Loading...
HomeMy WebLinkAbout2017 CON Portillo Concrete - 16th Street and Grove Pedestrian Enhancements, CIP No. 16-03 - Notice of CompletionNOTE TO FILE 07-17-2019 IN THE MATTER OF: The 2017 Portillo Concrete 16th Street and Grove Pedestrian Enhancements, CIP No. 16-03 — Notice of Completion. Please note the following: NO FULLY EXECUTED ORIGINAL NOTICE OF COMPLETION WAS FILED WITH THE OFFICE OF THE CITY CLERK. ORIGINATING DEPARTMENT: NTF CDC Housing & Economic Development City Attorney _ Human Resources City Manager MIS Community Svcs. Planning X Eng/PW Police Finance Fire CITY OF NATIONAL CITY, CALIFORNIA COUNCIL AGENDA STATEMENT 20 /6 - 5 2- MEETING DATE: June 6, 2017 AGENDA ITEM NO. 9 ITEM TITLE: Resolution of the City Council of the City of National City: 1) accepting the work performed by Portillo Concrete, Inc. for the E 16th Street and Grove Street Pedestrian Enhancements Projects, CIP No. 16- 03; 2) approving the final contract amount of $98,418.50; 3) ratifying the release of retention in the amount of $4,920.92; and 4) authorizing the Mayor to sign the Notice of Completion for the project. PREPARED BY: Alynn Sun, Junior Engineer - Civil PHONE: 619-336-4362 EXPLANATION: See attached. DEPARTMENT: Engineering/Public Works APPROVED BY: 4(2 INANCIAL STATEMENT: ACCOUNT NO. N/A ENVIRONMENTAL REVIEW: N/A ORDINANCE: INTRODUCTION: FINAL ADOPTION: APPROVED: APPROVED: Finance MIS STAFF RECOMMENDATION: Adopt Resolution accepting the work performed by Portillo Concrete, Inc. for the E 16th Street and Grove Street Bdestrian Enhancements Projects, CIP No. 16-03 and approving the final contract amount of $98,418.50 ARD / COMMISSION RECOMMENDATION: N/A ATTACHMENTS: 1. Explanation 2. Notice of Completion 3. Final Contract Balance Report 4. Resolution �Esovvj�o� No. ao\q-r17 EXPLANATION The E. 16th Street and Grove Street Pedestrian Enhancements Project, CIP No. 16-03, included the following pedestrian and Americans with Disabilities Act (ADA) enhancements for the intersection of E. 16th Street and Grove Street: removal and replacement of existing curb, gutter, sidewalk and curb ramps, AC overlay, AC paving, slurry seal, high intensity signing and striping, and corner bulb -outs for traffic calming. On August 24, 2016, the bid solicitation was posted on PlanetBids, a free public electronic bidding system for contractors. On August 24 and August 31, 2016, the bid solicitation was advertised in local newspapers. On September 13, 2016, six (6) bids were received electronically on PlanetBids by the 1:00 p.m. deadline. Bid results were available immediately after the 1:00 p.m. deadline. Portillo Concrete, Inc. was the apparent low bidder with a total bid amount of $99,759.00. Upon review of all documents submitted and reference checks, Portillo Concrete, Inc.'s bid is responsive, and they were the lowest responsible bidder qualified to perform the work as described in the project specifications. Staff recommended awarding a contract in the not to exceed amount of $99,759.00 to Portillo Concrete, Inc. for the E. 16th Street and Grove Street Pedestrian Enhancements Project, CIP No. 16-03, and authorizing a 15% contingency in the amount of $14,963.85 for unforeseen changes that may arise. This project was funded through existing TransNet Prop A appropriations. The Notice to Proceed with construction was issued on November 16, 2016 with a construction start date of December 12, 2016. The attached Final Contract Balance reports final line item amounts with a total decrease of $1,340.50 due to numerous line item adjustments. As a result of satisfactory completion of the project, staff recommends that City Council: 1) accept the work of Portillo Concrete, Inc. for the E 16th Street and Grove Street Pedestrian Enhancements Projects, CIP No. 16-03; 2) approve the final contract amount of $98,418.50; 3) ratify the release of retention in the amount of $4,920.92; and 4) authorize the Mayor to sign the Notice of Completion for the project. The Notice of Completion will be filled with the San Diego County Recorder's Office. RECORDING REQUESTED BY WHEN RECORDED MAIL TO: NAME: CITY OF NATIONAL CITY ADDRESS: 1243 NATIONAL CITY BOULEVARD NATIONAL CITY, CA 91950 NOTICE OF COMPLETION CALIFORNIA CIVIL CODE -SECTION 3093 NOTICE IS HEREBY GIVEN of the completion on January 19, 2017 of E 16th Street and Grove Street Pedestrian Enhancements, CIP No. 16-03 Work of improvement or portion of work of improvement under construction or alteration. Intersection of E 16th Street and Grove Street along with four corners and pedestrian ramps. Street Address City State Zip Code The undersigned owns the following interest or estate in said property: Owner in fee Nature of the interest or estate of owner (mortgagor, lessee, etc.) Said work of improvement was performed on the property pursuant to a contract with Portillo Concrete, Inc. Name of Original Contractor The following work and material were supplied: Labor provided: general laborer. Materials: concrete, masonry, asphalt, irrigation, landscaping, street lighting, and signing and striping. Equipment: demolition, grading, paving and excavation equipment. General statement of kind of labor, services, equipment or materials The names and addresses of co -owners are: N/A Joint tenants, tenants in common, or other owners Dated: January 19, 2017; Signature of Owner City of National City, 1243 National City Blvd., National City, CA 91950 I, the undersigned, say: I have read the foregoing Notice of Completion and know the contents thereof ; the same is true of my own knowledge. I declare under penalty of perjury that the forgoing is true and correct. Executed on January 19, 2017 at, National City, California. Signature: RON MORRISON, MAYOR Noc 15-10 -1- .'-CALIFORNIA NATIONAL, city. xNeoRPORATE FINAL CONTRACT BALANCE DATE: March 31, 2017 PROJECT: E. 16th St. and Grove St. Pedestrian Enhancements Project Specification No. 16-03 TO: Portillo Concrete, Inc. 3527 Citrus St. Lemon Grove, CA 91945 ORIGINAL CONTRACT AMOUNT: START DATE: COMPLETION DATE: ORIGINAL CONTRACT LENGTH: EXTENTION OF WORK DAYS: TOTAL CONTRACT TIME: DESCRIPTION: $99,759.00 December 12, 2016 January 18, 2017 20 Working Days 12 Working Days 32 Working Days The Final Contract Balance reports final line item amounts and summarizes all change orders to produce a final contract amount. CHANGE ORDERS AND LINE ITEM ADJUSTMENTS: There were no change orders issued on this project. There were numerous line item adjustments that resulted in a total decrease of $ 1,340.50. CONTRACT ADJUSTMENT: As a result of the above line item adjustments, the contract price is adjusted as follows: 1. The final contract price is adjusted to $ 98,418.50. 2. As a result of the satisfactory completion of said project, a retention amount of $ 4,920.92 is set for invoice processing and payment upon the receipt of signatures and City Council's ratification of this agreement and the Notice of Completion. This document and its purpose to balance payment shall be considered full compensation for furnishing and installing the materials, labor, tools and equipment, profit, overhead, and all incidentals for performing the work described above. Portillo Concrete, Inc. will not be entitled to damages or additional payment for delays as described in the 2012 edition of the Standard Specifications for Public Works Construction, Section 6-6.3, for performing the work as described above. -2- RESOLUTION NO. 2017 — RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NATIONAL CITY ACCEPTING THE WORK PERFORMED BY PORTILLO CONCRETE, INC., FOR THE EAST 16TH STREET AND GROVE STREET PEDESTRIAN ENHANCEMENTS PROJECTS, APPROVING THE FINAL CONTRACT AMOUNT OF $98,418.50, RATIFYING THE RELEASE OF RETENTION IN THE AMOUNT OF $4,920.92, AND AUTHORIZING THE MAYOR TO EXECUTE THE NOTICE OF COMPLETION FOR THE PROJECT WHEREAS, the Engineering Department is satisfied that all work contracted to be performed by Portillo Concrete, Inc., for the East 16th Street and Grove Street Pedestrian Enhancements Project (CIP No. 16-03; 2) has been completed. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of National City that the work performed by Portillo Concrete, Inc., for the East 16th Street and Grove Street Pedestrian Enhancements Project is accepted, the total final contract amount of $98,418.50 is approved, the Mayor is authorized to execute the Notice of Completion, the release of retention in the amount of $4,920.92 is ratified, and payment for said work is ordered to be made in accordance with said contract. PASSED and ADOPTED this 6th day of June, 2017. Ron Morrison, Mayor ATTEST: Michael R. Dalla, City Clerk APPROVED AS TO FORM: Angil P. Morris -Jones City Attorney RESOLUTION NO. 2017 — 77 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NATIONAL CITY ACCEPTING THE WORK PERFORMED BY PORTILLO CONCRETE, INC., FOR THE EAST 16' STREET AND GROVE STREET PEDESTRIAN ENHANCEMENTS PROJECTS, APPROVING THE FINAL CONTRACT AMOUNT OF $98,418.50, RATIFYING THE RELEASE OF RETENTION IN THE AMOUNT OF $4,920.92, AND AUTHORIZING THE MAYOR TO EXECUTE THE NOTICE OF COMPLETION FOR THE PROJECT WHEREAS, the Engineering Department is satisfied that all work contracted to be performed by Portillo Concrete, Inc., for the East 16th Street and Grove Street Pedestrian Enhancements Project (CIP No. 16-03; 2) has been completed. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of National City that the work performed by Portillo Concrete, Inc., for the East 16th Street and Grove Street Pedestrian Enhancements Project is accepted, the total final contract amount of $98,418.50 is approved, the Mayor is authorized to execute the Notice of Completion, the release of retention in the amount of $4,920.92 is ratified, and payment for said work is ordered to be made in accordance with said contract. PASSED and ADOPTED this 6th day of June, on Morrison, Mayor ATTEST: Michael R. Dalla, fifty Clerk APPROVED AS TO FORM: Passed and adopted by the Council of the City of National City, California, on June 6, 2017 by the following vote, to -wit: Ayes: Councilmembers Cano, Mendivil, Morrison, Rios, Sotelo-Solis. Nays: None. Absent: None. Abstain: None. AUTHENTICATED BY: RON MORRISON Mayor of the City of National City, California // N City Clerk of the City of Rlational City, California By: Deputy I HEREBY CERTIFY that the above and foregoing is a full, true and correct copy of RESOLUTION NO. 2017-77 of the City of National City, California, passed and adopted by the Council of said City on June 6, 2017. City Clerk of the City of National City, California By: Deputy