Ameresco Engergy Services Agreement
CIP No. 17-03
Contractor: Ameresco, Inc.
CHANGE ORDER NO. 2
September 18, 2018
Reason/Purpose for this Change Order:
During the Civic Center Roof Replacement project (separate contract), failed electrical conduits were exposed on the roof.
Ameresco contracted with Baker Electric through West Coast Air to perform the repair as a change order under our
agreement on a time and materials basis. Baker Electric completed the repair on 8/8/18 to help keep the City's roofing
project on track.
!The City of National City and Contractor agree to the following change to the original Contract:
Electrical Repairs to five conduits penetrating the Civic Center Roof. Per the attached photos, existing
conduits were rusted. One conduit had failed. Baker Electric repaired the conduits and an associated junction
box under Ameresco's supervision in coordination with Arturo Gonzales, the Facilities Maintenance
Supervisor.
Original Contract Amount $ 5,403,308.00
Net change by previously authorized Change Orders
Subtotal
Amount of this change order
New contract amount
Calendar days added:0
Submitted by:
Working days subtracted: 0
6,124.00
5,409,432.00
1,209.90
$ 5,410,641.90
Percent change in Contract to date 0.14%
Project Manager
Approved by:
Date
City Project Manager
Date
City ngineer / - Date City Manager, required for Change Orders>$24,999 Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly
negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and
labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the
price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor,
supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions
of the original contrac • • - - - inco ...: • herein. (2 originals: 1 for City Clerk, 1 for Contractor)
Acce
and a• eed to by AMERESCO, In
N. -. Date
Note to Contractor: It you do not agree with this unange Vraer you may be directed to proceed wan this work under the "terms" dime— ---
contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect
your claim.
Originals: City Clerk, Contractor cc: Engineering project file, Project Manager
0410s
1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380
AMERESCO
Green • Clean • Sustainable
September 11, 2018
City of National City
1243 National City Blvd.
National City, CA 91950
Attention: Jose Lopez
Project Manager
Regarding:
Dear Jose:
Change Order Request No. 2, Revision No. 1
The attached Change Order Request No. 2, Revision No. 1 is proposed regarding the urgent repair of
failed electrical conduits on the Civic Center roof that were exposed during the roof replacement.
Ameresco contracted with Baker Electric through West Coast Air to perform the repair as a change order
under our agreement on a time and materials basis. Baker Electric completed the repair on 8/8/18 to
help keep the City's roofing work on track.
Ameresco will provide a separate change order request to address other electrical modifications, which
are excluded from this change order.
Change Order Request Item
1. Electrical Repairs to five conduits penetrating the Civic Center Roof. As depicted in the photos
below, the existing conduits were rusted. One conduit had failed. Baker Electric repaired the
conduits and an associated junction box under Ameresco's supervision in coordination with Arturo
Gonzales, the Facilities Maintenance Supervisor. Ameresco's Work does not include:
a. Any Work beyond the repair of the conduits and the junction box
b. Patching of the roof deck
c. Any structural modifications
135 S. State College Blvd, Suite 265, Brea, CA 92821
California State Contractor's License #817191 Class A, B, C10, C46
Jose Lopez
Change Order Request No. 2, Revision No. 1
September 11, 2018
Page 2
Cost
The total cost for this work is $1,209.90 per the attached invoice from West Coast Air. Ameresco is not
marking up the subcontractor's invoice.
Extension of Time
No extension of time is requested for this change
If you agree with this Change Order Request No. 2, Revision No. 1 as presented, please prepare the
City's documents for execution. If you would like to discuss this item, please contact me by e-mail, or by
calling 510-684-7684.
Sincerely,
Scott Wentworth
Senior Project Manager
Attachments:
Change Order Request No. 2, Revision No. 1
Baker Electric Invoice
C: Kevin Nissley
Kelsey Gormley
Seth Pearce
Dan Feld
John Caruso
135 S. State College Blvd, Suite 265, Brea, CA 92821
California State Contractor's License #817191 Class A, B, C10, C46
AMERESCO
Green • Clean • Sustainable
Change Order Request No. 2, Revision No. 1
Change Request Number: 4
Customer:
Project Number:
Contract:
I. REQUEST DATE:
City of National City
73456-20
Energy Services Agreement dated June 20, 2017
September 11, 2018
1.
Requested By
Scott Wentworth, Senior Project Manager
2.
Description of Changes
Time and materials repairs to five failed electrical conduits on
Civic Center roof
3.
Addition or Deduction from Contract Price
Addition
4.
Change to Contract Amount
$ 1,209.09
II. AMERESCO's AGREEMENT
With respect to all costs involved in this change, and subject to Section 8 of the Agreement, Ameresco proposes
to perform the work described in this Change Order, in accordance with the provisions of the Agreement and
in exchange for the payment specified below.
Payment shall be made on the basis of:
(X) Lump Sum in the amount of:
Contract Time will be Increased by:
III. CONTRACT ADJUSTMENT
Contract Award
Previous Additions
This Change
Total Contract Amount
$ 1,209.90
Zero calendar days
$ 5,403,308.00
$ 6,124.00
$ 1,209.90
$ 5,410,641.90
No changes to the Substantial Completion Date are included in this Change Order; however such
changes are requested under Change Order Request No. 1.
west coast Air
Conditioning Co., Inc.
CHANGE ORDER REQUEST # 007 R1
DATE: August 28, 2018
PROJECT: National City HVAC Upgrade Project
Various Locations
BELOW IS A SUMMARY OF THE ATTACHED ITEMS REQUESTED FOR A FORMAL CHANGE ORDER
Conduit repairs on the roof of the Civic Center per enclosed proposal
dated 08-27-18.
COR Total
O&P 15%
1,041.67
1,041.67
156.25
Sub Total
Bond 1
Grand Total
WCA:
Colin M. Fisher, CEO
Ameresco, Inc.:
Scott Wentworth
1,197.92
11.98
1,209.90
WEST COAST AIR CONDITIONING CO., INC. 1155 PIONEER WAY, SUITE 101 EL CAJON, CA 92020 PH.619-561-8000
Baker
Electric
Bill To:
West Coast Air
1155 Pioneer Way Ste. 101
El Cajon, CA 92020
Invoice Summary Breakdown
Description:
Repair Conduit on roof damaged by others
Invoice Date: 8/27/2018
Invoice # 30510
Payment Terms: Net Due 30 Days
Job Address: National City Civic Center
1243 National City Blvd.
National City, CA 91950
Job No. 18404
Date Description Quantity Unit Price Extended Price
Labor
8/9/2018 Dustin Stanley
Materials
Per work tickets
8 Hours $ 115.00 $ 920.00
Hours $
8 Hours LABOR TOTALS $ 920.00
1 Lot $ 111.88 $ 111.88
MATERIAL TOTAL $ 111.88
Labor Cost
Material Cost
Misc. Cost
Sales Tax
Total
8.75%
$ 920.00
$ 111.88
$ 9.79
$ 1,041.67
1298 Pacific Oaks Place • Escondido, CA 92029 • (760) 745-2001 Fax: (760) 745-0321
Baker
Electric
TICKET 1/
18404-01
e,,....,..e ,R..
Work Order Invoice
DATE: 8/8//18
JOB NUMBER
18404
USTOMER INFORMATION
West Coast Air
Q10te
T E M
XX '
Extra
Order Taken By:
Lynne
1155 Pioneer way St. 101
Day Phone:
Job Complete?
(Please
Check)
YES
t-
NO
(-
1
El Cajon, CA 92020
Tony - 619-520-6395
Job Location / Address ( if different):
Room/ Bldg. Floor
John - 480-721-9271
Customer Authorization to Perform work
x
National City Civic Center
1243 National City Blvd.
National City, CA 91950
SERVICE
TECHNICIAN
- DATE
OF WORK AND LABOR UNITS
Name
Date
Reg
OT
Dbl-time
Name
Date
Reg
OT
Dbl-time
Dustin Stanley
8
MISC.
MATERIALS-
(SEE
SIDE 2
FOR ADDITIONAL MATERIALS)
Qty
Items
20ft
3/4" EMT
5
3/4" threadless connectors
1
12x4x4 3r pull can
10
3/4" rain tight connectors
RENTALS: (SCISSOR LIFT, BACKHOE, DITCHWITCH., ETC)
5
3/4" strut straps
1ft
1 5/8" strut
20
Red wire nuts
Description of Work Completed:
Repair conduit damaged by roof demo - Notify West Coast Air before proceeding before if repairs require
outage or conduit repair is below roof level
Made the repairs and restored power.
PAYMENT TERMS
Credit Card (Mastercard, Visa, AM Express) Customer Acknowledgment of Work Performed
P X OW
Check / Cash
P x Chris Rybar
Customer POP (Please Print Name)
1298 Pacific Oaks Place •Escondido, CA • 92029 • (760) 745-2001 • Fax (760) 745-0321
Foreman Use oni
Introduce Yourself to Customer
7
Identify All Safety Hazards
7
Perform Preliminary Job walk with Customer
Self - inspect and test your work
Signed Rate sheet by Customer
7Clean
up
V
Final job walk and training with the Customer X
ustomer Signature
Ameresco Engergy Services Agreement
CIP No. 17-03
Contractor: Ameresco, Inc.
Reason/Purposeifor this Change Order:
This attached Change Order Request No. 3 was agreed upon by the City and Ameresco to facilitate the City's purchase of
96 light fixtures for Camacho Recreation Center.
CHANGE ORDER NO. 3
September 18, 2018
The City of National City and Contractor agree to the following change to the original Contract:
The 96 fixtures described in the attached table will be supplied by Retro Tech to the City. Ameresco and Retro
Tech are not providing any work that is typically associated with Ameresco's Work under the Agreement;
Ameresco is only supplying the fixtures to be installed by City Facilities Maintenance staff. Neither Ameresco
or Retro Tech are providing any warranty, express or implied, beyond the light fixture manufacturer's warranty.
Original Contract Amount
Net change by previously authorized Change Orders
Subtotal
Amount of this change order
New contract amount
Calendar days added:0 Working days subtracted: 0
Submitted by:
5,403,308.00
7,333.90
5,410,641.90
8,000.00
$ 5,418,641.90
Percent change in Contract to date 0.28%
Project Manager Date City Project Manager
Approved by:
Date
_ io%-/it
City% ngineer , Date City Manager, required for Change Orders>$24,999 Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly
negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and
labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the
price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor,
supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions
of the original contract documents are incor.orated herein. (2 originals: 1 for City Clerk, 1 for Contractor)
Accepte
agreed to by AMERESCO, Inc.:
°I,ri6
Name: Date
Note to Uont . • .r: If you do not agree . change Uraer you may be directed to proceed wan this work under the terms of the
contract and you may p . - -. uner protest. You must comply with the contract requirements of submitting a written protest to protect
your claim.
Originals: City Clerk, Contractor cc: Engineering project file, Project Manager
1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380
AMERESCO
Green • Clean • Sustainable
Change Order Request No. 3
Change Request Number: 3
Customer: City of National City
Project Number: 73456-20
Contract: Energy Services Agreement dated June 20, 2017
I. REQUEST DATE: September 11, 2018
1.
Requested By
Scott Wentworth, Senior Project Manager
2.
Description of Changes
Lighting materials for City use
3.
Addition or Deduction from Contract Price
Addition
4.
Change to Contract Amount
$ 8,000.00
II. AMERESCO's AGREEMENT
With respect to all costs involved in this change, and subject to Section 8 of the Agreement, Ameresco proposes
to supply light fixtures that Ameresco's subcontractor Retro Tech procured for Camacho Recreation Center.
Ameresco and Retro Tech are supplying these fixtures for the City's future use in exchange for the payment
specified below. Ameresco and Retro Tech are not Providing any Work that is typically associated with
Ameresco's Work under the Agreement; they are only supplying the fixtures. Therefore, neither Ameresco or
Retro Tech are providing any warranty, express or implied, beyond the light fixture manufacturer's warranty.
Payment shall be made on the basis of:
(X) Lump Sum in the amount of:
$ 8,000.00
Contract Time will be Increased by: Zero calendar days
III. CONTRACT ADJUSTMENT
Contract Award
Previous Additions
This Change
Total Contract Amount
$ 5,403,308.00
$ 7,333.90
$ 8,000.00
$ 5,418,641.90
No changes to the Substantial Completion Date are included in this Change Order; however such
changes are requested under Change Order Request No. 1.
AMERESCO
Green • Clean • Sustainable
September 11, 2018
City of National City
1243 National City Blvd.
National City, CA 91950
Attention: Jose Lopez
Project Manager
Regarding: Change Order Request No. 3 Lighting Fixtures for Camacho Recreation Center
Dear Jose:
This attached Change Order Request No. 3 is proposed to facilitate the City's purchase of light fixtures
for Camacho Recreation Center. The fixtures described in the table below will be supplied by Retro Tech
to the City. Ameresco and Retro Tech are supplying these fixtures for the City's future use in exchange
for the payment specified in the attached Change Order Request. Ameresco and Retro Tech are not
Providing any Work that is typically associated with Ameresco's Work under the Agreement; we are only
supplying the fixtures. Therefore, neither Ameresco or Retro Tech are providing any warranty, express
or implied, beyond the light fixture manufacturer's warranty.
Light Fixtures Materials Supplied for Camacho Recreation Center
Part Type
Manufacturer
Part #
Qty
LAMP
VENTURE
LP76418
4
NEW FIXTURE
LITHONIA
IBG-18000LM-SEF-AFL-WD-MVOLT-
OZ10-35K-70CRI-DW H-THUN-
WGIBG26
20
RETROFIT KIT
FSC
LB-04-27W-35K-UFD
17
RETROFIT KIT
FSC
L74-24-25-35K-RFK
28
SENSOR
WATTSTOPPER
DT-300
9
SENSOR
WATTSTOPPER
PW-301-w
3
SENSOR
WATTSTOPPER
W2000H
1
POWER PACK
WATTSTOPPER
BZ-50
14
135 5. State College Blvd, Suite 265, Brea, CA 92821
California State Contractor's License #817191 Class A, B, C10, C46
Jose Lopez
Change Order Request No. 3
September 11, 2018
Page 2
Cost
The total cost for this change order is $8,000. Ameresco is,not marking up Retro Tech's charges.
Extension of Time
No extension of time is requested for this change
Once you agree with items in this Change Order Request No. 3, please provide the City's change order
form for execution. If you would like to discuss any item, please contact me by e-mail, or by telephone
at 510-684-7684.
Sincerely,
M--
Scott Wentworth
Senior Project Manager
Attachment:
Change Order Request No. 3
C: Kevin Nissley
Kelsey Gormley
Seth Pearce
Dan Feld
John Caruso
135 S. State College Blvd, Suite 265, Brea, CA 92821
California State Contractor's License #817191 Class A, B, C10, C46
CITY OF NATIONAL CITY
Office of the City Clerk
1243 National City Blvd., National City, California 91950-4397
619-336-4228
Michael R. Dalla, CMC - City Clerk
AMERESCO
Ameresco Energy Services Agreement,
CIP No. 17-03
Change Orders #2 and #3
Judith Hernandez (Engineering/Public Works) forwarded copies of the
change orders to Ameresco.