HomeMy WebLinkAbout2019 CON Bert W. Salas - Las Palmas Storm Drain Repair Project, CIP No. 17-16 - Change Order #1Las Palmas Storm Drain Repairs CIP No: 17-16 Contractor: Bert W. Salas, Inc. CHANGE ORDER NO. 1 February 22, 2019 Reason/Purpose for this Change Order: The city has directed the contractor to repair an unknown lateral line hit during excavation. The City of National City and Contractor agree to the following change to the original Contract: The contractor was directed to repair an unknown lateral line hit during excavation of the main storm drain repairs. The 18" line was replaced and reconnected to the new 36" RCP. A concrete lug was poured around the new connection. All worked was performed on a T&M basis for the lump sum price listed below. Original Contract Amount $ 334,056.00 Net change by previously authorized Change Orders Subtotal Amount of this change order New contract amount Working days added: 1 Working days subtracted: 0 334,056.00 4,656.84 $ 338, 712.84 Percery change in Contract to date 1.39% Su ' ted by: roj Man er Date Cit ro) ct Ma-ager 3/t4' Date oved by: Ci ngineer Date City Manager, required for Change Orders>$24,999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. (2 originals: 1 for City Clerk, 1 for Contractor) Accepted and agreed to by Bert W. Salas, Inc. Name: a Date I� Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 CITY OF NATIONAL CITY Office of the City Clerk 1243 National City Blvd., National City, California 91950-4397 619-336-4228 Michael R. Dalla, CMC - City Clerk BERT W. SALAS Change Order #1 Las Palmas Storm Drain Repairs, CIP No. 17-16 Judith Hernandez (Engineering/Public Works) forwarded a copy of the Change Order to Bert. W. Salas.