to receive the advanced payment or not, if applicable. 2) If the Grantee or Local Project Sponsor is requesting the advanced payment, the request must also include: i) Specification of those projects listed in Exhibit B for which Advanced Payment will be requested and how those projects are consistent with the adopted IRWM Plan. ii) A funding plan which shows by project: the budget and anticipated schedule, the amount of advanced funding requested, and how the advanced funds will be expended within 18 months of this Grant Agreement's execution. (i.e., for what, how much, and when) iii) A discussion of the Grantee or Local Project Sponsor's financial capacity to complete the project once the advance funds have been expended. 3) If a Grantee or Local Project Sponsor is requesting advanced payment, Grantee shall also submit a single Advance Payment invoice, itemized for each qualified project, to the DWR Project Manager with signature and date (in ink) of Grantee's Project Representative, as indicated in Paragraph 23of this Agreement. The Grantee shall be responsible for the timely distribution of the advanced funds to the individual Local Project Sponsors. Within 60 calendar days of receiving the Advanced Payment invoice and subject to the availability of funds, State will authorize payment of the advanced funds sought of 50% of the grant award for the qualified project(s). The Advance Payment Invoice shall be submitted on forms provided by State and shall meet the following format requirements: i) Invoice must contain the date of the invoice, the time period covered by the invoice, and the total amount due. ii) Invoice must be itemized based on the projects (i.e., tasks) specified in Exhibit B. iii) DWR Project Manager will notify Grantee, in a timely manner, when, upon review of an Advance Payment Invoice, the State determines that any portion or portions of the costs claimed are not eligible costs. Grantee may, within thirty (30) calendar days of the date of receipt of such notice, submit additional documentation to cure such deficiency(ies). After the disbursement requirements in Paragraph 6 "Basic Conditions" (6a and) only) are met, State will disburse the whole or portions of State funding to Grantee, following receipt from Grantee via US mail or Express mail delivery of a "wet signature" invoice for costs incurred, including Cost Share, and timely Progress Reports as required by Paragraph 16 "Submission of Reports." 4) On a quarterly basis, the Grantee will submit an Accountability Report to DWR that demonstrates how actual expenditures compare with the scheduled budget. The Accountability Report shall include the following information: i) An itemization of how advanced funds have been expended to date (Expenditure Summary), including documentation that supports the expenditures (e.g., contractor invoices, receipts, personnel hours, etc.). Invoices must be itemized based on the projects (i.e., tasks) specified in Exhibit B. ii) A funding plan, itemized by project, which shows how the remaining advanced funds will be expended. Grant Agreement No. 4600012233 Page 5 of 71 iii) Documentation that the funds were placed in a non -interest bearing account, including the dates of deposits and withdrawals from that account. DWR Project Manager will notify Grantee, in a timely manner, when, upon review of the Expenditure Summary, the State determines that any portion or portions of the expenditures claimed are not eligible costs. Grantee may, within thirty (30) calendar days of the date of receipt of such notice, submit additional documentation to cure such deficiency(ies). If costs are not consistent with the tasks in Exhibit B, the State will reject the claim and remove them from the Expenditure Summary. Once Grantee has expended all advanced funds, then the method of payment will revert to the reimbursement process specified in Paragraph 9a) and any remaining requirements of Paragraph 6. 10. REPAYMENT OF ADVANCES. State may demand repayment from Grantee of all or any portion of the advanced State funding along with interest at the California general obligation bond interest rate at the time the State notifies the Grantee, as directed by State and take any other action that it deems necessary to protect its interests for the following conditions: a) A project is not being implemented in accordance with the provisions of this Grant Agreement. b) Grantee has failed in any other respect to comply with the provisions of this Grant Agreement, and if Grantee does not remedy any such failure to State's satisfaction. Repayment amounts may also include: c) Advance funds which have not been expended within 18 months of the Grant Agreement's execution by the Local Project Sponsor. d) Actual costs incurred are not consistent with the Exhibit A (Work Plan) activities, not supported, or are ineligible. e) At the completion of the project, the funds have not been expended. For conditions 10 c) and 10 d), repayment may consist of deducting the amount from future reimbursement invoices. State may consider Grantee's refusal to repay the requested advanced amount a substantial breach of this Grant Agreement subject to the default provisions in Paragraph 12, "Default Provisions." If State notifies Grantee of its decision to demand repayment or withhold the entire funding amount from Grantee pursuant to this paragraph, this Grant Agreement shall terminate upon receipt of such notice by Grantee and the State shall no longer be required to provide funds under this Grant Agreement and the Grant Agreement shall no longer be binding on either party. 11. WITHHOLDING OF DISBURSEMENTS BY STATE. If State determines that a project is not being implemented in accordance with the provisions of this Grant Agreement, or that Grantee has failed in any other respect to comply with the provisions of this Grant Agreement, and if Grantee does not remedy any such failure to State's satisfaction, State may withhold from Grantee all or any portion of the State funding and take any other action that it deems necessary to protect its interests. Where a portion of the State funding has been disbursed to the Grantee and State notifies Grantee of its decision not to release funds that have been withheld pursuant to Paragraph 12, the portion that has been disbursed shall thereafter be repaid immediately with interest at the California general obligation bond interest rate at the time the State notifies the Grantee, as directed by State. State may consider Grantee's refusal to repay the requested Grant Agreement No. 4600012233 Page 6 of 71 disbursed amount a contract breach subject to the default provisions in Paragraph 12, "Default Provisions." If State notifies Grantee of its decision to withhold the entire funding amount from Grantee pursuant to this paragraph, this Grant Agreement shall terminate upon receipt of such notice by Grantee and the State shall no longer be required to provide funds under this Grant Agreement and the Grant Agreement shall no longer be binding on either party. 12. DEFAULT PROVISIONS. Grantee and any Local Project Sponsor receiving grant funding through this Grant Agreement will be in default under this Grant Agreement if any of the following occur: a) Substantial breaches of this Grant Agreement, or any supplement or amendment to it, or any other agreement between Grantee and State evidencing or securing Grantee's obligations. b) Making any false warranty, representation, or statement with respect to this Grant Agreement or the application filed to obtain this Grant Agreement. c) Failure to operate or maintain project(s) in accordance with this Grant Agreement (Paragraph 18). d) Failure to make any remittance required by this Grant Agreement. e) Failure to comply with Labor Compliance Program requirements (Paragraph 16). f) Failure to submit timely progress reports. g) Failure to routinely invoice State. h) Failure to meet any of the requirements set forth in Paragraph 13, "Continuing Eligibility." Should an event of default occur, State shall provide a notice of default to the Grantee and shall give Grantee at least ten (10) calendar days to cure the default from the date the notice is sent via first-class mail to the Grantee. If the Grantee fails to cure the default within the time prescribed by the State, State may do any of the following: 1) Declare the funding be immediately repaid, with interest, at the California general obligation bond interest rate at the time the State notifies the Grantee of the default. 2) Terminate any obligation to make future payments to Grantee. 3) Terminate the Grant Agreement. 4) Take any other action that it deems necessary to protect its interests. In the event State finds it necessary to enforce this provision of this Grant Agreement in the manner provided by law, Grantee agrees to pay all costs incurred by State including, but not limited to, reasonable attorneys' fees, legal expenses, and costs. 13. CONTINUING ELIGIBILITY. Grantee must meet the following ongoing requirement(s) to remain eligible to receive State funds: a) An urban water supplier that receives grant funds governed by this Grant Agreement shall maintain compliance with the Urban Water Management Planning (UWMP) Act (Water Code § 10610 et seq.) and Sustainable Water Use and Demand Reduction, Part 2.55 of Division 6 (Water Code § 10608 et seq.) by doing the following: 1) Have submitted their 2015 UWMP and had it deemed consistent by DWR. For more information, visit the following website: http://www.waterca.aoviurbanwatermanaaement. 2) By July 1, 2016, ail urban water suppliers must have submitted documentation that demonstrates they are meeting the 2015 interim GPCD target. If not meeting the interim Grant Agreement No. 4600012233 Page 7 of 71 target, also include a schedule, financing plan, and budget for achieving the gallons per capita per day (GPCD) target, as required pursuant to Water Code § 10608.24. Starting June 30, 2017, those urban water suppliers that did not meet their 2015 GPCD target must also submit, by June 30, annual reports that include a schedule, financing plan, and budget for achieving the GPCD target (Water Code § 10608.24). b) An agricultural water supplier receiving grant funding must: 1) Comply with Sustainable Water Use and Demand Reduction requirements outlined in Part 2.55 (commencing with § 10608) of Division 6 of the Water Code. 2) Have their Agricultural Water Management Plan (AWMP) deemed consistent by DWR. For more information, visit the following website: htto://www.water.ca.aov/wateruseefficiencv/agricultural/aamgmt.cfm. c) Grantees diverting surface water must maintain compliance with diversion reporting requirements as outlined in Part 5.1 of Division 2 of the Water Code. d) Grantee and Local Project Sponsors must demonstrate compliance with the groundwater compliance options set forth on pages 11 and 12 of the 2016 IRWM Program Guidelines, dated July 2016. e) Grantee and Local Project Sponsors that have been designated as monitoring entities under the California Statewide Groundwater Elevation Monitoring (CASGEM) Program must maintain reporting compliance, as required by Water Code § 10920 and the CASGEM Program. 14. PERMITS, LICENSES, APPROVALS, AND LEGAL OBLIGATIONS. Grantee shall be responsible for obtaining any and all permits, licenses, and approvals required for performing any work under this Grant Agreement, including those necessary to perform design, construction, or operation and maintenance of the Projects. Grantee shall be responsible for observing and complying with any applicable federal, state, and local laws, rules or regulations affecting any such work, specifically those including, but not limited to, environmental, procurement, and safety laws, rules, regulations, and ordinances. Grantee shall provide copies of permits and approvals to State. 15. RELATIONSHIP OF PARTIES. Grantee is solely responsible for design, construction, and operation and maintenance of projects within the work plan. Review or approval of plans, specifications, bid documents, or other construction documents by State is solely for the purpose of proper administration of funds by State and shall not be deemed to relieve or restrict responsibilities of Grantee under this Grant Agreement. 16. LABOR COMPLIANCE. The Grantee agrees to be bound by all the provisions of the Labor Code regarding prevailing wages and shall monitor all contracts subject to reimbursement from this Agreement to assure that the prevailing wage provisions of the Labor Code are being met. Current Department of Industrial Relations (DIR) requirements may be found at: htto://www.dir.ca.gov/Ico.aso. For more information, please refer to DIR's Public Works Manual at: htto://www.dir.ca.gov/dIse/PWManualCombined.gdf. 17. SUBMISSION OF REPORTS. The submittal and approval of all reports is a requirement for the successful completion of this Grant Agreement. Reports shall meet generally accepted professional standards for technical reporting and shall be proofread for content, numerical accuracy, spelling, and grammar prior to submittal to State. If requested, Grantee shall promptly provide any additional information deemed necessary by State for the approval of reports. Reports shall be presented in the formats described in the applicable portion of Exhibit G. The timely submittal of reports is a requirement for initial and continued disbursement of State funds. Grant Agreement No. 4600012233 Page 8 of 71 Submittal and subsequent approval by the State of a Final Report is a requirement for the release of any funds retained for such projects. a) Progress Report: Grantee shall submit progress reports quarterly to meet the State's requirement for disbursement of funds. The progress reports shall be sent via e-mail to the State's Project Manager and shall be uploaded into GRanTS at the frequency specified in EXHIBIT C (Schedule). The progress reports shall provide a brief description of the work performed during the reporting period including: Grantee's activities, milestones achieved, any accomplishments, and any problems encountered in the performance of the work under this Agreement. b) Accountability Report: Grantee shall submit, on a quarterly basis, an Accountability Report by individual Local Project Sponsor (if applicable) that at a minimum: 1) Includes an itemization of how advanced funds have been expended to date (Expenditure Summary), including documentation that supports the expenditures (e.g. contractor invoices, receipts, personnel hours, etc.). Invoices must be itemized based on the categories (i.e., tasks) specified in Exhibit B. 2) Includes a funding plan which shows how the remaining advanced funds will be expended. 3) Provides an accounting of distribution of the advanced funds to the appropriate Local Project Sponsor (if applicable). 4) Documents that the funds were spent on eligible reimbursable costs. 5) Documentation that the funds were placed in a non -interest bearing account, including the dates of deposits and withdrawals from that account. c) Final Report: Upon completion of the projects included in Exhibit A, Grantee shall submit to State a Final Grant Completion Report. The Final Completion Report shall be submitted within ninety (90) calendar days of completion of the projects. The Final Completion Report shall include a stakeholder summary; description of involvement activities and the projects developed from those activities; discussion of findings from the needs assessment, identification of ongoing barriers, and recommendations for future activities. Retention will not be disbursed until the Final Grant Completion Report is submitted to and approved by the State. d) Post -Performance Reports: Grantee shall submit Post -Performance Reports, if applicable. Post - Performance Reports shall be submitted to State within ninety (90) calendar days after the first operational year of a construction and implementation project has elapsed. This record keeping and reporting process shall be repeated annually for a total of 10 years after the completed project(s) begins operation. 18. OPERATION AND MAINTENANCE OF PROJECT. For the useful life of construction and implementation projects and in consideration of the funding made by State, Grantee agrees to ensure or cause to be performed the commencement and continued operation of each project, and shall ensure or cause each project to be operated in an efficient and economical manner; shall ensure all repairs, renewals, and replacements necessary to the efficient operation of the same are provided; and shall ensure or cause the same to be maintained in as good and efficient condition as upon its construction, ordinary and reasonable wear and depreciation excepted. The State shall not be liable for any cost of such maintenance, management, or operation. Grantee or their successors may, with the written approval of State, transfer this responsibility to use, manage, and maintain the property. For purposes of this Grant Agreement, Grant Agreement No. 4600012233 Page 9 of 71 "useful life" means period during which an asset, property, or activity is expected to be usable for the purpose it was acquired or implemented; "operation costs" include direct costs incurred for material and labor needed for operations, utilities, insurance, and similar expenses, and "maintenance costs" include ordinary repairs and replacements of a recurring nature necessary for capital assets and basic structures and the expenditure of funds necessary to replace or reconstruct capital assets or basic structures. Refusal of Grantee to ensure operation and maintenance of the projects in accordance with this provision may, at the option of State, be considered a breach of this Grant Agreement and may be treated as default under Paragraph 12, "Default Provisions." 19. STATEWIDE MONITORING REQUIREMENTS. Grantee shall ensure that all groundwater projects and projects that include groundwater monitoring requirements are consistent with the Groundwater Quality Monitoring Act of 2001 (Part 2.76 (commencing with § 10780) of Division 6 of California Water Code) and, where applicable, that projects that affect water quality shall include a monitoring component that allows the integration of data into statewide monitoring efforts, including where applicable, the Surface Water Ambient Monitoring Program carried out by the State Water Resources Control Board. See Exhibit H (Requirements for Statewide Monitoring and Data Submittal), for web links and information regarding other State monitoring and data reporting requirements. 20. NOTIFICATION OF STATE. Grantee shall promptly notify State, in writing, of the following items: a) Events or proposed changes that could affect the scope, budget, or work performed under this Grant Agreement. Grantee agrees that no change in the scope of a project will be undertaken until written notice of the proposed change has been provided to State and State has given written approval for such change. b) Any public or media event publicizing the accomplishments and/or results of this Grant Agreement and provide the opportunity for attendance and participation by State's representatives. Grantee shall make such notification at least 14 calendar days prior to the event. c) Final inspection of the completed work on a project by a California Registered Professional (Civil Engineer or Geologist, as appropriate), in accordance with Standard Condition D.19 in Exhibit D. Grantee shall notify the State's Project Manager of the inspection date at least 14 calendar days prior to the inspection in order to provide State the opportunity to participate in the inspection. 21. NOTICES. Any notice, demand, request, consent, or approval that either party desires or is required to give to the other party under this Grant Agreement shall be in writing. Notices may be transmitted by any of the following means: a) By delivery in person. b) By certified U.S. mail, return receipt requested, postage prepaid. c) By "overnight" delivery service; provided that next -business -day delivery is requested by the sender. d) By electronic means. Notices delivered in person will be deemed effective immediately on receipt (or refusal of delivery or receipt). Notices sent by certified mail will be deemed effective given ten (10) calendar days after the date deposited with the U. S. Postal Service. Notices sent by overnight delivery service will be deemed effective one business day after the date deposited with the Grant Agreement No. 4600012233 Page 10 of 71 delivery service. Notices sent electronically will be effective on the date of transmission, which is documented in writing. Notices shall be sent to the addresses set forth in Paragraph 23. Either party may, by written notice to the other, designate a different address that shall be substituted for the one below. 22. PERFORMANCE EVALUATION. Upon completion of this Grant Agreement, Grantee's performance will be evaluated by the State and a copy of the evaluation will be placed in the State file and a copy sent to the Grantee. 23. PROJECT REPRESENTATIVES. The Project Representatives during the term of this Grant Agreement are as follows: Department of Water Resources San Diego County Water Authority Arthur Hinojosa Maureen A. Stapleton Chief, Division of IRWM General Manager P.O. Box 942836 4677 Overland Avenue Sacramento CA 94236-0001 San Diego, CA 92123 Phone: (916) 653-4736 Phone: (858) 522-6781 Email: arthur.hinojosa@water.ca.gov Email: mstapleton@sdcwa.org Direct all inquiries to the Project Manager: Department of Water Resources San Diego County Water Authority Erik Goodman Mark Stadler Division of Integrated Regional Water Program Manager Management 4677 Overland Avenue P.O. Box 942836 San Diego, CA 92123 Sacramento CA 94236-0001 Phone: (858) 522-6735 Phone: (916) 653-4403 Email: mstadler@sdcwa.org Email: erik.goodman@water.ca.gov Either party may change its Project Representative or Project Manager upon written notice to the other party. 24. STANDARD PROVISIONS. The following Exhibits are attached and made a part of this Grant Agreement by this reference: Exhibit A - Work Plan Exhibit B - Budget Exhibit C - Schedule Exhibit D - Standard Conditions Exhibit E - Authorizing Resolution Exhibit F - Local Project Sponsors Exhibit G- Report Formats and Requirements Exhibit H- Requirements for Statewide Monitoring and Data Submittal Exhibit I- State Audit Document Requirements for Grantees Grant Agreement No. 4600012233 Page l 1 of 71 IN WITNESS WHEREOF, the parties hereto have executed this Grant Agreement. STATE OF CALIFORNIA DEPARTMENT OF W TER RESOURCES Arthur Hinojosa, Division of Integrated Regional Water Management Date Approved as to Legal Form and Sufficiency Rabin Brewer, Assistant Chief Counsel Office of Chief Counsel Date .2 - SAN DIEGO COUNTY WATER AUTHORITY Maureen A. tap 'ton General Manager Date 430 Grant Agreement No. 4600012233 Page 12 of 71 EXHIBIT A WORK PLAN This Work Plan describes the work to be performed (including deliverables) by San Diego County Water Authority ("Grantee") on behalf of the San Diego Funding Area (SDFA) for the Proposition 1 IRWM Disadvantaged Community (DAC) Involvement Grant Program. The associated general budget and schedule for this work are presented in Exhibits B and C, respectively. Within 30 days of the execution of the grant agreement with DWR, to assist DWR in tracking the work and reviewing and processing invoices, Grantee will submit to DWR a detailed budget and graphical schedule for each project described herein. The SDFA covers three distinct IRWM regions (San Diego, South Orange County, and Upper Santa Margarita Watershed). The SDFA covers a large area extending from Orange County in the northwest of the funding area to the United States -Mexico border at the south. Most of the areas in southern San Diego County qualify as either a DAC or an Economically Distressed Area (EDA). The SDFA Disadvantaged Community Involvement (DACI) work plan includes eleven (11) Projects that address DAC water management concerns within the Funding Area. The eleven Projects include: Grant Administration, DAC Needs Assessment, Groundwater Planning for DACs and Tribes in the Anza Valley Groundwater Basin, Groundwater Planning for Pauma Valley DACs and Tribes, Healthy Water for Forester Creek DACs, Alternative Non -Potable Water Supplies, Xeriscape Design, and Flood Prevention for DACs, Sediment Management for Tijuana River Valley DACs, Stormwater Quality for Grape Day Park DACs, Stormwater Quality for Paradise Valley DACs, Stormwater Quality for Escondido Creek DACs, Stormwater Quality for Chollas Creek DACs. The objective of the work plan is to increase DAC and Tribal involvement in Integrated Regional Water Management (IRWM) activities and opportunities. This work plan will address the water -related needs of the SDFA which include: water quality, water supply, urban flooding, infrastructure, cost of water, and cultural challenges. PROJECT 1: GRANT ADMINISTRATION LOCAL PROJECT SPONSOR: San Diego County Water Authority (SDCWA) PROJECT DESCRIPTION: Involves overall management and administration of the IRWM DAC Involvement grant agreement between SDCWA and DWR, including: disseminating and tracking grant compliance information with the LPS; obtaining, submitting (as requested) and retaining evidence of compliance (e.g., applicable California Environmental Quality Act/National Environmental Policy Act [CEQA/NEPA] documents, as applicable, reports, monitoring compliance documents, continuing eligibility requirements, etc.); assembling, reviewing and submitting quarterly progress reports and invoices to DWR; tracking the overall program budgets and expenditures and processing invoices and payments, as well as disseminating reimbursements to the LPS. Includes the following activities: 1. Grant Program Administration and Coordination. Includes processing the grant agreement between SDCWA and DWR. Agreement processing will also include individual agreements between SDCWA and the LPS, who will be responsible for completing their Activities as described here. This task also involves tracking and ensuring grant agreement compliance throughout the implementation period. SDCWA will serve as the primary liaison between the grantor (DWR) and LPS, and will periodically report to the Regional Advisory Committee (RAC) and the Tri-County FACC (Members of the San Diego, Upper Santa Margarita and South Grant Agreement No. 4600012233 Page 13 of 71 Orange County IRWM planning regions) on the grant's progress, payment status, and other relevant issues. 2. Reporting. In accordance with grant agreement requirements, SDCWA will compile quarterly progress reports from LPS and submit to DWR for review and approval. SDCWA will also compile quarterly accountability reports for those LPS receiving advance payment funds. SDCWA staff will ensure that reports meet generally accepted professional standards for technical reporting and the terms of the agreement with DWR and the LPS outlined in the funding and LSP agreements. This task will require coordination between SDCWA and LPS, as well as coordination between SDCWA and DWR. A grant completion report will be compiled at the end of the grant agreement period and submitted to DWR during agreement close-out. This completion report will include the DAC Needs Assessment produced under Project 2. 3. Invoicing. In accordance with grant agreement requirements, SDCWA will compile quarterly invoices from LPS and submit to DWR for review and approval. This includes collecting invoice documentation and compiling the information into a DWR Invoice Packet. 4. Budget Development and Monitoring. SDCWA will be responsible for monitoring and tracking the grant program's budget. SDCWA will also track advance funding payments and assist in expenditure reconciliation against those payments. 5. Webtool Development. SDCWA will establish a Webtool for this grant program. This task also includes development (including a purchase of server or hosting service, and/or other supplies, as needed) and monitoring and maintaining the Webtool site through the life of the grant. Deliverables: o Invoices and Backup Documentation o Quarterly Progress Reports o Grant Completion Report with DAC Needs Assessment PROJECT 2: DAC NEEDS ASSESSMENT LOCAL PROJECT SPONSOR: San Diego County Water Authority Project Partners: Members of the San Diego, Upper Santa Margarita and South Orange County IRWM planning regions, which cover the San Diego Funding Area. PROJECT DESCRIPTION: The DAC Needs Assessment must identify DAC needs across the SDFA. This project involves activities within the San Diego, South Orange County (SOC), Upper Santa Margarita Watershed (USMW) Regions to engage and involve DACs in defining their water management needs and determining how to ensure DAC involvement in the IRWM Program over the long term. The DAC Needs Assessment will include information from individual LPS in developing needs assessments for their targeted DACs. As part of their Planning Projects, LPS will be responsible for developing an understanding of DAC needs within their planning areas. This step is included within the outreach components of Project 3 through Project 11 of this proposal that creates a nexus with future implementation projects. The final step in development of the DAC Needs Assessment will be to compile the results from the regional and targeted efforts. Task 2.1: DAC, EDA, and URC Updates This task will define DACs, EDAs, and URCs. This component will include development of draft definitions by the RWMGs of such terms as isolated communities, financial hardship, and URCs. This task involves development of geographic information system (GIS) shapefiles for DACs, EDAs, and Grant Agreement No. 4600012233 Page 14 of 71 URCs within the SDFA. A GIS specialist will use local population data, land use, and other data as appropriate, to create shapefiles showing the location of isolated communities, communities with financial hardship, and underrepresented communities. These shapefiles will be combined with data from the DWR DAC and EDA mapping tools to create a map of DACs, EDAs, and URCs within the SDFA. As part of their Proposition 1 2016 IRWM Planning Grant, the San Diego IRWM Region will define DACs, EDAs, and URCs to help update information in the IRWM Plan. (This work will not be reimbursable under this Grant Agreement). Following incorporation of feedback from the project partners, a refined set of definitions and maps will be presented to the stakeholder groups appropriate to each IRWM region. Following input from stakeholders, these definitions will be refined, finalized, and approved. Task 2.2: DAC, EDA, and URC Outreach Targeted outreach is required to identify the needs of EDAs and URCs, and revisit DAC needs at the community level. The 2013 San Diego IRWM Plan presents DAC needs by Urban and Rural DACs, but not on the community level. As part of their Proposition 1 2016 IRWM Planning Grant, the San Diego IRWM Region will host a series of three (3) workshops for DACs, EDAs, and URCs to help update information in the IRWM Plan. (This work will not be reimbursable under this Grant Agreement). The purpose of these workshops will be to identify water -related issues within the communities that are highest priority. The DAC Needs Assessment Table will serve as the guiding document for the discussion. Task 2.3: Identify and Map DAC Locations and Demographics After the location of the DACs, EDAs, and URCs has been determined, the team will complete mapping to show the location of each community in the SDFA. This scope assumes that mapping will be completed using existing GIS files as a starting point, and that the team will not need to manually digitize the location of any identified communities. The mapping data will include: median household income, population size, age characteristics, ethnicity, etc. for each community. A technical memorandum (TM) will be created with the results of DAC characterization, which will establish the location of the communities to be targeted for further DAC outreach. TM results will be presented to the Tri-County FACC for review and comment. Task 2.4: Identify DAC Contacts After DAC communities have been identified throughout the SDFA, the team will review the existing IRWM stakeholder lists for each region to identify potential organizations and contacts for the identified DACs. If an existing contact cannot be determined for each community, the team will reach out to known organizations to identify an appropriate contact for each community. For this task, it is assumed that the team will partner with at least one non -governmental organization (NGO) in each IRWM region to gather input on the stakeholder list, and gather additional DAC contacts that are not currently included in stakeholder lists. The draft list of DAC contacts will be presented to the Tri-County FACC to gain additional stakeholder input on DAC contacts. Once the final list of DAC contacts has been identified, the team will work with the identified NGOs to prepare a letter that will be sent to each contact, explaining the DAC outreach efforts and DAC Needs Assessment. The letter will ask if the organization is interested in receiving a Speakers Bureau presentation. Task 2.5: Conduct Speakers Bureau Presentations Once DAC contacts have been notified, the team will work with one academic partner and/or one NGO partner in each IRWM Region to prepare for a series of Speakers Bureau presentations. The team will develop a draft Speakers Bureau presentation that will be provided to the RWMGs for Grant Agreement No. 4600012233 Page 15 of 71 review and comment. Once the presentation is finalized, the team will work together to identify organizations and schedule Speakers Bureau presentations. This scope assumes that the consultant team will be responsible for scheduling Speakers Bureau presentations, but that the presentations themselves will be delivered by an RWMG staff member, the academic partner, and/or the NGO partner. An RMC team member will be present during each presentation to record notes from the meeting. This scope assumes that up to 25 Speakers Bureau presentations will take place; up to 15 in the San Diego IRWM Region, and up to 5 each in the SOC and USMW IRWM Regions. Task 2.6: Complete Needs Assessment The team will work with the academic and/or NGO partner organizations to conduct a review and analysis process of information received for the regional DAC Needs Assessment to quantitatively identify the most critical issues based upon factors identified by the team and approved of by the project partners. All this information will be compiled into an Administrative Draft DAC Needs Assessment for review and approval by the Tri-County FACC. The team will incorporate Tri-County FACC input into a Draft DAC Needs Assessment that will be provided to the stakeholder group for each IRWM Region and the identified DAC contacts for review and input. The team will compile comments received on the regional DAC Needs Assessment, and will review the comments with the stakeholders. Critical comments will be addressed and the team will complete a Final Needs Assessment. The regional DAC Needs Assessment will be structured to meet DWR's requirements associated with the 2016 DAC Grant per terms of the grant agreement with DWR, but will also include information that is useful to each IRWM Region for future outreach and engagement efforts, including input and feedback received by stakeholders during the review process. As part of their project completion reports, individual LPS will develop a writeup about the water - related needs of their targeted DACs. The results of the issues analysis will also be used to develop DAC "water stories" that showcase DAC water issues and how they can potentially be addressed by grant -funded projects. The DAC "water stories" will be compiled into a stand-alone report that is a companion to the IRWM Plans on each region's website. Deliverables: DAC/EDA/URC Definitions Agenda for up to three DAC, EDA, and URC Outreach Workshops (San Diego IRWM Region) DAC Characterization Technical Memorandum Refined DAC contact lists for San Diego, SOC, and USMW Regions Final Speakers Bureau Presentation Final SDFA DAC Needs Assessment Final DAC Water Stories PROJECT 3: GROUNDWATER PLANNING FOR DACS AND TRIBES IN THE ANZA VALLEY GROUNDWATER BASIN LOCAL PROJECT SPONSOR: Ramona Band of Cahuilla Project Partners: U.S. Geological Survey (USGS), Santa Margarita River Watershed Watermaster (Watermaster) Grant Agreement No. 4600012233 Page 16 of 71 PROJECT DESCRIPTION: This project will build on a prior Anza DAC Groundwater Study, funded through the USMW IRWM Program and conducted by USGS, by conducting necessary studies to characterize the hydrogeology of the Anza-Cahuilla Groundwater Basin. In recent years, the Basin has experienced additional water demands due to increases in pumping, continued residential growth, and pending commercial development. This project will enable sole -source groundwater supplies for a rural DAC and two Native American Tribes to be managed on a sustainable basis. As part of the hydrogeological studies, a conceptual hydrogeological framework will be updated and a pilot surface and borehole geophysical investigation will be conducted. As part of the quantification of the hydrologic budget, studies will be conducted to collect hydrologic data such as recharge and return flows, groundwater level, tributary inflows, and land use. DAC outreach during the groundwater studies will include a partnership with the Anza Groundwater Association (AGWA) to jointly host several community outreach meetings. Stakeholder feedback generated during the community outreach meetings will be shared with the USMW IRWM to aid in the development of the area's DAC Needs Assessment. Task 3.1: Project Management Project 3 involves grant administration tasks such as reporting and invoicing; completion of required documentation to receive advance funding; completion of quarterly accountability report for advance funding; quarterly progress reports and compilation of invoices from contractors, vendors, and consultants; and submission to SDCWA's Webtool. The Ramona Band of Cahuilla will coordinate with SDCWA to revise submission documents/invoices as necessary. The final step in Task 3.1 is preparing a Project Completion Report. This task also includes development of the Targeted DAC Needs Assessment for the DAC, EDA, and URC communities targeted by this Project. Deliverables: Quarterly Advanced Funding Accountability Report Quarterly Invoices and Back-up Documentation Quarterly Progress Reports Project Completion Report Targeted DAC Needs Assessment for Project 3 Communities Copy of Sovereign Immunity Waiver for Site Auditing Purposes Task 3.2: DAC Outreach DAC outreach will include a partnership with the AGWA to jointly host several community outreach meetings. Stakeholder feedback generated during the community outreach meetings will be shared with the USMW IRWM to aid in the development of the areas DAC Needs Assessment. Deliverables: Agenda for up to two DAC Outreach Workshops Task 3.3: Planning Activities under this task include development of a hydrogeological framework and quantification of a hydrologic budget for the Anza-Terwillinger Groundwater Basin. Subtask 3.3.a: Update and Summarize the Conceptual Hydrogeological Framework The previous USGS study of the Anza-Terwillinger Area defined the thickness and characteristics of the alluvial sediments that are the main part of the aquifer system and identified where wells completed in the underlying fractured bedrock are located. Although Grant Agreement No. 4600012233 Page 17 of 71 the fractured bedrock is an important part of the aquifer system, the thickness and hydraulic characteristics of the fractured bedrock are not well understood. Under Subtask 3.3.a, analysis of data from drillers' logs or other sources of information on water level response to pumping in wells, vertical distribution of well open intervals, and bedrock descriptions will be used to improve characterization of the location and thickness of fractured bedrock. This information will be combined with the previously collected information on basin characteristics of the alluvial aquifer system to update and summarize the overall conceptual hydrogeologic framework and make decisions about where new geophysical data collection and future research drilling is needed. Subtask 3.3.b: Conduct Surface Geophysical Study Based upon the analysis in Subtask 3.3.a, new borehole geophysical log data will be collected from selected existing wells with polyvinyl chloride (pvc) casing and access for geophysical tools. The borehole geophysical logging could be used to measure detailed profiles of sediment and bedrock permeability and porosity (potentially including collection of resistivity, gamma, nuclear magnetic resonance, and borehole flow) that are currently lacking in the basin. In addition, surface geophysical data, which could include seismic, resistivity, or electromagnetic methods, will be collected in selected areas to develop spatial understanding of the thickness of fractured bedrock and its relation to proximity to faults and other structural features. Better understanding the spatial distribution of fractured bedrock aquifers will be necessary to include these aquifers in future groundwater flow models. Subtask 3.3.c: Collect and Evaluate Groundwater Level Data This subtask will include the installation of pressure transducers, along with data collection and analysis by USGS hydrologists. Data will be collected over a period of approximately one year, with regular visits to the wells made by USGS staff to retrieve the data. Additional groundwater level measurements across the basin need to be collected to map how groundwater levels vary across the basin and with time in response to changes in water use and climatic fluctuations, particularly following the recent extended drought. Continued measurements in wells with water -level data extending back to the 1940s and 1950s are particularly valuable to evaluate Tong -term trends. The groundwater level monitoring data are essential to calibrate a groundwater flow model planned for the future. Subtask 3.3.d: Install Gaging Stations and Analyze Flows This subtask will install a stream gage, a crest stage gage, and streambed sensors, along with data collection and analysis by USGS hydrologists. Data will be collected over a period of approximately one year, with regular visits to the wells made by USGS staff to retrieve the data. Historical streamflow data in the study area are sparse. There are no streamflow gaging stations in the basin that have been active since the 1950s. Streamflow is generally ephemeral. Under Subtask 3.3d, a streamflow gaging station will be installed, to collect and define surface flow in the basin. Streamflow response to rainfall, snowmelt, and irrigation return events is vital to calibrate runoff and recharge models of the watershed, which in turn are key inputs to the groundwater flow model. Because streamflow gaging stations cannot be deployed at all locations where information on stream runoff is needed, cost-effective proxy measurements of streamflow duration, infiltration, and peak stage will be used to estimate streamflow and recharge in the distributed drainage network. These measurements can be made at dozens of sites as a complement to continuous streamflow measurements at a single integrator site on Cahuilla Creek. A Grant Agreement No. 4600012233 Page 18 of 71 combination of streambed electrical resistance sensors to measure streamflow duration, streambed temperature profiles to estimate stream infiltration, and crest stage gages to record peak stream stage will be used to estimate how runoff and recharge from streamflow vary across the basin and to improve the accuracy of watershed models to simulate these flows. Subtask 3.3.e: Analyze Land Use Changes This subtask will analyze land use changes in the basin. The project's partners and consultants will obtain and interpret aerial surveys, satellite imagery, and geographic information system data from various sources to map how land use has changed over time in the study area. This information will directly contribute to models used to simulate recharge and runoff. Subtask 3.3.f: Update Watershed Model A watershed model, the Basin Characteristic Model (BCM) that simulates monthly recharge and runoff was updated and refined as part of the recent USGS study in the Anza study area. However, only reconnaissance analysis was done because this model was not well constrained due to the absence of streamflow or streamflow location and duration data, or independent estimates of where recharge from streams may occur. This subtask will further update the model with the data developed under Subtasks 3.3.a through 3.3.e. Subtask 3.3.g: Analyze Evapotranspiration and Groundwater Outflow Using the updated conceptual hydrogeological models, new data collected in this study, and estimates of evapotranspiration from crop coefficient models and/or satellite imagery, estimates of evapotranspiration from natural and irrigation landscapes will be calculated for the basin. These estimates of evapotranspiration and other groundwater outflow will be compared to recharge estimates to develop a better constrained understanding of the water budget. These estimates will provide input to a groundwater flow model developed as part of future study phases for simulating the groundwater system. Subtask 3.3.h: Prepare Baseline Study Report A Baseline Study Report will be published describing the results of Subtasks 3.3.a through 3.3.g. The Baseline Study Report will inform groundwater managers about the basin and form the basis for the next phase of basin studies. This effort will support sustainable management of the basin by answering critical questions regarding basin hydro -geography necessary to understanding sustainable levels of use. One or more USGS data releases that include data collected for the study will be published. Some of the data collected will be available from the publicly accessible USGS National Water Information System website. All reports and data will be available from public websites. Deliverables: Analysis of data from drillers' logs Updated summary of the conceptual hydrogeological framework Technical memorandum on pilot surface and borehole geophysical investigation Analysis of land use based on aerial surveys Updated Basin Characteristic Model Evapotranspiration estimates Baseline Study Report Grant Agreement No. 4600012233 Page 19 of 71 Public meeting materials PROJECT 4: GROUNDWATER PLANNING FOR PAUMA VALLEY DACS AND TRIBES LOCAL PROJECT SPONSOR: County of San Diego Project Partners: Yuima Municipal Water District and Lazy H Mutual Water Company PROJECT DESCRIPTION: The County of San Diego (County), Yuima Municipal Water District (Yuima MWD), and their local partners are leading efforts in creating a more reliable drinking water supply source for the DACs in Pauma Valley. As local groundwater aquifers are depleted, DACs in the area become more vulnerable to water resource issues. This issue is being addressed in two ways: (1) development of a Groundwater Sustainability Plan (GSP) and (2) the consolidation of Lazy H Mutual Water Company (Lazy H MWC) with Yuima MWD. The Sustainable Groundwater Management Act of 2014 (SGMA) mandates that the San Luis Rey Valley Groundwater Basin (SLRVGB) be managed sustainably by 2042. SGMA requires that a Groundwater Sustainability Agency (GSA) be formed by June 30, 2017 and a Groundwater Sustainability Plan (GSP) be developed by 2022. With input from stakeholders and the community, the formation of a multi -agency GSA for the SLRVGB is nearing completion. Stakeholder outreach and community engagement will continue to be an important component of GSP preparation within an area containing DACs. Once the GSA is formed, a consultant will be hired to prepare a GSP that complies with SGMA and the Emergency Regulations. The formation of a multi -agency GSA with the County of San Diego, Yuima MWD, and local agencies will have laid the foundation for developing a GSP that will increase the reliability of the region's water supply by effectively and efficiently managing the local groundwater aquifers. In conjunction with development of the GSP, the Lazy H MWC shareholders have requested Yuima MWD to assist in a study for ultimate consolidation of their aging water system. The Lazy H MWC is a small DAC community consisting of 42 parcels and 40 shareholders/property owners. They depend on the water supply from two groundwater wells that are 53 and 36 years old, respectively, and are experiencing historically low ground water levels due to the extended drought, as well as water quality issues. The small Lazy H community does not have the resources to identify all the necessary steps for consolidation and are concerned that their small mutual water company may not have the resources or ability to be able to supply a safe and sustainable water supply to their community. The Lazy H community requested assistance in developing a consolidation, design, and funding plan for the long-term sustainably of their community's water supply, including the necessary documents to get them to the point of shovel ready plans and specifications to move this project forward. The Lazy H MWC and community has reached out for assistance in identifying funding for DACs and assistance identifying the required system consolidation regulatory approvals (Yuima MWD, Local Agency Formation Commission [LAFCO], and Health Department), improvements, and construction. Yuima MWD is the only Public Agency in the Pauma Valley area with staff that can assist them through this process. Yuima MWD staff has requested support from the County to implement this grant while Yuima MWD will work with consultants to provide a feasibility study and construction documents that will identify the steps and lead the way to consolidation of the water systems. Task 4.1: Project Management Project management activities involve grant administration tasks such as reporting and invoicing. Task 4.1 will include all reporting and invoicing related to both GSP Development and Lazy H MWC consolidation. Activities under this task include completion of required documentation to receive advance funding; completion of quarterly accountability report for advance funding; quarterly Grant Agreement No. 4600012233 Page 20 of 71 progress reports and compilation of invoices from contractors, vendors, and consultants; and submission to SDCWA's Webtool. The County of San Diego will implement this task and coordinate with Yuima MWD and SDCWA to revise submission documents/invoices as necessary. The final step in Task 4.1 is preparing a Project Completion Report. Deliverables: Quarterly Accountability Report Quarterly Invoices and back-up documentation Quarterly Progress Reports Project Completion Report Task 4.2: DAC Outreach Outreach activities listed in these sections include community outreach for GSP development and Lazy H consolidation. Subtask 4.2.a: Community Outreach - GSP The County will conduct stakeholder outreach and community engagement activities during GSP preparation. The County will first prepare background materials on SGMA implementation and the GSP process. Outreach and Executive Team meetings will be held with local agencies and the public to discuss components of the GSP, incorporate input and recommendations, and determine next steps to successfully implement SGMA in the SLRVGB. These meetings will help to develop a consensus approach on moving forward with necessary projects and management actions to ensure sustainable groundwater management. Due to the large number of stakeholders and organizations with an interest in the basin, including Tribes, private pumpers, and mutual water companies, outreach efforts are anticipated to be extensive, with quarterly outreach meetings conducted for the duration of the planning Project. Subtask 4.2.b: Community Outreach - Lazy H Consolidation Similar to the GSP outreach process, background material and presentations will be prepared by Yuima MWD for three community meetings with property owners/shareholders. The meetings will help to identify current issues for Lazy H MWC stakeholders (see description under "Current Conditions in the Planning Area and Impacts to DACs" above), and the benefits for consolidation with Yuima MWD. The scope of services, time requirements and proposal requirements for the Feasibility Study Request for Proposal. Deliverables: o Presentation materials for GSP preparation and SGMA implementation (assumes quarterly public meetings) o Confirmation of successful vote of the shareholders for a Consolidation Feasibility Study Task 4.3: Planning All activities under Task 4.3 are considered planning activities that will help to develop groundwater sustainability projects, prepare project schedules, and determine budgets required for GSP implementation. Subtask 4.3.a: Existing Data Compilation and Assessment This subtask will include collection and assessment of data from all available sources to aid in development of the GSP. Data could include, but is not limited to, local and regional reports, plans, studies, models, existing well information, basin condition information, pumping records, Grant Agreement No. 4600012233 Page21 of71 groundwater elevation data, surface and groundwater quality data, stream gauging data, precipitation records, water rights summary, water demand (including historic use), groundwater contamination, prior water budgets, subsidence records, and other information pertinent to GSP development. A technical memorandum will be prepared to summarize the data assessment. Subtask 4.3.b: Water Level and Quality Data The County will lead the effort to conduct quarterly water level monitoring and semi-annual water sampling/analysis of wells in the groundwater monitoring network in the Pauma and Pala Sub basins. These data will be used to inform the GSP. Subtask 4.3.c: Water Budget This subtask will develop the hydrogeologic flow model/water budget for the Pauma and Pala Subbasins to simulate current conditions in the groundwater system regarding water levels and water quality to be used for the development of a hydrogeologic flow model to predict future impacts. This water budget is a critical component of the GSP, and forms the basis for understanding sustainable use of the groundwater basin. Subtask 4.3.d: Feasibility Study and Consolidation Process Steps and Timeline Yuima Staff will complete a Request for Proposal for a Consolidation Feasibility Study and will identify all necessary steps and associated fees for consolidation including regulatory review such as LAFCO. A conceptual level improvement plan and costs will be developed as part of this study. Deliverables: o Memo on Existing Data Assessment o Water Level and Quality Data o Water Budget o Request for Proposal for Feasibility Study o LAFCO Approval Timeline o Conceptual Improvement Plan o Consolidation Budget Task 4.4: Stakeholder Consolidation Vote Subtasks included under the stakeholder consolidation vote consist of the presentation of the final consolidation feasibility study and a stakeholder vote on consolidation approval. Subtask 4.4.a: Feasibility Study Presentation The Feasibility Study consultant team will present the study to the Lazy H Board of Directors and Stakeholders for review. Once reviewed, the stakeholders will have an opportunity to ask clarifying questions, if necessary, to fully understand all benefits, and any ramifications resulting from consolidation. Subtask 4.4.b: Stakeholder Vote Once the study has been presented and thoroughly reviewed by the Board and Stakeholders Yuima staff will conduct a vote to determine if the stakeholders would like to move forward with the consolidation process or remain independent from the Yuima Municipal Water District. Grant Agreement No. 4600012233 Page 22 of 71 Deliverables: o Final Feasibility Study PROJECT 5: HEALTHY WATER FOR FORESTER CREEK DACS LOCAL PROJECT SPONSOR: San Diego River Park Foundation (SDRPF) Project Partners: Earth Discovery Institute and California Polytechnic University Pomona's Studio 606 or Similar Program PROJECT DESCRIPTION: In order to prevent water quality issues and to increase engagement of the DACs living in the Forester Creek watershed in the City of El Cajon, investment is needed to evaluate and plan for best practices for illegal trash and dumping prevention. Project 5 will utilize a variety of DAC involvement tools to better understand the trash issues within the watershed and identify long- term solutions for addressing them: Organize a stakeholder committee, including community members and agency representatives, to engage and empower community members in the process of evaluating needs and future projects. Engage partners from the community using culturally appropriate, innovative strategies for addressing trash and lack of recreation. Hold trainings to engage community volunteers in on -the -ground source identification assessments. Teams of volunteers'will assess quantities and types of trash entering the creek as dumping, stormwater debris, litter, homeless encampment debris, and other categories as needed. Documentation and analysis will take place at seasonal field assessments along the creek, and following major storm flushing events. Sorting and weighing of trash and debris will provide valuable data for planning future trash capture and prevention projects. These data will be compared to data along the main stem of the San Diego River both upstream and downstream of the confluence with Forester Creek, to evaluate impact on downstream communities and opportunities for collaboration. Complete a Recommendations Report with community priorities. Conduct community outreach and surveys to assess and document community -defined recreation needs. In order to plan for future recreational and nature interpretation on the creek, we must understand current community preconceptions or awareness levels. Conduct targeted surveys in Title 1 schools in El Cajon to evaluate youth understanding of water resource issues. Through this planning project, we will identify opportunities for future projects to address both sides of this issue: Reduce threats and stressors to water quality related to trash issues through development of more effective trash capture and prevention and increased community participation in the project process. Reconnect the community to the creek through plans for increased recreational resources and interpretive outings. Planning will focus on developing needs assessment and current level of awareness through community surveys and outreach. Using this data, we will synthesize preliminary recommendations and existing Best Management Practices (BMPs) for non -contact water -based recreation opportunities, such as wildlife viewing areas or other needs as defined by the community. Ultimately, we believe that this effort will also lead to a reduction in threats and stressors as community members become more engaged in stewardship. Task 5.1: Project Management Grant Agreement No. 4600012233 Page 23 of 71 Task 5.1 involves quarterly reporting to SDCWA and DWR on project progress, as well as preparation and submission of a Project completion report. Activities under this task include preparation and submittal of materials that may be required for grant execution. This task also includes development of the Targeted DAC Needs Assessment for the DACs targeted by this Project. This task also involves preparation and submittal of materials to secure advance payment. All advanced payment reporting and invoicing activities will occur under this subtask. Deliverables: o Quarterly Accountability Reports o Quarterly Progress Reports o Quarterly Invoices o Targeted DAC Needs Assessment for Project 5 o Project Completion Report Task 5.2: DAC Outreach This task includes activities required for direct outreach and community engagement within the San Diego River Watershed to assist with identification of pollution and recreational access needs along Forester Creek. This task comprises three subtasks, each geared to raise awareness of Forester Creek and actively engage individuals within the surrounding DACs. Subtask 5.2.a: Community Stakeholder Group This subtask involves organizing and facilitating community stakeholder meetings to determine community needs related to pollution and recreational access to Forester Creek. It will also involve communication, outreach, and public education within the El Cajon community about the proposed activities via existing mechanisms (social media, emails, websites, and flyers). Surveys targeting DAC residents in El Cajon will be conducted to inform the stakeholder group as well as planning activities under Task 5.3. Subtask 5.2.b: Field Assessments and Surveys This subtask involves conducting field assessments and surveys with trained volunteers to collect, sort and weigh trash and debris in and around Forester Creek to determine sources. Volunteers will be solicited from within El Cajon DACs and trained by SDRPF staff. Existing trained volunteers will also provide training and peer leadership. Data from these assessments will be incorporated into SDRPF's existing database, which will also be updated to address the needs of these assessments. Subtask 5.2.c: Education Subtask 5.2c will provide outreach and education through local schools. In cooperation with Earth Discovery Institute, SDRPF will engage community teachers at Title I schools and conduct a minimum of six field trips to engage youth in watershed management. SDRPF will conduct targeted surveys in Title 1 schools in El Cajon to evaluate youth understanding of water resource issues. Deliverables: o Survey results about community awareness and perceptions of Forester Creek o Analysis of source identification for trash and illegal dumping in Forester Creek o Community volunteer records Grant Agreement No. 4600012233 Page 24 of 71 o Survey results documenting youth understanding of water resource issues Task 5.3: Planning Task 5.3 includes two subtasks to develop planning documents to lay the foundation of future improvements to Forester Creek. These documents will evaluate and assess opportunities and mechanisms for reducing trash loading and improving recreational opportunities, especially for residents of surrounding DACs. Subtask 5.3.a: Trash Capture and Reduction Plan Development Subtask 5.3.a will utilize a consultant to develop an actionable plan to reduce threats and stressors to water quality in Forester Creek that are related to trash issues. The Trash Capture and Reduction Plan will develop more effective trash capture and prevention measures, and will incorporate the results of the field assessments and inputs from the community stakeholder group (Subtasks 5.2.a and 5.2.b). Subtask 5.3.b: Recreational Access Plan Development Under this subtask, SDRPF will partner with Cal Poly Pomona's Studio 606 program or similar program to develop an actionable Recreational Access Plan for Forester Creek, based on inputs received during the activities in Task 5.2, and an analysis of relevant data and community needs. Deliverables: o Trash and Capture Reduction Plan o Recreational Access Plan PROJECT 6: ALTERNATIVE NON -POTABLE WATER SUPPLIES, XERISCAPE DESIGN, AND FLOOD PREVENTION FOR DACS PROJECT SPONSOR: University of California San Diego - San Diego Bioregional Center for Sustainability Science, Planning and Design (UCSD BRC) Project Partner: San Diego Housing Commission (SDHC) PROJECT DESCRIPTION: UCSD and SDHC have partnered to engage DAC residents in the design of effective use of alternative non -potable water supplies while also expanding the understanding of the safety of the appropriate use of non -potable water. This Planning Project will develop completed designs, cost estimates and permitting for water resilient landscapes on SDHC properties, as well as designs, cost estimates and permitting preparation for implementation of water resilient landscapes and alternative non -potable reuse systems on sites in Chula Vista and Imperial Beach. These designs will integrate alternative non -potable water supplies and drought- and flood -resistant features into community greenspace, urban agriculture, and green infrastructure. SDHC estimates that the average monthly demand for irrigation water at its properties in mapped DACs is 1.5 million gallons per month during peak use. This estimate used a base average of irrigation meter data (where available), overall water uses at the properties, and property type. SDHC estimates that a 55% reduction in irrigation is possible. If the plans produced by this Project are implemented across all 81 SDHC sites in DACs, savings could be as high as 825,000 gallons per month. Reductions in irrigation water needs have also been shown to reduce site runoff volumes and conveyance of pollutants into nearby water bodies. Additionally, the effort will help to promote alternative non -potable water reuse at multi -family sites. Grant Agreement No. 4600012233 Page 25 of 71 Task 6.1: Project Management This task includes activities required for grant administration, reporting, and invoicing for the work that will be completed under Task 6. Subtask 6.1.a: Reporting and Invoicing UCSD BRC will prepare and submit initial and quarterly reporting to SDCWA and DWR on project progress. This task will also include entering into a project sponsor agreement with SDCWA, as well as preparation and submittal of documentation required for grant execution. UCSD BRC will also prepare and submit initial and quarterly invoicing to SDCWA for submittal to DWR. This includes reviewing invoices from project partners and contractors, and preparing invoice packages compliant with grant agreement requirements, as well as submittal of the invoice package to SDCWA's online Webtool. Subtask 6.1.b: Targeted DAC Needs Assessment UCSD BRC and the grant partners will prepare a joint Targeted DAC Needs Assessment report identifying DAC issues and strategies emerging from this Project. This needs assessment will be developed based on the results of coordination efforts with the cities of Imperial Beach and Chula Vista, as well as engagement activities with the DAC residents in SDHC's properties within the City of San Diego. The "community weaving" process described in Subtask 6.2c and the engagement with SDHC residents in Subtask 6.2.d will inform the Targeted DAC Needs Assessment. Subtask 6.1.c: RFP Development and Contractor Selection SDHC will lead preparation and issuance of a Request for Qualifications (RFQ) for engineering design, landscape architecture, and permitting services from qualified consultants. It is anticipated by UCSD and SDHC that one consultant or consultant team will be hired to be part of the design and community engagement process, and to prepare the documentation described in this scope of work. This consultant or consultant team would be involved with these efforts for SDHC properties as well as the sites in Imperial Beach and Chula Vista. The final contract agreements with the selected consultant team will specify the level of effort and project management structure for each component of the project, to ensure consistency with this work plan and budget, and the project deliverables. Deliverables: o Quarterly Progress Reports o Quarterly Invoices and Backup Documentation o Targeted DAC Needs Assessment for Project 6 o Completion Report o RFP for Engineering Design, Landscape Architecture, and Permitting Services o Executed Contract with Contractor o Planning Project Completion Task 6.2: DAC Outreach Task 6.2 Outreach includes extensive, robust outreach in target DACs (includes EDAs and URCs in SDHC housing). The four proposed subtasks will actively engage DACs with the planning activities to lay the groundwork for effective implementation of the plans in future projects. This task is also Grant Agreement No. 4600012233 Page 26 of 71 designed to ensure DACs understand the benefits of implementing the plans, as well as to solicit input from DACs regarding their needs. Subtask 6.2.a: DAC Needs Assessment Presentations to RAC The project partners will prepare and deliver presentations to the San Diego IRWM Program's Regional Advisory Committee (RAC) at one or more of the RAC's regularly held stakeholder meetings. Subtask 6.2.b: Public Health - Project Dissemination A consultant will lead dissemination efforts on the public health aspects of alternative uses of non -potable water. Project partners will assist with this effort as appropriate based on the audience and objectives of different dissemination methods. Venues for information dissemination will include conferences, regulator round -tables, municipal permitting staff, the engineering and design community, and agencies active in DACs. Subtask 6.2.c: Outreach - Identify Community Engagement and Reuse Opportunities in Chula Vista and Imperial Beach Subtask 6.2.c includes outreach efforts specifically targeting DACs in the cities of Chula Vista and Imperial Beach. Chula Vista has large areas that qualify as DACs, and most of its population are minority populations that may be considered URCs. Imperial Beach qualifies as a DAC, and is also home to primarily minority populations. This targeted outreach includes three components, described here as Subtask 6.2.c-1 though Subtask 6.3.c-3. Subtask 6.2.c-1: Chula Vista and Imperial Beach - Meet with City Leadership, Community Groups, and Collaborators to Identify Opportunities UCSD BRC will convene meetings with leadership in the cities of Chula Vista and Imperial Beach. In each city, a team will work with City leadership to identify sites and community groups within mapped DACs that offer potential application of alternative non -potable water supply, focusing on laundry -to -landscape greywater, rainwater harvesting for urban agriculture, and stormwater for greenspace. Each city has already identified several potential sites and community groups that will be narrowed down during this Project. SDFSA will also provide knowledge regarding existing and potential urban agriculture sites and community organizations, while affordable housing developers in each City will be contacted to help identify potential projects and sites where alternative non -potable reuse systems can be incorporated to act as pilot locations. Subtask 6.2.c-2: Chula Vista and Imperial Beach - Conduct Outreach and Community "Weaving" Process with Candidate Areas and Sites A consultant will lead community engagement with identified community groups or neighborhood areas selected in Imperial Beach and Chula Vista under Subtask 6.2.c-1, and will act as the primary liaison and facilitator for work with the identified neighborhoods, organizations, and potential project sites. All sites identified in Subtask 6.2.c-1 are expected to be DACs in Imperial Beach and Chula Vista. Outreach completed under Subtask 6.2.c-2 will work with key individuals in the targeted communities, who will act in the interest of their communities and as appropriate would lend credibility to the outreach and engagement efforts being undertaken by the project partners. This process is referred to as "weaving" because it works in and through the existing information pathways, organizations, and social/leadership structures within a community. The consultant will lead the weaving process, which begins by identifying leaders and organizations who are credible and reliable sources of information. Discussion and planning with these leaders yields key insights on what community Grant Agreement No. 4600012233 Page 27 of 71 members know or do not know about issues such as urban agriculture, water conservation, and non -potable reuse; their limitations in participating (e.g. transit access, food access, costs, etc.); their likely concerns; and the best methods of drawing people together to learn and become actively engaged in the process of design and management of urban green spaces and water systems. As has been the case at UCSD's Ocean View Growing Grounds site in a disadvantaged area of San Diego, SIO staff will provide science communication and support regarding water systems, soil systems, and urban applications of alternative non -potable water supplies in the context of community engagement. SDFSA will provide support for engagement related to urban agriculture applications. The selected engineering design/landscape architecture contractor also will be engaged to provide input on alternatives, design constraints or considerations. Once initial options for sites and projects are identified, Global ARC will provide community engagement such as attending community meetings, organizing "field days" and site walks, and providing survey and input opportunities for residents and organizations. Subtask 6.2.c-3: Chula Vista and Imperial Beach - Conduct Site Visits and Provide Science Translation from Public Health Process A consultant and UCSD BRC will facilitate direct contact with DAC community members and working group leadership teams, as well as the designers, installers and operators of alternative non -potable water systems in San Diego to allow residents, stakeholders, and design support professionals to visit existing installations, understand cost and maintenance issues, and learn from the community's experience. We will use the "weaving" process described in Subtask 6.2.c-2 above to determine the sites, timing, and content of the site visits and science translation activities. Visits are anticipated to include "field days" and tours of properties where greywater, rainwater harvesting, and stormwater biofilters are in place, including sites on the UCSD and SIO campuses, at single-family homes in North Park, and elsewhere in the region. This will provide a direct peer -to -peer and community -building opportunity helpful to address concerns and "unknowns" about alternative non -potable systems. Subtask 6.2.d: Outreach - Identify Water Conservation and Reuse Opportunities on SDHC Properties This subtask focuses on outreach targeting residents of SDHC properties. These residents are DACs, and frequently represent minority populations that could be considered URCs. Work completed under this subtask has been broken into two components, described here as Subtask 6.2.d-1 and Subtask 6.2.d-2. SDHC has 81 properties located within DACs; past outreach efforts have reached over 14,000 residents and 2,000 landlords. Subtask 6.2.d-1: SDHC - Engage Residents, Property Managers, Leadership in Discussion of Landscape Uses, Options The consultant will work with SDHC to prepare and carry out feedback/engagement strategies that effectively involve SDHC property residents and managers in discussing where and how landscaped areas are used, perceptions of landscapes and water resources, desired opportunities for open space, active recreation or food production on area properties, and considerations for design, maintenance and governance. Anticipated methods include but are not limited to an online survey, comment boards, focus groups, and identification of "weavers" who are SDHC property residents (similar to the outreach in Subtask 6.2.c-2), meetings on SDHC properties that will be advertised to residents, and "walkthroughs" on SDHC properties with residents to understand the use and function of landscaped spaces. Grant Agreement No. 4600012233 Page 28 of 71 While on -site outreach to SDHC properties will target residents at the selected properties, they will be open to residents outside of a given property. Subtask 6.2.d-2: SDHC - Provide Science Translation, and Technology Demonstration, to Residents and Property Managers Once initial outreach is completed, UCSD BRC and its partners will provide comparable to the work in Subtask 6.2.c-3 above for SDHC maintenance and management staff, and residents, to visit and learn about alternative non -potable water supplies, urban agriculture, xeriscaping, greywater, and rainwater harvesting in San Diego. This outreach will also include a component on flood prevention to address known flooding problems that occur at some SDHC properties, and how changes to landscape design can help address flooding issues on the sites. The consultant team (engineering design/landscape architecture) selected in Subtask 6.1.c will participate in this process to gauge residents' interests, concerns and desires for redesigned landscapes. Deliverables: o Documentation of meetings and workshops, (e.g., pictures, sign -in sheets) o Feedback materials (e.g., surveys or comment board) o Final list of selected neighborhood areas and community workgroups o Group leadership and working group structures o List of preliminary identified sites and applicable organizations o Up to two journal articles o UCSD BRC website content (website screen captures) o Presentations and website case study Task 6.3: Planning This task includes four subtasks, each designed to develop plans or recommendations that would contribute to the designs in Task 6.4, the Targeted DAC Needs Assessment in Subtask 6.1.c, or otherwise facilitate future implementation of alternative use of non -potable water within DACs. Subtask 6.3.a: Public Health Research Translation A lack of education regarding the safety of non -potable water can prove a hindrance to adoption of non -potable water reuse regulations by municipal planning, permitting, and public health agencies, and well as implementation of water reuse systems in DACs, especially those with substantial non-English speaking populations. Improved public health education is critical to successful implementation and continued use of non -potable water in communities. Public health research translation includes the communication of scientific research about non -potable water reuse into lay terms for both regulators and community members. Public health research translation also is needed to ensure that local land use and environmental health permitting processes are consistent with the most current and state-of-the-art Statewide knowledge and practice around alternative non -potable re -use system design and maintenance. The disconnect between local permitting processes and current best practices in design has been a substantive barrier to greater safe and effective implementation at the local level, as noted in the participation letters from the Cities of Imperial Beach and Chula Vista. This subtask includes three components to identify public health translation needs and to engage directly with regulators (including and especially County environmental health and municipal planning and land use permit managers), DAC residents, and system designers to Grant Agreement No. 4600012233 Page 29 of 71 define safe alternative uses of non -potable water, to establish recommendations for design and management, and to identify updates to permitting processes and standards needed to increase safe implementation of alternative non -potable water use systems. Subtask 6.3.a is integral to the project outcomes around advancing non -potable reuse and will inform outreach, engagement, and design/permitting processes. Subtask 6.3.a-1: Public Health - Convene Working Group A consultant will convene a working group of public health and allied professionals who will serve in an advisory capacity to work through regulatory, research, design and management issues related to alternative non -potable water supply in DACs. This working group will include professionals and community leaders who are actively engaged in work with DACs in Imperial Beach, Chula Vista, and the City of San Diego, as well with SDHC constituents or residents. Subtask 6.3.a-2: Public Health - Problem Statement/Identification and Research Translation Process This subtask will result in a concise Problem Statement/Identification which summarizes the issues where research translation is needed to maximize potential benefits of alternative non - potable supply in the context of public health and community resilience in the region. Efforts in this subtask will focus on applicability to resilience and public health planning, such as creating greenspace and promoting community agriculture in DACs. Work will include background interviews and research with permitting staff, designers and installers of alternative non - potable reuse, and environmental health regulators and professionals, to assess levels of knowledge, barriers, and other considerations. Subtask 6.3.a-3: Public Health - Facilitated Process and Regulatory Recommendations Following completion of Subtask 6.3.a-2, a facilitated process will be implemented to yield specific regulatory recommendations that maximize the potential benefit of alternative non - potable supply, and identify specific objectives and considerations for the design and management of these systems in DACs. Recommendations are anticipated to include County- and municipal -level issues as well as specific next steps for facilitating permitting, providing greater education, and ensuring safe reuse. This will build on the CCDEH workplan goals to address barriers. Working group meetings will include DAC members representing different public interests, but are expected to be highly technical in nature and as such are not anticipated to be advertised as public meetings. Subtask 6.3.b: Water Use and Conservation Database Coordination This subtask includes work require to update SDHC's existing database to meet the needs of SDHC related to this Project. SDHC will engage with the City of San Diego to create a data sharing platform whereby water consumption information is readily available to project staff. This effort includes identification of data fields that require ongoing input from users to maintain up-to-date information, as well as identification of critical customer information required to develop a standard set of dimensions to apply to data from San Diego Public Utilities Department. This task will also include creation of guidance for development of data sharing platform application, which would allow for data integration and functionality of active usage management. Based on available resources and what is learned from data, SDHC will develop an action plan to monitor resident water consumption, conduct comparative analysis and measure progress, post Project completion, and initial baseline consumption information. This comparison will allow us to assess the effectiveness of the landscape renovation. Grant Agreement No. 4600012233 Page 30 of 71 Subtask 6.3.c: Planning - Identify Community Engagement and Reuse Opportunities in Chula Vista and Imperial Beach Subtask 6.3.c has been further divided into two components to identify sites in Chula Vista and Imperial Beach, as well as further refine engagement and reuse opportunities in the target sites. Subtask 6.3.c-1: Apply UCSD Spatial Analytics and Participatory Mapping Tools with Community Groups Once sites/organizations and initial project possibilities are identified, UCSD BRC will coordinate with the targeted communities to use spatial analysis models to focus on and evaluate potential sites for reuse opportunities, as well as to identify project types, landscape approaches, and rainwater/stormwater harvesting potential. Potential for use of some sites as Alternative Compliance for stormwater permitting may be evaluated, if requested by Chula Vista or Imperial Beach. At affordable housing sites, potential quantitative benefits of individual projects such as potable water conserved, volume of stormwater infiltrated, area of landscape irrigated, and reduction in wastewater flows if/where laundry greywater is utilized would be documented. Subtask 6.3.c-2: Finalize Sites, Selected Options, and Community Leadership Team for Design Process Under this subtask, selected sites will be finalized. The consultant will also work with community members and leadership from organizations and each city to identify important aspects of safe and effective operation of the alternative non -potable systems. This may include a plan and budget for operation and maintenance, budget projections for variability in supply (i.e. need for potable water back-up in dry conditions or if an apartment with laundry greywater is vacant for an extended period), and agreements on how water supply for community gardens will be allocated. Subtask 6.3.d: Planning - Identify Water Conservation and Reuse Opportunities on SDHC Properties SDHC staff, the UCSD BRC team, and the selected engineering design/landscape architecture team will build on existing work by SDHC to identify the extent and types of landscape conditions on SDHC properties in DACs within the City of San Diego. Outputs from this task will identify the extent, locations and relative visibilities, and water consumption profiles of SDHC's portfolio of DAC properties' landscapes. UCSD BRC's spatial analysis toolkit will be applied to evaluate other cross -factors including area health indicators, flood prone areas, and surface flow paths to identify opportunities for alternative non -potable use and storm water mitigation. Deliverables: o List of committed participants and affiliations o Problem Statement report o Final workgroup report with recommended actions o Recommendations for Database revisions o Guidelines for application development for database o Participatory spatial analysis documentation o Documentation of final site selection Grant Agreement No. 4600012233 Page 31 of 71 o Governance outline for each selected site o Mapping and inventory of landscape conditions, site visibility and relative water consumption on SDHC properties Task 6.4: Design Task 6.4 will result in physical designs and related permitting documents applicable to the selected sites within the targeted DACs. These designs are also anticipated to be adaptable to other locations. Design activities have been divided into three subtasks. Subtask 6.4.a: Chula Vista and Imperial Beach - Prepare Site Plans, Cost Estimates, and Permitting The selected engineering design/landscape architecture contractor will prepare site plans, cost estimates, and permitting as applicable for up to three sites in each city (Chula Vista and Imperial Beach), including specifications for landscape, storm water management, and alternative non -potable reuse systems. Estimated water use savings will be developed with the site plans, depending on the selected properties. During plan development, periodic meetings and presentations to the working groups and stakeholders for each site will be held to gain continuing and meaningful input into the designs and ensure understanding of operation and maintenance issues. Permitting efforts under this task will include preparation of supporting technical materials, but not acquisition of permits, which will occur under a future implementation project. Subtask 6.4.b: SDHC - Prepare Site Plans, Cost Estimates, and Permitting The selected engineering design/landscape architecture contractor will prepare site plans, cost estimates and permitting as applicable for SDHC properties. To the extent possible within the project budget, sites will be grouped by type or typical landscape condition (e.g. interior courtyard, lawn, passive recreation, etc.) so that SDHC can develop typical specifications for the renovation and management of its properties with water -conserving landscapes, community garden opportunities where desired, and use of different alternative non -potable systems. SDHC anticipates landscape designs for a minimum of 5 site types, but as many as 15, based on the sites selected and input from the landscape architect. Estimated water use savings will be developed with the site plans, depending on the selected properties. Periodic meetings with property management and resident/stakeholder groups will be held to gain meaningful input on design. Permitting efforts under this task will include preparation of supporting technical materials, but not acquisition of permits, which will occur under a future implementation project. Subtask 6.4.c: Design Educational Signage Plans for educational signage will be developed for each of the selected sites in Chula Vista and Imperial Beach, and for SDHC properties. Planned signage for SDHC properties will developed based on landscape and alternative non -potable water source type (e.g., laundry to landscape graywater, water conservation xeriscaping). Deliverables: o Plans for approximately 2-3 sites in Chula Vista and 2-3 sites in Imperial Beach o Plans for 5-15 SDHC sites/landscape types or settings o Sign plans for up to 3 sites in each City (Chula Vista and Imperial Beach) o Sign plans for SDHC properties Grant Agreement No. 4600012233 Page 32 of 71 PROJECT 7: SEDIMENT MANAGEMENT FOR TIJUANA RIVER VALLEY DACS PROJECT SPONSOR: California Department of Parks and Recreation (CA State Parks) Project Partners: Tijuana River Action Network (TRAN), Tijuana River Valley Recovery Team (Recovery Team) PROJECT DESCRIPTION: Project 7 will provide the final planning and design elements needed for restoration of the Nelson Sloan Quarry- a project that seeks to fill and restore to native habitat an abandoned sand and gravel quarry in the Tijuana River Valley (Valley) through beneficial re -use of sediment excavated from the Goat Canyon Sediment Basins, other flood control channels, and habitat restoration projects located in the Valley. Project 7 will result in a coordinated plan for beneficial reuse of the excavated sediments from the Valley, developed through a cooperative effort by the Recovery Team. The effort will produce a multi -jurisdictional agreement for sediment management in the Valley, 95% design package, and Environmental Impact Report/Environmental Impact Statement (EIR/EIS), and regulatory permits. These efforts will prepare for a future implementation project that will help local DACs realize multiple benefits, including: reduced flooding, sedimentation, vegetation overgrowth and trash pollution; improved surface water quality; reduced volume surface runoff; increased recreational spaces; and improved food security. The Tijuana River Valley has a decades -long history of water quality and flooding issues. Significant improvements in wastewater treatment have in recent years improved water quality on both sides of the border. However, storm water flows continue to bring substantial amounts of sediment and trash and other contaminants into the Valley from sources in both the United States (U.S.) and Mexico. The sediment and trash pollutants cause water quality impairments, threaten life and property from flooding, degrade valuable riparian and estuarine habitats, and impact recreational opportunities for residents and visitors. Project 7 will provide the necessary planning and design elements, overcoming a major hurdle in a keystone project that will facilitate the implementation of several high priority water -related projects in the Valley, and allow land managers to implement a cost- effective solution for sediment and trash management in the Valley. Task 7.1: Project Management Task 7.1 includes the work required to manage the proposed Project and the grant funds. Subtask 7.1.a: Reporting and Invoicing This subtask involves quarterly reporting to SDCWA and DWR on project progress, as well as preparation of materials that may be required for the grant agreement. This task also includes a completion report and development of the Targeted DAC Needs Assessment for the DACs targeted by this Project. This subtask also involves quarterly invoicing to SDCWA and DWR on project progress. Activities include reviewing invoices from project partners and consultants, preparation of a compliance invoice package, and submittal of the invoice package to SDCWA's online Webtool. This subtask will be paid for through matching funds. Subtask 7.1.b: Select Project Manager A Project Manager will be selected with the use of matching funds. CA State Parks will be responsible for selecting a Project Manager for the Planning Project. Subtask 7.1.c: Select Consultant The consultant selection process will begin in May 2017, and paid for through matching funds. CA State Parks will select a consultant for this planning effort. The consultant will be responsible for completion of design and environmental compliance and permitting. Grant Agreement No. 4600012233 Page 33 of 71 Deliverables: o Quarterly Invoices o Quarterly Progress Reports o DAC Needs Assessment for Project 7 o Completion Report Task 7.2: DAC Outreach Task 7.2 includes outreach related to engaging DACs, EDAs, and URCs who would benefit from the proposed Project 7. Subtask 7.2.a: Negotiate Multi -Jurisdictional Agreement This effort will require involvement of and coordination between many entities. This subtask includes efforts to negotiate a multi -jurisdictional agreement for future operations at the Nelson Sloan Quarry. Included in this agreement will be City, County, State, and federal partners, as well as other project partners, as appropriate. CA State Parks will facilitate the negotiation process, which will be paid for through matching funds. Subtask 7.2.b: Community Outreach This subtask involves outreach and coordination with associated DACs (City of Imperial Beach, San Ysidro and Otay Mesa -Nestor). This effort will include bi-directional information sharing related to flooding and contaminants in the Tijuana River Valley, and will engage the DACs in the planning process for the Sediment Management for the Tijuana River Valley DACs Project. Deliverables: o Multi -jurisdictional agreement toward future operation o Community engagement meetings, associated presentations and public comment Task 7.3: Planning Not applicable - all planning activities have been completed. Task 7.4: Design Subtasks included here consist of all engineering and infrastructure planning and design. Subtask 7.4.a: Preliminary Plans - Design Development CA State Parks and its consulting team will develop 65% design drawings for the Nelson Sloan Quarry restoration. CA State Parks estimates planning work that has been completed to -date is equivalent to 30% design. Subtask 7.4.b: Working Drawings - Plans, Specifications, and Construction Cost Estimates Following development of the 65% design drawings under Subtask 7.4.a, CA State Parks and its consulting team will complete 95% design drawings, specifications, and construction cost estimates for Nelson Sloan Quarry restoration. Deliverables: o 65% Design Package o 95% Design Package Grant Agreement No. 4600012233 Page 34 of 71 Task 7.5: Environmental Compliance and Permitting This task includes environmental planning, regulation, and permitting of the proposed Planning Project. Subtask 7.5.a: Environmental Compliance CA State Parks and its consulting team will complete a joint EIR/EIS for the Nelson Sloan Quarry reuse. This Project includes development of the EIR/EIS, as well as all required public noticing and meetings. A Scoping Meeting will be held, with DACs, EDAs, and URCs who would realize benefits from the proposed project specifically invited to attend to provide input on the proposed project. Subtask 7.5.b: Environmental/Regulatory Permits CA State Parks and its consulting team will prepare submittal packages for regulatory permits, including a Coastal Development application to the City of San Diego's Tijuana River Valley Local Coastal Program/Land Use Plan, City of San Diego discretionary grading permit, Construction Activities Storm Water General Permit (2009-0009-DWQ permit), modification of the Conditional Use Permit, and coordination with US Fish and Wildlife and CA Fish and Wildlife. Deliverables: o Draft EIR/EIS o Final EIR/EIS o Notice of Determination o Permit Applications PROJECT 8: STORMWATER QUALITY FOR GRAPE DAY PARK DACS PROJECT SPONSOR: The Escondido Creek Conservancy (TECC) Project Partners: City of Escondido, Escondido Education COMPACT (COMPACT) PROJECT DESCRIPTION: In recent years, communities are re -imagining their flood control channels as urban assets, removing concrete wastelands and creating vibrant parks which revitalize neighborhoods, clean water, and raise property values. The concrete, 6-mile long Escondido Flood Control Channel bifurcates neighborhoods and affects property values and the quality of life for nearby DAC residents. Working with the City of Escondido and other community partners, TECC proposes to spark a re -imagining of the Escondido Creek Flood Control channel to develop a pilot restoration project to 30% design which would showcase a restored Escondido Creek at Grape Day Park. Grape Day Park is Escondido's "Central Park," adjacent to Escondido City Hall and the Escondido Center for the Arts. This will be accomplished by providing water quality, hydrologic/hydraulic, geomorphic, sediment transport and biological analysis on the opportunities to integrate habitat restoration, including floodplain expansion, water quality enhancement, and potential MS4 Alternative compliance within the quarter -mile site. This Project is intended to help revitalize the creek corridor, improve water quality and riparian habitat, maintain flood capacity, provide additional recreational access to DACs, and provide opportunities for DAC youth to engage in water resource restoration. Stakeholder outreach will focus on DAC communities adjacent to the site; at least 10 public meetings will be held with the City's neighborhood committees which are organized as part of the City's Community Development Block Grant (CDBG) implementation. Additionally, disadvantaged youth will be recruited from DAC communities to become "Conservation Fellows," and receive mentoring Grant Agreement No. 4600012233 Page 35 of 71 from project consultants to learn the technical skills needed to carry out this project such as civil engineering, hydrology and wildlife biology. Project consultants will engage Fellows in site -specific tasks associated with the project such as stream monitoring and economic research. This project will leverage COMPACT growing network of Latino families to engage families and youth in the project. Traditional outreach will include stakeholder meetings with the public and with the City of Escondido's Neighborhood Services program to tap its network of residents who participate in neighborhood groups associated with administration of the CDBG program. Additionally, TECC will convene a stakeholder's group of Grape Day Park tenants and interest groups to engage them in the project. Disadvantaged youth will be encouraged to participate in the Project on multiple levels, to comment on restoration designs as a member of the public, but also through the Conservation Fellows program, to learn first-hand how restoration design, economic research, and associated technical studies are done, providing a unique opportunity for these young people to investigate potential career options. Task 8.1: Project Management Project management activities involve grant administration tasks such as reporting and invoicing. Task 8.1 will include all reporting and invoicing related to design development of the Grape Day Park Pilot Project. Activities under this task include completion of required documentation to receive advance funding; completion of quarterly accountability report for advance funding; quarterly progress reports and compilation of invoices from contractors, vendors, and consultants; and submission to SDCWA's Webtool. TECC will coordinate with SDCWA to revise submission documents/invoices as necessary. This task also includes preparation of a Completion Report for Project 8. Subtask 8.1.a: Reporting This subtask involves quarterly reporting to SDCWA and DWR on project progress, and development of the Project Completion Report, including a Targeted DAC Needs Assessment for DACs served by Project 8. Subtask 8.1.b: Invoicing This task involves quarterly invoicing to SDCWA and DWR on project progress. Administrative staff will compile invoices from contractors and vendors and process them for eligible grant costs. This subtask also includes the preparation of invoice materials for quarterly submittals to SDCWA's Webtool as well as coordination with SDCWA to revise invoices as necessary. Subtask 8.1.c: Project Management This subtask involves project management activities that include facilitating the integration of all project components, coordination of contractors, overseeing meaningful public outreach to DACs and ensuring the effective engagement of Conservation Fellows. In addition, this subtask also includes the management of consultants selected to assist with Task 8.4. Deliverables: o Quarterly Progress Reports o Quarterly invoicing o Planning Project Completion Report o Targeted DAC Needs Assessment Grant Agreement No. 4600012233 Page 36 of 71 Task 8.2: DAC and Stakeholder Outreach Outreach activities include community outreach for stakeholders and the recruitment of Conservation Fellows. Subtask 8.2.a: Stakeholder and Community Outreach COMPACT will lead the DAC stakeholder and community outreach program, with assistance from TECC and the City of Escondido. At least 10 meetings will be held with the public and City of Escondido's Neighborhood Services program in local DACs. The Neighborhood Services Program implements the City's CDBG program through neighborhood groups. COMPACT will work with those same groups to engage them in the Grape Day Park Pilot program, to solicit their engagement and input into the design process. Other stakeholders will be invited to attend the neighborhood group meetings. Additionally, TECC will convene a stakeholders' group consisting of Grape Day Park tenants and advocacy groups to engage them in the project. Conservation Fellows will be welcomed to attend all stakeholder meetings. Subtask 8.2.b: Conservation Fellowships Conservation Fellows, high school to college -age students and youth, will be recruited by COMPACT through targeted outreach to DACs along Escondido Creek near Grape Day Park. Based on preliminary coordination efforts with local schools, the majority (if not all) Conservation Fellows are anticipated to be recruited from organizations and schools serving high school -aged youth such as the Boys and Girls Club. Recruitment will include outreach to schools serving disadvantaged youth and social services organizations focused on disadvantaged youth such as the Boys and Girls Club. Chosen Fellows will come from families that meet DAC criteria. Fellows will participate in all aspects of the Grape Day Pilot project to be given real world experience that could be transferable to further academic and/or professional opportunities. All participating project consultants will be required to provide mentoring time to the Fellows throughout the duration of the project. Fellows will receive non- profit service credit from COMPACT and TECC at the completion of their participation. Deliverables: o At least 10 DAC community meetings o At least 4 other stakeholders' meetings o At least 25 Conservation Fellows Task 8.3: Planning All activities under Task 8.3 are planning activities that will help to prepare project schedules and budgets prior to implementation. TECC's consultant will complete the analyses included in this task. For many organizations and individuals, understanding the financial benefits of a project is essential to gaining support. Identifying the economic benefits of implementing the pilot program, and the economic benefits to surrounding DACs of the larger effort to restore the entire flood control channel, will provide an essential tool for gaining community support. Residents of DACs that could economically benefit from these efforts will be more inspired to get and stay engaged with IRWM to see it through to project implementation. This task demonstrates that improving water quality, habitat values, and water -based recreation for Escondido Creek is also an economic benefit for DAC residents. Subtask 8.3.a: Analysis of Economic Potential of a Restored Escondido Creek, Analogue Analysis Grant Agreement No. 4600012233 Page 37 of 71 Communities throughout the nation have experienced improved similar valuation and real estate development opportunities as the result of restoration, or the achievement of "premiums" through proximity, views and other attributes associated with amenities. In this subtask, an economist will discover those analogues, codify them and apply them to this project in terms of establishing a basis for valuation and marketing potential. Subtask 8.3.b: Market Analysis The consultant will apply the results of Subtask 8.3a to the existing community. First, the economist will establish baseline real estate and asset values in the primary market area. Then, the consultant will apply the premiums achieved as discovered in Subtask 8.3. as to the existing market. In this subtask, the consultant will also identify the types of projects anticipated to be developed, as well as their location and scale. Subtask 8.3.c: Economic Impact Analysis The restoration of the creek and the development and improvement of the area will result in a positive economic impact to the community and region. The consultant will conduct an economic impact analysis to determine both the direct and indirect economic benefits of the project. Subtask 8.3.d: Fiscal Impact Analysis The restoration of the creek and the development and improvement of the area will result in certain fiscal benefits to the City of Escondido and the region. This will be in the form of increased tax and fee revenues, which the consultant will estimate in the analysis completed under this subtask. Deliverables: o Economic Potential Report and Tables o Market Analysis Report and Tables o Economic Impact Analysis Report and Tables o Fiscal Impact Analysis Report and Tables Task 8.4: Design Subtasks included under the design task consist of all engineering and infrastructure planning and design. Subtask 8.4.a: Compile and Review Existing Watershed Data and Identify Data Gaps This task will involve obtaining and reviewing existing data and information for the watershed, including a recent study done for the City of Escondido, City of Escondido Creeks Hydraulic Study: Alternative Compliance and Water Quality Improvements (Michael Baker International, 2015) as it relates to the goal and objectives for the proposed actions at Grape Day Park. Relevant data to be collected will include compilation of biological, water quality, hydrology/hydraulic, sediment transport, soils and geologic, topography, stream data, land ownership, utilities, and floodplain and flood control information. These data will be reviewed to determine if the information is current and to identify gaps in data that will need to be collected to complete the analysis. For each data gap type (grouped into spatial, temporal, and restoration phase), a program will be developed that will include the objective (e.g., confirm prior stream flow projections), collection methodology (e.g., continuous stream gauge deployment for two storm events), Grant Agreement No. 4600012233 Page 38 of 71 analysis methodology (e.g., hydrograph plots and extreme event statistics), and planned deliverable (e.g., data deliverable, technical memorandum, and summary report). It is possible that only a portion of the data gap filling program will be authorized and/or that components of the data gap filling program are authorized incrementally for the project; therefore, this should be factored into the development of the data gap filling program (Le., phased implementation program). Subtask 8.4.b: Fill Data Gaps Once the data gaps have been identified, this task will involve the collection of the necessary information. It is anticipated that the data gap filling program will include a combination of literature research, field work, and desktop activities. Anticipated work under this subtask includes a stream network field assessment. The stream network field assessment (Field Assessment) will be conducted to observe and document the conditions of the stream network near Grape Day Park, including geomorphic conditions and impediments that would restrict enhancements in DACs. Where possible, the Field Assessment will be linked to observations made during earlier analyses and studies to allow analysis of changes (e.g., erosion and sedimentation, channelization, etc.) that have occurred at the same locations over time, if data are available. In addition, the Field Assessment will potentially include water temperature, plant cover, the potential for sensitive plant or animal species occurrence, stream bed composition, physical impediments, photographic documentation at key observation points including dates, times, locations, view orientation, and stream flows. The specific focus of the Field Assessment will be to gather information that will inform projects within DACs. Additional anticipated activities in this subtask include documenting site -specific supplemental hydrologic, hydraulic, sediment and geomorphic conditions. A complete knowledge of existing conditions is needed and will include data and information related to precipitation, interception, infiltration, runoff, evapotranspiration, stream flows, stream velocities, stream elevations, sediment yield, sediment delivery, fluvial geomorphology, and land uses. Data gaps for water quality and biological information are anticipated and supplemental information pertaining to habitat types, sensitive species occurrences, impediments for aquatic life, as well as water quality data may be needed. Subtask 8.4.c: Develop Analytical Tools for Creation, Restoration, and Water Quality Site Evaluations This subtask involves the development of a set of analytical tools (e.g., conceptual model, numerical computer model, and empirical methodology) to analyze the hydrology, hydraulics, sediment transport, and geomorphology relevant to the proposed actions at Grape Day Park, with a specific focus on the surrounding DACs. The analytical tools will be developed to a level suitable for planning -level analyses utilizing methodologies that would be understandable and acceptable to the relevant stakeholders (e.g., resource agencies, land owners, regulatory agencies, and interested public). The analytical tools will be sufficient in accuracy and acceptability to allow informed decision - making by the relevant stakeholders, and the tools should be readily transferable for use during the environmental review process and as part of final design. In addition, some level of analytical tool confirmation will be included to provide a degree of confidence between field observations and/or measurements and the results produced by the analytical tools. This may include calibration/validation of numerical computer models, direct comparison with field Grant Agreement No. 4600012233 Page 39 of 71 observations/measurements, cross-referencing with literature values, sensitivity analyses, and/or a combination of these methods for the various analytical tools. Other layers such as utilities, landownership, soils and geology, and habitat types will be evaluated to understand potential design constraints as well as identify other opportunities, if needed. Subtask 8.4.d: Feasibility and Design of Stream Restoration Actions at Grape Day Park This subtask includes the identification of potential restoration actions and development of feasibility and 30% design level documents at Grape Day Park and the surrounding DACs. It will identify areas where habitat, floodplain and water quality restoration and creation actions could be implemented at Grape Day Park to benefit the surrounding DACs. Work will include performing hydrologic, hydraulic, sediment transport, and geomorphic analysis to assess the feasibility and support the development of initial designs (30 percent) for proposed restoration actions at Grape Day Park. This effort will also estimate the benefits of the proposed restoration actions to the hydrology (e.g., changes in magnitude and timing of flows), hydraulics (e.g., changes in flood elevations and velocities), and sediment dynamics (e.g., changes in sediment yield or delivery) of the greater watershed. This subtask will assess the predicted geomorphic response (e.g., channel migration, streambed erosion, head cutting, and streambank widening) of the stream network resulting from the proposed restoration alternatives at Grape Day Park, which will benefit the surrounding DACs. The restoration designs will be developed to a level suitable for evaluation utilizing the analytical tools developed under Subtask 8.4.c (e.g., cross -sections defined for use in analyzing stream flow hydraulics). Subtask 8.4.e: Prepare Escondido Storm Water Quality for Grape Day Park DACs Analysis Report The outcome of Project 8 will be summarized in a summary analysis report. This report will provide baseline and proposed conditions pertaining to the specific restoration and water quality project that analyzed for this effort. The report will detail 30% designs necessary for permitting and will provide potential constraints that would need to be overcome in later design phases. Deliverables: o List, timeframes, methodology, locations, and cost estimates to fill data gaps o Data and maps pertaining to data collection o Hydrologic, hydraulic, sediment transport, geomorphic, biological, and other analytic tools and descriptions o 30% design o Escondido Creek Storm Water Quality for Grape Day Park DACs Report Task 8.5: Environmental Compliance and Permitting Not applicable - Project 8 is a planning Project and does not include components requiring environmental compliance and permitting; future implementation project will include applicable environmental compliance and permitting. PROJECT 9: STORM WATER QUALITY FOR PARADISE VALLEY DACS PROJECT SPONSOR: City of National City Grant Agreement No. 4600012233 Page 40 of 71 Project Partner: City of San Diego PROJECT DESCRIPTION: Project 9 will involve a dual process that will treat and direct storm water runoff along Paradise Valley Road from Paradise Avenue to 700 feet east of East Plaza Boulevard. The system will address pollutants and direct storm water runoff towards a dry extended basin located along Paradise Valley Road, east of East Plaza Boulevard. Runoff will be collected in the basin that will eventually discharge through an outflow tying back into an existing storm drain system. A bioswale will be incorporated east of East Plaza Boulevard that will collect runoff from the adjacent roadways and direct the flow across E Plaza Boulevard toward the detention basin. The bioswale will assist in collecting low flows and treating the storm water through granular filtration and recharge groundwater, while providing flood conveyance for large storm events across East Plaza Boulevard and areas further west. Modifications of the existing curb inlets will allow for diversion of the street runoff to flow into the proposed storm water treatment area. The detention basin will assist with peak flow rate control, water quality improvements, and flow volume reduction. The system will provide incidental infiltration and be designed to detain storm water to allow additional particulates and associated pollutants to settle. A new inlet will be installed to the north of the detention basin that is systematically located to capture the 100-year storm event, but designed to allow for low flow attenuation for additional groundwater recharging. Water quality sampling will determine the specific point -source pollutants in the flow so that the biofiltration features associated with the dry detention basin and creek can target those specific pollutants (e.g., bacteria, nitrogen, iron, sulfur, aluminum, zinc, etc.) that exceed the thresholds set by the R9-2015-0100 San Diego Regional MS4 Permit and the Water Quality Improvement Plan for the City of National City. Project 9 addresses the 2013 San Diego IRWM Plan's Urban DAC issues of flooding, poor surface water quality, illegal dumping and trash, high volume surface runoff, lack of recreational space, and education and outreach. • Flooding. The existing creek does not have the capacity to efficiently convey the 100-year storm event without resulting in potential flood damage or hazard to over 30 properties within the DAC. Project 9 will increase the capacity of the creek and will add an inlet to efficiently convey the 100-year peak flow. The creek and detention basin will control the storm water runoff flow, further reducing potential flooding risks. This Project will also include a recreational path along the bank of the creek, which will be lined with a fence to prevent trash and other debris from being illegally deposited into the waterway. • Poor Surface Water Quality. Project 9 will include a bioswale and a dry extended detention basin in order to improve surface water quality and flood conveyance. The bioswale creek will filter out small levels of pollutants and the dry extended detention basin will provide flow - through treatment. It will detain storm water for an extended period to allow for sedimentation. Some dissolved pollutants will be removed via biofiltration, uptake by vegetation, and/or through infiltration. It will be sized to completely drain between storm events and to accommodate the 100-year peak flow. The creek will be improved to reduce the impacts caused by hydromodification from areas upstream. Improvements will reduce the scour potential along the creek, protect the creek banks, and reduce the amount of additional sediment that is transported downstream. • Illegal Dumping and Trash. Project 9 will include a sidewalk/recreational path along the south side of the creek. The path will be lined with a fence to prevent trash and other debris from being illegally deposited into the creek. It will also include signage prohibiting littering as well as ample trash/recycle bins. Grant Agreement No. 4600012233 Page 41 of 71 • High Volume Surface Runoff. Project 9 will include a bioswale and a dry detention basin. The creek will have a low flow channel that will help to slow down surface runoff flow and better direct it toward the detention basin. The detention basin will detain runoff volumes and will collect and convey storm water into the existing storm drain system. The educational path will also be composed of gravel or other • permeable material that is graded towards the swale and detention basin in order to minimize surface runoff outside of the proposed BMPs. • Lack of Recreational Space. Project 9 will include an educational path along the creek for pedestrians and bicyclists. The path will be safe and well -lit for dog walkers, runners, and bicyclists, particularly because it will be exposed along a street. It will help preserve and restore the existing open space while providing an aesthetically pleasing solution for the community. • Education and Outreach. Project 9 will include an outreach program consisting of mailers and flyers which will notify residents of the new improvements to the creek, focusing on the added recreational opportunities. The project includes a walking path that will have educational signage teaching users about native plants and wildlife along the path and creek, as well as information about water quality, surface water, and groundwater. It will inform residents about the goals of the IRWM Program and will provide contact information for those seeking more information on how to assist in the collaborative effort to identify and implement water management solutions that increase regional self-reliance, reducing conflict, and managing water to concurrently achieve social, environmental, and economic objectives. Task 9.1: Project Management This task includes activities required for grant administration, reporting, and invoicing for the work that will be completed under Task 9. Subtask 9.1.a: Reporting and Invoicing This subtask involves entering into an LPS agreement with SDCWA, and preparation of any required documentation for grant agreement execution with DWR. It includes quarterly reporting and invoicing to SDCWA and DWR on project progress, as well as reporting from the Consultant team. This subtask also includes development of the Targeted DAC Needs Assessment for the DACs targeted by this Project. A Project Completion Report will be completed under this subtask. Subtask 9.1.b: Monthly Status Meetings This subtask involves tracking the monthly status of the overall project. It is estimated that monthly status meetings will be held with the project team. Deliverables: o Quarterly Invoices o Quarterly Progress Reports o Targeted DAC Needs Assessment for Project 9 o Project Completion Report Grant Agreement No. 4600012233 Page42of71 Task 9.2: DAC Outreach Outreach activities are focused on engaging DAC community members on the design of the creek improvements, along with developing a long-term watershed ethic that will result in greater care for the creek and less direct trash and pollution. Subtask 9.2.a: Mailing Notices This subtask involves generating mailing notices in order to inform the public of the creek and quality of life improvements to be made and how it will benefit the community. Notices will include information on the creek, the project, benefits to the community, and how to provide input and feedback on the project. Subtask 9.2.b: Community Meetings This subtask involves working with the project partners to plan community meetings. The intent of these community meetings will be to provide informal education on the importance of storm water management while explaining how the improvements to the Paradise Valley Creek will enhance the community and provide educational value to its community members with the proposed learning path. Community meetings will help the coordinate creek cleanups and engage community involvement in maintaining the proposed improvements. Subtask 9.2.c: Focus Groups This subtask involves meeting with specific groups, either a community group or local business group, to receive their input on the creek improvements. Subtask 9.2.d: Community Groups Supplies for Creek Clean-ups This subtask involves gathering the supplies needed in order to successfully coordinate a volunteer led creek cleanup. Trash bins will be rented and supplies such as gloves, bags, and trash grabbers will be purchased for volunteers. Deliverables: o Mailers o Community Meeting notes o Focus group(s) meeting materials and notes Task 9.3: Planning Planning subtasks include field surveys, geotechnical investigations, and hydrology and hydraulics modeling to support the basin design. Subtask 9.3.a: Aerial and Field Survey This subtask involves gathering aerial photography of the project site. This will also include field surveying to develop 1-foot contours across the project site and will involve identifying existing creek geometry. Subtask 9.3.b: Geotechnical Evaluation This subtask involves performing below -ground investigation by boring, sampling, and testing the soil in order to establish its characteristics that would influence the construction of the project. A report will be developed in order to provide the design team and contractors with subsurface information and design parameters during the initial planning stages. Subtask 9.3.c: Hydrology and Hydraulics Modeling Grant Agreement No. 4600012233 Page43of71 This subtask involves providing a representation of the hydrologic process that occurs on the project site, while providing a solution to control and improve the existing conditions. Hydrology will be conducted for the 2-year, 5-year, 10-year, 50-year, 100-year, and 500-year storm events. Hydraulics analysis will be conducted using US Army Corps of Engineers (USACE) software GEO-RAS or HEC-RAS 5.0 to develop the existing and proposed creek alternatives. The modeling will incorporate methods established by the San Diego Municipal Stormwater Permit. Subtask 9.3.d: Basis of Design Report with Alternatives This subtask involves developing a design intent that will provide the explanation of the ideas, concepts and criteria that are considered to be very important to the City of National City, coming out of the programming and conceptual design phases. The basis of design, developed from the design intent, is the documentation of the primary thought processes and assumptions behind design decisions that will be made to meet the design intent. Subtask 9.3.e: FEMA CLOMR A Conditional Letter of Map Revision (CLOMR) is FEMA's formal review on whether a proposed project is in compliance with the minimum National Flood Insurance Program (NFIP) floodplain management criteria. The CLOMR helps to describe any eventual revision that will be made on the NFIP maps when the project has been completed. A CLOMR is required only for those projects that will result in a 1-percent annual chance water surface elevation increase of greater than 1.00 foot for streams with base flood elevations (BFEs) specified, but no floodway designated, or any 1% annual chance water surface elevation increase for proposed construction within a regulatory floodway. Deliverables: o Aerial and Field Survey Reports o Geotechnical Evaluation Report o Hydrologic Study Report o Basis of Design Report o CLOMR letter with GIS Map Exhibits Task 9.4: Design Design subtasks include preliminary and final design packages, along with construction cost estimates. Subtask 9.4.a: Preliminary Design This subtask involves the development of base mapping for the project using collected survey data, as -built data, field data, and utility information Subtask 9.4.b: Construction Cost Estimate This subtask involves preparing the construction cost estimate from the design recommendations to include quantity detail and verification of unit cost. Construction cost estimates will be prepared at the 60% design stage and the 100% design stage. Subtask 9.4.c: Final Design and Specifications Grant Agreement No. 4600012233 Page 44 of 71 This subtask involves plan preparation and various stages of design for the proposed detention basin and bioswale, as well as improved grading in the Paradise Creek. 100% design plans and specifications will be produced. Deliverables: o Preliminary Design Drawing Set o Construction Cost Estimate o Final Plans, Specifications, and Estimates Task 9.5: Environmental Compliance and Permitting Environmental subtasks include preparation of CEQA compliance documentation and regulatory permits. Subtask 9.5.a: Initial Study/Mitigated Negative Declaration (IS/MND) This subtask includes performing an IS to determine if the proposed project would have a significant environmental impact. The MND is appropriate when the IS has determined that no significant environmental effects will occur since the project implementation will have improved mitigation measures and will be implemented to reduce all potentially significant impacts. The IS/MND will address the potential for construction or operation of the Paradise Valley detention basin to result in potential environmental impacts, per CEQA Guidelines. Subtask 9.5.b: Biological Technical Report This subtask involves the preparation of a Biological Technical Report based on project information and analysis. The report will include a description of existing resources and an impact analysis of the biological resources resulting from project implementation. Cumulative impacts will be qualitatively assessed. Mitigation measures will also be determined. Subtask 9.5.c. Regulatory Permitting (401 /404/1602) This subtask involves the preparation of the USACE 404 Permit Application, Regional Water Quality Control Board (RWQCB) 401 Certification Form, and California Department of Fish and Wildlife (CDFW) 1602 Streambed Alteration Agreement Form based on the information in the IS/MND and Biological Technical Report (BTR). Electronic copies of each shall be sent to the County of San Diego, USACE, RWQCB, and CDFW respectively. Deliverables: o Initial Study/Mitigated Negative Declaration (IS/MND) o Biological Technical Report o Permit Applications PROJECT 10: STORM WATER QUALITY FOR ESCONDIDO CREEK DACS PROJECT SPONSOR: City of Escondido PROJECT PARTNER: The Escondido Creek Conservancy PROJECT DESCRIPTION: The Spruce Street Drainage located between 3rd Avenue and Escondido Creek in the City of Escondido has a long history of being chronically wet with standing water. The project is located in a DAC. This has created a breeding habitat for mosquitoes, particularly in the upstream concrete -lined portion of the proposed project area, which is located within a DAC. As a Grant Agreement No. 4600012233 Page 45 of 71 result, the existing channel has a long history of flooding and vector control issues, resulting in impacts related to flood control, public health and safety, and water quality. The City has completed 30% design plans and CEQA for the project. Permit applications to the Resource Agencies have also been initiated. The goal of this Project is to complete the engineering design and permitting process for construction projects to resolve water quality, vector control and flooding issues while creating additional habitat. The effort would result in 100% plans (with interim deliverables of 60 and 90% plans) which would allow the City of Escondido to bring a shovel -ready project forward for construction funding. Task 10.1 Project Management This task involves quarterly reporting and invoicing to SDCWA and DWR on project progress as well as submitting the Completion Report. This task also includes development of the DAC Needs Assessment for the DACs targeted by this Activity. This task also includes entering into project sponsor agreement with SDCWA and provision of any materials required for grant agreement execution. Deliverables: o Quarterly Project Progress Reports o Quarterly Invoices o Targeted DAC Needs Assessment o Completion Report Task 10.2 DAC Outreach Outreach subtasks include development of educational materials about the Spruce Street Channel issues and engagement of the community in the proposed design. Subtask 10.2.a. Education/Public Outreach A consultant and city staff will prepare education materials about the project, the watershed and water quality issues to spur public interest and participation. Outreach material may be placed at the Escondido Transit Center and on City social media. Specific outreach may extend to nearby neighborhood groups, businesses, and TECC meetings. The City of Escondido has 18 Neighborhood Groups. These Neighborhood Groups are formed in low income areas which correlate with the DAC areas in the urban core of Escondido. These communities have not traditionally been engaged in City planning. One of the first items that City staff works on with a group as they are forming is a Neighborhood Plan, which evaluates the neighborhood's infrastructure, identifies problems and cooperatively suggests solutions which may be unique to the specific community, and begins improving communication between residents in the community and the City. Subtask 10.2.b. Pilot Creek Clean -Up A consultant or city staff will bring together at -risk youth and other members of the community for a clean-up within the Spruce Street Drainage area. This clean-up will be based at Westside Park, which drains to the Channel, to educate the community about the watershed, how our actions in the watershed affect the Channel, and build interest in an unrecognized community asset. This task is anticipated to include outreach to people living in illegal encampments. Deliverables: o Education/Public Outreach Material (after 60% Drawings are complete) Grant Agreement No. 4600012233 Page 46 of 71 o Public Outreach Meeting - (after 60% Drawings are complete) o Public Outreach Meeting - (after 100% Drawings are complete) o Pilot Clean-up day along Spruce Street Drainage Area Task 10.3 Planning Not applicable - planning work has already been completed. Task 10.4 Design Subtask 10.4.a. 60% Drawings City of Escondido will work with its consultant, to review 30% engineering plans and CEQA studies. After reviewing all technical reports, the consultant will begin design work. Subtask 10.4.b. 90% Drawings Based on response from City of Escondido, Permitting Agencies and the public, City and Consultant will proceed with 90% engineering plan. The main goal of this outreach will be to engage the community in environmental issues by educating them about the program. Subtask 10.4.c. 100% Drawings Based on response from City of Escondido, Permitting Agencies and the public, City and Consultant will proceed with 100% engineering plan and construction specifications Deliverables: O 60% Design Drawing Package O 90% Design Drawing Package O 100% Design Drawing Package Task 10.5 Environmental Compliance and Permitting Not applicable - environmental compliance and permitting will be included in future implementation project. PROJECT 11: STORM WATER QUALITY FOR CHOLLAS CREEK DACS PROJECT SPONSOR: Groundwork San Diego-Chollas Creek Project Partners: San Diego Canyonlands, Circulate San Diego, Webster Community Council, San Diego Habitat Conservancy, City of San Diego PROJECT DESCRIPTION: Project 11 focuses on two key issues in the Chollas Creek watershed: 1) de- channelization and trail development and 2) conservation easements and restoration. The de- channelization effort will remove impervious surfaces and vegetation overgrowth in the Chollas Creek channel along Federal Blvd., thereby improving surface water quality and reducing high volume surface run-off. The development of the trail segment on the project site will augment recreational spaces, and connect communities to the emerging Chollas Creek Watershed Regional Park. It will leverage additional financial resources for construction, and will provide valuable hydrologic, water quality, and GHG reduction information to the Groundwork Chollas Creek watershed repository database funded by a previous IRWM grant (Prop 84-Round 1). Civil engineering services will address the de-channelization and trail development effort, including hydrologic and hydraulic modeling, engineering surveys, and civil engineering Grant Agreement No. 4600012233 Page 47 of 71 plans/specifications/cost estimates. Environmental studies conducted during this project will include biological surveys, jurisdictional determinations, cultural resources study and necessary studies to complete City of San Diego permitting, CEQA documentation, and State/Federal regulatory agency permitting. The effort will produce a Landscape Design by that will include revegetation plans and specifications, including planting plans and irrigation design. Incorporated into this design will be a planting trail to restore the natural beauty of the riparian habitat and allow users and residents to enjoy an interactive experience in the area. A Habitat Restoration will serve as a baseline for the engineering design and permit application. Long term maintenance will be conducted by the City of San Diego Stormwater Department. The conservation easement effort will achieve site control over and/or place in conservation easements on 1.2 acres of creek for the purposes of nonnative vegetation removal, security, habitat, and water quality improvement. A Habitat Enhancement and Restoration Plan will be prepared that conforms to the limitations of the flood control easement for the creek where exotic removal will be conducted. Properties may then be eligible for mitigation credits to provide long-term maintenance and will serve as a model for other restoration opportunities in the watershed. Task 11.1: Project Management Project management subtasks address processing a project sponsor grant agreement with SDCWA, reporting, and consultant management. Subtask 11.1.a: Reporting and Invoicing This subtask involved quarterly reporting and invoicing to the SDCWA and DWR on project progress. It will also include preparation and submission of the Project completion report. This subtask also includes development of a Targeted DAC Needs Assessment for the DACs targeted by this Project. This subtask also involves the development of budgets, timelines, and justification for Advance Payment award. Subtask 11.1.b: Project Management - De-Channelization and Trails This subtask includes managing and ensuring regular updates from project consultants and proper management and time management of project progress for this effort. Subtask 11.1.c: Project Management - Conservation Easements This subtask includes managing and ensuring regular updates from project consultants and proper management and time management of project progress for this effort. Deliverables: o Quarterly Accountability Report o Quarterly Project Reports o Quarterly Invoices o Targeted DAC Needs Assessment o Completion Report Task 11.2: DAC Outreach Outreach subtasks include community presentations and design workshops. Subtask 1 1.2.a: De-Channelization and Trails Outreach This task includes outreach to the community using presentations to area community groups. A community group will participate in trail design charrettes, including recommendations for Grant Agreement No. 4600012233 Page 48 of 71 interpretive signage and trail user amenities to be planned by the LPS. The community group will share trail and water quality best practice information (resident BMPs to include erosion control and non-toxic/non-fertilizer home behaviors) with residents in and around the project area. Up to Three design workshops will also be held for community groups and citizens, and will involve community partners. The community partners will participate in the three design workshops to teach members of the neighborhoods the fundamentals of walkability, including advocacy to city officials for safer walking and biking conditions. Subtask 1 1.2.b: Conservation Easement Outreach This task includes outreach to the community using presentations to landowners and community groups. Deliverables: o Community Presentations and materials Task 1 1.3: Planning Planning subtasks include hydraulic and hydrologic modeling, surveying, and development of restoration plans. Subtask 11.3.a: De-Channelization and Trails Plan Subtask 11.3.a-1: Hydrologic and Hydraulic Modeling This subtask includes modeling that will utilize high resolution LiDAR data from the County of San Diego. An engineering analysis will be conducted to determine the proposed creek contour, creek bottom grade changes, and tie-ins with the upstream and downstream concrete channel. The hydrology will be based on existing FEMA and San Diego data, and the hydraulics model will start with the consultant's survey and design data. The analysis will evaluate the hydraulic performance of the proposed natural creek compared to the existing concrete channel. Subtask 11.3.a-2: Surveying Project partners will perform supplemental ground surveys to characterize the channel slope, and ground -truth key structure elevations (road crossings, existing culverts, and existing channel). In addition, the surveyor will research and locate existing utilities in the project area. Data and information collected in the Survey will support construction of the models in Subtask 11.3.a-1. Subtask 11.3.a-3: Habitat Mitigation and Monitoring Plan A HMMP will be developed as a baseline for the engineering design and the permit application, and the plans and specifications described in Subtask 11.5.a-1. Long term maintenance will be conducted by the City of San Diego Stormwater Department as required in the City's HMMP. Subtask 1 1.3.b: Conservation Easements Plan Subtask 11.3.b-1: Habitat Enhancement and Restoration Plan Grant Agreement No. 4600012233 Page 49 of 71 A Habitat Enhancement and Restoration Plan will be prepared that conforms to the limitations of the flood control easement for the creek where exotic removal will be conducted. Project 11 will prepare these parcels for restoration through the completion of Biological Survey and Cultural Resources Study and will serve as a model for restoration priorities identified in the CCWORP. Support for this task will be provided by the San Diego Habitat Conservancy (SDHC). Deliverables: o Habitat Enhancement and Restoration Plan Task 11.4: Design The design includes the engineering design for the naturalized channel and landscaping design to restore the channel to its natural vegetation. Subtask 11.4.a: De-Channelization and Trails Subtask 11.4.a-1: Engineering Design The 60% design will be based on the hydraulic results, and input from regulators and the City. It is anticipated that the project will consist of demolition and removal of the existing concrete channel and re -contouring with natural stone, where needed. The natural creek bottom will be designed based on the hydraulic analysis using calculated water levels and velocities. Where it is necessary to reduce excessive creek velocities, natural stone energy dissipaters will be designed. The creek banks will be restored with native vegetation; the channel invert will be composed of low grasses. The 60% design plans for the creek will identify the limits of the project, and will also provide detail on the type of restoration equipment, access requirements, and material storage areas. We will also prepare specifications for site preparation, equipment and material staging, channel and bank grading, and restoration requirements. City staff will review engineering and design/construction drawings, and guide project review, including necessary permits. Subtask 1 1.4.a-2: Landscape Design The Landscape Architect will work closely with the Design Engineer to develop the revegetation plans and specifications, including planting plans and details, and irrigation design. We will prepare a planting trail plan to restore the natural beauty of the riparian habitat and allow users and residents to enjoy an interactive experience in the area. We will also prepare plans for the irrigation of the planted areas. Plans, specification, and cost estimate will be prepared for the project. Deliverables: 0 60% Design Drawings (Plans, Specifications and Cost Estimates) o Landscape Design (Revegetation Plans and Specifications, Planting Plan, Irrigation Plan) Task 1 1.5: Environmental Compliance and Permitting Subtask 11.5.a: De-Channelization and Trails Permits This subtask includes all the environmental studies necessary to compete CEQA documentation and regulatory permits for future construction. Permit applications and supporting materials will be generated for: Grant Agreement No. 4600012233 Page 50 of 71 1. City of San Diego Permits: The project is expected to require a Site Development Permit (SDP) and a Right of Entry (ROE) Permit from the City of San Diego. The project will also likely require a wetlands deviation from the City's Environmentally Sensitive Land Regulation (ESL) because the project proposal involves work in Chollas Creek, a City -regulated wetland. An application will be submitted and processed by the LPS, and the City of San Diego will be the lead agency under CEQA. 2. CEQA Initial Study: The LPS will prepare an Initial Study to be submitted to the City for a Substantial Conformance Review. Technical studies will include, at a minimum, a hydrology/hydraulic assessment, a water quality assessment, a biological survey report, and a cultural resources study. 3. Biological Survey Report: A biological survey will be conducted to determine the potential for occurrence of special status species under the City's MSCP Subarea Plan, California Endangered Species Act/Federal Endangered Species Act (CESA/FESA), or other regulations and species that are considered sufficiently rare or sensitive by the scientific community to qualify for such listing. It will also be confirmed that the project will mitigate any temporary impacts to biological resources to below a significant level under CEQA, and return impacted habitats to their original or improved condition. 4. Wetlands Delineation: A jurisdictional determination pursuant to the current USACE Arid West Supplement to the 1987 Wetlands Delineation Manual, CDFW, and City of San Diego guidelines will be conducted. Jurisdictional boundaries will be mapped to identify and delineate wetlands and non -wetland waters within the project impact area. The results of the jurisdictional delineation will be incorporated into the Biological Survey Report, and will become part of the permit application to USACE, CDFW, and RWQCB. 5. Cultural Resources Study: A cultural resources study will be conducted to identify significant cultural resources (archaeological sites, historic buildings, structures, and objects) that could be affected by the project. This work will minimally include a records search and literature review and may include a field survey. 6. USACE, RWQCB, and CDFW Pre -Application Meetings: The LPS will schedule and prepare for a Pre -Application Meeting with USACE, CDFW and RWQCB to determine the type of permits applicable to the project, minimization and mitigation measures, and the required documentation to be submitted to the agencies. Groundwork will then apply for and secure the permits needed for construction of the Project. Subtask 1 1.5.b: Conservation Easements Permits This subtask includes all the environmental studies necessary to compete CEQA documentation and regulatory permits for future construction. Permit applications and supporting materials will be generated for: 1. City of San Diego Permits: The project is expected to require a ROE Permit and a Site Development Permit (SDP) from the City of San Diego. As with Subtask 1 1.5.a-2, this project will likely require a wetlands deviation from the City's Environmentally Sensitive Land Regulation (ESL). An application will be submitted and processed by the project sponsor. Therefore, the City of San Diego will be the lead agency under CEQA. 2. CEQA Initial Study: The LPS will prepare an Initial Study to be submitted to the City for a Substantial Conformance Review. Technical studies will include, at a minimum, a Grant Agreement No. 4600012233 Page 51 of 71 hydrology/hydraulic assessment, a water quality assessment, a biological survey report, and a cultural resources study. 3. Biological Survey Report: A biological survey will be conducted to determine the potential for occurrence of special status species under the City's MSCP Subarea Plan, CESA/FESA, or other regulations and species that are considered sufficiently rare or sensitive by the scientific community to qualify for such listing. The project sponsor will also confirm that the project will mitigate any temporary impacts to biological resources to below a significant level under CEQA as described in Subtask 11.5.a-1. 4. Wetland Delineation: A jurisdictional determination pursuant to the current USACE Arid West Supplement to the 1987 Wetlands Delineation Manual, CDFW, and City of San Diego guidelines will be conducted. Jurisdictional boundaries will be mapped to identify and delineate wetlands and non -wetland waters within the project impact area, and results will be incorporated into the Biological Survey Report. The determination report will become part of the permit application with the USACE, CDFW, and RWQCB. 5. Cultural Resources Study: A cultural resources study will be conducted to identify significant cultural resources that could be affected by the project. Work will include items described in Subtask 9.5.a-1. 6. USACE, RWQCB, and CDFW Pre -Application Meetings: The LPS will schedule and prepare for a Pre -Application Meeting with USACE, CDFW, and RWQCB to determine the type of permits applicable to the project, minimization and mitigation measures, and the required documentation to be submitted to the agencies. Groundwork will then apply for and secure the permits needed for construction of the Project. Deliverables: o City of San Diego Permit Applications (2x - SDP, ROE, ESL) o Initial Studies (2x) o Biological Survey Reports (2x) o Wetland Delineation Reports (2x) o Cultural Resources Studies (2x) o State and Federal Permit Pre -Application Meetings Grant Agreement No. 4600012233 Page 52 of 71 EXHIBIT B BUDGET SUMMARY BU*`` Planning Project Grant Amount 1. Grant Administration $264,350 2. DAC Needs Assessment $120,000 $600,000 3. Groundwater Planning for DACs and Tribes in the Anza Valley Groundwater Basin 4. Groundwater Planning for Pauma Valley DACs and Tribes $800,000 5. Healthy Water for Forester Creek DACs $320,000 $1,175,000 6. Alternative Non -Potable Water Supplies, Xeriscape Design, and Flood Prevention for DACs 7. Sediment Management for Tijuana River Valley DACs $890,000 8. Storm Water Quality for Grape Day Park DACs $355,000 9. Storm Water Quality for Paradise Valley DACs $365,000 10. Storm Water Quality for Escondido Creek DACs $258,000 11. Storm Water Quality for ChoIlas Creek DACs $404,000 Total $5,551,350 Grant Agreement No. 4600012233 Page 53 of 71 EXHIBIT C SCHEDULE Jan 16 -Jul 17 Aug-17 Sep-17 Ott-17 Nor11 Dec-17 Jan-18 Feb-18 Mar-18 Apr-18 May-18 lun-18 Jul-18 Aug-18 Sep-18 O1-18 Nov18 Dec•18 lan•19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 Jul-19 Aug-19 Sep-L at-19 Nov-19 Dec-19 Jan•20 Feb-20 Mar-20 Apr-20 May20 Jun-20 PROJECT TASKS 1 Grant Administration 1.1 12Invoicing 1.3 1.4 Agreement Administration Progress Reports Finat Report • • • • • + • • •• • •• •• •• •+ • • . 2 DAC Needs Assessment 2.1 2 2 2.3 2.4 25 2.6 DAC, EDS, and URC Updates DAC, EDA, and URC Dutreath Identify and Map DAC Locations and Identify DAC Contacts Conduct Speakers Bureau Presentations Complete Needs Assessment • • Demographics • 3 Groundwater Planning for DACs and T ibes in the Arta Valley Groundwater Bas n 3.1 3.2 3.3 Project Management DACCutreach Planning . 4 Groundwater Planning for Pauma Val ey DACs and Tubes 4.1 4.2 4.3 4.4 Project Management DAC Outreach Planning Design . — 5 Healthy Water for Forester Creek DACs 5.1 5.2 5.3 Project Management DAC Outreach Planning . 6 Alternative Non -Potable Water Supp' i es, Xeriscape Design, and Fiood Prevention fo DACs 6.1 6.2 6.3Pannng 6.4 Project Management DAC Outreach Design ! . • . 1 Grant Agreement No. 4600012233 Page 54 of 71 EXHIBIT C SCHEDULE ,an 18- ui 17 Aug-17 Sep-17 Oct-17 Nov-17 Dec-17 Jan•18 feb18 Mar•18 Apr•IE May18 Ain-18 ;uI.18 Aug-18 Sep•18 Oct-18 Nov-18 Dec•18 Jan-19 Feb19 Mar-19 Apr•19 May19 Jun-9 Jul•19 Aug•19 Sep-19 Oct-19 Nov19 Dec•19 ;an-20 Feb2 Mar•20 Apr•20 May-20 Jun•20 PROJECT TASKS 7 Sed ment Management for Tijuana River Valley DA s 7.1 7.2 7.4 7.5 Project Management DACCutreacn Design' Environmental Compliance and Perm ltnng ' ' 8 Stormwater Quality fce Grape Day Part DAIS 8.1 8.2 8.3 8.4 Project Management DACCutreach Planning Design ' ' _ _ ' 9 Sto~raaterDuality for Paradise Valley DACs 9.1 9.2 9.3 94 93 Project Management DACCutreach Planning Design Environmental Compliance and Permitting ' ' ' ' :0 Stomrwater Quality for Escondido Creek DACs 10.1 10.2 10.4 Project Management DACCutreach Design ' _ _ _ ' 11 Star water Duality for thollasCreek DACs 111 11.2 11.3 114 113 Project Management DAC Outlet Planning Design Environmental Compliance and Pernitting ' ' ' ' * Asterisk connotes a single event within a month (it could be 'executed' or completed at any time within that month) Grant Agreement No. 4600012233 Page 55 of 71 EXHIBIT D STANDARD CONDITIONS D.1) ACCOUNTING AND DEPOSIT OF FUNDING DISBURSEMENT: a) Separate Accounting of Funding Disbursements and Records: Grantee shall account for the money disbursed pursuant to this Grant Agreement separately from all other Grantee funds. Grantee shall maintain audit and accounting procedures that are in accordance with generally accepted accounting principles and practices, consistently applied. Grantee shall keep complete and accurate records of all receipts and disbursements of such funds. Grantee shall require its contractors or subcontractors to maintain books, records, and other documents pertinent to their work in accordance with generally accepted accounting principles and practices. Records are subject to inspection by State at any and all reasonable times. b) Fiscal Management Systems and Accounting Standards: The Grantee agrees that, at a minimum, its fiscal control and accounting procedures will be sufficient to permit tracing of grant funds to a level of expenditure adequate to establish that such funds have not been used in violation of state law or this Grant Agreement. c) Disposition of Money Disbursed: All money disbursed pursuant to this Grant Agreement shall be deposited, administered, and accounted for pursuant to the provisions of applicable law and be placed in a non -interest bearing account. d) Remittance of Unexpended Funds: Grantee shall remit to State any unexpended funds that were disbursed to Grantee under this Grant Agreement and were not used to pay Eligible Project Costs within a period of sixty (60) calendar days from the final disbursement from State to Grantee of funds or, within thirty (30) calendar days of the expiration of the Grant Agreement, whichever comes first. D.2) ACKNOWLEDGEMENT OF CREDIT: Grantee shall include appropriate acknowledgement of credit to the State and to all cost -sharing partners for their support when promoting the Projects or using any data and/or information developed under this Grant Agreement. During construction of each project, Grantee shall install a sign at a prominent location, which shall include a statement that the project is financed under Water Quality, Supply and Infrastructure Improvement Act of 2014, administered by State of California, Department of Water Resources. Grantee shall notify State that the sign has been erected by providing them with a site map with the sign location noted and a photograph of the sign. D.3) AIR OR WATER POLLUTION VIOLATION: Under State laws, the Grantee shall not be: (1) in violation of any order or resolution not subject to review promulgated by the State Air Resources Board or an air pollution control district; (2) subject to cease and desist order not subject to review issued pursuant to § 13301 of the Water Code for violation of waste discharge requirements or discharge prohibitions; or (3) finally determined to be in violation of provisions of federal law relating to air or water pollution. D.4) AMENDMENT: This Grant Agreement may be amended at any time by mutual agreement of the Parties, except insofar as any proposed amendments are in any way contrary to applicable law. Requests by the Grantee for amendments must be in writing stating the amendment request and the reason for the request. State shall have no obligation to agree to an amendment. Grant Agreement No. 4600012233 Page 56 of 71 D.5) AMERICANS WITH DISABILITIES ACT: By signing this Grant Agreement, Grantee assures State that it complies with the Americans with Disabilities Act (ADA) of 1990, (42 U.S.C. § 12101 et seq.), which prohibits discrimination on the basis of disability, as well as all applicable regulations and guidelines issued pursuant to the ADA. D.6) APPROVAL: This Agreement is of no force or effect until signed by all parties to the agreement. Grantee may not submit invoices or receive payment until all required signatures have been obtained. D.7) AUDITS: State reserves the right to conduct an audit at any time between the execution of this Grant Agreement and the completion of Projects, with the costs of such audit borne by State. After completion of the Projects, State may require Grantee to conduct a final audit to State's specifications, at Grantee's expense, such audit to be conducted by and a report prepared by an independent Certified Public Accountant. Failure or refusal by Grantee to comply with this provision shall be considered a breach of this Grant Agreement, and State may elect to pursue any remedies provided in Paragraph 12or take any other action it deems necessary to protect its interests. Pursuant to Government Code §8546.7, the Grantee shall be subject to the examination and audit by the State for a period of three years after final payment under this Grant Agreement with respect to all matters connected with this Grant Agreement, including but not limited to, the cost of administering this Grant Agreement. All records of Grantee or its contractor or subcontractors shall be preserved for this purpose for at least three (3) years after project completion or final billing, whichever comes later. D.8) BUDGET CONTINGENCY: If the Budget Act of the current year covered under this Grant Agreement does not appropriate sufficient funds for the Proposition 1 Implementation Grant Program, this Grant Agreement shall be of no force and effect. This provision shall be construed as a condition precedent to the obligation of State to make any payments under this Grant Agreement. In this event, State shall have no liability to pay any funds whatsoever to Grantee or to furnish any other considerations under this Grant Agreement and Grantee shall not be obligated to perform any provisions of this Grant Agreement. Nothing in this Grant Agreement shall be construed to provide Grantee with a right of priority for payment over any other Grantee. If funding for any fiscal year after the current year covered by this Grant Agreement is reduced or deleted by the Budget Act, by Executive Order, or by order of the Department of Finance, State shall have the option to either cancel this Grant Agreement with no liability occurring to State, or offer a Grant Agreement amendment to Grantee to reflect the reduced amount. D.9) CALIFORNIA CONSERVATION CORPS: As required in Water Code §79038(b), Grantee shall examine the feasibility of using the California Conservation Corps or community conservation corps to accomplish the habitat restoration, enhancement and protection activities listed in the Exhibit A, Work Plan, and shall use the services of one of these organizations whenever feasible. D.10) CEQA: Activities funded under this Grant Agreement, regardless of funding source, must be in compliance with the California Environmental Quality Act (CEQA) (Public Resources Code §21000 et seq.). Information on CEQA may be found at the following links: Environmental Information: http://resources.ca.aov/ceaa/ California State Clearinghouse. Handbook: httos://www.opr.ca.gov/docs/SCH Handbook 2012.pdf Grant Agreement No. 4600012233 Page 57 of 71 D.11) CHILD SUPPORT COMPLIANCE ACT: For any Grant Agreement in excess of $100,000, the Grantee acknowledges in accordance with Public Contract Code §71 10, that: a) The Grantee recognizes the importance of child and family support obligations and shall fully comply with all applicable state and federal laws relating to child and family support enforcement, including, but not limited to, disclosure of information and compliance with earnings assignment orders, as provided in Chapter 8 (commencing with §5200) of Part 5 of Division 9 of the Family Code; and b) The Grantee, to the best of its knowledge is fully complying with the earnings assignment orders of all employees and is providing the names of all new employees to the New Hire Registry maintained by the California Employment Development Department. D.12) CLAIMS DISPUTE: Any claim that the Grantee may have regarding performance of this agreement including, but not limited to, claims for additional compensation or extension of time, shall be submitted to the State's Project Manager, within thirty (30) calendar days of the Grantee's knowledge of the claim. State and Grantee shall then attempt to negotiate a resolution of such claim and process an amendment to this Agreement to implement the terms of any such resolution. D.13) COMPETITIVE BIDDING AND PROCUREMENTS: Grantee shall comply with all applicable laws and regulations regarding securing competitive bids and undertaking competitive negotiations in Grantee's contracts with other entities for acquisition of goods and services and construction of public works with funds provided by State under this Grant Agreement. D.14) COMPUTER SOFTWARE: Grantee certifies that it has appropriate systems and controls in place to ensure that state funds will not be used in the performance of this Grant Agreement for the acquisition, operation, or maintenance of computer software in violation of copyright laws. D.15) CONFLICT OF INTEREST: All participants are subject to State and Federal conflict of interest laws. Failure to comply with these laws, including business and financial disclosure provisions, will result in the application being rejected and any subsequent contract being declared void. Other legal action may also be taken. Applicable statutes include, but are not limited to, Government Code, § 1090 and Public Contract Code, § 10410 and § 10411, for State conflict of interest requirements. a) Current State Employees: No State officer or employee shall engage in any employment, activity, or enterprise from which the officer or employee receives compensation or has a financial interest and which is sponsored or funded by any State agency, unless the employment, activity, or enterprise is required as a condition of regular State employment. No State officer or employee shall contract on his or her own behalf as an independent contractor with any State agency to provide goods or services. b) Former State Employees: For the two-year period from the date he or she left State employment, no former State officer or employee may enter into a contract in which he or she engaged in any of the negotiations, transactions, planning, arrangements, or any part of the decision -making process relevant to the contract while employed in any capacity by any State agency. For the twelve-month period from the date he or she left State employment, no former State officer or employee may enter into a contract with any State agency if he or she was employed by that State agency in a policy -making position in the same general subject area as the proposed contract within the twelve-month period prior to his or her leaving State service. Grant Agreement No. 4600012233 Page 58 of 71 c) Employees of the Grantee: Employees of the Grantee shall comply with all applicable provisions of law pertaining to conflicts of interest, including but not limited to any applicable conflict of interest provisions of the California Political Reform Act, Government Code §87100 et seq. d) Employees and Consultants to the Grantee: Individuals working on behalf of a Grantee may be required by the Department to file a Statement of Economic Interests (Fair Political Practices Commission Form 700) if it is determined that an individual is a consultant for Political Reform Act purposes. D.16) DELIVERY OF INFORMATION, REPORTS, AND DATA: Grantee agrees to expeditiously provide throughout the term of this Grant Agreement, such reports, data, information, and certifications as may be reasonably required by State. D.17) DISPOSITION OF EQUIPMENT: Grantee shall provide to State, not less than 30 calendar days prior to submission of the final invoice, an itemized inventory of equipment purchased with funds provided by State. The inventory shall include all items with a current estimated fair market value of more than $5,000.00 per item. Within 60 calendar days of receipt of such inventory State shall provide Grantee with a list of the items on the inventory that State will take title to. All other items shall become the property of Grantee. State shall arrange for delivery from Grantee of items that it takes title to. Cost of transportation, if any, shall be borne by State. D.18) DRUG -FREE WORKPLACE CERTIFICATION: Certification of Compliance: By signing this Grant Agreement, Grantee, its contractors or subcontractors hereby certify, under penalty of perjury under the laws of State of California, compliance with the requirements of the Drug -Free Workplace Act of 1990 (Government Code §8350 et seq.) and have or will provide a drug -free workplace by taking the following actions: a) Publish a statement notifying employees, contractors, and subcontractors that unlawful manufacture, distribution, dispensation, possession, or use of a controlled substance is prohibited and specifying actions to be taken against employees, contractors, or subcontractors for violations, as required by Government Code §8355(a) (1). b) Establish a Drug -Free Awareness Program, as required by Government Code §8355(a)(2) to inform employees, contractors, or subcontractors about all of the following: i) The dangers of drug abuse in the workplace, ii) Grantee's policy of maintaining a drug -free workplace, iii) Any available counseling, rehabilitation, and employee assistance programs, and iv) Penalties that may be imposed upon employees, contractors, and subcontractors for drug abuse violations. c) Provide, as required by Government Code §8355(a) (3), that every employee, contractor, and/or subcontractor who works under this Grant Agreement: i) Will receive a copy of Grantee's drug -free policy statement, and ii) Will agree to abide by terms of Grantee's condition of employment, contract or subcontract. D.19) FINAL INSPECTIONS AND CERTIFICATION OF REGISTERED PROFESSIONAL: Upon completion of the Project, Grantee shall provide for a final inspection and certification by the appropriate registered professional (California Registered Civil Engineer or Geologist) that the Project has Grant Agreement No. 4600012233 Page 59 of 71 been completed in accordance with submitted final plans and specifications and any modifications thereto and in accordance with this Grant Agreement. Grantee shall notify the State's Project Manager of the inspection date at least 14 calendar days prior to the inspection in order to provide State the opportunity to participate in the inspection. D.20) GRANTEE COMMITMENTS: Grantee accepts and agrees to comply with all terms, provisions, conditions and commitments of this Grant Agreement, including all incorporated documents, and to fulfill all assurances, declarations, representations, and statements made by the Grantee in the application, documents, amendments, and communications filed in support of its request for funding. D.21) GRANTEE NAME CHANGE: Approval of the State's Program Manager is required to change the Grantee's name as listed on this Grant Agreement. Upon receipt of legal documentation of the name change the State will process an amendment. Payment of invoices presented with a new name cannot be paid prior to approval of said amendment. D.22) GOVERNING LAW: This Grant Agreement is governed by and shall be interpreted in accordance with the laws of the State of California. D.23) INDEMNIFICATION: Grantee shall indemnify and hold and save the State, its officers, agents, and employees, free and harmless from any and all liabilities for any claims and damages (including inverse condemnation) that may arise out of the Projects and this Agreement, including, but not limited to any claims or damages arising from planning, design, construction, maintenance and/or operation of levee rehabilitation measures for this Project and any breach of this Agreement. Grantee shall require its contractors or subcontractors to name the State, its officers, agents and employees as additional insured on their liability insurance for activities undertaken pursuant to this Agreement. D.24) INDEPENDENT CAPACITY: Grantee, and the agents and employees of Grantees, in the performance of the Grant Agreement, shall act in an independent capacity and not as officers, employees, or agents of the State. D.25) INSPECTION OF BOOKS, RECORDS, AND REPORTS: During regular office hours, each of the parties hereto and their duly authorized representatives shall have the right to inspect and to make copies of any books, records, or reports of either party pertaining to this Grant Agreement or matters related hereto. Each of the parties hereto shall maintain and shall make available at all times for such inspection accurate records of all its costs, disbursements, and receipts with respect to its activities under this Grant Agreement. Failure or refusal by Grantee to comply with this provision shall be considered a breach of this Grant Agreement, and State may withhold disbursements to Grantee or take any other action it deems necessary to protect its interests. D.26) INSPECTIONS OF PROJECT BY STATE: State shall have the right to inspect the work being performed at any and all reasonable times during the term of the Grant Agreement. This right shall extend to any subcontracts, and Grantee shall include provisions ensuring such access in all its contracts or subcontracts entered into pursuant to its Grant Agreement with State. D.27) INVOICE DISPUTES: In the event of an invoice dispute, payment will not be made until the dispute is resolved and a corrected invoice submitted. Failure to use the address exactly as provided may result in return of the invoice to the Grantee. Payment shall be deemed complete upon deposit of the payment, properly addressed, postage prepaid, in the United States mail. Any claim that Grantee may have regarding the performance of this Grant Agreement including, but not limited to claims for additional compensation or extension of time, shall be submitted to the DWR Project Manager within thirty (30) calendar days of Grant Agreement No. 4600012233 Page 60 of 71 Grantee's knowledge of the claim. State and Grantee shall then attempt to negotiate a resolution of such claim and process an amendment to the Grant Agreement to implement the terms of any such resolution. D.28) NONDISCRIMINATION: During the performance of this Grant Agreement, Grantee and its contractors or subcontractors shall not unlawfully discriminate, harass, or allow harassment against any employee or applicant for employment because of sex (gender), sexual orientation, race, color, ancestry, religion, creed, national origin (including language use restriction), pregnancy, physical disability (including HIV and AIDS), mental disability, medical condition (cancer/genetic characteristics), age (over 40), marital status, and denial of medial and family care leave or pregnancy disability leave. Grantee and its contractors or subcontractors shall ensure that the evaluation and treatment of their employees and applicants for employment are free from such discrimination and harassment. Grantee and its contractors or subcontractors shall comply with the provisions of the Fair Employment and Housing Act (Government Code § 12990 (a-f) et seq.) and the applicable regulations promulgated there under (California Code of Regulations, Title 2, §7285 et seq.). The applicable regulations of the Fair Employment and Housing Commission implementing Government Code § 12990 (a-f), set forth in Chapter 5 of Division 4 of Title 2 of the California Code of Regulations, are incorporated into this Agreement by reference and made a part hereof as if set forth in full. Grantee and its contractors or subcontractors shall give written notice of their obligations under this clause to labor organizations with which they have a collective bargaining or other agreement. Grantee shall include the nondiscrimination and compliance provisions of this clause in all subcontracts to perform work under the Grant Agreement. D.29) NO DISCRIMINATION AGAINST DOMESTIC PARTNERS: For contracts over $100,000 executed or amended after January 1, 2007, the Grantee certifies by signing this Grant Agreement, under penalty of perjury under the laws of State of California that Grantee is in compliance with Public Contract Code § 10295.3. D.30) OPINIONS AND DETERMINATIONS: Where the terms of this Grant Agreement provide for action to be based upon, judgment, approval, review, or determination of either party hereto, such terms are not intended to be and shall never be construed as permitting such opinion, judgment, approval, review, or determination to be arbitrary, capricious, or unreasonable. D.31) PERFORMANCE AND ASSURANCES: Grantee agrees to faithfully and expeditiously perform or cause to be performed all Project work as described in Exhibit A (Work Plan) and to apply State funds received only to Eligible Project Costs in accordance with applicable provisions of the law. D.32) PRIORITY HIRING CONSIDERATIONS: If this Grant Agreement includes services in excess of $200,000, the Grantee shall give priority consideration in filling vacancies in positions funded by the Grant Agreement to qualified recipients of aid under Welfare and Institutions Code § 1 1200 in accordance with Public Contract Code § 10353. D.33) PROHIBITION AGAINST DISPOSAL OF PROJECT WITHOUT STATE PERMISSION: The Grantee shall not sell, abandon, lease, transfer, exchange, mortgage, hypothecate, or encumber in any manner whatsoever all or any portion of any real or other property necessarily connected or used in conjunction with the Projects, or with Grantee's service of water, without prior permission of State. Grantee shall not take any action, including but not limited to actions relating to user fees, charges, and assessments that could adversely affect the ability of Grantee to meet its obligations under this Grant Agreement, without prior written permission of Grant Agreement No. 4600012233 Page 61 of 71 State. State may require that the proceeds from the disposition of any real or personal property be remitted to State. D.34) REMEDIES NOT EXCLUSIVE: The use by either party of any remedy specified herein for the enforcement of this Grant Agreement is not exclusive and shall not deprive the party using such remedy of, or limit the application of, any other remedy provided by law. D.35) RETENTION: Notwithstanding any other provision of this Grant Agreement, State may, for each project, withhold five percent (5.0%) of the funds requested by Grantee for reimbursement of Eligible Costs. Each project in this Grant Agreement will be eligible to release its respective retention when that project is completed and Grantee has met requirements of Paragraph 17, "Submissions of Reports", except in the case of the last project to be completed under this Grant Agreement, in which case retention for such project will not be disbursed until the "Final Report" is submitted to and approved by State. State shall disburse retained funds to the Grantee. D.36) RIGHTS IN DATA: Grantee agrees that all data, plans, drawings, specifications, reports, computer programs, operating manuals, notes and other written or graphic work produced in the performance of this Grant Agreement shall be made available to the State and shall be in the public domain to the extent to which release of such materials is required under the California Public Records Act., Government Code §6250 et seq. Grantee may disclose, disseminate and use in whole or in part, any final form data and information received, collected and developed under this Grant Agreement, subject to appropriate acknowledgement of credit to State for financial support. Grantee shall not utilize the materials for any profit -making venture or sell or grant rights to a third party who intends to do so. The State shall have the right to use any data described in this paragraph for any public purpose. D.37) SEVERABILITY: Should any portion of this Grant Agreement be determined to be void or unenforceable, such shall be severed from the whole and the Grant Agreement shall continue as modified. D.38) STATE REVIEWS: The parties agree that review or approval of project applications, documents, permits, plans, and specifications or other project information by the State is for administrative purposes only and does not relieve the Grantee of their responsibility to properly plan, design, construct, operate, maintain, implement, or otherwise carry out the projects. D.39) SUSPENSION OF PAYMENTS: This Grant Agreement may be subject to suspension of payments or termination, or both, and Grantee may be subject to debarment if the State determines that: a) Grantee, its contractors, or subcontractors have made a false certification, or b) Grantee, its contractors, or subcontractors violates the certification by failing to carry out the requirements noted in this Grant Agreement. D.40) SUCCESSORS AND ASSIGNS: This Grant Agreement and all of its provisions shall apply to and bind the successors and assigns of the parties. No assignment or transfer of this Grant Agreement or any part thereof, rights hereunder, or interest herein by the Grantee shall be valid unless and until it is approved by State and made subject to such reasonable terms and conditions as State may impose. D.41) TERMINATION BY GRANTEE: Subject to State approval which may be reasonably withheld, Grantee may terminate this Agreement and be relieved of contractual obligations. In doing Grant Agreement No. 4600012233 Page 62of71 so, Grantee must provide a reason(s) for termination. Grantee must submit all progress reports summarizing accomplishments up until termination date. D.42) TERMINATION FOR CAUSE: Subject to the right to cure under Paragraph 11, the State may terminate this Grant Agreement and be relieved of any payments should Grantee fail to perform the requirements of this Grant Agreement at the time and in the manner herein, provided including but not limited to reasons of default under Paragraph 12. D.43) TERMINATION WITHOUT CAUSE: The State may terminate this Grant Agreement without cause on 30 calendar days advance written notice. The Grantee shall be reimbursed for all reasonable expenses incurred up to the date of termination. D.44) THIRD PARTY BENEFICIARIES: The parties to this Grant Agreement do not intend to create rights in, or grant remedies to, any third party as a beneficiary of this Agreement, or any duty, covenant, obligation or understanding established herein. D.45) TIMELINESS: Time is of the essence in this Grant Agreement. D.46) TRAVEL: Travel includes the reasonable and necessary costs of transportation, subsistence, and other associated costs incurred by personnel during the term of this Agreement. Travel and per diem expenses to be reimbursed under this Agreement shall be at the same rates the State provides for unrepresented employees in accordance with the provisions of Title 2, Chapter 3, of the California Code of Regulations and shall be reimbursed consistent with the rates current at the time of travel. These rates are published at: http://www.calhr.ca.aov/employees/Paaes/travel-meals.aspx, or its successor website. For the purpose of computing such expenses, Grantee's designated headquarters shall be: 4677 Overland Avenue, San Diego, CA 92123.No travel outside the San Diego Funding Area shall be reimbursed unless prior written authorization is obtained from the State's Project Manager. D.47) VENUE: The State and the Grantee hereby agree that any action arising out of this Agreement shall be filed and maintained in the Superior Court in and for the County of Sacramento, California, or in the United States District Court in and for the Eastern District of California. The Grantee hereby waives any existing sovereign immunity for the purposes of this Agreement. D.48) WAIVER OF RIGHTS: None of the provisions of this Grant Agreement shall be deemed waived unless expressly waived in writing. It is the intention of the parties here to that from time to time either party may waive any of its rights under this Grant Agreement unless contrary to law. Any waiver by either party of rights arising in connection with the Grant Agreement shall not be deemed to be a waiver with respect to any other rights or matters, and such provisions shall continue in full force and effect. D.49) WORKERS' COMPENSATION: Grantee affirms that it is aware of the provisions of §3700 of the Labor Code, which requires every employer to be insured against liability for workers' compensation or to undertake self-insurance in accordance with the provisions of that code, and Grantee affirms that it will comply with such provisions before commencing the performance of the work under this Grant Agreement and will make its contractors and subcontractors aware of this provision. Grant Agreement No. 4600012233 Page 63 of 71 EXHIBIT E AUTHORIZING RESOLUTION RESOLUTION No. 2016-2 . RESOLUTION OF THE BOARD OF DIRECTORS OF 1'HE SAN DIEGO COUNTY WATER AUTHORITY AUTHORIZING THE GENERAL MANAGER OR HER DESIGNEE TO SUBMIT A 2016 IRWM DISADVANTAGED COMMUNITY ENGAGEMENT GRANT APPLICATION FOR S5,305,040, ACCEPT THE GRANT FUNDS THAT ARE AWARDED AND ENTER INTO CONTRACTS TO DISTRIBUTE THE FUNDS TO PROJECT SPONSORS WHEREAS, Proposition 1, the Water Quality, Supply, and Infrastructure Improvement Act of 2014 (Water Code Section 79700 et seq.), authorized the California Legislature to appropriate S510 million to encourage integrated regional water management planning in California; and WHEREAS, Section 79744(a) of the California Water Code appropriated to the Department of Water Resources funds for integrated regional water management programs, projects and other purposes; and WHEREAS, DWR is making these funds available through several grant programs; and WHEREAS, thc 2016 IRWM Disadvantaged Community Engagement Grant allocates specific amounts of money to 12 funding areas located throughout California, including the San Diego Funding Area; and WILEREAS, achieving IRWM grant funding will help to achieve the regional water supply goals established in thc Water Authority's 2015 Urban Water Management Plan and to prepare the San Diego Region for the impacts of drought; and WHEREAS, thc San Diego Regional Water Management Group, in close cooperation with the Regional Advisory Committee and the Upper Santa Margarita and South Orange County planning regions, is preparing an application for a 2016 1RWM Disadvantaged Community Engagement Crrant to ensure the involvement of disadvantaged communities in IRWM planning efforts; and WHEREAS, on August 3, 2016, the RAC recommended that thc Water Authority Board authorize submittal of the San Diego Region's application for a 2016 IRWM Disadvantaged Community Engagement Grant; and WHEREAS, the guidelines for the DAC Engagement Planning Grant requiring that each IRWM funding area submit a funding application that comprises all of the projects proposed by thc planning regions within the funding arca; and WI IEREAS, the memorandum of understanding that established the San Diego IRWM Program identifies the Water Authority as the program's authorized representative; and Grant Agreement No. 4600012233 Page 64 of 71 WI IEREAS, the Water Authority Board of Directors is the decision -making body for the Water Authority. WHEREAS, grant application procedures established by DWR require applicants to provide a copy of a resolution adopted by the applicant's governing body designating an authorized representative to file an application for an IRWM planning grant; and NOW, THEREFORE, the Board of Directors of the San Diego County Water Authority resolves the following: 1. The foregoing facts are true and correct. 2. The General Manager or her designee is authorized to prepare the necessary data, conduct investigations and submit a 2016 1RWM Disadvantaged Community Engagement Grant application. 3. The General Manager or her designee is authorized to enter into an agreement to receive a 2016 IRWM Disadvantaged Community Engagement Planning Grant from the California Department of Water Resources. 4. The General Manager or her designee is authorized to accept the grant funds that are awarded and enter into a contract to distribute the awarded grant funds to the project sponsors. PASSED, APPROVED AND ADOPTED, this 27th day of October, 2016, by the following vote: AYES: Unless noted below all Directors voted aye. NOES: None. ABSTAIN: None. ABSENT: Boyle, Brady, Hilliker, Morrison, Mark Muir Chair At t"bST: ary Crouch Secretary Grant Agreement No. 4600012233 Page 65 of 71 I, Melinda Cogle, Cleric of the Board ofthc San Diego County Water Authority, certify that the vote shown above is correct and this Resolution No. 2016- 20 was duly adopted at the meeting of the Board of Directors on the date stated above. ehM inda'Cogl � . Clerk of the Board Grant Agreement No. 4600012233 Page 66of71 EXHIBIT F LOCAL PROJECT SPONSORS Grantee has assigned, for each project, a Local Project Sponsor according to the roles of the participating agencies identified in the IRWM Plan. Local Project Sponsors may act on behalf of Grantee for the purposes of individual project management, oversight, compliance, and operations and maintenance. Local Project Sponsors are identified for each Sponsored Project below: Sponsored Project Sponsor Agency Agency Address Project 1: Grant Administration San Diego County Water Authority 4677Overland Avenue San Diego, CA 92123 Project 2: DAC Needs Assessment San Diego County Water Authority 4677 Overland Avenue San Diego, CA 92123 Project 3: Groundwater Planning for DACs and Tribes in the Anza Valley Groundwater Basin Ramona Band of Cahuilla 56310 Highway 371, Suite B Anza, CA 92539 Project 4: Groundwater Planning for Pauma Valley DACs and Tribes County of San Diego 5510 Overland Avenue, Third Floor, San Diego, CA 92123 Chula Vista, CA 91910 Project 5: Healthy Water for Forester Creek DACs San Diego River Park Foundation (SDRPF) 4891 Pacific Highway, Suite 114 San Diego, CA 92110 Project 6: Alternative Non- Potable Water Supplies, Xeriscape Design, and Flood Prevention for DACs University of California San Diego - San Diego Bioregional Center for Sustainability Science, Planning and Design (UCSD BRC) 9500 Gilman Drive La Jolla, CA 92093 Project 7: Sediment Management for Tijuana River Valley DACs California Department of Parks and Recreation (CA State Parks) 4477 Pacific Highway San Diego, CA 92110 Project 8: Storm Water Quality for Grape Day Park DACs The Escondido Creek Conservancy (TECC) 120 W Grand Avenue Escondido, CA 92025 Project 9: Storm Water Quality for Paradise Valley DACs City of National City 1243 National City Boulevard National City, CA 91950 Project 10: Storm Water Quality for Escondido Creek DACs City of Escondido 201 North Broadway Escondido, CA 92025 Project 11: Storm Water Quality for Chollas Creek DACs Groundwork San Diego- Chollas Creek 5106 Federal Blvd San Diego, CA 92105 Grant Agreement No. 4600012233 Page 67 of 71 EXHIBIT G REPORT FORMATS AND REQUIREMENTS The following reporting formats should be utilized. Please obtain State approval prior to submitting a report in an alternative format. PROGRESS REPORTS Progress reports shall generally use the following format. This format may be modified as necessary to effectively communicate information. For each project, discuss the following at the task level, as organized in Exhibit A (Work Plan): • Estimate of percent work complete. • Milestones or deliverables completed during the reporting period. • Discussion of work accomplished during the reporting period and submission of deliverables per Exhibit A. • Scheduling concerns and issues encountered that may delay completion of the task. • Work anticipated for the next reporting period. • Updated schedule or budget inclusive of any changes that have occurred. FINAL REPORT The Final Report shall generally use the following format. This format may be modified as necessary to effectively communicate information on the various projects in the IRWM Program funded by this Grant Agreement, and includes the following: Executive Summary The Executive Summary consists of a maximum of twenty (20) pages summarizing information for the grant as well as the individual projects. Stakeholder Summary • General description of water management needs of DACs, Economically Distressed Areas (EDAs), and underrepresented communities at the Funding Area learned from the activities performed in this program • General summary of DACs, EDAs, and underrepresented communities involved in IRWM efforts through this Program • Map(s) identifying all DACs, EDAs, and underrepresented communities with IRWM regions learned from the activities performed in this program Involvement Activity Summary • General description of involvement activities performed in this Program, including both successful and unsuccessful involvement activities • Identification of projects developed from the DAC involvement activities, if applicable Findings • Needs Assessment o Narrative summary of community characteristics identified and specific community water management needs and resources (technical, managerial, and financial) to address the needs of DACs, EDAs, and underrepresented communities o Needs Assessment template table filled in (at the community level) • Identification of ongoing barriers for DAC involvement in IRWM efforts Grant Agreement No. 4600012233 Page 68 of 71 • Recommendations for water managers on future DAC involvement activities in IRWM efforts Looking into the Future • Next steps for the IRWM regions to continue DAC involvement efforts Grant Agreement No. 4600012233 Page 69 of 71 EXHIBIT H REQUIREMENTS FOR STATEWIDE MONITORING AND DATA SUBMITTAL Surface and Groundwater Quality Data Groundwater quality and ambient surface water quality monitoring data that include chemical, physical, or biological data shall be submitted to the State as described below, with a narrative description of data submittal activities included in project reports, as described in Exhibit G. Surface water quality monitoring data shall be prepared for submission to the California Environmental Data Exchange Network (CEDEN). The CEDEN data templates are available on the CEDEN website. Inclusion of additional data elements described on the data templates is desirable. Data ready for submission should be uploaded to your CEDEN Regional Data Center via the CEDEN website. CEDEN website: http://www.ceden.org. If a project's Work Plan contains a groundwater ambient monitoring element, groundwater quality monitoring data shall be submitted to the State for inclusion in the State Water Resources Control Board's Groundwater Ambient Monitoring and Assessment (GAMA) Program Information on the GAMA Program can be obtained at: http://www.waterboards.ca.gov/Qama/aeotracker aama.shtml. If further information is required, the Grantee can contact the State Water Resources Control Board (SWRCB) GAMA Program. Groundwater Level Data Grantee shall submit to DWR groundwater level data collected as part of this grant. Water leveldata must be submitted using the California Statewide Groundwater Elevation Monitoring (CASGEM) online data submission system. Grantee should use their official CASGEM Monitoring Entity or Cooperating Agency status to gain access to the online submittal tool and submit data. If the data is from wells that are not part of the monitoring network, the water level measurements should be classified as voluntary measurements in the CASGEM system. If the grantee is not a Monitoring Entity or Cooperating Agency, please contact your DWR grant project manager for further assistance with data submittal. The activity of data submittal should be documented in appropriate progress or final project reports, as described in Exhibit G. Information regarding the CASGEM program can be found athttp://www.water.ca.gov/groundwater/casgem/. Grant Agreement No. 4600012233 Page 70of71 EXHIBIT I STATE AUDIT DOCUMENT REQUIREMENTS GUIDELINES FOR GRANTEES State Audit Document Requirements The list below details the documents/records that State Auditors typically reviewed in the event of a Grant Agreement being audited. Grantees should ensure that such records are maintained for each State funded Program/Project. Where applicable, this list of documents also includes documents relating to the Grantee's funding match which will be required for audit purposes. Internal Controls: 1. Organization chart (e.g., Agency's overall organization chart and organization chart for this Grant Agreement's funded project. 2. Written internal procedures and flowcharts for the following: a) Receipts and deposits b) Disbursements c) State reimbursement requests d) State funding expenditure tracking e) Guidelines, policy(ies), and procedures on State funded Program/Project 3. Audit reports of the Grantee's internal control structure and/or financial statements within the last two years. 4. Prior audit reports on State funded Program/Project. State Funding: 1. Original Grant Agreement, any amendment(s) and budget modification documents. 2. A list of all bond -funded grants, loans or subventions received from the State. 3. A list of all other funding sources for each Program/Project. Contracts: 1. All subcontractor and consultant contracts and related, if applicable. 2. Contracts between the Grantee, member agencies, and project partners as related to the State funded Program/Project. Invoices: 1. Invoices from vendors and subcontractors for expenditures submitted to the State for payments under the Grant Agreement. 2. Documentation linking subcontractor invoices to State reimbursement requests and related Grant Agreement budget line items. 3. Reimbursement requests submitted to the State for the Grant Agreement. Cash Documents: 1. Receipts (copies of warrants) showing payments received from the State. 2. Deposit slips or bank statements showing deposit of the payments received from the State. Grant Agreement No. 4600012233 Page 71 of 71 3. Cancelled checks or disbursement documents showing payments made to vendors, subcontractors, consultants, and/or agents under the Grant Agreement. Accounting Records: 1. Ledgers showing receipts and cash disbursement entries for State funding. 2. Ledgers showing receipts and cash disbursement entries of other funding sources. 3. Bridging documents that tie the general ledger to reimbursement requests submitted to the State for the Grant Agreement Administration Costs: 1. Supporting documents showing the calculation of administration costs. Personnel: 1. List of all contractors and Grantee staff that worked on the State funded Program/Project. 2. Payroll records including timesheets for contractor's staff and the Grantee's staff Project Files: 1. All supporting documentation maintained in the Program/Project files. 2. All Grant Agreement related correspondence. MEMBER AGENCIES Carlsbad Municipal Water District City of Del. Mar City of Escondido City of National City City -of Oceanside City of Poway City of San Diego Falibrook Public Utility District Helix Water Disfrk Lakeside Water District Olivenhain MumcipalWater District Otay Water District Padre Dom Municipal Water District Camp Pendleton Monne Corps Base Rainbow Municipal Water District Ramona Municipal Water District Rincon del Diablo Municipal Water District San Dieguuo Water District Santa Fe Irrigation District South Say Irrigation District Vollecitos Water District Valley Center Municipal Water District Vista Irrigation District Yuimo Municipal Water District - OTHER REPRESENTATIVE County of Son Diego San Diego County Water. Authority 4677• Overland Avenue • San Diego, California 92123-1233 (858) 522-6600 FAX (858) 522-6568 www.sdcwa.org March 22, 2018 Luca Zappiello Junior Engineer — Civil City of National City 1243 National City Boulevard National City, CA 91950 RE: Agreement for the Integrated Regional Water Management Program between the San Diego County Water Authority and City of National City for the Storm Water Quality for Paradise Valley DACs (Project Nos. 1-DACI-9-80062) Dear Mr. Zappiello: Enclosed is an original copy of the above -referenced Agreement. If you have any questions, please call me at 858/522-6739, or Mark Stadler, Project Manager at 858/522-6735. Thank you. Sincerely, Art4AP Loisa Burton Grant Administrator Enclosures A public agency providing a safe and reliable water supply to the San Diego region CITY OF NATIONAL CITY Office of the City Clerk 1243 National City Blvd., National City, California 91950-4397 619-336-4228 Michael R. Dalla, CMC - City Clerk SAN DIEGO COUNTY WATER AUTHORITY Integrated Regional Water Management Program Agreement Storm Water Quality for Paradise Valley DACs Project # 1-DACI-9-80062 Luca Zappiello (Engineering/Public Works) forwarded Fully Executed Agreement to San Diego County Water Authority.