HomeMy WebLinkAbout2018 CON Palm Engineering - Westside Mobility Improvements CIP No. 17-04 - Change Orders #21 through #2811/ n-. CALIFORNIA NATIONAL aTir aoutt tNaonrcTATM), WESTSIDE MOBILITY IMPROVEMENTS CIP NO. 17-04 Contractor: Palm Engineering Construction Company, Inc. Reason/Purpose for this Change Order: During demolition of the pedestrian ramp at the Northwest corner of 11th Street and Roosevelt Avenue an existing 8" corrugated metal drain pipe adjacent to the ramp was deteriorated and needed to be replaced. Under direction of the Engineer the Contractor proceeded with the installation of 40 linear feet of new 8" PVC drain pipe, adjusting the layout and encasing in concrete. CHANGE ORDER NO. 21 Match 20, 2018 The City of National City and Contactor agree to the following change to the original Contract: The City and the Contractor agree that the Contractor shall proceed with the installation of 40 linear feet of 8" PVC drain pipe, adjusting the layout and encasing in concrete at the Northwest corner of 11 th Street and Roosevelt Ave. The agreed upon price for all costs associated with this work is as stated on this Change Order. See Attachment for cost breakdown. Original Contract Amount $ 1,780,325.57 Net change by previously authorized Change Orders 107,809.84 Subtotal 1,888,135.41 Amount of this change order 4,590.00 New contract amount $ 1,892,725.41 Working days added: 0 Working days subtracted: 0 Percent change in Contract to date 6.31% Submitted by: City.Lngineer Date City Manager, required for Change Orders>$24,999 Date By signing this Change Order the Contractor confirms that he/she Is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms Thal the price Is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are Incorporated herein. Accepted and agreed to by Palm Eniineering Construction Company, Inc. Name: Date Flote toOonlractor: If you do not agree with this Change Order you may be Tirected to proceed with this work under the -terms l the contract and you may proceed under protest. You must comfy with the contract reauirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 \ .,: CALI ORNIA *�+- NATIONAL Cuirir e e INcoaponnTVD / 1 WESTSIDE MOBILITY IMPROVEMENTS CHANGE ORDER NO. 21 CIP NO. 17-04 DATE: January 30, 2018 WORK PERFORMED BY: Palm Engineering DESCRIPTION OF WORK: Reconstruction of drain at NW corner of 11th Street and Roosevelt ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT Unit Qty Wage Total 1) Reconstruction of drain pipe LS 1.00 4,500.00 4,500.00 TOTAL: SUB TOTAL: $ 4,500.00 BOND AND INSURANCE (2%): $90.00 L GRAND TOTAL: $4,59 Working days subtracted: 0 Percent change in Contract to date 6.60% WESTSIUE MOBILITY IMPROVEMENTS CIP NO. 17-04 Contractor: Palm Engineering Construction Company, Inc. Reason/Purpose for this Change Omer.: Two trees at the Southeast comer of Wilson Ave and 15th Street had lifted the sidewalk and were growing around electrical lines and needed to be removed. One tree at 1726 Wilson Ave had lifted the sidewalk and needed to be removed. Under direction of the Engineer the Contractor proceeded with removing and disposing of the three trees. CHANGE ORDER NO. 22 March 20, 2018 The City of National City and Contractor agme to the following change to the original Contract: The City and the Contractor agree that the Contractor shall proceed with removing and disposing of the three trees mentioned at the locations above. The agreed upon price for all costs associated with this work is as stated on this Change Order. See Attachment for cost breakdown. Original Contract Amount $ 1,780,325.57 Net change by previously authorized Change Orders Subtotal 112,399.84 1,892,725.41 Amount of this change order 5,100.00 Now contract amount $ 1,897,825.41 Working days added: 0 Submitted by: ngineer� - Date City Manager, required kfa,m Orders>524,999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order Is approved, Contractor will provide all d the equipment, materials and labor necessary to provide a complete work as described above at that the priceslated herein. Additionally, Contractor confirms that the price Is fair and complete and represents all costs associated with the work. Including but not limited to all equipment, materials, labor, supervision, overhead, tees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are Incorporated herein. Accepted and at eed to by Palm Engineering Construction CompanyLlnc. Name: r � Date ofe to Coniraclor:lt you do not ogee wTl trlfifs Cttange Order you m ay be directed to proceed with this work under I�ie terms orthe coMrac>i - you may Proceed under Protest. You must comely with the contract reouirements of submittina a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 1 I --. CALIFORNIA 017 e e r- XNCORPORATED '.. WESTSIDE MOBILITY IMPROVEMENTS CIP NO. 17-04 DATE: January 30, 2018 CHANGE ORDER NO. 22 WORK PERFORMED BY: Palm Engineering DESCRIPTION OF WORK: Removal of 3 Trees at 15th Street and Wilson Avenue ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT Unit Qty Wage Total $ 5,000.0AW1 1) Removal of 2 Trees on 15th LS 1.00 3,750.00 3,750.00 2) Removal of 1 Tree on Wilson LS 1.00 1,250.00 1,250.00 TOTAL: SUB TOTAL: 5,000.00 BOND AND INSURANCE (2%): $100.00 I GRAND TOTAL: $ ,100.00 WESTSIDE MOBILITY IMPROVEMENTS CIP NO. 17-04 Contractor. Palm Engineering Construction Company, Inc. CHANGE ORDER NO. 23 March 22, 2018 Reason/Purpose for this Change Order Large eucalyptus trees along Wilson Avenue between 18th Street and Civic Center Drive raised and damaged adjacent curb/gutter causing ponding and drainage issues and needed to be removed and replaced. Under direction of the Engineer the Contractor proceeded under time and materials for the demolition of the curb/gutter. The City of National City and Contractor agree to the following change to the original Contract: The City and the Contractor agree that the Contractor shall proceed with removing and disposing of the damaged curb and gutter on Wilson Avenue between 18th Street and Civic Center Drive. The agreed upon price for all costs associated with this work is as stated on this Change Order. See Attachments for cost breakdown. Original Contract Amount $ 1,780,325.57 Net change by previously authorized Change Orders 117,499.84 Subtotal Amount of this change order New contract amount $ 1,906,421.48 Working days added: 0 Workinq days subtracted: 0 Percent change in Contract 10 date 7.08% 1,897,825.41 8,596.05 Submitted by: Pict Man r ti 3. ate /. pproved by: Ci�eer Y 9 • Date City Manager,r, required � Orders>s24.tass Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated Its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above al that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Accept 9d and agreed to by Palm Engineering Construction Company, Inc. N 6 /4? i/..1 Date ote to you not agree wi ange you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract reauirements of submittlna a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager Contra ctor: If do th this Ch Order 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 CALIFORNIA� OV ATED WESTSIDE MOBILITY IMPROVEMENTS CIP NO. 17-04 DATE: February 1, 2018 CHANGE ORDER NO. 23 WORK PERFORMED BY: Palm Engineering DESCRIPTION OF WORK: Wilson Ave curb and gutter Demolition ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT Unit Qty Wage Total 1) Curb/Gutter -I-&M - 1/23/18 LS 1.00 972.41 972.41 2) Curb/Gutter T&M - 1/24/18 LS 1.00 967.14 967.14 3) Curb/Gutter T&M - 1/30/18 LS 1.00 2,732.02 2,732,02 4) Curb/Gutter "I-&M - 1/31/18 LS 1.00 2,312.41 1,612.07 2,312,41 1,612,07 5) Curb/Gutter T&M - 2/1/18 LS 1.00 GRAND TOTAL: i ` - y }� .;:: CALIFORNIA -0r NATIONAL Cintry INCORpO?tATI i WESTSIDE MOBILITY IMPROVEMENTS CHANGE ORDER NO. 23 CIP NO. 17-04 DATE: January 23, 2018 WORK PERFORMED BY: Palm Engineering DESCRIPTION OF WORK: Wilson Ave curb and gutter sawcutting ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT LABOR' Unit Qty Wage Total 1) 2) Stacey Kearns - Labor G4 F. Hernandez - Labor G1 Hour Hour 5.00 2.00 54.24 52.53 271.20 105.06 $ 376.26 Sub -Total Labor: Labor surcharge (29.45%): Labor Markup (20%): TOTAL LABOR: $ 110.81 $ 97.41 584.48. MATERIALS Unit Qty Rate Total Sub -Total Materials: $ Materials Markup (15%): $ - TOTAL MATERIALS: EQUIPMENT Unit Qty Rate Total 1) Saw Truck Hour 5.00 64.15 320.75 $ 320.75 Sub -Total Equipment: Equipment Markup (15%): TOTAL EQUIPMENT: $ 48.11 SUB TOTAL: BOND AND INSURANCE (2%): GRAND TOTAL: 368.86 953.3 $19.07 $972.41, 4 CALIFORNIA —F Lam` I ONAL C r eUvCOEpoRATED -J WESTSIDE MOBILITY IMPROVEMENTS CHANGE ORDER NO. 23 CIP NO. 17-04 DATE: January 24, 2018 WORK PERFORMED BY: Palm Engineering DESCRIPTION OF WORK: Wilson Ave curb and gutter sawcutting ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT 1) Stacey Kearns - Labor G4 Unit Hour Qty 6.00 Wage 54.24 Total 325.44 $ 325.44 Sub -Total Labor: Labor surcharge (29.45%): Labor Markup (20%): TOTAL LABOR: $ 95.84 $ 84.26 'MATERIALS Unit Qty Rate Total Sub-Tota Materials: Materials Markup (15%): TOTAL MATERIALS: $ $` 505.54 EQUIPMENT Unit Qty Rate Total 1) Saw Truck Hour 6.00 64.15 384.90 $ 384.90 Sub -Total Equipment: Equipment Markup (15%): TOTAL EQUIPMENT: $ 57.74 SUB TOTAL: BOND AND INSURANCE (2%): GRAND TOTAL: $ 442.64 948.18 $18.96 $967.14. ir-. CALIFORNIA r NATIONAL Cnrr o o U INCORPORATED WESTSIDE MOBILITY IMPROVEMENTS CHANGE ORDER NO. 23 CIP NO. 17-04 UA I E: January 30, 2018 WORI< PERFORMED BY: Palm Engineering DESCRIPTION OF WORK: Wilson Ave curb and gutter demolition ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT LABpbR Unit Qty Wage Total 1) 2) 3) 4) Hernandez, F - Operator G4 Hour Diaz, R. - Operator G3 Hour Beas, Jose, Labor GI. Hour Donan, R. - Operator G3 Hour 6.00 6.00 6.00 3.00 72.60 71.11 52.53 72.6(l 435.60 426.66 315.18 217.80 $ 1,395.24 Sub -Total Labor: Labor surcharge (29.45%): Labor Markup (20%): TOTAL LABOR: $ 410.90 $ 361.23 Unit Qty Rate Total $ Sub -Total Materials: Materials Markup (15%): TOTAL MATERIALS: 2,167,37 EQUIPMENT Unit Qty Rate Total 1) 2) 3) 246 D Cat Skidsteer S171 Bobcat Skidsteer E42 Bobcat Mini -Ex (use E45 caltans) Hour Hour Hour 6.00 3.00 6.00 29.46 29.46 29.88 176.76 88.38 179.28 $ 444.42 Sub -Total Equipment: Equipment Markup (15%): TOTAL EQUIPMENT: $ 66.66 $ 511.08 SUB TOTAL: $ 2,678.45 BOND AND INSURANCE (2%): GRAND TOTAL: $53.57 $2.,732.02 +;-e CALIFORNIA NATIONAL CIv e e cti INCORPORA'1'UD WESTSIDE MOBILITY IMPROVEMENTS CHANGE ORDER NO. 23 CIP NO. 17-04 DATE: January 31, 2018 WORK PERFORMED BY: Palm Engineering DESCRIPTION OF WORK: Wilson Ave curb and gutter demolition ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT LABOR 1) Hernandez, F - Operator G4 2) Diaz, R. - Operator G3 3) Avila, S - Operator G3 4) Donan, R. - Truck Driver Unit Hour Hour Hour Hour Qty 6.00 3.00 3.00 5.00 Wage 72.60 71.11 71.11 24.00 Total 435.60 213.33 213.33 120.00 $ 982.26 Sub -Total Labor: Labor surcharge (29.45%): Labor Markup (20%): TOTAL LABOR: $ 289.28 $ 254.31 u Unit Rate Total Sub -Total Materials: $ - Materials Markup (15%): $ - TOTAL MATERIALS: Qty EQUIPMENT Unit Qty Rate Total 1) 2) 3) 4) 246 D Cat Skidsteer Hour 3.00 29.46 88.38 S171 Bobcat Skidsteer E42 Bobcat Mini -Ex (use E45 caltans) 3-Axle Dump truck Hour Hour Hour 3.00 6.00 5.00 29.46 29.88 57.70 88.38 179.28 288.50 $ 644.54 Sub -Total Equipment: Equipment Markup (15%): TOTAL EQUIPMENT: $ 96.68 $ 1525.85 $ 741.22 SUB TOTAL: $ 2,267.07 BOND AND INSURANCE (2%): GRAND TOTAL: $45.34 $2,312.41 fr-> CALIFORNIA NATIONAL 1NAL Car `. XNCORPORATE WESTSIDE MOBILITY IMPROVEMENTS CHANGE ORDER NO. 23 CIP NO. 17-04 DATE: February 1, 2018 WORK PERFORMED BY: Palm Engineering DESCRIPTION OF WORK: Wilson Ave curb and gutter demolition ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT LABOR Unit Qty Wage Total 1) 2) F. Hernandez - Operator G4 Diaz, R. _ Operator G3 3) Donan, R. - Truck Driver Hour Hour Hour 4.00 4.00 72.60 71.11 4.00 24.00 290.40 284.44 96.00 $ 670.84 $ 197.56 $ 173.68 Unit Qty Rate Total Sub -Total Materials: Materials Markup (15%): TOTAL MATERIALS: EQUIPMENT Unit Qty Rate Total 1) 2) 3) 246 D Cat Skidsteer E42 Bobcat Mini -Ex (use E45 caftans) 3-Axle Dump Truck Hour Hour Hour 4.00 4.00 4.00 29.46 29.88 57.70 117.84 119.52 230.80 $ 468.16 Sub -Total Equipment: Equipment Markup (15%): TOTAL EQUIPMENT: $ 70.22 $ 538.38 SUB TOTAL: $ 1,580.46 BOND AND INSURANCE (2%): GRAND TOTAL: $31.61 1,612.07 Sub -Total Labor: Labor surcharge (29.45%): Labor Markup (20%): TOTAL LABOR: WESTSIDE MOBILITY IMPROVEMENTS CIP NO. 17-04 Contractor: Palm Engineering Construction Company, Inc. Reason/Purpose for this Change Order: The service order was created during construction and needed payment. Under direction of the Engineer the Contractor proceeded with paying the SDGE service order for the 14th St and Harding Ave roundabout lighting. CHANGE ORDER NO. 24 March 22, 2018 The City of National City and Contractor agree to the following change to the original Contract: The City and the Contractor agree that the Contractor shall proceed with paying the SDGE service order for the street lights at the 14th St and Harding Ave roundabout. The agreed upon price for all costs associated with this work is as stated on this Change Order. See Attachments for cost breakdown. Original Contract Amount $ 1,780,325.57 Net change by previously authorized Change Orders 126,095.89 Subtotal Amount of this change order New contract amount Working days added: 0 Working days subtracted: 0 Percent change in Contract to date 7.20% Submitted by: 1,906,421.46 2,174.74 $ 1,908,596.20 Approved bey: it�ee Date City Manager, rewired tor Change Orclers >$24,999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price Is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, Insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are Incorporated herein. Acced and agreed to by Palm Engineering Construction Company, Inc. Name: Note to Contractor: If you do not agree with this Charge Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest You must comply with the contract reauiremants of submMina a written protest to protect vour claim. Originals: City Cleric, Contractor cc: Engineering project file, Project Manager Date 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 ,:\ CALIFORNIA NATIONAL Ci r _ fir c V J - INCORPOJ1ILTED WESTSIDE MOBILITY IMPROVEMENTS CIP NO. 17-04 DATE: February 23, 2018 CHANGE ORDER NO. 24 WORK PERFORMED I3Y: Palm Engineering DESCRIPTION OF WORK: Pay SDGE Service Order ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT MATERIALS Unit Qty Rate Total 1) SDG&E service order LS 1.00 1,854.00 1,854.00 $ 1,854.00 Sub -Total Materials: Materials Markup (15%): TOTAL MATERIALS: $ 278.10 SUB TOTAL: BOND AND INSURANCE (2%): GRAND TOTAL: $ 2,132.10 1 $ 2,132.10 $42.64 $2474.74 PCR Remittance Ver 1.0 Page 1 of 1 SDG( A X Sempra Energy utility' CUSTOMER PAYMENT REMITTANCE Invoice/CR # 298522 Project # 186264 Date January 30, 2018 Preparer Brodbeck, Nicole Customer/Project Name: P105839J, NEW UG SVC PT Project Location: HARDING @ W 14TH SDG&E Contact: Mims, Jessica Telephone: 858-636-5713 PAYMENT DUE: $1,854.00 - Make checks payable to SDG&E - MAIL TO: Customer Payment Services - CP61C San Diego Gas & Electric PO Box 129831 San Diego, CA 92112-9831 THIS REMITTANCE MUST BE RETURNED WITH PAYMENT http://infoweb.sdge.com/departments/cac/cac_remittance.cfm 1/30/2018 CASH ONLY IF ALL Chec6Lucti". SECURITY FEATURES LISTED ON BACK INDICATE NO TAMPERING OR COPYING "'"" Palm Engineering Construction Company, Inc. 7330Opporlanity Road, Suite San Diego, CA 92111 (619) 291-1495 UNION BANK OF CALIFORNIA, N.A. MIDWAY BRANCH #10 - (619) 221-2828 3281 SPORTS ARENA BLVD, SAN DIEGO, CA 92110 18-49/1220 15085 2/23/2018 PAY TO THE SDG& E I $ **1,854.00 ORDER OF ri One Thousand Eight Hundred Fifty -Four and 00/100********************************************* DOLLARS SDG& E - Customer Payment CP61C P.O. Box 129831 San Diego, CA 92112-9831 Westside - Project #186264 - paid on behalf of 00 L 508 5il' ': L 2 2000496n: 0 L000446090 Palm Engineering Construction Company, Inc. SDG& E Date Type Reference 2/21/201 Bill 298522 15085 2/23/2018 Original Amt. Balance Due Discount Payment 1,854.00 1,854.00 1,854.00 Check Amount 1,854.00 Main Checking - UB Westside - Project #186264 - paid on beha 1,854.00 RT n Id WESTSIDE MOBILITY IMPROVEMENTS CIP NO. 17-04 Contractor: Palm Engineering Construction Company, Inc. Reason/Purpose for this Change Order: The frontage of 1539 Roosevelt Ave had to be adjusted due to the elevations of the new improvements to meet ADA requirements. Under direction of the Engineer the Contractor proceeded under time and materials to with adjusting the concrete forms and repairing the inigation. The City of National City and Contractor agree to the following change to the original Contract: The City and the Contractor agree that the Contractor shall proceed with adjusting the concrete forms and repairing the irrigation at 1539 Roosevelt Ave. The agreed upon price for all costs associated with this work is as stated on this Change Order. See Attachments for cost breakdown. Original Contract Amount $ 1,780,325.57 128,270.63 Net change by previously authorized Change Orders Subtotal Amount of this change order New contract amount Working days added: 0 Working days subtracted: 0 1,908,596.20 1,978.18 $ 1,910,574.38 Percent change in Contract to date 7.32% Submitted by: Approved bf i y ngineer `12de ' Date City Manager, required r«aa,oeorders 424,993 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated Its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Accepted a d agreed to by Palm Engineering Construction Company, Inc. J CHANGE ORDER NO. 25 March 22, 2018 (4. Name: ate Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract reauirements of submittina a written protest to protect vour claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 * CALIFORNIA NATIONAL C fly. iNcortroRATV) WESTSIDE MOBILITY IMPROVEMENTS CHANGE ORDER NO. 25 CIP NO. 17-04 DATE: October 3, 2017 WORK PERFORMED BY: Palm Engineering DESCRIPTION OF WORK: Redo irrigation and adjusting concrete forms in front of 1539 Roosevelt Ave ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT LABOR Unit Qty Wage Total 1) 2) 3) 4) F. Hernandez-Landscape/Irrig. L J. Resendez-Landscape/Irrig. Lat I. Avila - Cement Mason 5. Fragosa - Equip. Op G3 Hour Hour Hour Hour 7.00 7.00 5.00 1.00 51.51 72.60 53.65 71.11 360.57 508.20 268.25 71.11 $ 1,208.13 Sub -Total Labor: Labor surcharge (29.45%): Labor Markup (20%): TOTAL LABOR: $ 355.79 $ 312.78 $ _ 1;876.70 ViktEIVAis Unit Qty Rate Total 1) 2" Sleeve - (Imperial Ave.) LF 15.00 0.6720 10.08 2) 45 degree Coupling (Imperial Avc Each 4.00 0.6930 2.77 3) Couplings - (Imperial Ave.) LF 4.00 1.9800 7.92 4) 3/4 PVC Pipe LF 20.00 0.2140 4.28 $ 25.05 Sub -Total Materials: Materials Markup (15%): TOTAL MATERIALS: $ 3.76 28.81 EQUIPMENT Unit Qty Rate Total 1) 125 Skidsteer Hour 1.00 29.46 29.46 $ 29.46 Sub -Total Equipment: Equipment Markup (150/0): TOTAL EQUIPMENT: $ 4.42 $ 33.88 SUB TOTAL: $ 1,939.39 BOND AND INSURANCE (2°/o): GRAND TOTAL: $38.79 $1978.18 111111' Imperial SPRINI<LERSUPPLY Imperial Sprinkler Supply, Inc 1485 N. MANASSERO ST. ANAHEIM, CA - 92807 PHONE: (714)792-2925 FAX: (714)792-2926 CUST #: 4335 BILL TO: PALM ENGINEERING CONST. 7330 OPPORTUNITY ROAD SUITE J SAN DIEGO, CA, 92111 iNSTRUCT10NS , „ 2/RUN USE FORKTRUCK 6197703829 ..................• PRODUCT AND DESCRIPTION ORDERED 16 DTR. 00000 2 TAPE 2 x 60 YD RFD CL.QTH SUCT TAPE - 9 MIL' 13 7115: 00000 1 GLUE; .GREY LOW VOC PVC CEMENT (Gallon) 14 P+71G 40000:.: 1 GL `PURPLE LOIJ VCC. PVC PRXMER`(Gallon) 19 Ali Opa 00. 2 PAX r' �u1ITE MARKING : . 18A22'l.:::.::::.:.::.... Pi0.IN` iFLOliRESCE Xhterchangepry 12 P06:`.:.:.:.:::.:.:.:.:.:.:. 17 FTGI 15 S 4 200-Lt4 PIPES4l� 8 300-040 PIPESW 3"' 7 075 040 6 150=0 PIPESW I1/2' 5 400440' @IPESW 4 3 25D D40 00E541 21/2 2 12p4o PIPF$W 11/4 1 100040 PIPESW 1° 10 9 11 2 >�(li;'• lEXNG€;PAINT s € 12 `4RA$ E MARKING PAINT 0Q ING': 0000€ PIPE 00000' 100 PIPE. 00000 200 PIPE 00000, 220 SEH€4o Pvr, :PIPE, 0000.0 300 SCF140 PVC'4PIPE' 0000a 80 Prpe 00000 160 SCH 40 PVC ': PIPE 00000 140 SCH 40 PVC'• . PIPE.: PEUL 2 0) 150.UL I EI le�R € 4oNDuZ < :P € PE S H 40) FYGUL 1.1l2'::Ul stop Continued 2:1:121:4335 200 200 10 INVOICE 71 KEjJ 8Y INVOICE DATE.,' INVOICE NO, HF 09/07/17 3068745-00 Pi.0. DATE I: PLACLD 8Y PAGE:NO: 09/05/17 PHIL 11 of 2 P Q NUrofOR ,. 1705 Mainline 1705 SHIP TO: PALOMAR COLLEGE SOUTH CAMPUS 11111 RANCHO BERNARDO RD XST MATINAL RD SAN DIEGO, CA 92111 n u m [ESCONDIDO WAREHOUSE (30 0 SHIP PORN:}`:#i Shi]PPED 2 12 10 EA Our Truck 14.73 135.65 117.20 6.98 6.98 6.98 6.56 2 EA j 21.79 500 100 0 CIA-4 200 F 220 300 FT 80 160 140 FT 200 200 10 EA 1.31060 0.19780 0.46860 1.83300 1.02650 0.40 0.29040 1.75160 1.30360 4.76 FA EA EA EA EA Ft FT FT FT 09/06/17 8.3961 56.9730 49.2240 3.9786 3.9786 3.9786 1.9024 12.4203 0.6210 1.3106 0.1978 0.4686 1.8330 1.0265 0.4000 0.2904 0.7882 0.5866 1.3804 NET 30 DAYS Nc IAMOUNT:. Cash Discount 0.00 If Paid By 09/07/17 103 ."09' hill! Imperial SPRINKLER SUPPLY Imperial Sprinkler Supply, Inc 1485 N. MANASSERO ST. ANAHEIM, CA - 92807 PHONE: (714)792-2925 FAX: (714)792-2926 COST #: 4335 BILLTO: PALM ENGINEERING CONST. 7330 OPPORTUNITY ROAD SUITE J SAN DIEGO. CA, 92111 II I I I I I I (I I I I I1 u I I m II IIIIJ SHIP TO: INVOICE HA P. PO..a 08/21/17 INVQICE', DATE 1 INVOICE NO: 08/22/17 1 3053458-00 RN' PAGE NO. ROSS 1 of 1 �lWMs>nR 1704 * 1/04 WESTSIDE MOBILITY 14TH ST AND HARDING ST. NATIONAL CITY. CA 91950 ISTHUCIIONS .. SHIP POINT NATIONAL CITY WAREHOUSE Will Call VIA PRODUCT ANP.PESCHIPTION OROERE9 SHIPPED UM LIST PRICE 3 401-007 00000 12 FTGS40 3/4" TEE S ch40 PVC (s.s.$) 2`417-007 00000 10 FIGS40 3/4" ELL Sch40 PVC (s.$) 4.407.-101 0000030 . TG 40 3/4 x 1/2 90 CLL'Sch40`PVC (s.t) 1:206.010 00000 6 UL SWEEP 90 B.E. 00000 4 :FT6(JL a " 5 :3�48C :VENDS 14x19 RFCT VALVE`PDX ICV (GRN/(W.N) **************** Please remii.payleent to our corporate office:. 1485.N. Manssero`St, Anaheim..CA;22807 * ************** For Acct Rec,;Releases ow Credit Ca11 714 792.2925 option 4. 06%/0.editdept@imp40-41prinkler.com 714.696-7530 or ail 0editdept@imperlaisprinkler.com For Billing questions. Invoice or Pick Ti @t.copies please contact 714.792-2925 Ext 606 oi~ Ail billing@impe talsprinkler.�oI ,lnvoiceS::40fled to you, please sQnd o J NVP:mperialsprink::#.::Ct ********** R MOI4Th.Y' SPECIALS AND :WEBSITI IMPE.RIIUOBINKLERSUPPLY COM; Last Page 2:1:117:4335 u i i SH1f PED :TERMS 08/21/17 NET 30 DAYS NET PRICE NET AMOUNT 3.67 12 EA 1.02 EA:-. 0.3060 10 EA `' 1.83 FA 0.5490 30 CA 1.05 EA 0.3150 6 EA 2.53 EA 0.7337 4 `EA 72.20300 EA;;:.: 18.7728 62 ;;Total `axes iiaoice Total - Cash Discount 0.00 If Paid By 08/22/17 tip Imperial es6 SPRINKLER SUPPLY Imperial Sprinkler Supply, Inc 1485 N. MANASSERO ST. ANAHEIM, CA - 92807 PHONE: (714)792-2925 FAX: (714)792-2926 MST #: 4335 BILL TO: PALM ENGINEERING CONST. 7330 OPPORTUNITY ROAD SUITE J SAN DIEGO, CA, 92111 SHIP 10: ; ; I _ - - INVOICE TAKEN BY - '- ANYPIcE. DATE '' ., INVOICE NO ES 08/29/17 3061219-00 f.s.'ic;,.w,,Tg, .,. -2 .,_ kI044ilay ::.::.::;..,- PAGE NC.:.? 08/28/17 ROSS 1 of 1 .•.i.-..-Mei''...AbiWf:!':iCi.040iiii.'-T'.':'-''','.. --1704 1704 WESTSIDE MOBILITY 14TH ST AND HARDING ST. NATIONAL CITY, CA 91950 11 11 11 fi 111 NATIONAL CITY WAREHOUSE Will Ca11 08/28/17 NET 30 DAYS f311()IDIJCT AND DFSCRII'TION , ORDEPLD BO SHIPPED UM LIST I'NICE: UM 6 406-00/ FTGS40 3/4" 8 417-007 FiGS4Q 3/4:: #11.6PWAW .00:400.1400 1 2 5 477!:: ET 3 4O61'O FTGS40 .,: 8 Lines TOte(r 00000 10 90 ELL-049PVC (s.$) 10 0000i 45. fLLSch4OVC (s.$) 0000#i 5 00P 1))/C.,,§040 (s.$) 1 chso PVC 5 PVC (s.s.$) 10 A004F,Pit.i444VC (s.$) 5 (s.$) . 0 10 ftL'Sch4OPVC (s.$) 10 10 0 5 1 0 5 10 0 Qty hipped TO*4 Please it ' to our corporate offi'.-.. 1485'iii.lanieiiSt, Anaheim, cA,-94p07. .... -:—:: ..,, For Acct Rec, R0100!s or Oedit Ca11 714.42925'::_biition 4, Fax 714-696-7536kMail .editdept@imperlalsprinkler.com ******AAAAAAAA* • .,-'„1: .,•,•,.. ,.. ,I,' .: : :::„ ' - •:,-:. • I-',.,i H,: , For Billing c.iestionsAn*kce or Pick Ticket 0pie please Contatl400#2025 Ext 606 oi;4ajait-:: ........... ........... bill100f0p011alsprinkler.00, • • A A kVAM********** i ' ' ; . ; . To have ycur inyoice*i#0100 to you, please send y ur information to 4660tEN:.-40*itperialsprinklri'.!:0* . . — — :.:-.*:t##,a********** ::: • . ..... ..... CHECK .0J.Ti041 A0NViSPECIALS AND' wp541- AT ---':Oi.0000iA40.*INKLERSUPPLY0iii... Last Page 5:3:43:4335 5 10 56 EA •EA EA EA EA EA EA EA 0.81 1.83 0.64 14.78 1.91 2.19 1.13 1.43 EA 0 2430 EA 0.5490 EA 0.1920 EA 3.5472 EA 0.5730 EA 0.6570 EA 0.3390 EA 0.4290 Total Taxes Invoice Total Cash Discount 0.00 If Paid By 08/29/17 2.743. 5.49 0.96 3.55 ?.86 6.57 1 69 4 ?9; 27 84 2 30 30 .; • :• • •: • 14 cA6!FARNIA NATioNia airy C�olio& INCO/OoR 1TSD WESTSIDE MOBILITY IMPROVEMENTS CIP NO. 17-04 Contractor: Palm Engineering Construction Company, Inc. CHANGE ORDER NO. 26 March 22, 2018 Reason/Purpose for this Change Order: The dirt parkway on 19th St behind Kimball Elementary grades needed to be raised to prepare for mulch. Under direction of the Engineer the Contractor proceeded under time and materials with adjusting the grade and prepping for mulch within the parkway. The City of National City and Contractor agree to the following change to the original Contract: The City and the Contractor agree that the Contractor shall proceed with prepping the dirt parkway for mulch on 19th Street behind Kimball Elementary by adjusting the grades. The agreed upon price for all costs associated with this work is as stated on this Change Order. See Attachments for cost breakdown. Original Contract Amount $ 1,780,325.57 Net change by previously authorized Change Orders Subtotal Amount of this change order New contract amount Working days added: 0 Working days subtracted: 0 Submitted by: Approved by: Date 130,248.81 1,910,574.38 1,930.06 $ 1,912,504.44 Percent change In Contract to date 7.42% City Manager, regdredfar Change Orders '$24,999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price Is fair and complete and represents all costs associated with the work, Including but not limited to all equipment, materials, labor, supervision, overhead. fees, bonds, Insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Accepted and agreed to by Palm Engineering Construction Company, Inc. Name: Note to Contractor: If you do not agree with this Change Order you may beGected to proceed mirth -This work under the terms of1he contract an • you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect vour claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager Date 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 CALIFORNIA E .NATIONAL Calf Rut/ C. 'NeoRPORATE WESTSIDE MOBILITY IMPROVEMENTS CHANGE ORDER NO. 26 CIP NO. 17-04 DATE: February 15, 2018 WORK PERFORMED BY: Palm Engineering DESCRIPTION OF WORK: Grade between sidewalk & curb @ 19th & Harding - 2/15/18 ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT LABOR Unit Qty Wage Total 1) 2) 3) 4) 4) Resendez, J. - Labor G1 Naranjo, C. Labor G1 Martinez, A. - Labor G1 Beas, Jose - Operator G4 Hernandez, F. - Labor GI Hour Hour !lour Hour Hour 4.00 4.00 4.00 4.00 4.00 52.53 52.53 52.53 72.60 52.53 Sub -Total Labor: Labor surcharge (29.45%): Labor Markup (20%): TOTAL LABOR: 210.12 210.12 210.12 290.40 210.12 $ 1,130.88 $ 333.04 $ 292.78 Unit Qty Rate Total 1) N/a Sub -Total Materials: Materials Markup (15%): TOTAL MATERIALS: $ $ 1,756.70 EQUIPMENT Unit Qty Rate 1) S 171 Skidsteer Hour 4.00 29.46 117.84 $ 117.84 $ 17.68 SUB TOTAL: E3OND AND INSURANCE (2%): $ 135.52 $ 1,892.22 GRAND TOTAL: 1,9 30,. Sub -Total Equipment: Equipment Markup (15%): TOTAL EQUIPMENT: $ — CALIFORNIA !-11- NATIONia CtT V l,- wp,6„j.0.1,7tp WESTSIDE MOBILITY IMPROVEMENTS CIP NO. 17-04 March 22, 2018 Contractor: Palm Engineering Construction Company, Inc. Reason/Pu►pose for this Change Order: Unforeseen petromat was discovered during demolition on Wilson Ave. Under direction of the Engineer the Contractor proceeded under time and materials with removing and disposing of the petromat. The City of National City and Contractor agree to the following change to the original Contract: The City and the Contractor agree that the Contractor shall proceed with removing and disposing of the petromat discovered on Wilson Ave. The agreed upon price for all costs associated with this work is as stated on this Change Order. See Attachments for cost breakdown. Original Contract Amount $ 1,780,325.57 Net change by previously authorized Change Orders Subtotal Amount of this change order 132,178.87 1,912,504.44 1,759.50 New contract amount $ 1,914,263.94 Working days added: 0 Working days subtracted: 0 Percent change in Contract to date 7.52% Submitted by: Approved by: c y ngineer t2L1.g Date City Manager, rewired for Charge Orders >$24,900 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order Is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price Is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Accepted ar}u( agreed to by Palm Engineering Construction Company, Inc. Name: Date N Contractor: If do be directed to CHANGE ORDER NO. 27 ote to you not agree wit nga r you may proceis war ms contract and you may oroceed under protest. You must comolv with the contract reotirements of submittina a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager h this Cha 0rde ed with th k under the ter of the 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 CA IF RNIA * NATIONAL aIr i ,y A �� INCORPORATED WESTSIDE MOBILITY IMPROVEMENTS CHANGE ORDER NO. 27 CIP NO. 17-04 DATE: 2/1/18, 2/8/18 WORK PERFORMED BY: Palm Engineering DESCRIPTION OF WORK: Petromat Dump Fees 2-1-18 & 2-8-18 ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT MATERIA ,s9 4., Unit Qty Rate Total 1) Dump tees - Petromat only see attached 2.00 300.000 600.00 $ 600.00 Sub -Total Materials: Materials Markup (15%): TOTAL MATERIALS: $ 90.00 SUB TOTAL: BOND AND INSURANCE (2%): GRAND TOTAL: 690.00 1 690.00 $13.80 $703,80 1..ECUIINED Bill To: PALM ENGINEERING 7330 OPPORTUNITY RD STE1 SAN DIEGO CA 92111-2221 RAI CHULA VISTA FACILITY 855 Energy Way Chula Vista, CA 91911 (619) 656-1836 Fax: (619) 656-6733 ECEOVE: FEB) :) 2018 Invoice No: Date: Customer Job: PO Number: Invoice 74-ACC-09444 Feb 10/18 1704 MATERIAL ACCEPTED Cut Off Date: Feb 10/18 Freight 1 TotFrgt J Tickets , 't Material Accepted a :Quantit 00021297 Feb 01/18 00021297 Feb 01/18 00021303 Feb 01/18 00021306 Feb 01/18 00021332 Feb 05/18 00021339 Feb 05/18 00021346 Feb 05/18 00021387 Feb 08/18 00021387 Feb 08/18 00021393 Feb 08/18 Page: 1 PETROMAT TEN WHEELER TEN WHEELER TEN WHEELER TEN WHEELER TEN WHEELER TEN WHEELER PETROMAT TEN WHEELER TEN WHEELER UOM Unit Price Tot 1.00 LD 300.00 1.00 EA 325.00 1.00 EA 325.00 1.00. EA 325.00 1.00 EA 325.00 3.00 EA 325.00 1.00 EA 325.00 1.00 LD 300.00 1.00 EA 325.00 3 1.00 EA 325.00 Laf 300.00 .00 325.00 325.00 325.00 975.00 300.00. 325.00 Subtotal: Freight: Sales Tax: Total: 3,850.00 .00 .nn 3,850.00 Terms: 1. Invoice due and payable upon receipt. 2. Late charges on invoices 30 days past will be assessed at the rate of 1.5% per month of outstanding balances. 3. Accounts 45 days in arrears are subject to suspension. We Accept Visa and Mastercard PLEASE REMIT PAYMENTS TO: Reclaimed Aggregates, Inc. 10240 San Sevaine Way Jurupa Valley, CA 91752 (951) 787-8955 We Appreciate Your Business! 4�: !/a, CALIFORNIA +* NATIONAL Cirryt INCORPORA'TED WESTSIDE MOBILITY IMPROVEMENTS CIP NO. 17-04 DATE: January 31, 2018 CHANGE ORDER NO. 27 WORK PERFORMED BY: Palm Engineering DESCRIPTION OF WORK: Petromat Dump Fees per City 1/31/18 ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT 1) Unit Qty Rate ump ees a roma on y see attached 3.00 300.000 Total 900.00 $ 900.00 $ 135.00 SUB TOTAL: $ 1,035.00 BOND AND INSURANCE (2%): GRAND TOTAL: $20.70 $141111110 Sub -Total Materials: Materials Markup (15%): TOTAL MATERIALS: A.GGREG�4TES RAI CHULA VISTA FACILITY 855 Energy Way Chula Vista, CA 91911 (619) 656-1836 Fax: (619) 656-6733 Invoice Bill To: PALM ENGINEERING 7330 OPPORTUNITY RD STE1 SAN DIEGO CA 92111-2221 ECEIVE"r. rFFJ 0 5 2018 LAY:_ Invoice No: Date: Customer Job: PO Number: 74-ACC-09405 Jan 31/18 1704 MATERIAL ACCEPTED Cut Off Date: Jan 31/18 ticket)! Date -Material Accepted Quantity UOM Unit Price Tot Matt; Freigtft - Tot Frgt 00021023 00021120 00021132 00021136 00021145 00021148 00021167 00021182 00021192 00021198 00021204 00021209 00021245 00021278 00021282 00021282 00021287 00021287 Jan 15/18 Jan 19/18 Jan 22/18 Jan 22/18 Jan 22/18 Jan 23/18 Jan 24/18 Jan 24/18 Jan 25/18 Jan 25/18 Jan 25/18 Jan 25/18 Jan 29/18 Jan 31/18 Jan 31/18 Jan 31/18 Jan 31/18 Jan 31/18 TEN WHEELER TEN WHEELER TEN WHEELER TEN WHEELER TEN WHEELER TEN WHEELER TEN WHEELER TEN WHEELER TEN WHEELER TEN WHEELER TEN WHEELER TEN WHEELER TEN WHEELER TEN WHEELER PETROMAT TEN WHEELER PETROMAT TEN WHEELER `"_ Page: 1 1.00 EA 325.00 1.00 EA 325.00 1.00 EA 325.00 1.00 EA 325.00 1.00 EA 325.00 1.00 EA 325.00 2.00 EA 325.00 2.00 EA 325.00 1.00 EA 325.00 1.00 EA 325.00 1.00 EA 325.00 1.00 EA 325.00 1.00 EA 325.00 1.00 EA 325.00 1.00 LD 300.00 1.00 EA 325.00 1.00 LD 300.00 1.00 EA 325.00 325.00 325.00 325.00 325.00 325.00 325.00 650.00 650.00 325.00 325.00 325.00 325.00 325.00 325.A9. 325.00 00.00 CT: 323'00 Subtotal: Freight: Sales Tax: Total: c/W-Af- - 6,450.00 .00 .on 6,450.00 Terms: 1. Invoice due and payable upon receipt. 2. Late charges on Invoices 30 days past will be assessed at the rate of 1.5% per month of outstanding balances. 3. Accounts 45 days in arrears are subject to suspension. We Accept Visa and Mastercard PLEASE REMIT PAYMENTS TO: Reclaimed Aggregates, Inc. 10240 San Sevaiue Way Jurapa Valley, CA 91752 (951) 787-8955 We Appreciate Your Business! A G IC'Pe IM"4T RAI CHULA VISTA FACILITY 855 Energy Way Chula Vista, CA 91911 (619) 656-1836 Fax: (619) 656-6733 Invoice E ,, ,I EY 74-ACC-09422 Date: Jan 31/18 stomer Job: 1704 PO Number: Bill To: PALM ENGINEERING 7330 OPPORTUNITY RD STE1 SAN DIEGO CA 92111-2221 FEB 9 i 20fU Invoice No: MATERIAL ACCEPTED Cut Off Date: Jan 31/18 Ticket # Date Material Accepted 00021272 Jan 31/18 PETROMAT 00021272 Jan 31/18 TEN WHEELER t ) Page: 1 3,7 - 1..) ,� . ! 40 Quantity UOM Unit Price Tot Matl Freight Tot Frgt 1.00 LD 300.00 300.00 2C- -- 1 00 EA 325.00 9200 coy Subtotal: Freight: Sales Tax: Total: 625.00 .00 00 625.00 Terms: 1. Invoice due and payable upon receipt. 2. Late charges on Invoices 30 days past will be assessed at the rate of 1.5% per month of outstanding balances. 3. Accounts 45 days in arrears are subject to suspension. We Accept Visa and Mastercard PLEASE REMIT PAYMENTS TO: Reclaimed Aggregates, Inc. 10240 San Sevairre Way Jurupa Valley, CA 91752 (951) 787-8955 We Appreciate Yam. Business! } cAU•IFORNIA* NATIONAHL CIT1 a11 rivQOAS'O?t ATBD WESTSIDE MOBILITY IMPROVEMENTS CIP NO. 17-04 Contractor: Palm Engineering Construction Company, Inc. Reason/Purpose for this Change Order: Unforeseen reinforced concrete was discovered during demolition on the NE comer of 16th St and National City Blvd. Under direction of the Engineer the Contractor proceeded under time and materials with removing and disposing of the reinforced concrete. CHANGE ORDER NO. 28 March 22, 2018 The City of National City and Contractor agree to the following change to the original Contract: The City and the Contractor agree that the Contractor shall proceed with removing and disposing of the reinforced concrete at the NE comer of 16th St and National City Blvd. The agreed upon price for all costs associated with this work is as stated on this Change Order. See Attachments for cost breakdown. Original Contract Amount Net change by previously authorized Change Orders Subtotal 1,780,325.57 133,938.37 Amount of this change order New contract amount Working days added: 0 Workinq days subtracted: 0 1,914,263.94 829.22 $ 1,915,093.16 Percent change in Contract to date 7.57% Submitted by: Pr ct Ma eat 4 4 Ifilt pproved City eer Date City Manager, required for change Orders >$24sss Date By signing this Change Order the Contractor confirms that he/she Is completely familiar with Its terms and conditions and has fairly negotiated Its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price Is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Accepted and agreed to by Palm Engineering Construction Company, Inc. Name: Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comely with the contract reaulrements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager Date 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 +>- CALIFORNIA 4-0- N " ZONAL Cririr & V iNCORPORATVD WESTSIDE MOBILITY IMPROVEMENTS CHANGE ORDER NO. 28 CIP NO. 17-04 DATE: December 4, 2017 WORI< PERFORMED BY: Palm Engineering DESCRIPTION OF WORK: Remove reinforced concrete at 16th/NCB per City ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT LABOR Unit Qty Wage Total 1) 2) Carrillo, Carlos - Equip Op G4 Avila, Sergio - Equip Op G3 Hour Hour 2.00 2.00 72.60 71.11 Sub -Total Labor: Labor surcharge (29.45%): Labor Markup (20%): TOTAL LABOR: 145.20 142.22 $ 287.42 $ 84.65 $ 74.41 44648 MATERIALS Unit Qty Rate Total 1) Dump Fees - oversize cost only 2.00 100.000 200.00 Sub -Total Materials: Materials Markup (15%): TOTAL MATERIALS: 30.00 23a..go• EQUIPMENT Unit Qty Rate Total 1) 2) Mini -Ex E42 Bobcat Skidsteer Hour Hour 2.00 2.00 29.88 29.46 59.76 58.92 $ 118.68 Sub -Total Equipment: Equipment Markup (15%): TOTAL EQUIPMENT: $ 17.80 SUB TOTAL: BOND AND INSURANCE (20/0): GRAND TOTAL: $ 136.48 812.96 $16.26 $ 200.00 , G .11BLAIEMED AGGRECSpTES RAI CHULA VISTA FACILITY 855 Energy Way Chula Vista, CA 91911 (619) 656-1836 Fax: (619) 656-6733 Invoice Bit To: PALM ENGINEERING 7330 OPPORTUNITY RD STE1 SAN DIEGO CA 92111-2221 L r .. E.Ih j L. i Invoice No: I` Date: 4 Customer Job: PO Number: BY 1 3 2100 74-ACC-09158 Dec 09/17 1704 MATERIAL ACCEPTED Cut Off Date: Dec 09/17 [Ticket it Date Material Accepted 00020315 000203`t6 00020316 00020356 00020357 00020357 00020396 00020397 00020397 00020472 00020472 00020473 00020480 Page: 1 Dec 04/17 Dec 04/17 Dec 04/17 Dec 05/17 Dec 05/17 Dec 05/17 Dec 06/17 Dec 06/17 Dec 06/17 Dec 08/17 Dec 08/17 Dec 08/17 Dec 08/17 Quantity UOM TEN WHEELER OVERSIZE LD / STEEL - Per Loa ' EN WHEELER TEN WHEELER OVERSIZE LD / STEEL - Per Loa /EN WHEELER TEN WHEELER OVERSIZE LD / STEEL - Per Loa /EN WHEELER OVERSIZE LD / STEEL - Per Loa /EN WHEELER TEN WHEELER TEN WHEELER Unit Price . Tot Mat! FreIOht: Tot Frrgt l 4.00 EA 175.00 700.0C In y `�5 2.00 EA 100.00 200.00 -- "' 2.00 EA 175.00 350.00 2.00 EA 175.00 350.00 2.00 EA 100.00 200.00 2.00 EA 175.00 350.00 5.00 EA 175.00 875.00 1.00 EA 100.00 100.00 1.00 EA 175.00 175.00 3.00 EA 100.00 300.00 3.00 EA 175.00 525.00 2.00 EA 175.00 350.00 1.00 EA 175.00 175.00 Subtotal: Freight: Sales Tax: Total: 4,650.00 .00 00 4,650.00 Terms: 1. Invoice due and payable upon receipt. 2. Late charges on invoices 30 days past will be assessed at the rate of 1.5% per month of outstanding balances. 3. Accounts 45 days in arrears are subject to suspension. We Accept Visa and Mastercard PLEASE REMIT PAYMENTS TO: Reclaimed Aggregates, Inc. 10240 San Sevaine Way Jurupa Valley, CA 91752 (951) 787-8955 We Appreciate Your Business! CITY OF NATIONAL CITY Office of the City Clerk 1243 National City Blvd., National City, California 91950-4397 619-336-4228 Michael R. Dalla, CMC - City Clerk PALM ENGINEERING WESTSIDE MOBILITY IMPROVEMENTS CIP No. 17-04 Change Orders #21 through and #28 Judy Hernandez (Engineering/Public Works) forwarded a copy of the Change Orders to Palm Engineering.