Loading...
HomeMy WebLinkAboutWhillock Contracting Inc. Paradise Creek Park Site Remediation and Improvements, CIP No. 18-07 - Change Order #1 - 2019CALIFORNIA —: NATIONAL CITY la3'1 INCORPORATE Paradise Creek Park Site Remediation & Improvements CIP NO. 18-07 Contractor: WHILLOCK CONTRACTING Reason/Purpose for this Change Order: During the clearing and grubbing operation, the project team noticed potential asbestos containing materials in the surface soils on the formerly private property recorded as APN 559-125-16. PPC requested that Ensafe, third party environmental consultant, gather soil samples in the areas of concem. The report from Ensafe confirmed that there were asbestos -containing materials on site and recommends the removal of soil in this area to a depth of 1 foot. Please see attached report for particular details. CHANGE ORDER NO. 1 March 21, 2019 The City of National City and Contractor agree to the following change to the original Contract: The City and the Contractor agree that the Contractor shall proceed with the removal and disposal of asbestos containing soil per Ensafes, Limited Asbestos Soil Debris Investigation Report, dated January 2, 2019. The contractor shall comply with all contractual and California and Federal code & regulation requirements for handling and disposal of all materials. This work is a controlling item. The contractor and The City agree to add 16 working days to the project schedule and agreed on the lump sum price of $26,949.70. Amount of this change order Working days added. 16 Working days subtracted: 0 Submitted 26,949.70 9/3/11 Proct Manager Date Ap .il►j d by: Ci ►/ n ine =i Date Cit anager, requir i for Change Orders >$24,999 Date By signing thise Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and .. • ditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Accepted and agreed to by WHILLOCK CONTRACTING: Name' �- 9 Date Note to Contractor: If you do no agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract reouirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 �+►-_ CALIFORNIA NATIONAL Cnry aVti $D PARADISE CREEK PARK SITE REMEDIATION & IMPROVEMENTS CHANGE ORDER NO. 1 CIP NO. 18-07 DATE: January 16, 2019 WORK PERFORMED BY: Whillock Contracting DESCRIPTION OF WORK: Load and Haul ACM Materials ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT LABOR Unit Qty Wage Total 1) Labor HR 16.00 53.24 851.84 Sub -Total Labor: Labor Burden (27.02%): Labor Markup (20%): TOTAL LABOR: $ 230.17 $ 216.40 $ _ 1,298.41 MATERIALS Unit Qty Rate Total 1) Dump Fee TO N 140.00 45.25 6,335.00 2) Manifest EA 7.00 20.00 140.00 Sub -Total Materials: Taxes (8.5) Materials Markup (15%): $ 6,475.00 $ 550.38 $ 1,053.81 TOTAL MATERIALS: EQUIPMENT Unit Qty Rate Total 1) PC210 HR 16.00 98.00 1,568.00 Sub -Total Equipment: Equipment Markup (15%): TOTAL EQUIPMENT: $ 1,568.00 $ 235.20 SUB TOTAL: $ 8,079.19 $ 1,803.20 $ 11,180.80 SUBCONTRACTOR Unit Qty Rate Total 1) 2) Rust & Sons Trucking Nexon Corporation LS LS 1.00 1.00 6,160.00 8,858.00 Sub -total Subcontractor: Prime Contractor Markup (5%): 6,160.00 8,858.00 $ 15,018.00 $ 750.90 TOTAL SUBCONTRACTOR: $ 15, 768.90 GRAND TOTAL: $ 26, 949.70 $ 851.84 ti NIX C 0 R P 0 R A T I 0 N Asbestos x Lead x Mold x Hazardous Materials Remedlation x Demolition January 16th, 2019 Whillock Contracting, Inc. 346 Front Street El Cajon, CA 92020 Attn: Mr. Chris Moore Reference: Paradise Creek - National City Subject: Asbestos Abatement Proposal Proposal #: P-2717 Dear Mr. Moore, Phone (619) 579-0700 Fax (619) 579-0955 Nexon Corporation appreciates the opportunity to provide a proposal on your project. Our price is based on the following: SCOPE OF WORK: Nexon will mobilize and provide Certified Asbestos Laborers and an Operator to establish asbestos regulated area with signs and barrier tape, poly line end dumps, and operate loader, seal and make ready for transport. Nexon will remove approx. 90 cubic yards of contaminated soils to be transported by Rust & Son's Trucking. Nexon will supply own power, Whillock to supply water source. Nexon will not be responsible for profiling or manifesting of asbestos materials. All paperwork will be forwarded to client. CLARIFICATIONS TO PROPOSAL / TERMS & CONDITIONS: Conditions: • Removal of any other hazardous materials not defined in our scope of work. • Performance and/or Payment Bonds are not required on this project. • Prevailing Wage rates are included. • Notice of Intent to Lien - As per the laws of the State of California, Nexon Corporation reserves the right to initiate a Preliminary Notice on this project to preserve our Lien Rights. • All power and water needs for the job are to be provided by the owner / client. • Retention of any funds will be paid to Nexon 45 days after completion of our work. Inclusions: • Scope of Work listed Above. • All OSHA personal air samples will be run during removal procedures and written results will be available. All personal samples with be analyzed by an independent third -party laboratory. • All required Personal Protection Equipment and materials will be provided for by Nexon and utilized by our personnel at all times. • Only personnel certified in the type of work being performed will be allowed in work areas to include but not limited to Asbestos Supervisor / Worker, Lead / r 41 CDPH Certified, HAZ Wopper Certified, Current approved physicals and respirator fit tests. Exclusions: Nexon Corporation will not be held responsible for weather protection of our work areas including but not limited to rain, heat, cold, water or any other condition. ▪ Any work not covered in the scope of work. o All required third party air monitoring and inspection costs. o Disconnecting or safing off any utilities. o Removal of any items to be salvaged for reuse. • Moving of any furniture, fixtures, equipment etc.. • Any required SWPPP work. o Any Soils testing required. • Cutting, capping or redirecting of any utilities. OUR PRICE COMPLETE: $8.858.00 All work will be conducted in strict compliance with all federal, state and local regulations. This proposal is valid for 60 days and is subject to any regulatory change that would modify our price. Thank you for the opportunity to provide a proposal on your project. If you have any additional questions, please feel free to contact me at (858) 571-9100. Sincerely, William Stamper Nexon Corporation ACCEPTANCE: The above proposal, including Scope of Work, Clarifications to Proposal, Conditions, Inclusions, Exclusions, Proposal Amount and Terms of Payment is hereby accepted. This signed Proposal will serve as an authorization for Nexon Corporation to proceed with the scope of work as specified in P-2717. Company Name: V J CoJro+ecnYtS Date: l j l lo't q Print Name: 0\ l Title: ?Al Signature: 5450 Complex Street, Suite #301 • San Diego, CA 92123 • Phone: 858.571.9100 • Fax: 858.571-9200 www.nexonco.com • CSLB #897099 • DOSH #916 gUST&SONs To: Chris Moore Client: Whillock Contracting Generator/Project: National City, CA Date: 1/11/19 Material Type Volume Transportation from National City, CA to Yuma, AZ Asbestos N/A $6,160.00 Notes: Terms & Conditions: a) The generator or its authorized agent are responsible for loading the material onto the trucks and have generator representative available to sign the shipping manifest. The client must provide proper access and have adequate equipment to load the material in a timely manner onto the trucks, or less than 30 minutes, Unapproved stand-by or delay charges will be at a rate of $1.50 per minute loading/unloading. b) The generator or its authorized agent verifies that the waste testing data and the information and the representations made on the receiving landfill or facility Waste Profile Form are complete and accurate. This bid is based on the material being classified and profiled as described above and subject to final acceptance by the receiving facility. c) Rust & Sons Trucking, Inc. (RSTI) sole roles and responsibilities on this job are to provide project dispatch and provide for transportation of the waste profiled by the generator to the designated disposal site. d) The Payment term on this project is net 30 days after the date of the invoice or as otherwise agreed prior to start of work. All costs of collecting, attorneys & court fees, arbitration on the unpaid amounts will be paid and bome by client. e) Authorization: By engaging RSTI to perform the work described herein, the customer consequently authorizes RSTI and agrees to the terms and conditions stated herein. Acknowledgement: Your signature below indicates your acceptance of the pricing and terms detailed in the quote above. Thank o,, or th o : . rtunity to be of service. /%/z//9 Signature lYate Rust & Sons, Inc. 15353 Olde Highway 80 El Cajon, CA. 9202.1 Phone: 619.443.6193 Fax: 619. 443.9364 Confidential SOUTH YUMA COUNTY LANDFILL - QUOTATION OFFER This quotation offer is good for 30 days. Date: 1/22/2019 Profile Expiration Date: 4/12/2019 Approval No: C-5319 Contact/Company: Chris Moore -Whitlock Waste Stream: Industrial Solid Waste Estimated Tons: 0.00 Waste Details: Friable Asbestos Containing Material Total Estimated Charges: $o Rate per ton: 045.00 Generator. City of National City Minimum disposal fee of $250 per flat-bed, end dump, or roll off container. Duplicates Fee: A 55.00 per manifest or weight ticket will be charged for duplicates. A free copy of each manifest or weight ticket is provided to each driver before leaving our facility. State Taxes: An Arizona State Disposal Fee offer ton will be added to disposal fees above. EPA Manifest Fee: S20 for each paper manifest (only applies to Uniform Hazardous Waste Manifests) Other "Optional Wash Out Fee is a minimum 5250 per load" Fees: "Optional Unloading/Forklift Fee is a minimum $100 per load" SYCL has accepted your waste profile and Is pleased to provide you with this quotation for your waste and offered terms. SVCL payment terms are net 30-day and Late fees are based on over 30-day balance at a rate of 1.5% per month (18% per year). Solid waste profiles expire after 3 years. Liquid waste profiles expire c after 90 days. after 4 quarterly submittals they are valid for 1 year. SYCL reserves O the right to price escalation should fuel, labor. equipment, insurance, ADEQ tax or n7 any other operating expense impact this estimate. Pricing is based on performing c all the work proposed. O U Customer represents to SVCL that any material delivered by customer to SVCL does not contain EPA/RCRA defined hazardous. radioactive, volatile. flammable. explosive. or toxic waste material. Customer agrees to defend. Indemnify and hold harmless. SVCL from and against any and all claims for loss to property, or injury to, or death of a person or persons resulting from or arising out of material delivered which contains any of the characteristics mentioned above. Individual loads may be held on site for screening and analysis pending acceptance by SVCL. c Title to such material shall remain with customer. Customers may be accessed a m special handling fee for non -conforming loads that require additional operations c beyond direct disposal. If you have any further questions, please don't hesitate to t contact me. Please acknowledge receipt of this quotation letter. If you have any further questions. please dont hesitate to contact me. Please activate this offer by signing & emailing this to edwardl@crrmail.com & pennygry]crrmail.com Shipments prior to obtaining this signed off quotation may be delayed until this has been received Contact Name (printed) Signature Date Please make sure to schedule all loads 48 hours prior to shipping Unscheduled loads may be delayed or rejected. To schedule call a load please call: (928) 341-9300 SCYL reserves the right to modify its pricing should items be added. deleted or services exceed those anticipated on generator's waste profile by more than 10%. VIM PROJECT PROFESSIONALS CORPORATION TRANSMITTAL COVER To: National City Engineering Department Project Name: Paradise Creek Park Phase III CIP No.: 18-07 ITEMS DELIVERED: Change Order #1 Delivered by: AL., 4 roject Professionals Corporation Received by: Date: CITY OF NATIONAL CITY Office of the City Clerk 1243 National City Blvd., National City, California 91950-4397 619-336-4228 Michael R. Dalla, CMC - City Clerk WHILLOCK CONTRACTING Change Order #1 Paradise Creek Park Site Remediation and Improvements, CIP No. 18-07 Judith Hernandez (Engineering/Public Works) forwarded a copy of the Change Order to Whillock Contracting.