CHANGE ORDER NO. 1
April 3, 2019
Reason/Purpose for this Change Order.
The city has directed the contractor to perform additional potholing and explore an unknown utility conflict with
the new catch batch construction.
The City of National City and Contractor agree to the following change to the original Contract:
The contractor was directed to excavate additional locations to determine the depth and location of an
unknown water and gas line in conflict with the new catch basin construction. All worked was performed on a
T&M basis for the lump sum price listed below.
Original Contract Amount
Net change by previously authorized Change Orders
Subtotal
Amount of this change order
$ 290,575.00
290,575.00
1,638.66
New contract amount . $ 292,213.66
Working days added: 1 Wong days subtracted: 0
Percent change in Contract to date 0.56%
Su tted by:
of c M er
D to
City -/je• M ager
Date
oved by:
.2
City ngineer
`...... ..
91.2'
Date
City Manager, required for Change Orders s$24,999
Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly
negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and
labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the
price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor,
supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions
of the original contract documents are incorporated herein. (2 originals: 1 for City Clerk, 1 for Contractor)
Accepted and agr' • • to by e e, Inc.
Name:
4-3 /g
Date
Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the
contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect
your claim.
Originals: City Clerk, Contractor
cc: Engineering project file, Project Manager
1243 National City Boulevard, National City, CA 91950
Telephone (619) 336-4380
City of National City
Project Name: HARBISON AVE ROAD DIET
WORK PERFORMED BY: PCI
Location of work: HARBISON AVE.
Portillo Concrete Inc
FIELD ORDERS/ DAILY EXTRA WORK REPORT
Date Work Performed: 3/18/2019
Pothole corner at N/E corner 2nd & harbison to locate unknown utility. Sweetwater authority on site to claim utility as water main.
Pothole complete, backfilled, and safed off.
3/18/2019
REPORT NO. #1
EQUIP
NO
EQUIPMENT
HOURS
RATE
EXTENDED
AMOUNTS
I 1
LABOR
HOURS
BURDENED
RATE
EXTENDED
AMOUNTS
PC 38
Truck and Tools
3.50
39.96
139.86
Mike Portillo (Foreman)
3.50
73.41
256.94
PC 35
650 Bobtail
3.50
45.02
157.57
Bret Tyer (OP) Group 3
3.50
73.41
256.94
PCI
S770 Bobcat
3.50
29.69
103.92
Carlos Palomares (lab, group 1)
3.50
54.18
189.63
PC 40
Truck and Tools
3.00
39.96
119.88
Jose Talancon (lab, group 1)
3.00
54.18
162.54
MATERIAL AND/OR APPROVED WORK DONE BY SPECIALIST
No.
DESCRIPTION
NO
UNITS
UNIT COST
EXTENDED
AMOUNTS
TOTAL LABOR
A
866.04
TOTAL COST OF EQUIPMENT, MATERIALS AND WORK
521.23
B
521.23
+ 20 % ON LABOR COST
(A)
173.21
CONSTRACTOR'S REPRESENTATIVE
+ 15 %MARKUP ON EQUIPMENT,
(B)
78.18
MATERIAL AND WORK COST
+ %BOND AND LIABILITY INSURANCE
(C)
(NOT APPLIED TO FIELD ORDERS)
SUBTOTAL
$ 1,638.66
% MARKUP ON SUBCONTRACTED WORK
(D)
TOTAL
$ 1,638.66
Harbison Road Diet
CIP No: 18-17
Contractor: Portillo Concrete, Inc.
CHANGE ORDER NO. 2
April 3, 2019
Reason/Purpose for this Change Order:
The city has directed the contractor to construction eight ADA ramps at various locations along Harbison.
The City of National City and Contractor agree to the following change to the original Contract:
The contractor was directed to construct eight ADA ramps at various locations along Harbison at a unit cost of
$4000.00 each. The unit price includes removal of existing concrete and asphalt and all other work and
materials needed is construct ADA compliant ramps per SDRSD at Harbison and Division, Harbison and 2nd,
and Harbison and 4th. All worked will be performed for the lump sum price listed below.
Original Contract Amount $ 19,000.00
Net change by previously authorized Change Orders
Subtotal
Amount of this change order
New contract amount
Working days added: 0
Working days subtracted: 0
1,638.66
20,638.66
32,000.00
$ 52,638.66
Percent change in Contract to date 177.05%
Sub ' ed by:
roj ct Mana
Date
C. oje t M
ager
Date
A roved by:
2
'.
y77//7
Date
.7.
Cit Manager, req
d for Change Orders >$24,999
27............
Date
CI ngineer
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly
negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and
labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the
price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor,
supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions
of the original contract documents are incorporated herein. (2 originals: 1 for City Clerk, 1 for Contractor)
Accepted and ag
Name:
to by 'o :,�"�;<te, Inc.
Date
Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the
contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect
your claim.
Originals: City Clerk, Contractor
cc: Engineering project file, Project Manager
1243 National City Boulevard, National City, CA 91950
Telephone (619) 336-4380
CITY OF NATIONAL CITY
Office of the City Clerk
1243 National City Blvd., National City, California 91950-4397
619-336-4228
Michael R. Dalla, CMC - City Clerk
PORTILLO CONCRETE
Harbison Avenue Road Diet, CIP No. 18-17
Change Orders #1 and #2
Judith Hernandez (Engineering/Public Works) forwarded copies of the
Change Orders to Portillo Concrete.