Paradise Creek Park Site Remediation & Improvements CHANGE ORDER NO. 2
CIP NO. 18-07 February 28, 2019
Contractor: WHILLOCK CONTRACTING
Reason/Purpose for this Change Order:
i The existing slope between the west side of the access road and along a 50 Linear Foot frontage to private
property with APN ending 125-14, requires slope stabilization. The desgin team has recommended a line
item increase of the Gabbion Wall line item #62 to provide an additional 300 SF of gabion wall as detailed
on the attached plan revision. Per the plan revision, additional surveying efforts are needed to field verify the
location.
The City of National City and Contractor agree to the following change to the original Contract:
The City and the Contractor agree that the Contractor shall first proceed with surveying the additional
location of the Gabion Wall. This additional work is to be paid at the agreed price of $609. After the
surveying of the new Gabion Wall location, the contractor is to proceed with the installation of additional 300
SF of Gabion Wall. This work will be paid under line item #62 as a line item adjustment.
Amount of this change order
d 2ng days subtracted: 0
Approved by:
City gineer
`2M
Date
609.00
.City Manager, required for chsrgsOrders >s24999 Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its
price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a
complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents
all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc.
and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein.
Accepted and agreed to b WHILLOCK CONTRACTING:
qi-151/Name: te
ote to Contractor: If you do not agree is Change Order you may be directed to proceed with this work under the terms of the contract and you
may proceed under protest. You must comply with the contract reauirements of submitting a written protest to protect vour claim.
Originals: City Clerk, Contractor cc: Engineering project file, Project Manager
1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380
CALIFORNIA
NATIONAL CITY
SJ;J/
INCORPORATED
Paradise Creek Park Site Remediation & Improvements
CIP NO. 18-07
Contractor: WHILLOCK CONTRACTING
CHANGE ORDER NO. 3
February 25, 2019
Reason/Purpose for this Change Order:
The City requested additional construction site safety signs to be installed around the perimeter of the
construction site due to ongoing construction activities.
The City of National City and Contractor agree to the following change to the original Contract:
The City and the Contractor agree that the Contractor shall procure and install 6 additional construction site
safety signs. This change order sums up to $820.62.
Amount of this chan • e orde
Cityingineer
days subtracted: 0
3A-fi
3/y<li
Date
820.62
Cit Mana • er, required for Charge Orders >$24,999 Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its
price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a
complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents
all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc.
and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein.
Accepted and agreed to by WHILLOCK CONTRACTING:
Name`
.e7 z 7- / `I
Date
Note to Contractor:7f you do not ee with this Change Order you may be directed to proceed with this work under the terms of the contract and you
may proceed under protest. Yo must comply with the contract reauirements of submittina a written protest to protect your claim.
Originals: City Clerk, Contractor cc: Engineering project file, Project Manager
1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380
CALIFORNIA
NAT'IONAL, CITY
'!JJ1
IN(,0„poRATED
Paradise Creek Park Site Remediation & Improvements
CIP NO. 18-07
Contractor: WHILLOCK CONTRACTING
Reason/Purpose for this Change Order:
During the clearing and grubbing operation, the project team discovered unknown derbis in the slope comer
along 21 st street and Harding Avenue. Initial tests identified trash and debris within the slope, however did
not allow for fair quantification of removal material.
CHANGE ORDER NO. 4
February 26, 2019
The City of National City and Contractor agree to the following change to the original Contract:
The City and the Contractor agree that the Contractor shall proceed this work under time and materials. See
attached for T&M breakdown.
Amount of this change order... 28,454.64
rking • :ys a: • • 2 Wo ing •ays subtracted: 0
Approved by:
I/2.h9..
ngineer Date 'City Manager, requiredfor Change Orders>S24,999 Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its
price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a
complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents
all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc.
and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein.
Accepted and agreed to by WHILLOCK CONTRACTING:
z 2- 7-19
Name: Date
Note totontractor: If you do not ee with this Change Order you may be directed to proceed with this work under the terms of the contract and you
may proceed under protest. You must comply with the contract requirements of submittina a written protest to protect your claim.
Originals: City Clerk, Contractor cc: Engineering project file, Project Manager
1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380
CALIFORNIA
ittio
1•
PARADISE CREEK PARK SITE REMEDIATION & IMPROVEMENTS CHANGE ORDER NO. 4
CIP NO. 18-07
DATE: December 20, 2018
WORK PERFORMED BY: Whillock Contracting
DESCRIPTION OF WORK: Load and export trash and debri on slope corner of 21st and Harding
ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT
Unit
Qty
Wage
Total
1) Operator
HR
6.50
75.23
489.00
2) Driver
HR
26.75
35.00
936.25
2) Roofing Material Testing
Sub -Total Labor:
Labor Burden (27.02%):
Labor Markup (20%):
TOTAL LABOR:
Unit
TON
EA
Qty
249.31
5.00
Rate
73.35
15.00
$ 1,425.25
$ 385.10
$ 362.07
Total
18, 286.89
75.00
$ 18, 361.89
$ 1,560.76
$ 2,988.40
EQUIPMENT
Unit
Qty
Rate
Total
1)
PC-210
HR
6.50
98.00
637.00
2)
3)
#72 Super 10
#26 Ten Wheeler
HR
HR
20.50
6.25
90.08
71.65
1,846.64
447.81
Sub -Total Equipment:
Equipment Markup (15%):
TOTAL EQUIPMENT:
$ 2,931.45
$ 439.72
SUB TOTAL:
$ 22r
$ 3,371.17
$ 28,454.64
SUBCONTRACTOR
Unit
Qty
Rate
Total
Sub -total Subcontractor:
Prime Contractor Markup (5%):
TOTAL SUBCONTRACTOR:
$
GRAND TOTAL:
Sub -Total Materials:
Taxes (8.5)
Materials Markup (15%):
TOTAL MATERIALS:
WHILLOCK CONTRACTING, INC
LICENSE NO 572217
P.O. BOX 2322
LA MESA, CA 91943-2322
(619)579-0700
EXCAVATING • GRADING • DEMOLITION
REQUEST FOR
CHANGE ORDER No. 1537-002R1
AUTHORIZATION FOR CHANGES IN PLANS OR SPECIFICATIONS
JOB Paradise Creek Park Site Remediation CJP 18-07 DATE 02-22-2019
ADDRESS West 21st & Harding Ave National City. CA 91950
You are hereby authorized to make the following changes from Plans and/or Specifications or Contract:
Derrick Anderson / PPC
The undersigned promise(s) to pay to the order of Whillock Contracting, Inc. the total amount of $28,454.63 within 30 days
from the date hereof. Should the undersigned fail to pay said total amount within said period of time it is understood and agreed that
the amount due shall bear interest at the maximum rate permitted by law, per year from due date. Should an attomey be retained to
enforce my (our) promise, the undersigned agree(s) to pay all costs of collection including a reasonable attomey's fee. The
undersigned further agree(s) that neither defects, omissions, incompletion nor any other defaults with respect to the performance of
work not explicitly specified herein shall excuse, or extend the time for, the payment due hereunder. Should this job order be signed
by more than one person and/or firm and/or corporation, all the obligations herein contained shall be considered the joint and several
obligations of each signer hereof.
DESCRIPTION OF CHANGE OR MODIFICATION
CREDIT CHARGE
Removal of unknown debris found in slope at corner of
21st and Harding
$28,454.63
THE CHANGES OR MODIFICATIONS ABOVE ARE APPROVED AS TO TYPE AND PRICE.
WITNESS
OWNER
City of National City Paradise
Site
CONTRACTOR CHANGE ORDER REQUEST - COST WORKSHEET
COR # 1537-002 DESCRIPTION Removal and disposal of unknown debris found in
Creek Parr
Remediatior
DATE 02/22/19 slope corner of 21 st & Harding
Contractor
12/19/18
12/20/18
12/21/18
1
Direct Costs
Labor: (detail by classification, dates, etc.) Hours Rate Extended
Driver
./6.0
= 35.00
210.00
Operator - PC210
V3.5
175.23
263.31
Driver
112.0
V 35.00
420.00
Operator - PC210
V 3.0
✓ 75.23
225.69
Driver
J8.75
✓35.00
306.25
Subtotal Labor
Labor Burden
Total Labor
27.02%
(percentage)
1,425.25
385.10
$ 1,810.35
2
Material: (describe) Unit Unit Pr. Extended
4�
Y/
J
Dump Fee - Trash
J24931
73.35
18,286.89
Roofing Material Testing
5
15.00
75.00
Subtotal Material
Tax
Total Material
8.50%
(percentage)
18,361.89
1,560.76
_
$ 19,922.65
12/19/18
12/20/18
12/21/18
3
Equipment: (operators are included in #1) Specify Hr/Day/Wk/Mo Qty Unit Pr. Extended
Super10
HR
6
90.08
540.48
PC210
HR
be 3.5
98.00
343.00
Ten Wheeler
HR
V6.25
71.65
447.81
Superl0
HR
V5.75
90.08
517.96
PC210
HR
✓ 3
98.00
294.00
Superl0
HR
V8.75
90.08
788.20
Total Equipment
$ 2,931.45
4 Contractor Subtotal - Direct Costs (1+2+3)
$ 24,664.45
Subcontractors:
A-
B-
C-
D
E
F
5
Sub Contr Tier Sub Sub Markup Tier Sub
Direct Cost Sub Markup Direct Cost on Tier Sub Markup Total Sub.
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Total Subcontractors
$ -
Mark-up: Includes incidental overhead support costs and profit. Such incidental costs include: estimating and purchasing;
indirect supervision and project management; home office overhead; site overhead including facilities
change order coordination; course of construction and liability insurance; small tools; and all other miscellaneous
6 Markup on Contractor Direct Cost (ITEM 1) - 20%
7 Markup on Contractor Direct Cost (ITEM 2) - 15%
8 Markup on Contractor Direct Cost (ITEM 3) - 15%
9 Contractor Markup on Net Direct Cost of subs A
B
C
D
E
F
and utilities;
support costs.
$ 362.07
$ 2,988.40
$ 439.72
-
-
-
-
-
-
-
-
-
-
$ -
Change Order Request Total I $ 28,454.63
Time Extension:
Total Days Requested:
Days Approved: 1
2
Customer's Order No.
Phone No.
Date
/ —30 —/ '
Sold To
e,i 417 lUA-17nAJAL f>>'Pt/
Address .._
- -4- /-I A-2D;
City
/S3
J
m/ f.
1
.]�?`�'�'
!� f.:.�.)t
.(Y
{rf t.�f.YJf•yY.`L4
Sold By
kVA
Ot;.
, —.
Cash
PC. DID
C.O.D.
Descrrpnon
-� �-- --
Charge
h) ,4 ri-
On Acct.
Mdse. Ret'd.
Pnce
Paid Out
Amount
3
cJ `+
%� 5LA.� 1 - rrfllee-v1
1-5ye4nkao It.
.37Tdt.r
" J `.d 7S 772.¢S? Z+ `J „=
,�,— -
3-Ot y 6z.5z
P
1
�( J`l I
tt4: Ti LAJ/-4-a--l-e - )i Ar 12 K
/ 6,44( '772AsFf lac R2r
yp,47-
1-0
y !40'35i
3
/cP —I' — /$
c� /) ( IZAS bL 12,ki ,E/piitC
IF YOU'RE NOT AUTHORIZED
OR DON'T KNOW WHAT YOU'RE SIGNING
DON'T SIGN!
All claims and returned goods MUST be accompanied by this bill.
Rec'd.
By
Tax
Total
40114
2424
Thank You
0?`'
r' SaL t . YTa 4 ... 97,
X
y'R`:
yt �.'�..,�r�'ti ,t i». .�• t v. s �fy`Fe4^4
!f
%
Customer's Order No.
Phone No.
Date
Sold To
4 / ! %U,A 4;63 N.4- I. Zi ley
Address /
53 �i
i v#
g �4YA
� f t&' .,•- yd'C 0,"?E "N GJ tkvi4.
Sold By
S a
Or;
3
Cash C.O.D. Charge
Description
R. r o -- .a - A-+-tt-
On Acct.
Mdse. Ret'd.
Price
Paid Out
Amount
gr-i
''l.7a Su p 7? f .1 - l_AeA
\-jyrgMot4
19.I2rlrk3
1&Acc S ` t )2A-S f'i- — 66 21
-i -Ots-y 59ql-pns
kiCli d 't- 6 re T As t -
v- De-f3,k,i Olv S,4pc-
ern yl rtl ..2J r- r- /1/4-12bl'Ai
IF YOU'RE NOT AUTHORIZED
OR DON'T KNOW WHAT YOU'RE SIGNING
DON'T SIGN'
All claims and returned goods MUST be accompanied by this bill.
Rec'd.
By
Tax
Total
240114
2426
Thank You
\q;\
.; PH jsse} 57$
}
ner's Order No.
Phone No.
Date
/02_/9-/a'
/UA-71-/O n.).4 L.
off% `f-' /I,v2AA'Ng
31
} t �.t ii .gyp . .� �' '1• N{YaY
h.`w .f. "FPf"...v�"W>3a1. k. Y.LL
F :;1✓��., ..
t By
k
Cash
310-Li-
C.O.D. Charge
Description
S* -
On Acct.
Mdse. Ret'd.
Price
Paid Out
Amcunt
/
'c,.cai0 -a. -Sty' J
_____;z-)990
iris
5-
tune- s
A,Amiz. - /lEctAwc A
3
Pc.- k / �
j.Aai2- - MAtt J
S' U 14, Tercy-4
4-7a pie -r -N --LA-re
L3A2, s/f 2r- A
PP2
3 LzAci5 `77445h-
Syr4fare 21 •
/
,J5)Po,C
OtL'1 ,I.top
IF YOU'RE NOT AUTHORIZED
OR DON'T KNOW WHAT YOU'RE SIGNING
DON'T SIGN!
:Iaims and returned goods MUST be accompanied by this
bill.
Tax
Total
2420
Thank You
e kyv s & (
Axium Services
BRED DEC 2 1 2018
9187 Ciairemont Mesa Blvd, Ste 6-741
San Diego, CA 92123
Whitlock Contracting, Inc.
PO Box 2322
La Mesa, CA 91943-2322
TIN: 83-0554972 billing@axiumservices.net
Invoice # 241436 $75.00
Lab Order Number: 166207 Pate Sampled Who Sampled
Invoice Date: 12/19/201 12/13/2018 Mark Whillock
Net: Net 30
PO Number:
Contract Number:
Job Site Location: W 21st National City CA 91950
Comments:
WorkAnalysls Details:
Unit Extended
ID Qt Work Analysis Cost Cost /
231767 51 Bulk ASB Analysis - PLM $15.00/ $75.00 "
Wednesday, December 19, 2018
Invoice Total: $75.00
Invoice Balance: $75.00
Acct Use Only
Job # ( 5 3 Approved By C'6\
Date VZ-YIA\1
Cost Code i e- , h)
Insurance
Accounts Past Due W1 Be Charged A Finance Charge O/ 1.5% Per
Month (18% Annual Rate) On The Outstanding Balance
OTAY LANDFILL
1700 MAXWELL RD
CHULA VISTA, CA 91911
)
018308 - WHILLOCK CONTRACTING INC.
P.O. BOX 2322
GA MESA, CA 91943--232
Contract: GATE RATE
GROSS 57,380
TARE 34,180
NET 23,200
Tracking Qty: 0.00
Qty Unit Description
111.60 1 TN MSW
Origin: NATIONAL CITY
01 Ticket #:176521.9
Weighmaster: IN - estraal2 OUT - TOLBEC
In: December 19, 2018 12:16 pm
Out:
Vehicle;
Ref:
BOL:
Scale In
Scale Out INBOUND
INVOICE
OTll L j 2) v�t.� '. Z� .3 I /
100%
SuaTAatr-,� q.s 1
vim' A-tc-x Po
December 19, 2018
A46334
A46334/800.00
Rate Extension
Signature:
12:51 pm
Tax Total
Total
Paid
Change
01 Ticket #:1765291
OTAY LANDFILL
1700 MAXWELL RD
CHULA VISTA, CA 91911
018308 - WHILLOCK CONTRACTING INC.
P.O„ BOX 2322
LA MESA, CA 91943--232
Contract: WHILLOCK CONTRACT
GROSS 73,880 Scale In
TARE 34,460 Scale Out INBOUND
NET 39,420 INVOICE
Tracking Qty: 0.00
Ifti,Unit Description
1��3. /� ►. TN MSW
Origin: NATIONAL CITY 10.0%•
Rate Extension
Signature:
Weighmaster: IN - estraal2 OUT - TOLBEC
In:
December 19, 2018
Out: December 19, 2018
Vehicle: A46334
Ref: A46334/600.00
BOL:
1:42 pm
2:11 pm
Tax Total
Total
Paid
Change
ACRE LANDFILL
14 MAST BLVD
JANTEE, CA 92071
0-
Y9 Ticket #:1632492
Weighmaster: ribblal
In:
December 19, 2018
3:19 pm
018308 - WHILLOCK CONTRACTING INC..P.O. BOX 2322 Out: December 19, 2018 3:19 pm
LA MESA, CA 91943-2322 Vehicle: A46334 a37154
Contract: WHILLOCK, CQN ,,e, Ref: Zlst street
BOL:
GROSS
78,900 Scale In
TARE 0 Tare Out INBOUND
NET 42,080 INVOICE
Tracking Qty: 0.00
Qty Unit Description Rate Extension
21.041 TN MSW $73.35 $1,543.28
Origin: NATIONAL CITY 100%
Signature:
Tax Total
$0.00 $1,543.28
Total
Paid
Change
$1,543.28
$0.00
$0.00
OTAY LANDFILL
1700 MAXWELL RD
CHULA VISTA, CA 91911
0 -
01 Ticket #:1765548
Weighmaster: IN - estraal2 OUT - TOLBEC
,531
1 In: December 20, 2018 9:00 am
018308 - WHILLOCK CONTRACTING INC. Out:
P.O. BOX 2322
LA MESA, CA 91943--232 Vehicle:
Ref:
Contract: WHILLOCK CONTRACT BOL:
GROSS 54,100 Scale In
TARE 32,440 Scale Out INBOUND
NET 21,660 INVOICE
Tracking Qty: 0.00
Qty Unit Description
110.83. TN MSW
Origin: SAN DIEGO
100%
December 20, 2018
A2560
WHILLOCK/600.00
Rate Extension
Signature:
9:22 am
Tax Total
Total
Paid
Change
01 Ticket #:1765642
OTAY LANDFILL
1700 MAXWELL RD
CHULA VISTA, CA 91911
018308 - WHILLOCK CONTRACTING INC.
P.O. BOX 2322
LA MESA, CA 91943--232
Contract: WHILLOCK CONTRACT
GROSS 57,020 Scale In
TARE 32,180 Tare Out INBOUND
NET 24,840 INVOICE
Tracking Qty: 0.00
Weighmaster: estraal2
In:
December 20, 2018
10:33 am
Out: December 20, 2018 10:33 am
Vehicle: A2560 A45319
Unit Description
12.42 TN MSW
Origin: SAN DIEGO
100%
Ref:
BOL:
Rate Extension
Signature:
Tax Total
Total
Paid
Change
OTAY LANDFILL
1700 MAXWELL RD
CHULA VISTA, CA 91911
0 -
018308 - WHILLOCK CONTRACTING INC.
E.O. BOX 2322
LA MESA, CA 91943--232
Contract: WHILLOCK CONTRACT
GROSS 69,860 Scale In
34,780 Scale Out INBOUND
35,080 INVOICE
0.00
TARE
NET
Tracking Qty:
Qty
Origin:
Unit Description
TN MSW
NATIONAL CITY
100%
Rate Extension
Signature:
01 Ticket #:1765682
Weighmaster: IN - ledesma OUT - TOLBECO
In: December 20, 2018 10:48 am
Out: December 20, 2018 11:08 am
Vehicle: A46334
Ref: 21th st national city
BOL: whillock/500.00
Tax Total
Total
Paid
Change
01 Ticket #:1765725
OTAY LANDFILL
1700 MAXWELL RD
CHULA VISTA, CA 91911
0 -
018308 - WHILLOCK CONTRACTING INC.
P.O. BOX 2322
LA MESA, CA 91943--232
Weighmaster: ledesma
December 20, 2018
11:41 am
Out: December 20, 2018 11:41 am
Vehicle: A2560 A45319
Ref:
Contract: WHILLOCK CONTRACT BOL:
GROSS 56,120 Scale In
TARE 32,180 Tare Out INBOUND
NET 23,940 INVOICE
Tracking Qty: 0.00
Qty Unit Description
11.97 TN MSW
Origin: SAN DIEGO
100%
Rate Extension
Signature:
Tax Total
Total
Paid
Change
01 Ticket #:1765778
OTAY LANDFILL
1700 MAXWELL RD
CHULA VISTA, CA 91911
0 - \,111
I n :
Weighmaster: ledesma
018308 - WHILLOCK CONTRACTING INC.
P.O. BOX 2322
LA MESA, CA 91943--232
Contract: WHILLOCK CONTRACT
GROSS 66,280 Scale In
TARE 35,040 Tare Out INBOUND
NET 31,240 INVOICE
Tracking Qty: 0.00
Qty Unit Description
15.62 I TN MSW
Origin: NATIONAL CITY 100%
Rate Extension
Signature:
December 20, 2018
12:14 pm
Out: December 20, 2018 12:14 pm
Vehicle: A46334 A53240
Ref: 21ST ST NATIONAL CITY
BOL:
Tax Total
Total
Paid
Change
01 Ticket #:1765828
OTAY LANDFILL
1700 MAXWELL RD
CHULA VISTA, CA 91911
()-
018308 - WHILLOCK CONTRACTING INC.
P.O. BOX 2322
LA MESA, CA 91943--232
0'71
Weighmaster: ledesma
In:
December 20, 2018
12:49 pm
Out: December 20, 2018 12:49 pm
Vehicle: A2560 A45319
Ref:
Contract: WHILLOCK CONTRACT BOL:
GROSS 57,340 Scale In
TARE 32,180 Tare Out INBOUND
NET 25,160 INVOICE
Tracking Qty: 0.00
Qty
Unit Description
TN MSW
rigin: SAN DIEGO
100%
Rate Extension
Signature:
Tax Total
Total
Paid
Change
01 Ticket #:1765872
OTAY LANDFILL
1700 MAXWELL RD
CHULA VISTA, CA 91911
`�
eil
0- In:
Weighmaster: rodrian2
December 20, 2018
1:26 pm
018308 - WHILLOCK CONTRACTING INC. Out: December 20, 2018 1:26 pm
P.O. BOX 2322
LA MESA, CA 91943--232 Vehicle: A46334 A53240
Ref: 21ST NC
Contract: WHILLOCK CONTRACT BOL:
GROSS 61,020 Scale In
TARE 35,040 Tare Out INBOUND
NET 25,980 INVOICE
Tracking Qty: 0.00
Qty Unit Description
)12.99 \ TN MSW
Origin: NATIONAL CITY
100%
Rate Extension
Signature:
Tax Total
Total
Paid
Change
OTAY LANDFILL
1700 MAXWELL RD
CHULA VISTA, CA 91911
O -
018308 - WHILLOCK CONTRACTING INC.
P.O. BOX 2322
LA MESA, CA 91943--232
Contract: WHILLOCK CONTRACT
GROSS
TARE
NET
Tracking Qty:
Qty
01 Ticket #:1765911
Weighmaster: rodrian2
In: December 20, 2018
1:56 pm
Out: December 20, 2018 1:56 pm
Vehicle: A2560 A45319
Ref:
BOL:
57,280 Scale In
32,180 Tare Out INBOUND
25,100 INVOICE
0.00
Unit Description
TN MSW
Origin: SAN DIEGO 100%
Rate Extension
Signature:
Tax Total
Total
Paid
Change
Y9 Ticket #:1632866
SYCAMORE LANDFILL
8514 MAST BLVD
SANTEE, CA 92071
018308 - WHILLOCK CONTRACTING INC.
P.O. BOX 2322
LA MESA, CA 91943-2322
Contract: WHILLOCK CONTRACT
GROSS 66,120 Scale In
33,380 Tare Out INBOUND
32,740 INVOICE
0.00
TARE
NET
Tracking Qty:
Qty
Origin:
Weighmaster: STOVAJO
In:
December 20, 2018
2:56 pm
Out: December 20, 2018 2:56 pm
Vehicle: A46334 A46352
Unit Description
TN MSW
NATIONAL CITY
100%
Ref:
BOL:
21st st.
Rate Extension
$73.35 $1,200.74
Signature:
Tax Total
$0.00 $1,200.74
Total
Paid
Change
$1,200.74
$0.00
$0.00
OTAY LANDFILL
1700 MAXWELL RD
CHULA VISTA, CA 91911
;)-
018308 - WHILLOCK CONTRACTING INC.
P.O. BOX 2322
LA MESA, CA 91943--232
Contract: WHILLOCK CONTRACT
GROSS 61,760 Scale In
32,620 Scale Out INBOUND
29,140 INVOICE
0.00
TARE
NET
Tracking Qty:
01 Ticket #:1766140
Weighmaster: IN - woodsje OUT - TOLBECO
In: December 21, 2018 8:18 am
Out: December 21, 2018 8:48 am
Vehicle: A46334
Qty Unit Description
TN MSW
rigin: NATIONAL CITY 100%
Ref:
BOL:
WHILLOCK72
300.00
Rate Extension
Signature:
Tax Total
Total
Paid
Change
01 Ticket #:1766205
OTAY LANDFILL
1700 MAXWELL RD
CHULA VISTA, CA 91911
0 -
\ \
018308 - WHILLOCK CONTRACTING INC.
P.O. BOX 2322
LA MESA, CA 91943--232
Contract: WHILLOCK CONTRACT
GROSS - 62,540
TARE
NET
Tracking Qty:
32,520
30,020
0.00
Qty Unit Description
`15.01 , TN MSW
Origin: NATIONAL CITY
Scale In
Tare Out
100%
Weighmaster: mirange
In:
Out:
Vehicle:
Ref:
BOL:
INBOUND
INVOICE
December 21, 2018
December 21, 2018
A46334 A53247
whilloc/ per stacv
whillock72
Rate Extension Tax
Total
Paid
Change
Signature:
10:01 am
10:01 am
Total
01 Ticket #:1766283
OTAY LANDFILL
1700 MAXWELL RD
CHULA VISTA, CA 91911
()-
\"�
018308 - WHILLOCK CONTRACTING INC.
P.O. BOX 2322
LA MESA, CA 91943--232
Contract: WHILLOCK CONTRACT
GROSS
TARE
NET
Tracking Qty:
59,740
32,520
27,220
0.00
Weighmaster: ledesma
In:
December 21, 2018
11:23 am
Out: December 21, 2018 11:23 am
Vehicle: A46334 A53247
Ref:
BOL:
Scale In
Tare Out INBOUND
INVOICE
Qt Unit Description Rate Extension Tax Total
TN MSW
Origin: NATIONAL CITY •100%
Total
Paid
Change
Signature:
OTAY LANDFILL
1700 MAXWELL RD
CHULA VISTA, CA 91911
0 -
01 Ticket #:1766364
Weighmaster: mirange
121
018308 - WHILLOCK CONTRACTING INC.
P.O. BOX 2322
LA MESA, CA 91943--232
Contract:
GROSS
TARE
NET
WHILLOCK CONTRACT
66,080
32,520
33, 560
Tracking Qty: 0.00
Qty Unit Description
t16.78 TN MSW
Origin: NATIONAL CITY
Scale In
Tare Out
100%
In:
Out:
Vehicle:
December 21, 2018
December 21, 2018
A46334 A53247
Ref: WHILLOCK/TRASH
BOL: PER STACY
INBOUND
INVOICE
Rate Extension Tax
Total
Paid
Change
Signature:
12:40 pm
12:40 pm
Total
SYCAMORE LANDFILL
8514 MAST BLVD
SANTEE, CA 92071
0-
Y9 Ticket # : 1633229
Weighmaster: ribblal
In: December 21, 2018
018308 - WHILLOCK CONTRACTING INC. Out: December 21, 2018
P.O. BOX 2322
LA MESA, CA 91943-2322 Vehicle: A46334 a53247
Ref: whilock/trash
Contract: WHILLOCK CONTRACT BOL:
GROSS 60,760 Scale In
TARE 32,520 Tare Out INBOUND
NET 28,240 INVOICE
Tracking Qty: 0.00
Qty Unit Description
14.12 TN MSW
Origin: NATIONAL CITY 100%
2:13 pm
2:13 pm
Rate Extension Tax Total
$73.35 $1,035.70 $0.00 $1,035.70
Total
Paid
Change
Signature:
$1,035.70
$0.00
$0.00
- CALIFORNIA
AT'IONAL, CITY
INCORPORATED
Paradise Creek Park Site Remediation & Improvements
CIP NO. 18-07
Contractor: WHILLOCK CONTRACTING
Reason/Purpose for this Change Order:
Original plan for bid item #16, Temporary Pedestrian Access, was to install asphalt concrete for pedestrian
access to the 6 properties along the west side of Harding Ave from 20th Street to 21st Street. Underground
utility work is to be performed along the temporary accessway to connect water, sewer and gas laterals to
the 6 properties. The associated work for the utility connections would require several trench operations and
resurfacing efforts of the temporary walkway. As a result of this, the City accepted to install decomposed
granite as a substitution of material to accomodate this work. This substitution deletes line item #16 in its
entirety.
CHANGE ORDER NO. 5
March 4, 2019
The City of National City and Contractor agree to the following change to the original Contract:
The City and the Contractor agree that the Contractor shall proceed with installing 3" of decomposed granite
to support pedestrian access and utility work. The agreed upon price of this change order sums up to
$4,290.
Amount of this change order 4,290.00
Wor da de rt i days subtracted: 0
ubm"tte
roject Manager
Approved by:
CitEngineer
—Date
r?
Date iCity Manager, required fa Change orders>$24,999 Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its
price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a
complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents
all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc.
and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein.
Accepted and agreed to by WHILLOCK CONTRACTING:
Name: Date
Note to contractor: If you do not a with this Change Order you may be directed to proceed with this work under the terms -File contract and you
may proceed under protest. Y must comply with the contract requirements of submittina a written protest to protect your claim.
cc: Engineering project file, Project Manager
Originals: City Clerk, Contractor
1243 National City Boulevard, National City, CA 91950
Telephone (619) 336-4380
PROJECT PROFESSIONWLS CORPORATION
TRANSMITTAL COVER
To: National City Engineering Department
Project Name: Paradise Creek Park Phase III
CIP No.: 18-07
ITEMS DELIVERED:
Invoice #3
Change Order #2 -r4
Delivered by:
Received by:
Date:
Project Professionals Corporation
CITY OF NATIONAL CITY
Office of the City Clerk
1243 National City Blvd., National City, California 91950-4397
619-336-4228
Michael R. Dalla, CMC - City Clerk
WHILLOCK CONTRACTING
Change Orders #2, 3, 4, and 5
Paradise Creek Park Site Remediation and Improvements,
CIP No. 18-07
Judith Hernandez (Engineering/Public Works) forwarded a copy of the
Change Orders to Whillock Contracting.