HomeMy WebLinkAboutWhillock Contracting Inc. Paradise Creek Park Site Remediation and Improvements, CIP No. 18-07 - Change Order #8 - 2019►- CALIFORNIA -+
NATIONAL CITY
Paradise Creek Park Site Remediation & Improvements
CIP NO. 18-07
Contractor: WHILLOCK CONTRACTING
CHANGE ORDER NO. 8
March 19, 2019
Reason/Purpose for this Change Order.
304 W. 19th Street is being occupied by project staff during construction. Equipment and materials are being
stored in the garage space of the building and secured by the existing roll up garage door. Due to the age
of the door, the roll up door is no longer operable and requires replacement.
The City of National City and Contractor agree to the following change to the original Contract:
The City and the Contractor agree that the Contractor shall proceed this work under time and materials. See
attached for T&M breakdown.
Amount of this change order
Working day de Working days subtracted: 0
1,897.85
mitts
ro ana er
Date
�o,
3/20�"_.1
................
3 1-'4141
1
Approved by:
City Engineer
Date
City Manager, required for C
Orders>$24,999 Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its
price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a
complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents
all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc.
and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein.
-_•y OCK CONTRACTING:
3 )2_6 I
Date
Note to Contractor: If you do not agree with this Change Order you may be cfirected to proceed with this work under the terms of the contract and you
may proceed under orotest. You must comply with the contract reauirements of submittina a written protest to protect your claim.
Originals: City Clerk, Contractor cc: Engineering project file, Project Manager
1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380
i
\11/i
CALIFORNIA
NAT0NAL CITY
5 CORPORATED
PARADISE CREEK PARK SITE REMEDIATION & IMPROVEMENTS CHANGE ORDER NO. 8
CIP NO. 18-07
DATE: March 7, 2019
WORK PERFORMED BY: Whillock Contracting
DESCRIPTION OF WORK: Replace Garage Door
ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT
Unit
HR
HR
Qty
5.00
2.00
Wage
67.25
85.00
Total
336.25
170.00
Field Materials - Home Depot
Unit
LS
Qty
1.00
Rate
166.26
$ 506.25
$ 136.79
Total
166.26
Sub -Total Materials:
Taxes (8.5)
Materials Markup (15%): 27.06
TOTAL MATERIALS:
$ 14.13
EQUIPMENT
Unit
Qty
Rate
Total
Sub -Total Equipment: -
Equipment Markup (15%): -
TOTAL EQUIPMENT:
$
SUB TOTAL:
$
$
979.10
SUBCONTRACTOR
Unit
Qty
Rate
Total
1)
Easy Open Door Inc.
LS
1.00
875.00
875.00
Sub -total Subcontractor:
Prime Contractor Markup (5%):
$ 875.00
$ 43.75
TOTAL SUBCONTRACTOR:
$ 918.75
GRAND TOTAL:
$ 1,897.85
Sub -Total Labor:
Labor Burden (27.02%):
Labor Markup (20%): $ 128.61
TOTAL LABOFIIIIIMIM
$ 166.26
CITY OF NATIONAL CITY
Office of the City Clerk
1243 National City Blvd., National City, California 91950-4397
619-336-4228
Michael R. Dalla, CMC - City Clerk
WHILLOCK CONTRACTING
Change Order #8
Paradise Creek Park Site Remediation and Improvements,
CIP No. 18-07
Judith Hernandez (Engineering/Public Works) forwarded a copy of the
Change Order to Whillock Contracting.