Loading...
HomeMy WebLinkAbout2018 CON Preman Roofing - City Hall Roof Replacement, CIP No. 18-08 - Change Order #6+0-k CALIFORNIA —(. NOIONAL santV_, c� IKCORPORATV) PROJECT NAME: City Hall Roof Replacement CIP NO. 18-08 Contractor: Preman CHANGE ORDER NO. 6 September 6, 2018 Reason/Purpose for this Change Order: During construction of the new TPO roof, Change Order #3 was executed to install a 24 gauge galvanized cap to protect in place the existing spare conduits west of the south penthouse. Subsequent to this work, The City agreed to allow access to the existing spare conduits for potential future use. The City of National City and Contractor agree to the following change to the original Contract: The City and the Contractor agree that the Contractor shall remove the existing TPO flashing and extend the conduits above curb and install TPO boots with proper TPO flashing. Original Contract Amount ... $ Net change by previously authorized Change Orders Subtotal Amount of this change order New contract amount Working days added: 4 Working days subtracted: 0 304,410.00 23,115.00 Percent change in Contract to date 7.84% 327,525.00 740.00 c� 328,265.00 Sub ► . ted . Dat . Approved by: City gineer , Date City Manager, required for Change Orders>$24,999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. 11111111111111 CONTRACTOR NAME: Preman Nam Date Note o Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 CHANGE ORDER SUMMARY CITY HALL ROOF REPLACEMENT CIP NO. 18-08 Contractor: Preman Project Manager: Alex Preciado/Derrick Anderson Last Update: Contingency Amount: Approved Council Amount 9/6/18 11:45 PM No. Description CO Amount Change Order Running Total Contigency Remainder 304,410.00' Removal and installation of roof drains 4,800.00 4,800.00 40,861.50 309,210.00 316,472.00 31,7772.00 320, ,52.00 Installation of 20 One way vents 7,262.00 12,062.00 33,599.50 24 Gauge Cap 300.00 12,362.00 33,299.50 TPO Slip Sheets for The City to Provide Ameresco 3,380.00 15,742.00 29,919.50 Rubber Conduit Support Blocks 7,373.00 23,115.00 22,546.50 327,525.00 7 Extend Spare Conduits Above Curb 740.00 23,855.00 21,806.50 328,265.00 #REF! #REF! #REF! *REP 8 #REF! #REF! #REF! ##REE! 9 #REF! #REF! #REF! #REF! #REF! 10 #REF! #REF! #REF! #RE€! 11 #REF! #REF! #REF! *REF! 12 #REF! #REF! #REF! #REF! 13 #REF! #REF! #REF! *REF! ix 14 #REF! #REF! #REF! #RBF! 15 #REF! #REF! #REF! #REF! 16 #REF! #REF! #REF! #REF! 17 #REF! #REF! #REF! ,=r-ii•••• #REF! Signed by PM, Contractor, and delivered to City Change Order In-process/On-hold Completed and Sent to file r � RPREMAN ROOFING -SOLAR Owner's Name: City of National City Owner's City: National City, CA Owner's Zip Code: 91950 Owner's Address: 1243 National City Blvd. Atten: Luca Zappiello Owner's Work Phone: (619) 336-4380 BID PROPOS 875 34th Street, San Diego, CA 92102 P: (619) 276-1700 F: (619) 276-1703 CA License No. 764917 Project Name & Address: City Hall, 1243 National City Blvd., National City, CA 91950 Email: Iappiello@nationalca.gov a. Scope of Work: Preman Roofing Inc. hereby submits the following specifications and estimates: PROPOSAL FOR PLATFORM/CAP MODIFICATION #1. Cut open TPO and remove plywood to access abandoned conduits. #2. Extend conduits above curb and cap off. (as per existing extension) #3. Reinstall Plywood and flash back in withTPO #4. Install TPO boots as required. b. Not Included: This proposal does not include: Other than stated above. c. WE PROPOSE to furnish material, equipment and labor in accor- dance with the above specifications for the sum of: $740.00 dollars NOTE: This proposal may be withdrawn if not accepted within 30 days from 9-5-2018 date Respectfully submitted by: David Rodriguez Company Representative d. WE ACCEPT the prices, specifications, and terms as stated in this bid proposal are approved. We authorize you to draw up all neces- sary contract documents so work can begin. approved and accepted (owner or owner's authorized agent) date approved and accepted (second owner - if any) date Page ONE of 1 Total Pages PROJECT PROFESSIONALS CORPORATION TRANSMITTAL COVER To: National City Engineering Department Project Name: National City City Hall Roof Replacement CIP No. 18-08 ITEMS DELIVERED: Change Order #6 — Extend Spare Conduits Above Curb Delivered by: Alex Preciado Received by: Date: Project Professionals Corporation CITY OF NATIONAL CITY Office of the City Clerk 1243 National City Blvd., National City, California 91950-4397 619-336-4228 Michael R. Dalla, CMC - City Clerk PREMAN ROOFING AND SOLAR CITY HALL ROOF REPLACEMENT, CIP NO. 18-08 Change Order #6 Judy Hernandez (Engineering/Public Works) forwarded a copy of the Change Order to Preman.