HomeMy WebLinkAbout2018 CON L.C. Paving and Sealing - Plaza Blvd. Pedestrian Enhancements, CIP No. 17-12 - Change Orders #1 and #2PROJECT NAME: Project Plaza Blvd Pedestrian Enhancements CIP NO. 17-12 Contractor: L. C. Paving & Sealing CHANGE ORDER NO. 1 October 16, 2018 Reason/Purpose for this Change Order: The back edge of sidewalk on the South side of E. Plaza Blvd. has an adjacent large tree with the potential to cause root damage to the new improvements. In order to minimize future damage, a deepened curb is to be placed. The City of National City and Contractor agree to the following change to the original Contract: The City and the Contractor agree that the Contractor shall proceed with the forming and placing of the deepened curb on the South End sidewalk. Original Contract Amount Net change by previously authorized Change Orders Subtotal Amount of this change order New contract amount $ 101,260.59 101,260.59 1,190.00 Working days added: 2 Working days subtracted: 0 Percent change in Contract to date 1.18% 102,450.59 S ' teb • Project Manager 10(Itilixt Date Approved by: CI n irieer As - Date City Manager, required for Change Orders>$24,999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. y CONTRACTOR NAME: Plaza Blvd Pedestrian Enhancements /000.k Name: Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract reauirements of submittina a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1o/►g/if 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 Proposal Proposal# 99846 L.C. Paving & Sealing, Inc. Date: Sep, 12 2018 330 Rancheros Drive, Ste. 208 LCP Job No: 15230 San Marcos, CA 92069 P. (760) 752-1743 F. (760-752-1674 To: CITY OF NATIONAL CITY 1243 National City Blvd National City, CA 91950 Job Information: Plaza Blvd Pedestrian Enhancements Plaza Blvd, National City, CA Terms: Item Quantity Description 1 Root Barrier Deep Curb PER RFI #1 RESPONSE please see attached document Rate Price $1,190.00 Total: $1,190.00 4 4 a :itri n v J1.. a CENTER cflta VR wuru. nu13 • R.0.4 urrs UMW IOR-OTIQMOC fOR wersotriar riff Strar,..4 "au PLAZA BOULEVARD APN 556-590-61 I - APN 556-590-56 LEGEND L - • : •I ar cuaalrefxxrs AKYaFD an. WIRY SING AVOICrWY PLAN PLAZA BOULEVARD SCALE: 1'=5• SECTION A -A MICA!. INCLUDING REMOVAL OF EXISTING UNCLASSIFIED MATERIALS, ROOTS, AND RE-ROUTING EXISTING IRRIGATION I%l *1 RESPONSE PROJECT NAME: Project Plaza Blvd Pedestrian Enhancements CIP NO. 17-12 Contractor: L. C. Paving & Sealing CHANGE ORDER NO. 2 October 16, 2018 Reason/Purpose for this Change Order: On 8th and National City Blvd there is a section of sidewalk that is patched with asphalt and not uniform with the existing adjacent sidewalk panels and brick band. The City of National City and Contractor agree to the following change to the original Contract: The City and the Contractor agree that the Contractor shall proceed with the forming and placing of the new sidewalk panel and brick band. Original Contract Amount $ 101,260.59 Net change by previously authorized Change Orders Subtotal Amount of this change order New contract amount $ Working days added: 5 Working days subtracted: 0 1,190.00 Percent change in Contract to date 3.57% 102,450.59 2,420.00 104,870.59 10//104 Submitted .. rolect anager °bilk/ Date Approved by: c... ... .. City ngineer after Date City Manager, required for Change Orders>$24,999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. CONTRACTOR NAME: Plaza Blvd Pedestrian Enhancements /a/4//' Name: Date Note to Contractor: Ifyou do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract reauirements of submittino a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 L.C. Paving & Sealing, Inc. 330 Rancheros Drive, Ste. 208 San Marcos, CA 92069 P. (760) 752-1743 F. (760-752-1674 To: CITY OF NATIONAL CITY 1243 National City Blvd National City, CA 91950 Proposa I Proposal# Date: LCP Job No: 99859 Sep, 19 2018 15230 Job Information: Plaza Blvd Pedestrian Enhancements Plaza Blvd, National City, CA CCO #2 Terms: Item Quantity 1 Description Remove Cold Patch, install new sidewalk w/Brick Band at 8th & National City Blvd Rate Price $2,420.00 Total: $2,420.00 PROJECT PROFESSIONALS CORPORATION TRANSMITTAL COVER To: National City Engineering Department Project Name: Plaza Blvd. Pedestrian Enhancements CIP No. 17-12 ITEMS DELIVERED: Change Order #1 and #2 Delivered by: Alex Preciado Project Professionals Corporation Received by: Date: \\Wu „„..........nw/// CITY OF NATIONAL CITY Office of the City Clerk 1243 National City Blvd., National City, California 91950-4397 619-336-4228 Michael R. Dalla, CMC - City Clerk L.C. PAVING & SEALING PROJECT PLAZA BLVD PEDESTRIAN ENHANCEMENTS, CIP No. 17-12 Change Orders #1 and #2 Judith Hernandez (Engineering/Public Works) forwarded Copies of the Change Orders to L.C. Paving & Sealing.