HomeMy WebLinkAboutA Good Sign and Graphics CO - Wayfinding Signage Project CIP No. 16-13 - Change Order Nos. 9 -12 - 2017WAYFINDING SIGNAGE PROJECT CIP NO. 16-13 A Good Sign, Inc. Reason/Purpose for this Change Order: Two (2) interpretive panels proposed to be installed at the MTS trolley station located at 8th Street and 24th Street will not be installed by the contractor due to additional logistical and permitting processes. The City Engineer directed that the contractor will instead provide the hardware and sign panels to National City staff and crew who will then install the two signs at the stated locations. NATIO 51#aasioalrso CHANGE ORDER NO. 9 October 12, 2017 The City of National City and Contractor agree to the following change to the original Contract: The City and the Contractor agree that the Contractor shall provide the two (2) signage and hardware associated with the locations described previously. The contractror shall provide a credit for the installation associated with these two (2) interpretive signs. The change order provides a credit to the City in the amount of $391.38. Original Contract Amount $ 270,359.00 Net change by previously authorized Change Orders 37,504.11 Subtotal . 307,863.11 Amount of this change order (391.38) New contract amount $ 307,471.73 Workin_days Subm t:db ro-c ed: 0 Working days subtracted: 0 Percent change in Contract to date 13.73% 0i9 2.ot7 Approved by. /24/7 City ' ngineer Date Ci Manager, ,M.atach.+o.ode« ,ass Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. ted and agreed to byA Good Sign, Inc.: 4. Name: 4 Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 12/4/17 Telephone (619) 336-4380 -g CALIFORNIA NATIONAL CtTY tICAV 4NcoRPORATED WAYFINDING SIGNAGE PROJECT CIP NO. 16-03 DATE: October 12, 2017 CHANGE ORDER NO. 9 WORK PERFORMED BY: A Good Sign, Inc. DESCRIPTION OF WORK: Credit for the installation of two (2) interpretive signage ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT Unit Qty Rate Total Credit for the installation of two 1) interpretive signage HRS 4.00 (97.845) (391.38) GRAND TOTAL: A GOOD SIGN & GRAPHICS CO COR # 09 Job Name: National City Wayfinding Job Number. 1221 Full DeaafptIon of Change In Seo Date: Time Impact October 9, 2017 Credit for Interpretative Signs Not installed onto MTA Property Breakdown Direct Labor Sign Type Sign Detail Hours Rate Cost Qty (2) interpretative Panels Installation Cost 4.00 -$84.35 -$337.40 $0.00 $0.00 SUBTOTALS ,t 4.0 -337 40 Breakdown Sign Type Sign Detail Quantity Direct Materials Rate Cost $0.00 SUBTOTALS 0.0 S0.00 — Sign Type Breakdown Sign Detail Qty Dkect -. . sort Rate Cost S0.00 $0.00 SUBTOTALS 0.0 $0.00 Breakdown Other Sign Type Sign Detail Quantity Rate Cost (Including GC & First Tier Sub cost) SUBTOTALS $0.00 *Combined Subtotal: 15% Markup: Combined Subtotal + Markup: $337 40 -$50.61 -$388.01 Bond 1% (of *Subtotal): - $3.37 GRAND TOTAL 5 391 38 CUSTOMERS APPROVAL/ACKNOWLEDGEMENT SUB. CON - NAME/TITLE DATE: PROJECT PROFESSIONALS CORPORATION TRANSMITTAL COVER To: National City Engineering Department Project Name: NC Wayfinding Signage Project, CIP No. 16-13 ITEMS DELIVERED: Change Order No. 9 Delivered by: Received by: I .11z/2e17 Date: Project Professionals Corporation WAYFINDING SIGNAGE PROJECT CIP NO. 16-13 A Good Sign, Inc. CHANGE ORDER NO.10 December 8, 2017 Reason/Purpose for this Change Order:: Four (4) existing signages that were installed needs to be revised due to corrections on their contents. Two (2) downtown directional signages, one (1) Old Town directional signage, and one (1) Marina district directional signage will need to be corrected for this change order. Corrections for the signages are provided on the attachment provided (see attached). The contractor requests for an additional 10 working days to complete this work. The City of National City and Contractor agree to the following change to the original Contract: The City and the Contractor agree that the Contractor shall provide the changes and install the signages with the revised directions. Four (4) directional signages will be revised and reinstalled as per the attached document. The new end date for completing this project will be November 6, 2017, The agreed upon price for all cost associated is $6,752.20 Original Contract Amount Net change by previously authorized Change Orders................ .................. ..... .. . Subtotal.. Amount of this change order New contract amount Working dates added: 10 Working days subtracted: 0 270, 359.00 37,106.73 Percent dumps In Contract to date 16.22% 307,465.73 6,752.20 314,217.93 Sulirthitt hi.): nager 10 Date Projec Approved by: City ngineer Date City Manager, required for Change Orders >s24,a9a Date By signing this Change Order the Contractor confirms that hefshe is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Accepted and agreed to by A Good Sign, Inc.: Name: Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 NaIONAL, e c INCORPORATED WAYFINDING SIGNAGE PROJECT CIP NO. 16-13 DATE: December 8, 2017 CHANGE ORDER NO. 10 WORK PERFORMED BY: A Good Sign, Inc. DESCRIPTION OF WORK: Revision of four (4) signages and their content ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT Digital Prints for Directional 1) Signs (Small) Digital Prints for Directional 2) Signs (Large) Installation for 4 Directional Signs Unit EA EA Unit H RS Qty 2.00 2.00 Wage 395.00 495.00 Sub -Total Material: Labor Markup (15%): 267.00 SUBTOTAL: Total 790.00 990.00 Qty 12.00 Rate 86.350 1,780.00 Total 1,036.20 $ 1,036.20 Sub -Total Labor: Labor Markup (15%): 155.43 SUBTOTAL: Unit Qty Rate Total 1) Boom Lift Rental EA 1.00 2,906.00 2,906.00 $ 2,906.00 Sub -Total Equipment: Equipment Markup (15%): TOTAL EQUIPMENT: $ 435.90 $ 3,341.90 SUBTOTAL: $6,580.53 3% BOND: $ 171.67 GRAND TOTAL: $6,752.20 A GOOD SIGN & GRAPHICS CO __-- Job Name: National City Wayfinding Job Number. 1221 ate: ASI #: Time Impact: December 4, 2017 2 weeks Full Description of`CUiange in Scope: Redoing Qty 4 Digital prints on Directional Signs KTUA.02, 136, 30B, & 56A Breakdown Sign Type Digital Prints 56A & 30B Sign Detail Fabrication and Materials Quantity 2.00 Direct Labor Rate $395.00 Cost $790.00 Digital prints KTUA.02 & 13B Fabrication and Materials 2.00 $495.00 $990.00 $0.00 $0.00 SUBTOTALS 4.0 $1,780.00 Breakdown Sign Type Sign Detail Digital Prints 56A & 30B Installation Quantity 6 Direct Materials Rate Cost $86.35 $518.10 Digital prints KTUA.02 & 138 Installation 6 $86.35 $518.10 $0.00 $0.00 SUBTOTALS 12.0 1 $1,036.20 Breakdown Sign Type Sign Detail Directional Signs Boom Lift for Removal Direct Equipment Qty Rate 1.00 $1,959.00 Cost $1,959.00 Directional Signs Boom Lift for Install 1.00 $447.00 S447.00 Mobilization for Install 1 $500.00 $500.00 SUBTOTALS 3.0 $2,906.00 Breakdown Sign Type Sign Detail Quantity Other Rate Cost SUBTOTALS 'Combined Subtotal: 15% Markup: Combined Subtotal + Markup: (Including GC & First Tier Sub cost) Bond 3% (of *Subtotal): $0.00 $5,722.20 $858.33 $6,580.53 $171.67 GRAND TOTAL $6,752.20 Project Manager f Co traaQr DATE: SUB. CON - NAME/TITLE DATE CHANGE ORDER 10 - REVISION OF EXISTING CHANGE SIGNAGES City Hall T Historic + Downtown KTUA 02 pis► ►= Bayshore E Bikeway Plaza Bonita T Sweetwater T River Bikeway 56A ® • Bayshore T Bikeway City Hall -> Mile of Cars F Finance ÷ Department Kimball Park ÷ MLK Jr. T Comm. Center 30A 13B WAYFINDING SIGNAGE PROJECT CIP NO. 16-13 A Good Sign, Inc. i*- OAI.0 RNIA,re. NATIONAL CHI' fNoBn'roRATED CHANGE ORDER NO.11 December 14, 2017 Reason/Purpose for this Change Order: After the installation of the original proposed banners, it was determined that (21) additional banners were added to the sign package. These additional banners were requested to be originally double banners but were changed to single pole banners. This change order also includes the installation and fabrication of and additional interpretive panel for Morgan Square site. The contractor requests for an additional 25 working days to procure and install the items described above. The City of National City and Contractor agree to the following change to the original Contract: The City and the Contractor agree that the Contractor shall fabricate and install the requested additional signages per the description provided above. The contractor shall install Twenty-one (21) additional banners and one (1) interpretive panel sign. The new end date for completing this project is December 14, 2017. The agreed upon price for all cost associated is $8,653,59. Original Contract Amount $ Net change by previously authorized Change Orders. ...... ......... ..... ............ .. . .. ..... Subtotal Amount of this change order 270, 359.00 43,858.93 314,217.93 8,653.59 New contract amount $ Working c ys added5 Working days subtracted: 0 Percent change in Contract to date 19.42% 322,871.52 Su thitt y. 1 Approved by. . ity y�er � z/'r4r Date City Manager, requfred for Change Orders >$24,999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, Including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Accepted and agreed to by Aood Sign, Inc.: 1—'-tlb' Name: Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 N \/_ i'I O NA L CITy ,Y \L�� WAYFINDING SIGNAGE PROJECT CIP NO. 16-13 DATE: December 14, 2017 CHANGE ORDER NO. 11 WORK PERFORMED BY: A Good Sign, Inc. DESCRIPTION OF WORK: Install additional banners and Morgan Square sign panel ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT Interpretive Panel for Morgan 1) Square site 2) Single Pole Banner Hardware Unit EA EA Qty 1.00 21.00 Wage 2,274.00 116.25 Total 2,274.00 2,441.25 1) 2) Installation of Morgan Square sign panel Reinstall banners to a single pole hardware Unit HRS HRS Sub -Total Material: Labor Markup (15%): Qty 4.00 14.00 Rate 84.35 84.35 $ 4,715.25 Total 337.40 1,180.90 Sub -Total Labor: Labor Markup (15%): SUBTOTAL: $ 1,518.30 $ 227.75 EQUIPMENT Unit Qty Rate Total 1) Boom Lift Rental EA 1.00 1,100.00 Sub -Total Equipment: Equipment Markup (15%): 1,100.00 $ 1,100.00 $ 165.00 TOTAL EQUIPMENT: $ 1,265.00 SUBTOTAL: $8,433.59 3% BOND: $ 220.00 GRAND TOTAL: $8,653.59 Job Number. 1221 A GOOD SIGN & GRAPHICS CO Job Name: National City Wayfinding Date: ASI #: Time Impact October 26, 2017 5 weeks Full Description of Change In ��`� "°'`"` ���""`�' � '�"�' �''�`' . Interpretative Panel with Post & Installation of 21 additional Single Pole Banners with hardware Breakdown Sign Type Sign Detail Inperpretative Panel Installation Labor Quantity 4.00 Direct Labor Rate S84.35 Cost $337.40 Single Pole Banner Installation Labor 14.00 S84.35 S1,180.90 50.00 50.00 SUBTOTALS 18.0 $1,51830 Breakdown Sign Type Sign Detail Interpretative Panel Fabrication and Materials Direct Materials Quantity Rate Cost 1 52,274.00 52,274.00 Single Pole Banner Hardware Fabrlcatlon and Materials 21 $116.25 52,441.25 $0.00 $0.00 SUBTOTALS 22.0 54,715.25 Breakdown Sign Type Sign Detail Banners Boom Lift for banner Installation Direct Equipment Qty Rate Cost 1.00 $1,100.00 $1,100.00 SUBTOTALS 1.0 $1,100.00 Breakdown Sign Type Sign Detail Quantity Other Rate Cost SUBTOTALS *Combined Subtotal: 15% Markup: Combined Subtotal + Markup: (Including GC & First Tier Sub cost) Bond 3% (of *Subtotal): $0.00 $7,333.55 $1,100.03 $8,433.58 $220.01 GRAND TOTAL $8,653.59 Project Manager on ractor SUB. CON - NAME/TITL DATE: /6 DATE elf 2 WAYFINDING SIGNAGE PROJECT CIP NO. 16-13 A Good Sign, Inc. CHANGE ORDER NO.12 January 6, 2018 Reason/Purpose for this Change Order: Upon the review of the currently installed signages in the city, the City Engineer determined that few additional signages needed to be installed to improve the wayfinding system in National City. Additional five (5) directional signages were requested to be installed by the City to be installed in the various locations. The contractor requests for additional 31 working days to complet this work. The City of National City and Contractor agree to the following change to the original Contract: The City and the Contractor agree that the Contractor shall fabricate and install the requested additional signages per the description provided above. The contractor shall install five (5) directional signages per the locations provided by the designer (see attached). The new end date for completing this project is January 31, 2018. The agreed upon price for all cost associated is $17,215.02. Original Contract Amount $ 270,359.00 Net change by previously authorized Change Orders .................................... 52,518.52 Subtotal 322, 877.52 Amount of this change order 17,215.02 New contract amount $ Working ays added: 31 Working days subtracted: 0 340, 092.54 Percent change in Contract to date 25.79% Sub ' by: l .. Proje anage l Approved by: ... Ci ngineer ` +�,�/...er Date City Manager, required for Change Orders 42g898 .... Date _..... By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order Is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs assodated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees. bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are Incorporated herein. Accepted and agreed to byA tapod Sign, Inc.: -�i Name: Date Note to Contractor. If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 CALIFORNIA NSAO INSAL CI� 11'Y INCORPORATE WAYFINDING SIGNAGE PROJECT CHANGE ORDER NO. 12 CIP NO. 16-13 DATE: January 6, 2018 WORK PERFORMED BY: A Good Sign, Inc. DESCRIPTION OF WORK: Install five (5) additional directional signages ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT Five (5) additional directional 1) sianaae Unit EA Qty 5.00 Wage 1,303.00 Sub -Total Material: Labor Markup (15%): 977.25 SUBTOTAL: Total 6,515.00 $ 6,515.00 LABOR Unit Qty Rate Total 1) Fabrication and installation of five (5) directional signage HRS 40.00 84.35 3,374.00 $ 3,374.00 Sub -Total Labor: Labor Markup (15%): SUBTOTAL: $ 506.10 3,88O.10' EQUIPMENT Unit Qty Rate Total 1) Boom Lift Rental HRS 2.00 1,750.00 3,500.00 1) Mobilization EA 1.00 1,200.00 1,200.00 $ 4,700.00 Sub -Total Equipment: Equipment Markup (15%): TOTAL EQUIPMENT: $ 705.00 SUBTOTAL: $16,777.35 3% BOND: $ 437.67 GRAND TOTAL: $17,215.02 A GOOD SIGN & GRAPHICS CO COR#12 Job Name: National City Wayfinding Job Number. 1221 Date: January 23, 2018 ASI #: EMAIL 1/22/2018 Time Impact: 31 DAYS from approval Full Description of Change In Scope: Additional Street / Traffic Directionals Breakdown Direct Labor Sign Type Sign Detail Hours Rate Cost Qty (5) Street/Traffic Directional Additional days at no cost 40.00 $84.35 $3,374.00 SUBTOTALS 40.0 $3,374.00 Breakdown Direct Materials Sign Type Sign Detail Quantity Rate Cost Qty (5) Street/Traffic Directional Materials & Labor 5.00 $1,303.00 $6,515.00 SUBTOTALS 1 5.0 $6,515.00 Breakdown Direct Equipment Sign Type Sign Detail Qty Rate Cost Boom Lift Rental Rental Cost 2.00 $1,750.00 $3,500.00 Remobilization out to the site Mobilization Cost 1.00 $1,200.00 $1,200.00 SUBTOTALS 1 3.0 $4,700.00 Breakdown Other Sign Type Sign Detail Quantity Rate Cost (including GC & First Tier Sub cost) SUBTOTALS $0.00 *Combined Subtotal: 15% Markup: Combined Subtotal + Markup: Bond 3% (of *Subtotal): $14,589.00 $2,188.35 $16,777.35 $437.67 SUB. CON - NAME/TITLE GRAND TOTAL•r $17,215.02 DATE Additional Signage Locations NC Wayfinding Signage Project, CIP No. 16-13 Contractor: A Good Sign, Inc. LOCATION 1: 1-5 Off ramp at 8th Street 4 'W�• *".�e1 -.Y J _... Sign Type Vehicular Directional Sign — Downtown Comments/Sign Content Content: "City Hall 4", "Kimball Park 4", "Library 4", "Transit Center E" Additional Signage Locations NC Wayfinding Signage Project, CIP No. 16-13 Contractor: A Good Sign, Inc. LOCATION 2: 1-5 Off ramp at Marina Bay Dr and Mile of Cars (CALTRANS Area) Sign Type Vehicular Directional Sign — Marina Comments/Sign Content Content: "Aquatic Center 4", "City Hall f-", "Mile of Cars E", "Pier 32 Marina 4" CALTRANS property — will need an agreement for installation Additional Signage Locations NC Wayfinding Signage Project, CIP No. 16-13 Contractor: A Good Sign, Inc. LOCATION 3: Plaza Blvd and Roosevelt Avenue (EAST) Sign Type Vehicular Directional Sign — Downtown Comments/Sign Content Content: "Chamber of Commerce Is", "City Hall +", "Historic Downtown •t", "Library 4" Additional Signage Locations NC Wayfinding Signage Project, CIP No. 16-13 Contractor: A Good Sign, Inc. LOCATION 4: Plaza Blvd and Roosevelt Avenue (SOUTH) Sign Type Vehicular Directional Sign — Downtown Comments/Sign Content Content: "City Hall 4-", "Historic Downtown 4", "Library F" Additional Signage Locations NC Wayfinding Signage Project, CIP No. 16-13 Contractor: A Good Sign, Inc. LOCATION 5: Plaza Blvd and Roosevelt Avenue Sign Type Vehicular Directional (Small) — Marina Comments/Sign Content Content: "Bayshore Bikeway 4", "Pepper Park4", "Sweetwater River Bikeway E-" Place the sign towards the bike path LOCATION 6: Heritage Square and Morgan Square (Specific Location — TBD) Sign Type Interpretive Sign Panels Comments/Sign Content Content: (1) Heritage Square and (1) Morgan Square (content to be provided by Brad) AI, CITY OF NATIONAL CITY Office of the City Clerk 1243 National City Blvd., National City, California 91950-4397 619-336-4228 Michael R. Dalla, CMC - City Clerk A GOOD SIGN AND GRAPHICS CO. Wayfinding Signage Project, CIP No. 16-13 Change Orders #9 through #12 Judy Hernandez (Engineering/Public Works) forwarded Copies of the Change Orders to A Good Sign and Graphics Co.