HomeMy WebLinkAbout2018 CON DBX, Inc. - Fiber Optic Traffic Signal Interconnect Expansion, CIP No. 18-06 - Change Order #1CALIFORNIA
NATIONAL CITY
INCORPORAT
FIBER OPTIC TRAFFIC SIGNAL INTERCONNECT EXPANSION
CIP NO. 18-06
Contractor: DBX, Inc.
Reason/Purpose for this Change Order:
CHANGE ORDER NO. 1
November 16, 2018
Three existing pull boxes along Plaza Blvd west of Plaza Entrada were unable to be located and required
adjustments to bring to grade. This was an unforeseen condition that required additional work under time
and materials agreement between the construction manager and the contractor.
The City of National City and Contractor agree to the following change to the original Contract:
The City and the Contractor agree that the Contractor proceed with locating the buried existing fiber optic
pull box, setting the new pull box to grade and repairing the sidewalk panels.
Original Contract Amount $ 584,676.00
Net change by previously authorized Change Orders
Subtotal
584,676.00
Amount of this change order 7,043.86
New contract amount
$ 591,719.86
Working days added: 0 Working days subtracted: 0 Percent change in Contract to date 1.20%
Submittti?
anaq
Approved by:
Date
City Manager, required for Change Orders >$24,999 Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its
price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a
complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents
all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc.
and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein.
y DBX Inc.:
�r
N: me: James C. Perry Date 11/19/18
Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you
may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim.
Originals: City Clerk, Contractor cc: Engineering project file, Project Manager
1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380
TOl 1, L Cfry
NcoO .1 ED -J
l
Fiber Optic Traffic Signal Interconnect Expansion 18-06 (HSIP)
CIP NO. 18-06
DATE: October 17, 2018
WORK PERFORMED BY: DBX
DESCRIPTION OF WORK: Find buried #6 FO box (station 146+20) and raise to final grade
ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT
Unit
Qty
Wage
Total
Ken Dodds, DBX
Juan Carballido, DBX
HR
HR
3.00
3.00
65.00
55.04
195.00
165.12
27.55
Social Security/Medicare Tax 7.65%
Workers Compensation Class #6325 5.74/100
Liability Insurance 56.02/1000
Sub -Total Labor:
Labor Markup (20%): 85.70
TOTAL LABOR:
20.67
$ 20.17
$ 428.51
Unit
Qty
Rate
Total
1) I Cold Patch AC 1 Bags
8.00
6.99
55.92
Sales Tax 8.75%
Sub -Total Materials:
4.89
$ 60.81
Materials Markup (15%): $ 9.12
TOTAL MATERIALS:
EQUIPMENT
Unit
Qty
Rate
Total
1)
DBX Pick up
HR
3.00
22.02
66.06
2)
DBX F450 Flatbed
HR
3.00
34.49
103.47
3)
Jackhammer
HR
3.00
1.54
4.62
4)
Air Compressor
HR
3.00
16.81
50.43
$ 224.58
Sub -Total Equipment:
Equipment Markup (15%):
TOTAL EQUIPMENT:
$ 33.69
SUB TOTAL:
$ 258.27
842.41
Fiber Optic Traffic Signal Interconnect Expansion 18-06 (HSIP)
CIP NO. 18-06
DATE: October 18, 2018
WORK PERFORMED BY: DBX
DESCRIPTION OF WORK: Find buried #6 FO box (station 146+20) and raise to final grade
ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT
Unit
Qty
Wage
Total
1) Ken Dodds, DBX HR
2) Juan Carballido, DBX HR
3) Robert Romo, DBX HR
3.00
8.00
8.00
65.00
55.04
55.04
195.00
440.32
440.32
Social Security/Medicare Tax 7.65%
Workers Compensation Class #6325 5.74/100
Liability Insurance 56.02/1000
Sub -Total Labor:
Labor Markup (20%):
TOTAL LABOR:
$
$
61.74
60.26
$ 1,279.93
$ 255.99
1,535.92
Unit
Qty
Rate
Total
#6 Pull Box EA
#6 Pull Box Lid EA
3/4" Crushed Rock EA
1.00
1.00
15.00
35.90
35.27
3.29
35.90
35.27
49.35
2)
3)
4)
DBX F450 Flatbed
Sales Tax 8.75%
Sub -Total Materials:
10.55
$ 131.07
Materials Markup (15%): $ 19.66
TOTAL MATERIALS:
Unit
HR
HR
Qty
3.00
8.00
Rate
22.02
34.49
Total
66.06
275.92
Jackhammer
HR
8.00
1.54
12.32
Air Compressor
HR
8.00
16.81
134.48
$ 488.78
Sub -Total Equipment:
Equipment Markup (15%):
TOTAL EQUIPMENT:
73.32
SUB TOTAL:
GRAND TOTAL:
82.29
CALIFORNIA
INCORPORATED
Fiber Optic Traffic Signal Interconnect Expansion 18-06 (HSIP)
CIP NO. 18-06
DATE: October 19, 2018
WORK PERFORMED BY: DBX
DESCRIPTION OF WORK: Find buried #6 FO box (station 146+20) and raise to final grade
ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT
Ken Dodds, DBX
Juan Carballido, DBX
Robert Romo. DBX
Unit
HR
HR
HR
Qty
6.00
8.00
8.00
Wage
65.00
55.04
55.04
Total
390.00
440.32
440.32
Social Security/Medicare Tax 7.65%
Workers Compensation Class #6325 5.74/100
Liability Insurance 56.02/1000
Sub -Total Labor:
$ 97.20
$ 72.93
$ 71.18
$ 1,511.95
Labor Markup (20%): 302.39
TOTAL LABOR:
Unit
Qty
Rate
Total
1) Quickcrete Concrete Mix
2) Portland Cement
Bags
Bags
45.00
1.00
6.19
12.69
278.55
12.69
DBX Picku. Truck
F450 Flatbed
Air Com.ressor
Jackhammer
Dum. Truck
Cecilia Safety Service
Sales Tax 8.75%
Sub -Total Materials:
Materials Markup (15%): 47.51
TOTAL MATERIALS:
Unit
HR
HR
HR
HR
HR
25.48
$ 316.72
Qty Rate Total
6.00 22.02 132.12
8.00 34.49 275.92
8.00 16.81 134.48
8.00 1.54 12.32
8.00 45.02 360.16
Sub -Total Equipment: $ 915.00
Equipment Markup (15%):
Unit
HR
Qty
4.00
$ 137.25
TOTAL EQUIPMENT:
Rate
171.88
Sub -total Subcontractor:
Prime Contractor Markup (5%):
SUB TOTAL:
Total
687.50
$ 687.50
$ 34.38
$ 1,052.25
$ 3,230.82
TOTAL SUBCONTRACTOR:
$ 721.88
GRAND TOTAL:
PROJECT PROFESSIONALS CORPORATION
TRANSMITTAL COVER
To: National City Engineering Department
Project Name: Fiber Optic Traffic Signal Interconnect Expansion
CIP No. 18-06
ITEMS DELIVERED:
Change Order #1
Delivered Icy 1! 1 Project Professionals Corporation
Received by:
Date:
Jo s e-
12 /3/2 o t v
Lof z
CITY OF NATIONAL CITY
Office of the City Clerk
1243 National City Blvd., National City, California 91950-4397
619-336-4228
Michael R. Dalla, CMC - City Clerk
DBX, INC.
Change Order #1
Fiber Optic Traffic Signal Interconnect Expansion,
CIP No. 18-06
Judith Hernandez (Engineering/Public Works) forwarded a copy of the Change Order to