HomeMy WebLinkAbout2019 CON HMS Construction - Highland Avenue Traffic Signal Modifications, CIP No. 18-03 - Change Orders #1, #2, and #3Highland Avenue Traffic Signal Modifications CIP NO. 18-03 Contractor: HMS Construction Inc. CHANGE ORDER NO. 1 March 29, 2019 Reason/Purpose for this Change Order. At the intersection of Highland and 18th, the signal mounting hardware is not compatible with the new signals for poles A, B, and D as referred to RFI No.4. New framework must be used in order to install the new signals per the response provided by the engineer in RFI No.4. The City of National City and Contractor agree to the following change to the original Contract: The City and the Contractor agree that the Contractor shall proceed with the procrurement and installation of new SV-2-TB framework (mounting hardware) that will meet the requirement for Poles A, B, and D as identified in RFI no.4. The total cost associated with this work is $3,246.00. Amount of this change order 3,246.00 Submitted b Working days added: 5 Working days subtracted: 0 fI'i/tot - - MVO Cit I. ngi eer // Date City Manager, monitor avenge ord.. >$24,9eD Date By signing this Char1§e Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. AcCe_pted and a reed to b H Construction: Name: Sharon High, Corporate tary Date 4/16/19 Nate to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 40-F CALIFORNIA ATI QN ` 'try Highland Ave. Traffic Signal Change Order No. 1 CIP NO. 18-03 DATE: 8/ 28/ 18 WORK PERFORMED BY: HMS DESCRIPTION OF WORK: Procurement and installation of new pole and signal mounting hardware ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT LABOR 1) Electrician Unit HR Qty 16.00 Wage 59.25 Sub -Total Labor: Labor Surcharge: Labor Markup (20%): Total TOTAL LABOR: EQUIPMENT Unit Qty Rate Total 1) Bucket Truck HR 16.00 57.67 922.72 1 SV-2-TB Mounts $ 922.72 Sub -Total Equipment: Equipment Markup (15%): TOTAL EQUIPMENT: Unit EA Qty 3.00 Rate 257.00 $ 138.41 $ 1,061.13 Total 771.00 $ 771.00 Sub -Total Equipment: Sales Tax: Equipment Markup (15%): TOTAL EQUIPMENT: $ 63.61 125.19 «- cAt:IFI NiA -« 7 ZwconroSATto --? Highland Avenue Traffic Signal Modifications CIP NO. 18-03 Contractor. HMS Construction Inc. CHANGE ORDER NO. 2 March 29, 2019 Reason/Purpose for this Change Order. The contractor started their work in potholing for the designated locations provided per plans. However, several locations where new traffic signal poles are to be installed had utility conflicts that prevented the contractor in proceeding with their work. New locations for these traffic signal were provided by the designer engineer in order for the contractor to continue potholing work. The City of National City and Contractor agree to the following change to the original Contract: The City and the Contractor agree that the Contractor shall proceed with the potholing work for the revised locations as provided by the design engineer. Revised locations on two intersections: 1) Highland Ave & 24th St and 2) Highland Ave. & Walmart Dwy are included in this change order. The total cost associated with this work is $10,301.64. Amount of this change order 10,301.64 Working days added: 5 Working days subtracted: 0 441 to4-L..... toq City r�girieer _ City Manager, required laChange Orders 424,999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and corxdtions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Accepted a d e to H S Construction: S aronHi h Co orte. Name: g rp a ccruary Date 4/16/19 Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 Highland Ave. Traffic Signal T&M NO. 1 CIP NO. 18-03 DATE: 11/ 19/ 18 WORK PERFORMED BY: HMS DESCRIPTION OF WORK: Highland & 24th - NW Corner for TS Pole "A" Relocate #5 Pull box & Pothole. STC adjusted TS Pole "A" ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT LABOR Unit Qty Wage Total 1) Edgar Castro HR 3.00 57.70 173.10 2) 3) Modesto Rivera Ampelio Lopez HR HR 3.00 3.00 37.70 34.75 113.10 104.25 Sub -Total Labor: Labor Surcharge: Labor Markup (20%): TOTAL LABOR: 42.95 $ 86.68 $ 520.08 EQUIPMENT Unit Qty Rate Total 1) H19 Truck HR 3.00 32.48 97.44 2) H178 Truck HR 3.00 32.48 97.44 3) HE 178 Compressor HR 3.00 16.81 50.43 4) H175 Truck HR 3.00 32.48 97.44 5) HE01 Arrow Board HR 3.00 17.81 53.43 $ 396.18 Sub -Total Equipment: Equipment Markup (15%): TOTAL EQUIPMENT: $ 59.43 $ 455.61 GRAND TOTAL: $ 975.69 $ 390.45 CM?' 1�8 8'7 Highland Ave. Traffic Signal T&M NO. 2 CIP NO. 18-03 DATE: 11/ 21/ 18 WORK PERFORMED BY: HMS DESCRIPTION OF WORK: Pothole revised location for SE corner at Highland Ave & 24th St ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT LABOR Unit Qty Wage Total 1) Edgar Castro HR 2.00 57.70 115.40 2) Greg Velasquez HR 4.50 36.70 165.15 3) Fabian Velasquez HR 4.50 49.70 223.65 Sub -Total Labor: Labor Surcharge: Labor Markup (20%): $ 504.20 $ 55.46 $ 111.93 TOTAL LABOR: $ 671.59 EQUIPMENT Unit Qty Rate Total 1) H19 Truck HR 2.00 32.48 64.96 2) H 10 Truck HR 4.50 32.48 146.16 3) HE 178 Compressor HR 4.50 16.81 75.65 4) H175 Truck HR 2.00 60.45 120.90 $ 407.67 $ 61.15 $ 468.82 G RAND TOTAL: $ 1,140.41 Sub -Total Equipment: Equipment Markup (15%): TOTAL EQUIPMENT: 0- CALI 0 x Highland Ave. Traffic Signal CIP NO. 18-03 DATE: WORK PERFORMED BY: DESCRIPTION OF WORK: 1►s 8 •C1: 1 ,-N40 T&M NO. 3 11/27/18 HMS Pothole revised traffic signal foundation location at SE & NE corners at Highland Ave & Walmart Dwy ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT LABOR Unit Qty Wage Total 1) Ed9ar Castro 2) Ampelio Rivera HR HR 6.00 6.00 57.70 37.70 346.20 226.20 3Modesto Lopez HR 6.00 34.75 208.50 4LGreg Velasquez 5) Astolfo Galdean HR HR 6.00 6.00 36.70 35.70 220.20 214.20 Sub -Total Labor: Labor Surcharge: Labor Markup (20%): TOTAL LABOR: $ 133.68 $ 269.80 $ 1,618.78 EQUIPMENT Unit Qty Rate Total 1) H19 Truck HR 6.00 32.48 194.88 2) H178 Truck HR 6.00 32.48 194.88 3) HE 178 Compressor HR 6.00 16.81 100.86 4) H175 Truck HR 6.00 60.45 362.70 5) H31 Vacuum HR 6.00 95.89 575.34 6) HE01 Arrow Board HR 6.00 17.81 106.86 $ 1,535.52 $ 230.33 $ 1,765.85 GRAND TOTAL: $ 3,384.63 l $ 1,215.30 Sub -Total Equipment: Equipment Markup (15%): TOTAL EQUIPMENT: \\1/ ---CALIFO 0 A CliT "1►8 8 7� OP' :. , ,� Highland Ave. Traffic Signal T&M NO. 4 CIP NO. 18-03 DATE: 11/ 30/ 18 WORK PERFORMED BY: HMS DESCRIPTION OF WORK: Pothole revised traffic signal pole foundation location at Southwest corner of Walmart Dwy & Highland Ave ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT LABOR Unit Qty Wage Total 1) Edgar Castro HR 2.50 57.70 144.25 2) 3) Ampelio Rivera Modesto Lopez HR HR 2.50 2.50 37.70 34.75 94.25 86.88 Sub -Total Labor: Labor Surcharge: Labor Markup (20%): $ 325.38 $ 35.79 72.23 TOTAL LABOR: $ 433.40 EQUIPMENT Unit Qty Rate Total 1) H19 Truck HR 2.50 32.48 81.20 2) H178 Truck HR 2.50 32.48 81.20 3) HE 178 Compressor HR 2.50 16.81 42.03 $ 204.43 $ 30.66 $ 235.09 GRAND TOTAL: $ 668.49 Sub -Total Equipment: Equipment Markup (15%): TOTAL EQUIPMENT: Highland Ave. Traffic Signal T&M NO. 5 CIP NO. 18-03 DATE: 12/ 3/ 18 WORK PERFORMED BY: HMS DESCRIPTION OF WORK: Pothole revised traffic signal foundation locations at SW & NW corner of Walmart Dwy & Highland Ave ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT LABOR Unit Qty Wage Total 1) Edgar Castro HR 8.00 57.70 461.60 2) Ampelio Rivera HR 8.00 37.70 301.60 3) Modesto Lopez HR 8.00 34.75 278.00 4) Greg Velasquez HR 8.00 36.70 293.60 $ 1,334.80 Sub -Total Labor: Labor Surcharge: Labor Markup (20%): TOTAL LABOR: $ 146.83 $ 296.33 $ 1,777.96 EQUIPMENT Unit I Qty Rate Total 1) H19 Truck HR 8.00 32.48 259.84 2) H178 Truck HR 8.00 32.48 259.84 3) HE 178 Compressor HR 8.00 16.81 134.48 4) H175 Truck HR 8.00 60.45 483.60 5) H31 Vacuum HR 8.00 95.89 767.12 6) HE01 Arrow Board HR 8.00 17.81 142.48 Sub -Total Equipment: Equipment Markup (15%): TOTAL EQUIPMENT: $ 2,047.36 $ 307.10 $ 2,354.4,6 GRAND TOTAL: $ 4,132.42 Highland Avenue Traffic Signal Modifications CIP NO. 18-03 Contractor: HMS Construction Inc. CHANGE ORDER NO. 3 April 4, 2019 Reason/Purpose for this Change Order The contractor started their work in potholing for the designated locations provided per plans. However, several locations where new traffic signal poles are to be installed had utility conflicts that prevented the contractor in proceeding with their work. New locations for these traffic signal were provided by the designer engineer in order for the contractor to continue potholing work. The City of National City and Contractor agree to the following change to the original Contract: The City and the Contractor agree that the Contractor shall proceed with the potholing work for the revised locations as provided by the design engineer. Revised various pothole locations for Highland Ave and Walmart Dwy are included in this change order as provided in the attachments. The total cost associated with this work is $11,803.31. Amount of this change order Working days added: 5 Working days subtracted: 0 11,803.31 Submitted b 41 20141 Date Prole an qer Approved by: Ci nine r I ZS.1 11 f Date City Manager, requiredram Orders > 4,ese Date By signing this Change Order the Contractor confirms that he/she Is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. if this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Accepted and agreed to by HMS Construction: Name: Sharon High, CorporSecretary Date 4/16/19 Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 N TCi -�1�8 8 Highland Ave. Traffic Signal T&M NO. 6 CIP NO. 18-03 DATE: 1/ 2/ 19 WORK PERFORMED BY: HMS DESCRIPTION OF WORK: Potholed traffic signal foundation at N/W corner of Highland Ave. and Walmart. ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT LABOR Unit Qty Wage Total 1) Edgar Castro 2) Modesto Lopez HR HR 8.00 8.00 57.70 34.75 461.60 278.00 3) Greg Velazquez HR 8.00 36.70 Sub -Total Labor: Labor Surcharge: Labor Markup (20%): 293.60 $ 1,033.20 $ 113.65 $ 229.37 TOTAL LABOR: 1,376.22 EQUIPMENT Unit Qty Rate Total 1) H19 Truck HR 8.00 32.48 259.84 2) H178 Truck HR 8.00 32.48 259.84 3) HE 178 Compressor HR 8.00 16.81 134.48 $ 654.16 $ 98.12 $ 752.28 GRAND TOTAL: $ 2,128.50 Sub -Total Equipment: Equipment Markup (15%): TOTAL EQUIPMENT: Highland Ave. Traffic Signal T&M NO. 7 CIP NO. 18-03 DATE: 1/ 3/ 19 WORK PERFORMED BY: HMS DESCRIPTION OF WORK: Potholed traffic signal foundation at S/W corner of Highland Ave. and Walmart. ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT LABOR Unit Qty Wage Total 1) Edgar Castro HR 8.00 57.70 461.60 2) Modesto Lopez HR 8.00 34.75 278.00 3) Greg Velazquez HR 8.00 36.70 Sub -Total Labor: Labor Surcharge: Labor Markup (20%): 293.60 $ 1,033.20 $ 113.65 $ 229.37 TOTAL LABOR: $ 1,376.22 EQUIPMENT Unit Qty Rate Total 1) H 19 Truck HR 8.00 32.48 259.84 2) H178 Truck HR 8.00 32.48 259.84 3) HE 178 Compressor HR 8.00 16.81 134.48 $ 654.16 Sub -Total Equipment: Equipment Markup (15%): TOTAL EQUIPMENT: $ 98.12 $ 752.28 GRAND TOTAL: $ 2,128.50 Highland Ave. Traffic Signal T&M NO. 8 CIP NO. 18-03 DATE: 1/4/19 WORK PERFORMED BY: HMS DESCRIPTION OF WORK: Potholed traffic signal foundation at S/E corner of Highland Ave. and Walmart. ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT LABOR Unit Qty Wage Total 1) Edgar Castro HR 8.00 57.70 461.60 2) Modesto Lopez HR 8.00 34.75 278.00 3) Greg Velazquez HR 8.00 36.70 293.60 Sub -Total Labor: Labor Surcharge: Labor Markup (20%): $ 1,033.20 $ 113.65 $ 229.37 TOTAL LABOR: $ 1,376.22 EQUIPMENT Unit Qty Rate Total 1) H-19 Truck HR 8.00 32.48 259.84 2) H-178 Truck HR 8.00 32.48 259.84 3) 4) HE-178 Air Compressor H-31 Vac n Dig HR HR 8.00 8.00 16.81 134.48 95.89 767.12 5) HE-01 Saw HR 8.00 17.81 142.48 Sub -Total Equipment: $ 1,563.76 Equipment Markup (15%): $ 234.56 TOTAL EQUIPMENT: $ 1,798'32 GRAND TOTAL: $ 3,174.54 Highland Ave. Traffic Signal T&M NO. 9 CIP NO. 18-03 DATE: 1/7/19 WORK PERFORMED BY: HMS DESCRIPTION OF WORK: Potholed traffic signal at Highland Ave. and Walmart entrance. Shifted foundation to East to find clearance for auger. ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT LABOR Unit Qty Wage Total 1) Edgar Castro HR 8.50 57.70 490.45 2) Ampelio, Rivera HR 8.50 37.70 320.45 Sub -Total Labor: Labor Surcharge: Labor Markup (20%): $ 810.90 _$ 89.20 $ 180.02 TOTAL LABOR: EQUIPMENT Unit Qty Rate Total 4) 5) H-31 Vac n D HE-01 Saw 9 HR HR 8.50 8.50 95.89 17.81 815.07 151.39 Sub -Total Equipment: Equipment Markup (15%): TOTAL EQUIPMENT: $ 966.46 $ 144.97 $ 1,080.12 $ 1,111.43 GRAND TOTAL: $ 2,191.55 1/4\V46k4-r Highland Ave. Traffic Signal T&M NO. 10 CIP NO. 18-03 DATE: 1/7/19 WORK PERFORMED BY: HMS DESCRIPTION OF WORK: Finished potholing reivsed S/E corner of Highland Ave and Walmart entrance to 8-1/2 feet. ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT LABOR Unit Qty Wage Total 1) 2) Edgar Castro Greg Velazquez HR HR 8.50 8.50 57.70 36.70 Sub -Total Labor: Labor Surcharge: Labor Markup (20%): 490.45 311.95 $ 802.40 $ 88.26 $ 178.13 TOTAL LABOR: $ 1,068.79 EQUIPMENT Unit Qty Rate Total 4) 5) H-31 Vac n D HE-01 Saw 9 HR HR 8.50 8.50 95.89 17.81 815.07 151.39 Sub -Total Equipment: Equipment Markup (15%): TOTAL EQUIPMENT: $ 966.46 $ 144.97 $ 1,111.43 GRAND TOTAL: $ 2,180.22 CITY OF NATIONAL CITY Office of the City Clerk 1243 National City Blvd., National City, California 91950-4397 619-336-4228 Michael R. Dalla, CMC - City Clerk HMS CONSTRUCTION, INC. Change Orders #1, #2, and #3 Highland Avenue Traffic Signal Modifications, CIP No. 18-03 Judith Hernandez (Engineering/Public Works) forwarded a copy of the Change Orders to HMS Construction, Inc.