HomeMy WebLinkAbout2019 CON Portillo Concrete - Harbison Avenue Road Diet CIP No. 18-17 - Change Orders #1 and #2Harbison Road Diet CIP No: 18-17 Contractor: Portillo Concrete, Inc. CHANGE ORDER NO. 1 April 3, 2019 Reason/Purpose for this Change Order. The city has directed the contractor to perform additional potholing and explore an unknown utility conflict with the new catch batch construction. The City of National City and Contractor agree to the following change to the original Contract: The contractor was directed to excavate additional locations to determine the depth and location of an unknown water and gas line in conflict with the new catch basin construction. All worked was performed on a T&M basis for the lump sum price listed below. Original Contract Amount Net change by previously authorized Change Orders Subtotal Amount of this change order $ 290,575.00 290,575.00 1,638.66 New contract amount . $ 292,213.66 Working days added: 1 Wong days subtracted: 0 Percent change in Contract to date 0.56% Su tted by: of c M er D to City -/je• M ager Date oved by: .2 City ngineer `...... .. 91.2' Date City Manager, required for Change Orders s$24,999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. (2 originals: 1 for City Clerk, 1 for Contractor) Accepted and agr' • • to by e e, Inc. Name: 4-3 /g Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 City of National City Project Name: HARBISON AVE ROAD DIET WORK PERFORMED BY: PCI Location of work: HARBISON AVE. Portillo Concrete Inc FIELD ORDERS/ DAILY EXTRA WORK REPORT Date Work Performed: 3/18/2019 Pothole corner at N/E corner 2nd & harbison to locate unknown utility. Sweetwater authority on site to claim utility as water main. Pothole complete, backfilled, and safed off. 3/18/2019 REPORT NO. #1 EQUIP NO EQUIPMENT HOURS RATE EXTENDED AMOUNTS I 1 LABOR HOURS BURDENED RATE EXTENDED AMOUNTS PC 38 Truck and Tools 3.50 39.96 139.86 Mike Portillo (Foreman) 3.50 73.41 256.94 PC 35 650 Bobtail 3.50 45.02 157.57 Bret Tyer (OP) Group 3 3.50 73.41 256.94 PCI S770 Bobcat 3.50 29.69 103.92 Carlos Palomares (lab, group 1) 3.50 54.18 189.63 PC 40 Truck and Tools 3.00 39.96 119.88 Jose Talancon (lab, group 1) 3.00 54.18 162.54 MATERIAL AND/OR APPROVED WORK DONE BY SPECIALIST No. DESCRIPTION NO UNITS UNIT COST EXTENDED AMOUNTS TOTAL LABOR A 866.04 TOTAL COST OF EQUIPMENT, MATERIALS AND WORK 521.23 B 521.23 + 20 % ON LABOR COST (A) 173.21 CONSTRACTOR'S REPRESENTATIVE + 15 %MARKUP ON EQUIPMENT, (B) 78.18 MATERIAL AND WORK COST + %BOND AND LIABILITY INSURANCE (C) (NOT APPLIED TO FIELD ORDERS) SUBTOTAL $ 1,638.66 % MARKUP ON SUBCONTRACTED WORK (D) TOTAL $ 1,638.66 Harbison Road Diet CIP No: 18-17 Contractor: Portillo Concrete, Inc. CHANGE ORDER NO. 2 April 3, 2019 Reason/Purpose for this Change Order: The city has directed the contractor to construction eight ADA ramps at various locations along Harbison. The City of National City and Contractor agree to the following change to the original Contract: The contractor was directed to construct eight ADA ramps at various locations along Harbison at a unit cost of $4000.00 each. The unit price includes removal of existing concrete and asphalt and all other work and materials needed is construct ADA compliant ramps per SDRSD at Harbison and Division, Harbison and 2nd, and Harbison and 4th. All worked will be performed for the lump sum price listed below. Original Contract Amount $ 19,000.00 Net change by previously authorized Change Orders Subtotal Amount of this change order New contract amount Working days added: 0 Working days subtracted: 0 1,638.66 20,638.66 32,000.00 $ 52,638.66 Percent change in Contract to date 177.05% Sub ' ed by: roj ct Mana Date C. oje t M ager Date A roved by: 2 '. y77//7 Date .7. Cit Manager, req d for Change Orders >$24,999 27............ Date CI ngineer By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. (2 originals: 1 for City Clerk, 1 for Contractor) Accepted and ag Name: to by 'o :,�"�;<te, Inc. Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 CITY OF NATIONAL CITY Office of the City Clerk 1243 National City Blvd., National City, California 91950-4397 619-336-4228 Michael R. Dalla, CMC - City Clerk PORTILLO CONCRETE Harbison Avenue Road Diet, CIP No. 18-17 Change Orders #1 and #2 Judith Hernandez (Engineering/Public Works) forwarded copies of the Change Orders to Portillo Concrete.