HomeMy WebLinkAbout2018 CON Eagle Paving Company - Citywide Pedestrian Midblock Crossing Enhancements, CIP 17-05 - Change Orders #2 through #4CALIFORNIA —P
NATIONAL CITY
rki
NCORPOR ATED
Citywide Pedestrian Midblock Crossing Enhancements
CIP No: 17-05
Contractor: Eagle Paving Company, Inc.
Reason/Purpose for this Change Order:
The city has modified the designs plans on 16th after the contractor had surveryed the original improvements.
Since the plan revisions were made after the fact, the city has directed the contractor to provide new survery
as needed.
CHANGE ORDER NO. 2
April 19, 2018
The City of National City and Contractor agree to the following change to the original Contract:
The contractor was directed to survey the new improvement plans at 16th and F Ave and G Ave to reflect the
plan change revisions. All work survey work was completed at the lump sum price listed below.
Original Contract Amount
Net change by previously authorized Change Orders
Subtotal
Amount of this change order
$ 1,158,297.70
13,459.04
1,171,756.74
1,521.82
New contract amount $ 1,173,278.56
Working days added: 2
Working days subtracted: 0
Percent change in Contract to date 1.29%
Submitted by:
Project Manager
sh//e
Date
City Project Manager
Date
Approved by:
C. ngineer
Date
City Manager, required for Change Orders >$24,999
Date 1
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly
negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and
labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the
price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor,
supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions
of the original contract documents are incorporated herein. (2 originals: 1 for City Clerk, 1 for Contractor)
Accepted and agreed to by Eagle Pavin• Com,, Inc:
Name:
//as h
Date
Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the
contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect
your claim.
Originals: City Clerk, Contractor cc: Engineering project file, Project Manager
1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380
PURCHASE ORDER:
CITY OF NATIONAL CITY
Project Name
DATE PERFORMED 26-Mar-18 DATE OF REPORT 10-Apr-18 PCO NO
WORK PERFORMED BY Eagle Paving Co., Inc.
DESCRIPTION OF WORK See attached ticket
REPORT NO
EQUIP
NO
EQUIPMENT
HOURS
HOURLY
RATES
EXTENDED
AMOUNTS
LABOR
HOURS
HOURLY
RATES
EXTENDED
AMOUNTS
$ -
Carpenter
OT
$ -
$ -
REG
0
$ -
$ -
Laborer
OT
$ -
$ -
REG
0
$ -
$ -
Operator
OT
0
$ -
$ -
REG
0
$ -
$ -
Carpenter Foreman
OT
$ -
$ -
REG
0
$ -
$ -
Mason
OT
$ -
$ -
REG
0
$ -
$ -
Operator Foreman
OT
$ -
$ -
REG
0
$ -
Laborer Apprentice
OT
$ -
REG
0
$ -
APPROVED WORK DONE BY SPECIALISTS
0
Payroll Burden $0.00
DESCRIPTION
NO. UNIT
UNIT COST
*HOURLY RATES - PER SECTION 3-3.2.2
Golden Triangle Land Surveying, Inc.
5 hr
$ 287.00
TOTAL LABOR
A
$0.00
TOTAL COST OF EQUIPMENT, MATERIALS AND WORK
$ 1,435.00
$ 1,435.00
►
B
TOTAL EQUIPMENT & MATERIALS
C
$ -
%l
20 % MARKUP ON LABOR COST (A)
$
/ e,
,G (B)
15 % MARKUP ON EQUIPMENT, MATERIAL AND WORK COST
$
CONT CTOR'S REPRESENTATI
5 % MARKUP ON SUBCONTRACTED WORK (C
$ 71.75
SUBTOTAL
$ 1,506.75
$ 15.07
RESIDENT ENGINEER 1 % BOND AND LIABLILITY INSURANCE D)
TOTAL
$ 1,521.82
Golden Triangle
Land Surveying, Inc.
April 8, 2018
STATE OF CALIFORNIA
MICRO SMALL BUSINESS
DVBE CERTIFICATION #1770328
DIR REGISTRATION 1000015071
SAN DIEGO CITY ELBE 14GT1335
Nick Kuehl
Eagle Paving Company
13915 Danielson Street # 201
Poway, CA 92064
RE: RESTAKE CURB AT INTERSECTION
F STREET AND 16TH STREET DUE TO PLAN CHANGE
MIDBLOCK CROSSING ENHANCEMENTS, NATIONAL CITY
The following is a breakdown of the time to recalculate and restake the
curb at F street and 16`h street in National City.
WORK ORDER TICKET 3146
March 26, 2008
Two man Survey Crew 5hours at $ 287 hour $ 1,435.
Please let me know if you need any further information concerning this
request.
Sincerely,
GOLDEN TRIANGLE LAND SURVEYING, INC.
Willard Hall
President
PLS 6788
page 1 of 1
1298 Navel Place, Vista, CA 92081
Ph 760-758-7725 — fax 760-758-7726. license LS 6788 exp 09/30/2018
DATE:
BILL TO:
ADDRESS:
JOB NAME: — —
LOCATION:
WORK ORDERED BY
ORDER TAKE BY
W 0 R D E R
START DATE:
0 PURCHASE ORDER:
GI CONTRACT WORK
0 EXTRA WORK NOT IN CONTRACT
DATE COMPLETED
3146
oidem
riawgIe
land surveying, Inc.
phone: (760) 758-7725
tax: (760) 758-7726
0 BILLING TO BE MAILED
DESCH:IPPON Or INOHK
I HEREBY ACKNOWLEDGE THE SATISFACTORY COMPLETION OF WORK DESCRIBED ABOVE.
AUTHORIZING SIGNATUREr l bwithinapacybatbielectioncos4costs
5 : _________' _ ______________- - —
cr
y, eit
Extra will be paid per the current fee schedule available from our officeupon request. All mconeeyuclioube bfoercoemxteras wsial n
days of the date of this ticket. A late fee of 1.5°/0 per month is charpdforilate payments. It on
including but not limited to attorney's fees and time spent by this firm wil be payable. :e s
CALIFORNIA
NATIONAL.CITE
r"-�N OR OR`l ED
Citywide Pedestrian Midblock Crossing Enhancements CHANGE ORDER NO. 3
CIP No: 17-05 April 19, 2018
Contractor: Eagle Paving Company, Inc.
Reason/Purpose for this Change Order:
The city has directed the contractor to construct a footing depth to 9' to help stabilize it adjacent to an existing
16" AC waterline at 16th and G Ave.
The City of National City and Contractor agree to the following change to the original Contract:
The city has directed the contractor to extend the depth of a LED foundation four additional feet. The
foundations are typically constructed to a depth of five feet. Working with Sweetwater Authority in an effort to
stabilize the foundation adjacent to an existing Sweetwater 16" AC transmission line, the foundation shall be
extended to a depth of nine feet. All work shall be completed at the lump sum price listed below.
Original Contract Amount $ 1,158,297.70
Net change by previously authorized Change Orders
Subtotal
Amount of this change order
New contract amount
Working days added: 5
Working days subtracted: 0
14,980.86
1,173,278.56
2,205.00
$ 1,175,483.56
Percent change in Contract to date 1.48%
Sub itte by:
Proje t Manager
//� Et
Dat€
City Project Manager
Date
ved by:
City nneer
/
..... /.
Date
City Manager, required for Change Orders >$24,999
Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly
negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and
labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the
price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor,
supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions
of the original contract documents are incorporated herein. (2 originals: 1 for City Clerk, 1 for Contractor)
Accepted and a•reed o by Eagle 'avin• Coma y, Inc:
0S—/(
Date
Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the
contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect
your claim.
Originals: City Clerk, Contractor
cc: Engineering project file, Project Manager
1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380
EAGLE PAVING
A Service Company First
***CHANGE ORDER NO 4***
PG1
DATE: 4/16/2018 REVISION
TO: City of National City
1243 National City Blvd National City, CA 91950
PROJECT: Citiwide Pedestrian Midblock Crossing
National City Limits
ESTIMATOR: Nick Kuehl
OFFICE: 619 336-4312
EMAIL: jlopez@nationalcityca.gov
ATTN: Jose Lopez / Sean Gill
DESCRIPTION
I PROPOSE TO FURNISH ALL MATERIALS AND PERFORM ALL LABOR NECESSARY TO COMPLETE THE FOLLOWING:
ITEM #
DESCRIPTION
QTV
UNIT
UNIT $
SUBTOTAL
1
Lekos proposal to increase foundation depth at 16th & G
1
EA
$2,100.00
$ 2,100.00
2
Eagle Paving subcontractor markup on Lekos work(@ 5 %)
1
LS
$105.00
$ 105.00
NOTE:
NOTE:
TOTAL COST: $ 2,205.00
MOBILIZATIONS BASED UP TO THE SAID AMOUNT OF MOBILIZATIONS BELOW, ADDITIONAL MOB'S WILL BE CHARGED AFTER THE SAID AMOUNT
UNFORSEEN PETROMAT GRINDS WILL ADD $580/LOAD (TICKETS PROVIDED)
11-
Lekos Electric, Inc.
PROJECT: National City Midblock Pedestrian Crossing TO: Eagle Paving
DATE: 4/13/2018 ATTN: Nick Kuehl
RE: 16th and G Beacon Foundation
MESSAGE: The following is a request for a change order to approximately double the depth of the foundation of the LED Pedestrian Sign
to a depth of 9'.
Item
Quantity
Units
Unit Price
Total
Increase Foundation depth
1
EA
$ 2,100.00
$ 2,100.00
SUBTOTAL
$ 2,100.00
Thank you,
Riley Lekos
Vice President
CALIFORNIA
NATIVN&I CITY
J zyzir
mi.) OR ATED
Citywide Pedestrian Midblock Crossing Enhancements CHANGE ORDER NO. 4
CIP No: 17-05 April 24, 2018
Contractor: Eagle Paving Company, Inc.
Reason/Purpose for this Change Order:
The city directed the contractor to place geo-tech stabilization fabric at the intersection of 8th and R Ave. per
the recommendation of SCST when wet subgrade was encountered.
The City of National City and Contractor agree to the following change to the original Contract:
The contractor was in the process of excavation asphalt removals and base to reconstruct the improvements
at 8th and R Ave. when wet subgrade was encountered. SCST recommended the placement of tensar TX5
fabric in lieu of additional excavation due to the proximity of existing utility lines. The contractor obtained the
geo-tech fabric and placed it as directed across the entire intersection. All worked was performed on a T&M
basis for the lump sum price listed below.
Original Contract Amount $ 1,158,297.70
Net change by previously authorized Change Orders
Subtotal
Amount of this change order
New contract amount
Working days added: 2
Working days subtracted: 0
17,185.86
1,175,483.56
7,026.45
$ 1,182,510.01
Percent change in Contract to date 2.09%
Sub ' ed by:
Pr 'ect Manag r
5// tei
Date
City Project Manager
Date
oved by:
n ineer
-f�v!`t�'
Date
M. g Change
City Manager,
ana er, required for Chan a Orders >$24,999
Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly
negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and
labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the
price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor,
supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions
of the original contract documents are incorporated herein. (2 originals: 1 for City Clerk, 1 for Contractor)
Accepted and agreed to by Eagle Paving Company, Inc:
Date
Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the
contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect
your claim.
Originals: City Clerk, Contractor
cc: Engineering project file, Project Manager
1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380
PURCHASE ORDER:
CITY OF NATIONAL CITY
Project Name
1 DATE PERFORMED 25-Jan-18 DATE OF REPORT 9-Mar-18 PCO NO
WORK PERFORMED BY Eagle Paving
DESCRIPTION OF WORK See attached ticket
REPORT NO
EQUIP
NO
EQUIPMENT
HOURS
HOURLY
RATES
EXTENDED
AMOUNTS
LABOR
HOURS
HOURLY
RATES
EXTENDED
AMOUNTS
Salary Employee
OT
$ -
REG
3
$ 62.50
$ 187.50
$ -
OT
$ -
$ -
Operator 8
REG
6
$ 72.93
$ 437.58
$ -
OT
$ -
$ -
Operator 3
REG
3
$ 71.11
$ 213.33
$ -
OT
$ -
$ -
Teamster 4
REG
3
$ 56.58
$ 169.74
$ -
OT
$
$ -
Driver
REG
3
$ 22.00
$ 66.00
$ -
OT
$ -
$ -
Laborer4
REG
3
54.24
$ 162.72
$ -
OT
$ -
$ -
Operator 6
REG
3
72.82
$ 218.46
Laborer2
OT
$ -
REG
6
52.99
$ 317.94
APPROVED WORK DONE BY SPECIALISTS
$ 1,773.27
Payroll Burden $245.60
DESCRIPTION
NO. UNIT
UNIT COST
Tensar Tx5 fabric
1
$ 1,359.74
$ 1,359.74
3 Trucks on stand by x 3 hours
9
$ 120.00
$ 1,080.00
*HOURLY RATES - PER SECTION 3-3.2.2
TOTAL LABOR
$2,018.87
A
TOTAL COST OF EQUIPMENT, MATERIALS AND WORK
$ 2,439.74
$ 2,439.74
►
B
TOTAL EQUIPMENT & MATERIALS
C
$ -
20 % MARKUP ON LABOR COST (A)
$ 403.77
Nick Kuehl 15 % MARKUP ON EQUIPMENT AND WORK COST (B)
$ -
CONTRACTOR'S REPRESENTATIVE
15 % MARKUP ON MATERIALS C)
$ 365.96
SUBTOTAL
D)
$ 5,228.34
$ 52.28
RESIDENT ENGINEER 1 % BOND AND LIABLILITY INSURANCE (
TOTAL
$ 5,280.63
PURCHASE ORDER:
2
CITY OF NATIONAL CITY
Project Name
DATE PERFORMED 26-Jan-18 DATE OF REPORT 9-Mar-18 PCO NO
WORK PERFORMED BY Eagle Paving
DESCRIPTION OF WORK See attached ticket
REPORT NO
EQUIP
NO
EQUIPMENT
HOURS
HOURLY
RATES
EXTENDED
AMOUNTS
LABOR
HOURS
HOURLY
RATES
EXTENDED
AMOUNTS
$ -
Salary Employee
OT
$ -
$ -
REG
0.5
$ 62.50
$ 31.25
$ -
Operator 6
OT
$ -
$ -
REG
0.5
$ 72.82
$ 36.41
$ -
Laborer 2
OT
$ -
$ -
REG
1
$ 52.99
$ 52.99
$ -
Driver
OT
$ -
$ -
REG
$ -
$ -
Laborer 4
OT
$ -
$ -
REG
$ -
$ -
Operator 6
OT
$ -
$ -
REG
$ -
Laborer2
OT
$ -
REG
$ -
APPROVED WORK DONE BY SPECIALISTS
120.65
Payroll Burden $16.71
DESCRIPTION
NO. UNIT
UNIT COST
*HOURLY RATES - PER SECTION 3-3.2.2
Tensar Tx5 fabric
1
$ 1,359.74
$ 1,359.74
$ -
TOTAL LABOR
A
$137.36
TOTAL COST OF EQUIPMENT, MATERIALS AND WORK
$ 1,359.74
$ 1,359.74
N.
B
TOTAL EQUIPMENT & MATERIALS
C
S -
20 % MARKUP ON LABOR COST I A
$ 27 47
Nick Kuehl 15 % MARKUP ON EQUIPMENT AND WORK COST (B)
$
CONTRACTOR'S REPRESENTATIVE
15 % MARKUP ON MATERIALS (C)
$ 203.96
SUBTOTAL
$ 1,728.53
$ 17.29
RESIDENT ENGINEER 1 % BOND AND LIABLILITY INSURANCE (D
TOTAL
$ 1,745.82
EAGLE PAVING
Project ' # = ,�. r -,1
piston ur
ACK\OWLEDGEMENT OF
❑ Subgrade issues / wet or unsuitable soil
D Additional export required
❑ Additional dump fees required
❑ Import of Class II Base required
❑ Subgrade not ready, fine grading required
❑ Existing pavement has petromat fabric
❑ Additional asphalt required
❑ Additional mobilization(s) required
t
A OP 1,1{[ '''tom'()( ♦ ~"":, v1 itrY'
3 t-X 1- _ s
Eagle Rep
ISSUES / ACCEPTA
RE(VAM
13915 Danielson Street, Suite 201
Poway, CA 92064
858.486.6400
858.486.6402
info@eaglepaving.us
Contractor License # 944939
Job # - -74`G
-Date I
\CE OF CHANGE ORDER
CI Delays / standby time
❑ Bad weather conditions
❑ Additional concrete thickness required
❑ Additional concrete footage requested/required
❑ Additional striping requested/required
D Standard warranty null & void
❑ Accident or property damage to report
❑ Project is not ready_ for work
KS & \OTES
(2.t lief
3
, a 1p O i ,, ti ff. py -i-li - jC E 3--!-`-t-
pa.cy+ . -", c X. .3 i oit.dx. ,,e47,4,44006,4
#/we, authorized agent/owner, confirm receipt of this notice & accept these terms & conditions.
Rr'r it igI % Ave.
H•DSUPPLY
CONSTRUCTION & INDUSTRIAL
WHITE CAP
HD Supply Construction Supply. Ltd.
501 W. Church Street, Orlando, FL 32805-2247
ENROLLMENT TOKEN:
LKZ PMB HKF
SOLD TO: 10000003014
EAGLE PAVING COMPANY INC
13915 DANIELSON ST STE 201
POWAY CA 92064-8884
BRANCH ADDRESS
003 - SAN DIEGO
(858) 560-9933
7560 CONVOY COURT
SAN DIEGO CA 92111
SAN DIEGO
TERRITORY:
SHIP TO: 10001547647
INVOICE
INVOICE NUMBER
50007579709
INVOICE DATE
01/25/2018
CUSTOMER PO NUMBER
EP7418
PLEASE REMIT PAYMENT TO:
HD SUPPLY CONSTRUCTION AND
INDUSTRIAL - WHITE CAP
P.O. BOX 6040
CYPRESS, CA 90630-0040
DEL TACO EP7418
1851 EAST ORANGETHORPE AVE.
PLACENTIA CA 92870
ORDER DATE
ORDER NO.
ORDERED BY
ACCOUNT MANAGER
TAKEN BY
01/25/2018
27264892
ANTHONY SANCHEZ
DANIELS, TURNER
CAMACHO, DELIA
BRANCH
ACCT JOB NO.
TERMS
SHIP VIA / ROUTING
CUSTOMER JOB NO.
003
10001547647
NET 30 DAYS
0. WILL CALL
DEL TACO EP7418
LINE
PART NUMBER
DESCRIPTION
QTY ORD
UNIT PRICE
QTY BKO
QTY SHP
EXTENDED
PRICE
TAX
AMT
0
1
2
HDRDESC
104TX5475
10352
DELIVERY TAG#: 8658317
13.1'X246' TENSAR TRIAX TX5 475
5"X2" MARGIN TROWEL WOOD HANDLE
MARSHALLTOWN
1
3
4
0
1,261.939 RL
13.99 EA
0
0
0
1
3
4
0.00
3,785.82
55.96
293.40
4.34
THESE ITEMS ARE CONTROLLED BY THE U.S. GOVERNMENT AND AUTHORIZED FOR EXPORT ONLY TO THE COUNTRY OF
ULTIMATE DESTINATION FOR USE BY THE ULTIMATE CONSIGNEE OR END-USER(S) HEREIN IDENTIFIED. THEY MAY NOT BE
RESOLD, TRANSFERRED OR OTHERWISE DISPOSED OF TO ANY OTHER COUNTRY OR ANY PERSON OTHER THAN THE
AUTHORIZED ULTIMATE CONSIGNEE OR END-USER(S), EITHER IN THEIR ORIGINAL FORM OR AFTER BEING INCORPORATED INTO
OTHER ITEMS, WITHOUT FIRST OBTAINING APPROVAL FROM THE U.S. GOVERNMENT OR AS OTHERWISE AUTHORIZED BY U.S.
LAW AND REGULATIONS.
Please take a quick 5 minute survey at http://www.WhiteCap.com/re-survey or typing in your browser. Thank you for your feedback and we look
forward to hearing from you!
I I I f I I 1
For questions regarding this invoice please call 1-800-WHITECAP
(1-800-944-8322).
NO REFUNDS OR EXCHANGES ON NON STOCK MERCHANDISE
Visit http://whitecap.com/misdterms_and conditions.pdf to view complete terms and
conditions.
TOTAL GROSS
3,841.78
TOTAL TAX
297.74
TOTAL SHIPPING
AND HANDLING
0.00
RECEIVED BY. BALTAZAR NUNEZ SIGNATURE COPY ON FILE
TOTAL INVOICE
4,139.52
Please verify that the remit to address you are using agrees to the address shown at the top of this invoice.
Page 1 of 1
West Coast Sand & Gravel, Inc.
P.O. BOX 5067
BUENA PARK, CA 90622
DISPATCH: (800) 522-0282 FAX: (714) 522-4524 BILLING: (714) 522-4403
Inv. Date ; Invoice #
1 /30i201 8
13l2^3-
Cust. Job# or PO#
7181
Customer: j 11361 I Job: ._l 24703
EAGLE PAVING COMPANY. INC.
13915 DANIELSON ST STE 201
POWAY, CA 92064
DTicket # / Cust. PO# 1 Description
225053 / HOURLY TRUCKING
NATIONAL CITY STREETS
1750 E 8'1'I-1 ST
NATIONAL CITY CA
Qty Units 1 Unit Price Amount
NT 9.00 HOURS $120.00 $1,080.00
Terms: NET DUE 10TH OF MONTH FOLLOWING DATE OF Sub -Total: 1
DELIVERY. A 1 1/2% finance charge per month on the
unpaid balance shall be charged on all accounts 30 days or Sales Tax:]
more past due.
Mining Tax:I
Pay This Amount ► Total Due:]
$1,080.00
$0.00
$0.00
$1,080.00
Page 1 of 1
ALL MATERIALS SALES ARE F.O.B. POINT OF ORIGIN AND TITLE PASSES TO BUYER PRIOR TO TRANSPORTATION.
EkGLE PAVING
13915 Danielson Street, Suite 201
Poway, CA 92064
858.486.6400
858.486.6402
info@eaglepaving.us
Contractor License # 944939
Project tik ,. ` ft c V- i` Y t c74,1 Y")1
Customer ' ' ! ' `` .l Eagle Rep
Job#
Date
ACKNOWLEDGEMENT OF ISSUES / ACCEPTANCE OF CHANGE ORDER
CI Delays / standby time
❑ Bad weather conditions
❑ Additional concrete thickness required
❑ Additional concrete footage requested/required
❑ Additional striping requested/required
D Standard warranty null & void
Cl Accident or property damage to report
❑ Project is not ready for work
• Subgrade issues / wet or unsuitable soil
❑ Additional export required
Cl Additional dump fees required
❑ Import of Class II Base required
❑ Subgrade not ready, fine grading required
❑ Existing pavement has petromat fabric
❑ Additional asphalt required
• Additional mobilization(s) required
4¢ti_ c Qe&
c'v`c(4 ck- A
0)
REMARKS & \OTES
ilwe, authorized agent/owner, confirm receipt of this notice —& accept these terms & conditions
P-Fl7t. `Sii.' Date:
177
CITY OF NATIONAL CITY
Office of the City Clerk
1243 National City Blvd., National City, California 91950-4397
619-336-4228
Michael R. Dalla, CMC - City Clerk
EAGLE PAVING COMPANY, INC.
CITYWIDE PEDESTRIAN MIDBLOCK CROSSING ENHANCEMENTS
Change Orders #2 through #4
CIP No. 17-05
Judith Hernandez (Engineering/Public Works) forwarded a copy of the Fully Executed
Change Orders to Eagle Paving Company, Inc.