HomeMy WebLinkAboutWhillock Contracting Inc. Paradise Creek Park Site Remediation and Improvements, CIP No. 18-07 - Change Order #11 - 2019- - CALIFORNIA — NATIONAL CITY ej INCORPORATED PARADISE CREEK PARK SITE REMEDIATION & IMPROVEMENTS CHANGE ORDER NO. 11 CIP NO. 18-07 Contractor: Whillock Contracting Inc. PO Box 2322 La Mesa, CA 91943 May 9, 2019 This Change Order modifies Contractor's and the City's obligations and rights under the abovementioned contract. This change order is not effective until approved by the City. Time adjustment: One (1) working day are added to contract time due to the additional excavation for the park lights throughout the project site. Cost of Change Order: The additional cost change for the Excavation of the Park Lights: $1,736.86 Recommended by Project Manager: Date: 3 aS r r, By signing this Change Order the Contractor confirms that he/she is completely familiar with and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. The signer for the Contractor confirms that he/she is authorized to bind the Contractor to this Change Order. Agreed and Accepted by Contractor: Date: 9-- / S (Print Name and Title) ,-----a------ \ / / C� Date: ,' T/-z 1111 Approved by City Engineer: Approved by City Manager: (Required for change orders $25,000 and above) Date: CALIFOR NAT'1ONA PARADISE CREEK PARK SITE REMEDIATION & IMPROVEMENTS CHANGE ORDER NO. 11 CIP NO. 18-07 DATE: April 18, 2019 WORK PERFORMED BY: Whillock Contracting DESCRIPTION OF WORK: Excavation for Park Lights ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT LABOR Unit Qty Wage Total 1) 2) Operator - PC210 Operator - WA380 HR HR 3.50 3.50 75.23 75.12 263.31 262.92 $ 526.23 $ 142.19 $ 133.68 $ 002.10 MATERIALS Unit Qty Rate Total $ $ $ $ EQUIPMENT Unit Qty Rate Total 1) PC210 HR 3.50 98.00 343.00 2) WA380-5 HR 3.50 134.24 469.84 $ 812.84 Sub -Total Equipment: Equipment Markup (15%): TOTAL EQUIPMENT: $ 121.93 SUB TOTAL: $ 934,77 $ 1,736.86 SUBCO NTRACTO R Unit Qty Rate Total Sub -total Subcontractor: Prime Contractor Markup (5%): $ TOTAL SUBCONTRACTOR: GRAND TOTAL: $ 1,736.86 Attachment A - Excavation Breakdown Sub -Total Materials: - Taxes (8.5) - Materials Markup (15%): - TOTAL MATERIALS: Sub -Total Labor: Labor Burden (27.02%): Labor Markup (20%): TOTAL LABOR: CHANGE ORDER MEMORANDUM May 9, 2019 To: Stephen Manganiello Director of Engineering & Public Works/City Engineer Engineering and Public Works Department City of National City From: Alex Preciado Project Manager Project Professionals Corp Project: Paradise Creek Park Site Remediation & Improvements CIP No.: 18-07 Subject: Change Order No. 11 Change Order No. 11 provides for: The additional excavation of contaminated soil for the foundations of the park lights. Supporting Information: The initial design for the park lights was a direct burial system into contaminated soil. The design was modified to a standard break away support system with concrete foundations in clean soil. This new system will allow the City to maintain all park lights without contacting the remaining contaminated soil. See Attachment A for the Time and Material Breakdown. Time Adjustment: It is recommended that 1 working day be added to the contract time. Cost Adjustment: The initial removal and disposal of contaminated soil was captured under original Bid Line Item #11 - Impacted Soil Handling (Export). The additional efforts went above and beyond this bid item and was determined to be tracked under time and materials for a total of $1,736.86. The pay method and amount have been reviewed by the Construction Manager Inspector and are considered fair and reasonable. r./ct Manager 51,401 Date CITY OF NATIONAL CITY Office of the City Clerk 1243 National City Blvd., National City, California 91950-4397 619-336-4228 Michael R. Dalla, CMC - City Clerk WHILLOCK CONTRACTING Change Order #11 Paradise Creek Park Site Remediation & Improvements, CIP No. 18-07 Judith Hernandez (Engineering/Public Works) forwarded a copy of the Change Order to Whillock Contracting.