PARADISE CREEK PARK SITE REMEDIATION & IMPROVEMENTS CHANGE ORDER NO. 11
CIP NO. 18-07
Contractor: Whillock Contracting Inc.
PO Box 2322
La Mesa, CA 91943
May 9, 2019
This Change Order modifies Contractor's and the City's obligations and rights under the
abovementioned contract. This change order is not effective until approved by the City.
Time adjustment:
One (1) working day are added to contract time due to the additional excavation for the park lights
throughout the project site.
Cost of Change Order:
The additional cost change for the Excavation of the Park Lights:
$1,736.86
Recommended by Project Manager:
Date: 3 aS
r r,
By signing this Change Order the Contractor confirms that he/she is completely familiar with and has fairly
negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the
equipment, materials and labor necessary to provide a complete work as described above at that the price
stated herein. Contractor confirms that the price is fair and complete and represents all costs associated with
the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds,
insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the
original contract documents are incorporated herein. The signer for the Contractor confirms that he/she is
authorized to bind the Contractor to this Change Order.
Agreed and Accepted by Contractor:
Date: 9-- / S
(Print Name and Title) ,-----a------ \ /
/ C�
Date: ,' T/-z 1111
Approved by City Engineer:
Approved by City Manager:
(Required for change orders $25,000 and above)
Date:
CALIFOR
NAT'1ONA
PARADISE CREEK PARK SITE REMEDIATION & IMPROVEMENTS CHANGE ORDER NO. 11
CIP NO. 18-07
DATE: April 18, 2019
WORK PERFORMED BY: Whillock Contracting
DESCRIPTION OF WORK: Excavation for Park Lights
ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT
LABOR
Unit
Qty
Wage
Total
1)
2)
Operator - PC210
Operator - WA380
HR
HR
3.50
3.50
75.23
75.12
263.31
262.92
$ 526.23
$
142.19
$ 133.68
$ 002.10
MATERIALS
Unit
Qty
Rate
Total
$
$
$
$
EQUIPMENT
Unit
Qty
Rate
Total
1)
PC210
HR
3.50
98.00
343.00
2)
WA380-5
HR
3.50
134.24
469.84
$ 812.84
Sub -Total Equipment:
Equipment Markup (15%):
TOTAL EQUIPMENT:
$ 121.93
SUB TOTAL:
$ 934,77
$ 1,736.86
SUBCO NTRACTO R
Unit
Qty
Rate
Total
Sub -total Subcontractor:
Prime Contractor Markup (5%):
$
TOTAL SUBCONTRACTOR:
GRAND TOTAL:
$ 1,736.86
Attachment A - Excavation Breakdown
Sub -Total Materials: -
Taxes (8.5) -
Materials Markup (15%): -
TOTAL MATERIALS:
Sub -Total Labor:
Labor Burden (27.02%):
Labor Markup (20%):
TOTAL LABOR:
CHANGE ORDER MEMORANDUM
May 9, 2019
To: Stephen Manganiello
Director of Engineering & Public Works/City Engineer
Engineering and Public Works Department
City of National City
From: Alex Preciado
Project Manager
Project Professionals Corp
Project: Paradise Creek Park Site Remediation & Improvements
CIP No.: 18-07
Subject: Change Order No. 11
Change Order No. 11 provides for:
The additional excavation of contaminated soil for the foundations of the park lights.
Supporting Information:
The initial design for the park lights was a direct burial system into contaminated soil. The design was modified to a
standard break away support system with concrete foundations in clean soil. This new system will allow the City to
maintain all park lights without contacting the remaining contaminated soil. See Attachment A for the Time and
Material Breakdown.
Time Adjustment:
It is recommended that 1 working day be added to the contract time.
Cost Adjustment:
The initial removal and disposal of contaminated soil was captured under original Bid Line Item #11 -
Impacted Soil Handling (Export). The additional efforts went above and beyond this bid item and was
determined to be tracked under time and materials for a total of $1,736.86. The pay method and amount
have been reviewed by the Construction Manager Inspector and are considered fair and reasonable.
r./ct Manager
51,401
Date
CITY OF NATIONAL CITY
Office of the City Clerk
1243 National City Blvd., National City, California 91950-4397
619-336-4228
Michael R. Dalla, CMC - City Clerk
WHILLOCK CONTRACTING
Change Order #11
Paradise Creek Park Site Remediation & Improvements,
CIP No. 18-07
Judith Hernandez (Engineering/Public Works) forwarded a copy of the Change Order to
Whillock Contracting.