HomeMy WebLinkAbout2018 CON San Diego Gas and Electric SDGE - Electric Vehicle Charging Stations - Real Property LicenseNOTE TO FILE
07-30-2019
IN THE MATTER OF: The 2018 San Diego Gas & Electric Company (SDG&E)
Real Property License Agreement — Electric Vehicle Charging Stations — City
Hall and Public Works yard. Please note the following:
NO FULLY EXECUTED ORIGINAL AGREEMENTS
WERE FILED WITH THE OFFICE OF THE CITY CLERK.
A COPY OF THE PARTIALLY EXECUTED AGREEMENTS
ARE ON FILE.
ORIGINATING DEPARTMENT:
CDC Housing & Economic Development
City Attorney Human Resources
City Manager MIS
Community Svcs. Planning
X ENG/PW Police
Finance
Fire
*03/22/18: Forwarded six (6) partially executed Agreements to Tirza Gonzales (ENG/PW) for processing.
NTF
111111111110
E
(A A—Sempra Energy utility
REAL PROPERTY LICENSE AGREEMENT
THIS REAL PROPERTY LICENSE AGREEMENT (this "License"), made and entered
into as of March 20 , 2018 (the "Effective Date"), by and between CITY OF
NATIONAL CITY, a municipal corporation, hereinafter called "Licensor" and SAN DIEGO GAS
& ELECTRIC COMPANY, a California corporation, hereinafter called "Licensee."
This License is entered into pursuant to the online SDG&E's Power Your Drive Program
Site Host Participation Application (the "Application"). Except as may be defined herein,
capitalized terms used in this License shall have the meanings assigned to them in the
Application.
Licensor hereby grants to Licensee a license to erect, construct, change the size of, improve,
reconstruct, relocate, repair, maintain, and use the following facilities ("Facilities") on the
Premises (as described below):
1. Underground facilities, together with aboveground structures consisting of, but
not limited to, pad -mounted electrical equipment, and four (4) electric vehicle
charging stations ("EV Stations"), and all appurtenances for the distribution of
electricity to the Facilities.
2. Communication facilities, and appurtenances, which can include, Supervisory
Control and Data Acquisition (SCADA).
The Facilities will be installed within the Premises as Licensee may now or hereafter deem
convenient or necessary. Licensee also has the right of ingress and egress, to, from and along the
Premises in, upon, over and across the Property (as defined below). Licensee further has the right,
but not the duty to clear and keep this Premises clear from explosives, buildings, structures and
materials.
The Premises are located on the "Property" in the County of San Diego, State of California
described as follows:
Lots 13, 14, 15, 16 and 17 in Block 175 of National City, according to Map thereof No.
348, filed in the Office of the County Recorder of said County of San Diego, together with that
portion of the Northeasterly Half of the alley adjoining said Lots 14 through 17 and the remainder
portion of Lot 13 on the Southwest as vacated and closed to public use. EXCEPTING
THEREFROM, the Southerly 20 feet of Lot 13. (APN # 559-086-05)
The "Premises" shall be those strips of land, including all of the area lying between the
exterior sidelines, which sidelines shall be three (3) feet, measured at right angles, on each exterior
side of all Facilities installed on the Property on or before December 31, 2018.
Upon the installation of Licensee's Facilities, Licensor may survey the location of the
Facilities as an "as -built" drawing(s) and prepare a metes and bounds or "center line" description(s)
of the actual location of said Facilities, at its sole cost and expense. Licensee shall then prepare an
(� Sempra Energy uiaay
"Amendment to License", using Licensor's "as -built" drawing(s) and metes and bounds
description(s) as a substitute and replacement to the "blanket" description contained in the
paragraph above.
In order to provide adequate working space for Licensee, Licensor shall not erect, place or
construct, nor permit to be erected, placed or constructed any building or other structure, deposit
any materials, plant any trees and/or shrubs or change ground elevation within eight (8) feet of the
front of the door or hinged opening of any above ground Facilities (other than the EV Station) and
within three (3) feet of the EV Station installed on the Premises.
Licensor shall provide at all times, a delineated parking space surrounding each EV Station,
so that each EV Station may be accessed and used by an electric vehicle for charging. One (1) space
shall be marked for electric vehicles only; and shall be used only while such vehicles are being
charged. The remaining three (3) shall be marked for electric vehicles only, however, such vehicles
do not have to be actively charging.
Licensor grants to Licensee the right to erect and maintain on the Property adjacent to the
Facilities, retaining walls and/or protective barricades as may be necessary for Licensee's purposes.
Licensor shall not erect, place or construct, nor permit to be erected, placed or constructed,
any building or other structure, plant any tree, drill or dig, on the Premises.
Licensor shall not increase or decrease the ground surface elevations on the Premises after
installation of Licensee's Facilities, without prior written consent of Licensee.
Licensee shall have the right but not the duty, to trim or remove trees and brush along or
adjacent to the Premises and remove roots from within the Premises whenever Licensee deems it
necessary. Said right shall not relieve Licensor of the duty as owner to trim or remove trees and
brush to prevent danger or hazard to property or persons.
Licensee shall indemnify, defend, and hold Licensor harmless from and against all losses,
damages, or expenses that Licensor may sustain or become liable for that result from the
construction or maintenance by Licensee of its Facilities within the Premises. Such
indemnification shall include any losses, damages, or expenses arising solely out of negligence or
intentional acts of Licensee but excepting any losses, damages, or expenses resulting from the
negligent or intentional acts of the Licensor and third parties
CONDUITS CARRY HIGH VOLTAGE ELECTRICAL CONDUCTORS, therefore
Licensor shall not make or allow any excavation or fill to be made on the Premises WITHOUT
FIRST NOTIFYING SAN DIEGO GAS & ELECTRIC COMPANY BY CALLING (619) 696-
2000, and OBTAINING PERMISSION.
This License shall be governed by the laws of the State of California. The exclusive venue
for any litigation arising from or relating to this License shall be in San Diego County, California.
This License shall be binding upon and inure to the benefit of successors, heirs, executors,
administrators, permittees, licensees, agents or assigns of Licensor and Licensee.
MG/
(A JSempra Energy utility'
The term of this License shall commence upon the date of execution and if not mutually
renewed by both parties, shall have a term of 10 years ("Term"). This License shall remain in full
force and effect for the duration of the Agreement and beyond; and may not be revoked or
terminated without express written mutual consent subject to the terms and conditions for
termination set forth therein. Upon termination of this License after the expiration of the 10 year
term, Licensee shall pay all costs and expenses to remove the Facilities and Licensee shall restore
the Premises to the condition it was at the time of installation of the Facilities. If Licensor
terminates this License prior to the end of the Term, Licensor shall pay to Licensee the full cost
and sole expense of such removal, which shall include the depreciated cost of the Facilities,
including site design and engineering, installation and EV Station costs.
IN WITNESS WHEREOF, the parties hereto have executed this Agreement on the date
and year first above written.
CITY OF NATIONAL CITY
By:
Ron Morrison, Mayor
APPROVED AS TO FORM:
Angil P. Morris -Jones
City Attorne
By: ' 4i)
oberto M. Contreras
Deputy City Attorney
SAN DIEGO GAS & ELECTRIC
COMPANY, a California corporation
(Signatures of two corporate officers required)
By:
[Name], [Title]
By:
[Name], [Title]
Drawn: BCorbilla
Checked:
Date: 01/08/2018 (REV) 03/06/2018
Site No: WP170007
Site Name: City of National City — Public Works Yard
RW # 369040
SD GE.
(A JSempra Energy utility"
REAL PROPERTY LICENSE AGREEMENT
THIS REAL PROPERTY LICENSE AGREEMENT (this "License"), made and entered
into as of March 20 , 2018 (the "Effective Date"), by and between CITY OF
NATIONAL CITY, a municipal corporation, hereinafter called "Licensor" and SAN DIEGO GAS
& ELECTRIC COMPANY, a California corporation, hereinafter called "Licensee."
This License is entered into pursuant to the online SDG&E's Power Your Drive Program
Site Host Participation Application (the "Application"). Except as may be defined herein,
capitalized terms used in this License shall have the meanings assigned to them in the
Application.
Licensor hereby grants to Licensee a license to erect, construct, change the size of, improve,
reconstruct, relocate, repair, maintain, and use the following facilities ("Facilities") on the
Premises (as described below):
1. Underground facilities, together with aboveground structures consisting of, but
not limited to, pad -mounted electrical equipment, and four (4) electric vehicle
charging stations ("EV Stations"), and all appurtenances for the distribution of
electricity to the Facilities.
2. Communication facilities, and appurtenances, which can include, Supervisory
Control and Data Acquisition (SCADA).
The Facilities will be installed within the Premises as Licensee may now or hereafter deem
convenient or necessary. Licensee also has the right of ingress and egress, to, from and along the
Premises in, upon, over and across the Property (as defined below). Licensee further has the right,
but not the duty to clear and keep this Premises clear from explosives, buildings, structures and
materials.
The Premises are located on the "Property" in the County of San Diego, State of California
described as follows:
Lots 13, 14, 15, 16 and 17 in Block 175 of National City, according to Map thereof No.
348, filed in the Office of the County Recorder of said County of San Diego, together with that
portion of the Northeasterly Half of the alley adjoining said Lots 14 through 17 and the remainder
portion of Lot 13 on the Southwest as vacated and closed to public use. EXCEPTING
THEREFROM, the Southerly 20 feet of Lot 13. (APN # 559-086-05)
The "Premises" shall be those strips of land, including all of the area lying between the
exterior sidelines, which sidelines shall be three (3) feet, measured at right angles, on each exterior
side of all Facilities installed on the Property on or before December 31, 2018.
Upon the installation of Licensee's Facilities, Licensor may survey the location of the
Facilities as an "as -built" drawing(s) and prepare a metes and bounds or "center line" description(s)
of the actual location of said Facilities, at its sole cost and expense. Licensee shall then prepare an
G.
�a A" Sempra Energy utility
"Amendment to License", using Licensor's "as -built" drawing(s) and metes and bounds
description(s) as a substitute and replacement to the "blanket" description contained in the
paragraph above.
In order to provide adequate working space for Licensee, Licensor shall not erect, place or
construct, nor permit to be erected, placed or constructed any building or other structure, deposit
any materials, plant any trees and/or shrubs or change ground elevation within eight (8) feet of the
front of the door or hinged opening of any above ground Facilities (other than the EV Station) and
within three (3) feet of the EV Station installed on the Premises.
Licensor shall provide at all times, a delineated parking space surrounding each EV Station,
so that each EV Station may be accessed and used by an electric vehicle for charging. One (1) space
shall be marked for electric vehicles only; and shall be used only while such vehicles are being
charged. The remaining three (3) shall be marked for electric vehicles only, however, such vehicles
do not have to be actively charging.
Licensor grants to Licensee the right to erect and maintain on the Property adjacent to the
Facilities, retaining walls and/or protective barricades as may be necessary for Licensee's purposes.
Licensor shall not erect, place or construct, nor permit to be erected, placed or constructed,
any building or other structure, plant any tree, drill or dig, on the Premises.
Licensor shall not increase or decrease the ground surface elevations on the Premises after
installation of Licensee's Facilities, without prior written consent of Licensee.
Licensee shall have the right but not the duty, to trim or remove trees and brush along or
adjacent to the Premises and remove roots from within the Premises whenever Licensee deems it
necessary. Said right shall not relieve Licensor of the duty as owner to trim or remove trees and
brush to prevent danger or hazard to property or persons.
Licensee shall indemnify, defend, and hold Licensor harmless from and against all losses,
damages, or expenses that Licensor may sustain or become liable for that result from the
construction or maintenance by Licensee of its Facilities within the Premises. Such
indemnification shall include any losses, damages, or expenses arising solely out of negligence or
intentional acts of Licensee but excepting any losses, damages, or expenses resulting from the
negligent or intentional acts of the Licensor and third parties
CONDUITS CARRY HIGH VOLTAGE ELECTRICAL CONDUCTORS, therefore
Licensor shall not make or allow any excavation or fill to be made on the Premises WITHOUT
FIRST NOTIFYING SAN DIEGO GAS & ELECTRIC COMPANY BY CALLING (619) 696-
2000, and OBTAINING PERMISSION.
This License shall be governed by the laws of the State of California. The exclusive venue
for any litigation arising from or relating to this License shall be in San Diego County, California.
This License shall be binding upon and inure to the benefit of successors, heirs, executors,
administrators, permittees, licensees, agents or assigns of Licensor and Licensee.
SD GE
�a Sempra Energy utility'
The term of this License shall commence upon the date of execution and if not mutually
renewed by both parties, shall have a term of 10 years ("Term"). This License shall remain in full
force and effect for the duration of the Agreement and beyond; and may not be revoked or
terminated without express written mutual consent subject to the terms and conditions for
termination set forth therein. Upon termination of this License after the expiration of the 10 year
term, Licensee shall pay all costs and expenses to remove the Facilities and Licensee shall restore
the Premises to the condition it was at the time of installation of the Facilities. If Licensor
terminates this License prior to the end of the Term, Licensor shall pay to Licensee the full cost
and sole expense of such removal, which shall include the depreciated cost of the Facilities,
including site design and engineering, installation and EV Station costs.
IN WITNESS WHEREOF, the parties hereto have executed this Agreement on the date
and year first above written.
CITY OF NATIONAL CITY
on Morrison, Mayor
APPROVED AS TO FORM:
Angil P. Morris -Jones
City Attorne
By:
Roberto M. Contreras
Deputy City Attorney
SAN DIEGO GAS & ELECTRIC
COMPANY, a California corporation
(Signatures of two corporate officers required)
By:
[Name], [Title]
By:
[Name], [Title]
Drawn: BCorbilla
Checked:
Date: 01/08/2018 (REV) 03/06/2018
Site No: WP170007
Site Name: City of National City — Public Works Yard
RW # 369040
sOf
�n adSempra Energy utility
REAL PROPERTY LICENSE AGREEMENT
THIS REAL PROPERTY LICENSE AGREEMENT (this "License"), made and entered
into as of March 20 , 2018 (the "Effective Date"), by and between CITY OF
NATIONAL CITY, a municipal corporation, hereinafter called "Licensor" and SAN DIEGO GAS
& ELECTRIC COMPANY, a California corporation, hereinafter called "Licensee."
This License is entered into pursuant to the online SDG&E's Power Your Drive Program
Site Host Participation Application (the "Application"). Except as may be defined herein,
capitalized terms used in this License shall have the meanings assigned to them in the
Application.
Licensor hereby grants to Licensee a license to erect, construct, change the size of, improve,
reconstruct, relocate, repair, maintain, and use the following facilities ("Facilities") on the
Premises (as described below):
1. Underground facilities, together with aboveground structures consisting of, but
not limited to, pad -mounted electrical equipment, and four (4) electric vehicle
charging stations ("EV Stations"), and all appurtenances for the distribution of
electricity to the Facilities.
2. Communication facilities, and appurtenances, which can include, Supervisory
Control and Data Acquisition (SCADA).
The Facilities will be installed within the Premises as Licensee may now or hereafter deem
convenient or necessary. Licensee also has the right of ingress and egress, to, from and along the
Premises in, upon, over and across the Property (as defined below). Licensee further has the right,
but not the duty to clear and keep this Premises clear from explosives, buildings, structures and
materials.
The Premises are located on the "Property" in the County of San Diego, State of California
described as follows:
Lots 13, 14, 15, 16 and 17 in Block 175 of National City, according to Map thereof No.
348, filed in the Office of the County Recorder of said County of San Diego, together with that
portion of the Northeasterly Half of the alley adjoining said Lots 14 through 17 and the remainder
portion of Lot 13 on the Southwest as vacated and closed to public use. EXCEPTING
THEREFROM, the Southerly 20 feet of Lot 13. (APN # 559-086-05)
The "Premises" shall be those strips of land, including all of the area lying between the
exterior sidelines, which sidelines shall be three (3) feet, measured at right angles, on each exterior
side of all Facilities installed on the Property on or before December 31, 2018.
Upon the installation of Licensee's Facilities, Licensor may survey the location of the
Facilities as an "as -built" drawing(s) and prepare a metes and bounds or "center line" description(s)
of the actual location of said Facilities, at its sole cost and expense. Licensee shall then prepare an
(A AISempra Energy utility'
"Amendment to License", using Licensor's "as -built" drawing(s) and metes and bounds
description(s) as a substitute and replacement to the "blanket" description contained in the
paragraph above.
In order to provide adequate working space for Licensee, Licensor shall not erect, place or
construct, nor permit to be erected, placed or constructed any building or other structure, deposit
any materials, plant any trees and/or shrubs or change ground elevation within eight (8) feet of the
front of the door or hinged opening of any above ground Facilities (other than the EV Station) and
within three (3) feet of the EV Station installed on the Premises.
Licensor shall provide at all times, a delineated parking space surrounding each EV Station,
so that each EV Station may be accessed and used by an electric vehicle for charging. One (1) space
shall be marked for electric vehicles only; and shall be used only while such vehicles are being
charged. The remaining three (3) shall be marked for electric vehicles only, however, such vehicles
do not have to be actively charging.
Licensor grants to Licensee the right to erect and maintain on the Property adjacent to the
Facilities, retaining walls and/or protective barricades as may be necessary for Licensee's purposes.
Licensor shall not erect, place or construct, nor permit to be erected, placed or constructed,
any building or other structure, plant any tree, drill or dig, on the Premises.
Licensor shall not increase or decrease the ground surface elevations on the Premises after
installation of Licensee's Facilities, without prior written consent of Licensee.
Licensee shall have the right but not the duty, to trim or remove trees and brush along or
adjacent to the Premises and remove roots from within the Premises whenever Licensee deems it
necessary. Said right shall not relieve Licensor of the duty as owner to trim or remove trees and
brush to prevent danger or hazard to property or persons.
Licensee shall indemnify, defend, and hold Licensor harmless from and against all losses,
damages, or expenses that Licensor may sustain or become liable for that result from the
construction or maintenance by Licensee of its Facilities within the Premises. Such
indemnification shall include any losses, damages, or expenses arising solely out of negligence or
intentional acts of Licensee but excepting any losses, damages, or expenses resulting from the
negligent or intentional acts of the Licensor and third parties
CONDUITS CARRY HIGH VOLTAGE ELECTRICAL CONDUCTORS, therefore
Licensor shall not make or allow any excavation or fill to be made on the Premises WITHOUT
FIRST NOTIFYING SAN DIEGO GAS & ELECTRIC COMPANY BY CALLING (619) 696-
2000, and OBTAINING PERMISSION.
This License shall be governed by the laws of the State of California. The exclusive venue
for any litigation arising from or relating to this License shall be in San Diego County, California.
This License shall be binding upon and inure to the benefit of successors, heirs, executors,
administrators, permittees, licensees, agents or assigns of Licensor and Licensee.
sal
�A Sempra Energy utility'
The term of this License shall commence upon the date of execution and if not mutually
renewed by both parties, shall have a term of 10 years ("Term"). This License shall remain in full
force and effect for the duration of the Agreement and beyond; and may not be revoked or
terminated without express written mutual consent subject to the terms and conditions for
termination set forth therein. Upon termination of this License after the expiration of the 10 year
term, Licensee shall pay all costs and expenses to remove the Facilities and Licensee shall restore
the Premises to the condition it was at the time of installation of the Facilities. If Licensor
terminates this License prior to the end of the Term, Licensor shall pay to Licensee the full cost
and sole expense of such removal, which shall include the depreciated cost of the Facilities,
including site design and engineering, installation and EV Station costs.
IN WITNESS WHEREOF, the parties hereto have executed this Agreement on the date
and year first above written.
CITY OF NATIONAL CITY
on Morrison, Mayor
APPROVED AS TO FORM:
Angil P. Morris -Jones
City Attorne
Roberto M. Contreras
Deputy City Attorney
SAN DIEGO GAS & ELECTRIC
COMPANY, a California corporation
(Signatures of two corporate officers required)
By:
[Name], [Title]
By:
[Name], [Title]
Drawn: BCorbilla
Checked:
Date: 01/08/2018 (REV) 03/06/2018
Site No: WP170007
Site Name: City of National City — Public Works Yard
RW # 369040
S E
(A aiSempra Energy ut1riy`
REAL PROPERTY LICENSE AGREEMENT
THIS REAL PROPERTY LICENSE AGREEMENT (this "License"), made and entered
into as of March 20 , 2018 (the "Effective Date"), by and between CITY OF
NATIONAL CITY, a municipal corporation, hereinafter called "Licensor" and SAN DIEGO GAS
& ELECTRIC COMPANY, a California corporation, hereinafter called "Licensee."
This License is entered into pursuant to the online SDG&E's Power Your Drive Program
Site Host Participation Application (the "Application"). Except as may be defined herein,
capitalized terms used in this License shall have the meanings assigned to them in the Application.
Licensor hereby grants to Licensee a license to erect, construct, change the size of, improve,
reconstruct, relocate, repair, maintain, and use the following facilities ("Facilities") on the
Premises (as described below):
1. Underground facilities, together with aboveground structures consisting of, but
not limited to, pad -mounted electrical equipment, and eight (8) electric vehicle
charging stations ("EV Stations"), and all appurtenances for the distribution of
electricity to the Facilities.
2. Communication facilities, and appurtenances, which can include, Supervisory
Control and Data Acquisition (SCADA).
The Facilities will be installed within the Premises as Licensee may now or hereafter deem
convenient or necessary. Licensee also has the right of ingress and egress, to, from and along the
Premises in, upon, over and across the Property (as defined below). Licensee further has the right,
but not the duty to clear and keep this Premises clear from explosives, buildings, structures and
materials.
The Premises are located on the "Property" in the County of San Diego, State of California
described as follows:
Lots 5 and 6 in Quarter Section 154 of Rancho De La Nacion, according to Map thereof
No. 166, filed in the Office of the County Recorder of said County of San Diego.
(APN 560-100-03)
The "Premises" shall be those strips of land, including all of the area lying between the
exterior sidelines, which sidelines shall be three (3) feet, measured at right angles, on each exterior
side of all Facilities installed on the Property on or before December 31, 2018.
Upon the installation of Licensee's Facilities, Licensor may survey the location of the
Facilities as an "as -built" drawing(s) and prepare a metes and bounds or "center line" description(s)
of the actual location of said Facilities, at its sole cost and expense. Licensee shall then prepare an
"Amendment to License", using Licensor's "as -built" drawing(s) and metes and bounds
description(s) as a substitute and replacement to the "blanket" description contained in the
paragraph above.
SD E
(A aiSempra Energy utility'
In order to provide adequate working space for Licensee, Licensor shall not erect, place or
construct, nor permit to be erected, placed or constructed any building or other structure, deposit
any materials, plant any trees and/or shrubs or change ground elevation within eight (8) feet of the
front of the door or hinged opening of any above ground Facilities (other than the EV Station) and
within three (3) feet of the EV Station installed on the Premises.
Licensor shall provide at all times, a delineated parking space surrounding each EV Station,
so that each EV Station may be accessed and used by an electric vehicle for charging. One (1) space
shall be marked for electric vehicles only; and shall be used only while such vehicles are being
charged. The remaining seven (7) shall be marked for electric vehicles only, however, such vehicles
do not have to be actively charging.
Licensor grants to Licensee the right to erect and maintain on the Property adjacent to the
Facilities, retaining walls and/or protective barricades as may be necessary for Licensee's purposes.
Licensor shall not erect, place or construct, nor permit to be erected, placed or constructed,
any building or other structure, plant any tree, drill or dig, on the Premises.
Licensor shall not increase or decrease the ground surface elevations on the Premises after
installation of Licensee's Facilities, without prior written consent of Licensee.
Licensee shall have the right but not the duty, to trim or remove trees and brush along or
adjacent to the Premises and remove roots from within the Premises whenever Licensee deems it
necessary. Said right shall not relieve Licensor of the duty as owner to trim or remove trees and
brush to prevent danger or hazard to property or persons.
Licensee shall indemnify, defend, and hold Licensor harmless from and against all losses,
damages, or expenses that Licensor may sustain or become liable for that result from the
construction or maintenance by Licensee of its Facilities within the Premises. Such
indemnification shall include any losses, damages, or expenses arising solely out of negligence or
intentional acts of Licensee but excepting any losses, damages, or expenses resulting from the
negligent or intentional acts of the Licensor and third parties
CONDUITS CARRY HIGH VOLTAGE ELECTRICAL CONDUCTORS, therefore
Licensor shall not make or allow any excavation or fill to be made on the Premises WITHOUT
FIRST NOTIFYING SAN DIEGO GAS & ELECTRIC COMPANY BY CALLING (619) 696-
2000, and OBTAINING PERMISSION.
This License shall be governed by the laws of the State of California. The exclusive venue
for any litigation arising from or relating to this License shall be in San Diego County, California.
This License shall be binding upon and inure to the benefit of successors, heirs, executors,
administrators, permittees, licensees, agents or assigns of Licensor and Licensee.
The term of this License shall commence upon the date of execution and if not mutually
renewed by both parties, shall have a term of 10 years ("Term"). This License shall remain in full
force and effect for the duration of the Agreement and beyond; and may not be revoked or
sot
(A JSempra Energy uuety'
terminated without express written mutual consent subject to the terms and conditions for
termination set forth therein. Upon termination of this License after the expiration of the 10 year
term, Licensee shall pay all costs and expenses to remove the Facilities and Licensee shall restore
the Premises to the condition it was at the time of installation of the Facilities. If Licensor
terminates this License prior to the end of the Term, Licensor shall pay to Licensee the full cost
and sole expense of such removal, which shall include the depreciated cost of the Facilities,
including site design and engineering, installation and EV Station costs.
IN WITNESS WHEREOF, the parties hereto have executed this Agreement on the date
and year first above written.
CITY OF NATIONAL CITY
Bv:
on Morrison, Mayor
APPROVED AS TO FORM:
Angil P. Morris -Jones
City Attorne
By:
Ro s erto M. Contreras
Deputy City Attorney
Drawn: BCorbilla
Checked:
Date: 01/10/2018 (REV) 03/06/2018
Site No: WP170006
Site Name: City of National City — City Hall
RW 369044
SAN DIEGO GAS & ELECTRIC
COMPANY, a California corporation
(Signatures of two corporate officers required)
By:
[Name], [Title]
By:
[Name], [Title]
sag
(A aSempra Energy utility*
REAL PROPERTY LICENSE AGREEMENT
THIS REAL PROPERTY LICENSE AGREEMENT (this "License"), made and entered
into as of March 20 , 2018 (the "Effective Date"), by and between CITY OF
NATIONAL CITY, a municipal corporation, hereinafter called "Licensor" and SAN DIEGO GAS
& ELECTRIC COMPANY, a California corporation, hereinafter called "Licensee."
This License is entered into pursuant to the online SDG&E's Power Your Drive Program
Site Host Participation Application (the "Application"). Except as may be defined herein,
capitalized terms used in this License shall have the meanings assigned to them in the Application.
Licensor hereby grants to Licensee a license to erect, construct, change the size of, improve,
reconstruct, relocate, repair, maintain, and use the following facilities ("Facilities") on the
Premises (as described below):
1. Underground facilities, together with aboveground structures consisting of, but
not limited to, pad -mounted electrical equipment, and eight (8) electric vehicle
charging stations ("EV Stations"), and all appurtenances for the distribution of
electricity to the Facilities.
2. Communication facilities, and appurtenances, which can include, Supervisory
Control and Data Acquisition (SCADA).
The Facilities will be installed within the Premises as Licensee may now or hereafter deem
convenient or necessary. Licensee also has the right of ingress and egress, to, from and along the
Premises in, upon, over and across the Property (as defined below). Licensee further has the right,
but not the duty to clear and keep this Premises clear from explosives, buildings, structures and
materials.
The Premises are located on the "Property" in the County of San Diego, State of California
described as follows:
Lots 5 and 6 in Quarter Section 154 of Rancho De La Nacion, according to Map thereof
No. 166, filed in the Office of the County Recorder of said County of San Diego.
(APN 560-100-03)
The "Premises" shall be those strips of land, including all of the area lying between the
exterior sidelines, which sidelines shall be three (3) feet, measured at right angles, on each exterior
side of all Facilities installed on the Property on or before December 31, 2018.
Upon the installation of Licensee's Facilities, Licensor may survey the location of the
Facilities as an "as -built" drawing(s) and prepare a metes and bounds or "center line" description(s)
of the actual location of said Facilities, at its sole cost and expense. Licensee shall then prepare an
"Amendment to License", using Licensor's "as -built" drawing(s) and metes and bounds
description(s) as a substitute and replacement to the "blanket" description contained in the
paragraph above.
Sal
(A ajSempra Energy utility`
In order to provide adequate working space for Licensee, Licensor shall not erect, place or
construct, nor permit to be erected, placed or constructed any building or other structure, deposit
any materials, plant any trees and/or shrubs or change ground elevation within eight (8) feet of the
front of the door or hinged opening of any above ground Facilities (other than the EV Station) and
within three (3) feet of the EV Station installed on the Premises.
Licensor shall provide at all times, a delineated parking space surrounding each EV Station,
so that each EV Station may be accessed and used by an electric vehicle for charging. One (1) space
shall be marked for electric vehicles only; and shall be used only while such vehicles are being
charged. The remaining seven (7) shall be marked for electric vehicles only, however, such vehicles
do not have to be actively charging.
Licensor grants to Licensee the right to erect and maintain on the Property adjacent to the
Facilities, retaining walls and/or protective barricades as may be necessary for Licensee's purposes.
Licensor shall not erect, place or construct, nor permit to be erected, placed or constructed,
any building or other structure, plant any tree, drill or dig, on the Premises.
Licensor shall not increase or decrease the ground surface elevations on the Premises after
installation of Licensee's Facilities, without prior written consent of Licensee.
Licensee shall have the right but not the duty, to trim or remove trees and brush along or
adjacent to the Premises and remove roots from within the Premises whenever Licensee deems it
necessary. Said right shall not relieve Licensor of the duty as owner to trim or remove trees and
brush to prevent danger or hazard to property or persons.
Licensee shall indemnify, defend, and hold Licensor harmless from and against all losses,
damages, or expenses that Licensor may sustain or become liable for that result from the
construction or maintenance by Licensee of its Facilities within the Premises. Such
indemnification shall include any losses, damages, or expenses arising solely out of negligence or
intentional acts of Licensee but excepting any losses, damages, or expenses resulting from the
negligent or intentional acts of the Licensor and third parties
CONDUITS CARRY HIGH VOLTAGE ELECTRICAL CONDUCTORS, therefore
Licensor shall not make or allow any excavation or fill to be made on the Premises WITHOUT
FIRST NOTIFYING SAN DIEGO GAS & ELECTRIC COMPANY BY CALLING (619) 696-
2000, and OBTAINING PERMISSION.
This License shall be governed by the laws of the State of California. The exclusive venue
for any litigation arising from or relating to this License shall be in San Diego County, California.
This License shall be binding upon and inure to the benefit of successors, heirs, executors,
administrators, permittees, licensees, agents or assigns of Licensor and Licensee.
The term of this License shall commence upon the date of execution and if not mutually
renewed by both parties, shall have a term of 10 years ("Term"). This License shall remain in full
force and effect for the duration of the Agreement and beyond; and may not be revoked or
SO/
(n Sempra Energy utility.
terminated without express written mutual consent subject to the terms and conditions for
termination set forth therein. Upon termination of this License after the expiration of the 10 year
term, Licensee shall pay all costs and expenses to remove the Facilities and Licensee shall restore
the Premises to the condition it was at the time of installation of the Facilities. If Licensor
terminates this License prior to the end of the Term, Licensor shall pay to Licensee the full cost
and sole expense of such removal, which shall include the depreciated cost of the Facilities,
including site design and engineering, installation and EV Station costs.
IN WITNESS WHEREOF, the parties hereto have executed this Agreement on the date
and year first above written.
CITY OF NATIONAL CITY
By:
on Morrison, Mayor
APPROVED AS TO FORM:
Angil P. Morris -Jones
City Attorne
By:
Roberto M. Contreras
Deputy City Attorney
Drawn: BCorbilla
Checked:
Date: 01/10/2018 (REV) 03/06/2018
Site No: WP170006
Site Name: City of National City — City Hall
RW 369044
SAN DIEGO GAS & ELECTRIC
COMPANY, a California corporation
(Signatures of two corporate officers required)
By:
[Name], [Title]
By:
[Name], [Title]
,E
�A ?Sempra Energy utuity`
REAL PROPERTY LICENSE AGREEMENT
THIS REAL PROPERTY LICENSE AGREEMENT (this "License"), made and entered
into as of March 20 , 2018 (the "Effective Date"), by and between CITY OF
NATIONAL CITY, a municipal corporation, hereinafter called "Licensor" and SAN DIEGO GAS
& ELECTRIC COMPANY, a California corporation, hereinafter called "Licensee."
This License is entered into pursuant to the online SDG&E's Power Your Drive Program
Site Host Participation Application (the "Application"). Except as may be defined herein,
capitalized terms used in this License shall have the meanings assigned to them in the Application.
Licensor hereby grants to Licensee a license to erect, construct, change the size of, improve,
reconstruct, relocate, repair, maintain, and use the following facilities ("Facilities") on the
Premises (as described below):
1. Underground facilities, together with aboveground structures consisting of, but
not limited to, pad -mounted electrical equipment, and eight (8) electric vehicle
charging stations ("EV Stations"), and all appurtenances for the distribution of
electricity to the Facilities.
2. Communication facilities, and appurtenances, which can include, Supervisory
Control and Data Acquisition (SCADA).
The Facilities will be installed within the Premises as Licensee may now or hereafter deem
convenient or necessary. Licensee also has the right of ingress and egress, to, from and along the
Premises in, upon, over and across the Property (as defined below). Licensee further has the right,
but not the duty to clear and keep this Premises clear from explosives, buildings, structures and
materials.
The Premises are located on the "Property" in the County of San Diego, State of California
described as follows:
Lots 5 and 6 in Quarter Section 154 of Rancho De La Nacion, according to Map thereof
No. 166, filed in the Office of the County Recorder of said County of San Diego.
(APN 560-100-03)
The "Premises" shall be those strips of land, including all of the area lying between the
exterior sidelines, which sidelines shall be three (3) feet, measured at right angles, on each exterior
side of all Facilities installed on the Property on or before December 31, 2018.
Upon the installation of Licensee's Facilities, Licensor may survey the location of the
Facilities as an "as -built" drawing(s) and prepare a metes and bounds or "center line" description(s)
of the actual location of said Facilities, at its sole cost and expense. Licensee shall then prepare an
"Amendment to License", using Licensor's "as -built" drawing(s) and metes and bounds
description(s) as a substitute and replacement to the "blanket" description contained in the
paragraph above.
sal
(A aSempra Energy utility
In order to provide adequate working space for Licensee, Licensor shall not erect, place or
construct, nor permit to be erected, placed or constructed any building or other structure, deposit
any materials, plant any trees and/or shrubs or change ground elevation within eight (8) feet of the
front of the door or hinged opening of any above ground Facilities (other than the EV Station) and
within three (3) feet of the EV Station installed on the Premises.
Licensor shall provide at all times, a delineated parking space surrounding each EV Station,
so that each EV Station may be accessed and used by an electric vehicle for charging. One (1) space
shall be marked for electric vehicles only; and shall be used only while such vehicles are being
charged. The remaining seven (7) shall be marked for electric vehicles only, however, such vehicles
do not have to be actively charging.
Licensor grants to Licensee the right to erect and maintain on the Property adjacent to the
Facilities, retaining walls and/or protective barricades as may be necessary for Licensee's purposes.
Licensor shall not erect, place or construct, nor permit to be erected, placed or constructed,
any building or other structure, plant any tree, drill or dig, on the Premises.
Licensor shall not increase or decrease the ground surface elevations on the Premises after
installation of Licensee's Facilities, without prior written consent of Licensee.
Licensee shall have the right but not the duty, to trim or remove trees and brush along or
adjacent to the Premises and remove roots from within the Premises whenever Licensee deems it
necessary. Said right shall not relieve Licensor of the duty as owner to trim or remove trees and
brush to prevent danger or hazard to property or persons.
Licensee shall indemnify, defend, and hold Licensor harmless from and against all losses,
damages, or expenses that Licensor may sustain or become liable for that result from the
construction or maintenance by Licensee of its Facilities within the Premises. Such
indemnification shall include any losses, damages, or expenses arising solely out of negligence or
intentional acts of Licensee but excepting any losses, damages, or expenses resulting from the
negligent or intentional acts of the Licensor and third parties
CONDUITS CARRY HIGH VOLTAGE ELECTRICAL CONDUCTORS, therefore
Licensor shall not make or allow any excavation or fill to be made on the Premises WITHOUT
FIRST NOTIFYING SAN DIEGO GAS & ELECTRIC COMPANY BY CALLING (619) 696-
2000, and OBTAINING PERMISSION.
This License shall be governed by the laws of the State of California. The exclusive venue
for any litigation arising from or relating to this License shall be in San Diego County, California.
This License shall be binding upon and inure to the benefit of successors, heirs, executors,
administrators, permittees, licensees, agents or assigns of Licensor and Licensee.
The term of this License shall commence upon the date of execution and if not mutually
renewed by both parties, shall have a term of 10 years ("Term"). This License shall remain in full
force and effect for the duration of the Agreement and beyond; and may not be revoked or
Sempra Energy utility*
terminated without express written mutual consent subject to the terms and conditions for
termination set forth therein. Upon termination of this License after the expiration of the 10 year
term, Licensee shall pay all costs and expenses to remove the Facilities and Licensee shall restore
the Premises to the condition it was at the time of installation of the Facilities. If Licensor
terminates this License prior to the end of the Term, Licensor shall pay to Licensee the full cost
and sole expense of such removal, which shall include the depreciated cost of the Facilities,
including site design and engineering, installation and EV Station costs.
IN WITNESS WHEREOF, the parties hereto have executed this Agreement on the date
and year first above written.
CITY OF NATIONAL CITY
Bv:
on Morrison, Mayor
APPROVED AS TO FORM:
SAN DIEGO GAS & ELECTRIC
COMPANY, a California corporation
(Signatures of two corporate officers required)
By:
[Name], [Title]
By:
Angil P. Morris -Jones [Name], [Title]
City Attorney
By:
Roberto M. Contreras
Deputy City Attorney
Drawn: BCorbilla
Checked:
Date: 01/10/2018 (REV) 03/06/2018
Site No: WP170006
Site Name: City of National City — City Hall
RW 369044
RESOLUTION NO. 2018 — 43
RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NATIONAL CITY
AUTHORIZING THE MAYOR TO EXECUTE TWO SEPARATE REAL PROPERTY
LICENSE AGREEMENTS WITH SAN DIEGO GAS & ELECTRIC COMPANY (SDG&E)
FOR THE INSTALLATION OF EIGHT ELECTRIC VEHICLE CHARGING STATIONS,
ASSOCIATED EQUIPMENT, AND INFRASTRUCTURE AT CITY HALL (LOCATED AT
1243 NATIONAL CITY BOULEVARD) AND FOUR ELECTRIC VEHICLE CHARGING
STATIONS, ASSOCIATED EQUIPMENT, AND INFRASTRUCTURE AT THE PUBLIC
WORKS YARD (LOCATED AT 1726 WILSON AVENUE) TO BE USED FOR CITY FLEET
VEHICLES AND CITY EMPLOYEES' PERSONAL VEHICLES, AT CITY EMPLOYEES'
OWN EXPENSE, AS PART OF SDG&E'S "POWER YOUR DRIVE" PROGRAM
WHEREAS, San Diego Gas & Electric Company (SDG&E) has approved the City
of National City's application for installation of eight (8) Electric Vehicle Charging Stations,
associated equipment, and infrastructure at City Hall, located at 1243 National City Boulevard,
to be used for City fleet vehicles and City employees' personal vehicles, at City employees' own
expense, as part of SDG&E's "Power Your Drive" Program (the "Program"); and
WHEREAS, four (4) Electric Vehicle Charging Stations, associated equipment,
and infrastructure were also approved and will be installed at the Public Works Yard, located at
1726 Wilson Avenue, to be used for City fleet vehicles and City employees' personal vehicles,
at City employees' own expense, as part the Program; and
WHEREAS, SDG&E will install the twelve (12) Electric Vehicle Charging
Stations, associated equipment, and infrastructure at no cost to the City, however, the City will
be responsible for electricity costs associated with Electric Vehicle charging activities; and
WHEREAS, the Project directly supports National City's Strategic Plan, General
Plan, and Climate Action Plan goals of pursuing green initiatives and building a sustainable city.
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of
National City hereby authorizes the Mayor to execute a Real Property License Agreement with
San Diego Gas & Electric Company (SDG&E) for the installation of eight (8) Electric Vehicle
Charging Stations, associated equipment, and infrastructure at City Hall, located at 1243
National City Boulevard, to be used for City fleet vehicles and employees' personal vehicles, at
City employees' own expense, as part of SDG&E's "Power Your Drive" Program.
BE IT FURTHER RESOLVED that the City Council of the City of National City
hereby authorizes the Mayor to execute a Real Property License Agreement with San Diego
Gas & Electric Company (SDG&E) for the installation of eight (8) Electric Vehicle Charging
Stations, associated equipment, and infrastructure of four (4) Electric Vehicle Charging Stations,
associated equipment, and infrastructure at the Public Works Yard, located at 1726 Wilson
Avenue, to be used for City fleet vehicles and employees' personal vehicles, at City employees'
own expense, as part of SDG&E's "Power Your Drive" Program.
[Signature Page to Follow]
Resolution No. 2018 — 43
Page Two
PASSED and ADOPTED this 20th day of Marc 018.
ATTEST:
;?,
Michael R. Dalla, ity Clerk
APPROY,ED AS TO FORM:
(4()
Angil P. Morris -Jones
City Attorney
n Morrison, Mayor
Passed and adopted by the Council of the City of National City, California, on
March 20, 2018 by the following vote, to -wit:
Ayes: Councilmembers Cano, Mendivil, Morrison, Sotelo-Solis.
Nays: None.
Absent: Rios.
Abstain: None.
AUTHENTICATED BY: RON MORRISON
Mayor of the City of National City, California
City erk of the City of ational City, California
By:
Deputy
I HEREBY CERTIFY that the above and foregoing is a full, true and correct copy of
RESOLUTION NO. 2018-43 of the City of National City, California, passed and adopted
by the Council of said City on March 20, 2018.
City Clerk of the City of National City, California
By:
Deputy
CITY OF NATIONAL CITY, CALIFORNIA
COUNCIL AGENDA STATEMENT
MEETING DATE: March 20, 2018
AGENDA ITEM NO. 18
TEM TITLE:
Resolution of the City Council of the City of National City authorizing the Mayor to execute two separate Real
Property License Agreements with San Diego Gas & Electric Company (SDG&E) for the installation of eight
Electric Vehicle Charging Stations, associated equipment and infrastructure at City Hall (located at 1243 National
City Boulevard) and four Electric Vehicle Charging Stations, associated equipment and infrastructure at Public
Works Yard (located at 1726 Wilson Avenue) to be used for City fleet vehicles and City employees' personal
vehicles, at their own expense, as part of SDG&E's "Power Your Drive" Program.
PREPARED BY: Stephen Manganiello DEPARTMENT: Engineering/Public Works
PHONE: 619-336-4382 APPROVED BY:
EXPLANATION:
San Diego Gas & Electric Company (SDG&E) has approved the City of National City's application for installation
of eight Electric Vehicle (EV) Charging Stations, associated equipment and infrastructure at City Hall (located at
1243 National City Boulevard) and four EV Charging Stations, associated equipment and infrastructure at Public
Works Yard (located at 1726 Wilson Avenue) to be used for City fleet vehicles and City employees' personal
vehicles, at their own expense, as part of SDG&E's "Power Your Drive" Program. SDG&E will install the EV
Charging Stations, associated equipment and infrastructure at no cost to the City. Users will simply sign up for
the Power Your Drive application, enter their billing information and then swipe their phone or key fab to begin
charging. Users must be a City employee and have a Power Your Drive account with SDG&E to access the EV
charging stations.
'This project directly supports National City's Strategic Plan, General Plan and Climate Action Plan goals of
Irsuing green initiatives and building a sustainable city. The City's Capital Improvement Program proposes to
phase in electric vehicles for the City's fleet beginning in FY 2019.
FINANCIAL STATEMENT:
ACCOUNT NO.
APPROVED:
APPROVED:
Finance
MIS
SDG&E will install EV Charging Stations, associated equipment and infrastructure at no cost to the City. SDG&E
will bill the City for electricity costs associated with EV charging for City fleet vehicles; City employees with Power
Your Drive accounts will be billed separately by SDG&E for charging their personal vehicles.
ENVIRONMENTAL REVIEW:
N/A
ORDINANCE: INTRODUCTION:
FINAL ADOPTION:
STAFF RECOMMENDATION:
Adopt Resolution authorizing the Mayor to execute two separate Real Property License Agreements with SDG&E
for the installation of Electric Vehicle Charging Stations at City Hall and Public Works Yard.
BOARD / COMMISSION RECOMMENDATION:
N/A
ATTACHMENTS:
1. Preliminary Design Exhibits
2. Real Property License Agreements
3. Resolution
leesb/ufiy; A/o • 2at g - -f 3
Site Design Layout
For
City of National City
City Hall
W P 170006
1243 National City Blvd., National City, CA 91950
Prepared for:
&TOGE
P ,1 hiNJ 1'It .. .
November 7, 2017
Prepared by:
e=.
„N000licatas
Naval Base San Di
nibictkis
Vicinity Map
Chula Vista
Location Map
Page 3
PARADISE HILLS
BAY TERRACES dif
se
•Alle
Bonita
•
at
RANCHO
DTI RE,
- 2 -
',-1"'"11•460"".
Site Map
" d
J • Inr.H.,
5.-•• •
• '1.41.:f:
•
LEGEND: for Preliminary Design Layouts
# of New Standard EV Stalls
# of New ADA EV Stalis
—4 Existing Path of Travel
Design Summary:
El El
New Transf. / Meter
New Single/Dual EVCS
New Trench Line
New ADA Path/Loading
8 New EV Stalis (1 ADA Van + 1 ADA Std+ 6 Std)
0 Stalls Lost
5 New EV Chargers:
• Bollard Type SINGLE = 2, DUAL = 3
• Wall Mount SINGLE = 0, DUAL = 0
1 New 200 Amp Meter
1 New 150KVA, 208Y/120 Transformer
270'+/- Trenching
Page 4
•
-3-
Design Layout
WM/4 il•iiiiMR•IMMIlanisnOillhdelltafia.1111112.1111•611-1116116alla -••••lalmkno•61•01.2.L.un.... .• • t.d. .2 VAI••••••,11e 1••••••••0041111111.111ildlion.•••18,
•
lye!pdt,u0D Vat/
a>lety
Aepano2 pupp
• i'••••• :V,- • ••
klaali ••
•
, • .
J.91P EN
dw 00Z. MN
• -7:
0 = 1S01 S]JVdS 1V1.01
•s: .11" - •
pat,
( A AA01)
qDuJj7/+,0t7
I t
••"- • •• fo • -.•-• k •
•10. r1•41.
•
• t
ei .r.::141. • . •
e...!.• • A
•;3
Ill. irk
vt
•
.. • . : 1: •tv
wr .. .or• ,ti,
1. ,,,..• ,;,?.., . .
• Jo s. .. r
...alma.. am: la ess..a_g•monaa.
Lt-)
a)
bk)
CO
CL
New Transformer
Exist. Hand Hole
Site Photos
Proposed l V
Std Stalls
New Meter
Page 6
Reconstruct Curb
Ramp
i
Site Design Layout
For
City of National City
Public Works Yard
WP170007
1726 Wilson Ave, National City, CA 91950
Prepared for:
SDGE
A c Sempra Energy uAM y
September 21, 2017
December 11, 2107
Prepared by:
•
-6-
VIEW
1110
iotaTS
BARRIO LOGAN
Naval Base .,,an OsSI,
.--, -
‘
,----
Vicinity Map
National City
San Chegc
Ray Nation,'
Stf,ilgl
y
PARADS
PROJECT LOCATION
Chula Vist.
Location Map
LVATIK
FIA
‘4,
co.
P-7- •
Page 3
BAY TERRACES
Bentta
RANCH
OEL PEI
116:, •
111BILI'
-7-
t
Site Map
jin
'roposed Area
for EV
Improvements
Aide
LEGEND: for Site Design Layouts
# of New Standard EV Stalls
# of New ADA EV Stalls
—.4 Existing Path of Travel
Design Summary:
D
/I El
•
Existing XFMR
D215049
43-532 —
150 HBS
New Transf. / Meter
New Single/Dual EVCS
New Trench Line
New ADA Path/Loading
4 New EV Stalls (0 ADA + 4 Std)
0 Stalls Lost
2 New EV Chargers:
• Bollard Type SINGLE = 0, DUAL = 0
• Wall Mount SINGLE = 0, DUAL = 2
1 New 200 Amp Wall Mounted Meter
0 New 150KVA, 208Y/120 Transformer
100'+/- Trenching
Page 4
-8-
NOTE: This is a FLEET
application. No ADA
Stalls required.
Site Design Layout
onduit ,II
• Mo'unte'(.I (Low V)
100'4/ french (Sec.)
(90' in Concrete)
Page 5
I
Existing XFMVIR
D21510
043-532
1Y)Hac.
Lck�r�i�1:,
TOTAL SPACES LOST = 0
-9-
Site Photos
Rigid Conduit
Mounted on
this Wall
Page 6
sof
(A Sempra Energy ( my
REAL PROPERTY LICENSE AGREEMENT
THIS REAL PROPERTY LICENSE AGREEMENT (this "License"), made and entered
into as of , 2018 (the "Effective Date"), by and between CITY OF
NATIONAL CITY, a municipal corporation, hereinafter called "Licensor" and SAN DIEGO GAS
& ELECTRIC COMPANY, a California corporation, hereinafter called "Licensee."
This License is entered into pursuant to the online SDG&E's Power Your Drive Program
Site Host Participation Application (the "Application"). Except as may be defined herein,
capitalized terms used in this License shall have the meanings assigned to them in the Application.
Licensor hereby grants to Licensee a license to erect, construct, change the size of, improve,
reconstruct, relocate, repair, maintain, and use the following facilities ("Facilities") on the
Premises (as described below):
1. Underground facilities, together with aboveground structures consisting of, but
not limited to, pad -mounted electrical equipment, and eight (8) electric vehicle
charging stations ("EV Stations"), and all appurtenances for the distribution of
electricity to the Facilities.
2. Communication facilities, and appurtenances, which can include, Supervisory
Control and Data Acquisition (SCADA).
The Facilities will be installed within the Premises as Licensee may now or hereafter deem
convenient or necessary. Licensee also has the right of ingress and egress, to, from and along the
Premises in, upon, over and across the Property (as defined below). Licensee further has the right,
but not the duty to clear and keep this Premises clear from explosives, buildings, structures and
materials.
The Premises are located on the "Property" in the County of San Diego, State of California
described as follows:
Lots 5 and 6 in Quarter Section 154 of Rancho De La Nacion, according to Map thereof
No. 166, filed in the Office of the County Recorder of said County of San Diego.
(APN 560-100-03)
The "Premises" shall be those strips of land, including all of the area lying between the
exterior sidelines, which sidelines shall be three (3) feet, measured at right angles, on each exterior
side of all Facilities installed on the Property on or before December 31, 2018.
Upon the installation of Licensee's Facilities, Licensor may survey the location of the
Facilities as an "as -built" drawing(s) and prepare a metes and bounds or "center line" description(s)
of the actual location of said Facilities, at its sole cost and expense. Licensee shall then prepare an
"Amendment to License", using Licensor's "as -built" drawing(s) and metes and bounds
description(s) as a substitute and replacement to the "blanket" description contained in the
paragraph above.
-11-
�E
(A a)Sempra Energy utility
In order to provide adequate working space for Licensee, Licensor shall not erect, place or
construct, nor permit to be erected, placed or constructed any building or other structure, deposit
any materials, plant any trees and/or shrubs or change ground elevation within eight (8) feet of the
front of the door or hinged opening of any above ground Facilities (other than the EV Station) and
within three (3) feet of the EV Station installed on the Premises.
Licensor shall provide at all times, a delineated parking space surrounding each EV Station,
so that each EV Station may be accessed and used by an electric vehicle for charging. One (1) space
shall be marked for electric vehicles only; and shall be used only while such vehicles are being
charged. The remaining seven (7) shall be marked for electric vehicles only, however, such vehicles
do not have to be actively charging.
Licensor grants to Licensee the right to erect and maintain on the Property adjacent to the
Facilities, retaining walls and/or protective barricades as may be necessary for Licensee's purposes.
Licensor shall not erect, place or construct, nor permit to be erected, placed or constructed,
any building or other structure, plant any tree, drill or dig, on the Premises.
Licensor shall not increase or decrease the ground surface elevations on the Premises after
installation of Licensee's Facilities, without prior written consent of Licensee.
Licensee shall have the right but not the duty, to trim or remove trees and brush along or
adjacent to the Premises and remove roots from within the Premises whenever Licensee deems it
necessary. Said right shall not relieve Licensor of the duty as owner to trim or remove trees and
brush to prevent danger or hazard to property or persons.
Licensee shall indemnify, defend, and hold Licensor harmless from and against all losses,
damages, or expenses that Licensor may sustain or become liable for that result from the
construction or maintenance by Licensee of its Facilities within the Premises. Such
indemnification shall include any losses, damages, or expenses arising solely out of negligence or
intentional acts of Licensee but excepting any losses, damages, or expenses resulting from the
negligent or intentional acts of the Licensor and third parties
CONDUITS CARRY HIGH VOLTAGE ELECTRICAL CONDUCTORS, therefore
Licensor shall not make or allow any excavation or fill to be made on the Premises WITHOUT
FIRST NOTIFYING SAN DIEGO GAS & ELECTRIC COMPANY BY CALLING (619) 696-
2000, and OBTAINING PERMISSION.
This License shall be governed by the laws of the State of California. The exclusive venue
for any litigation arising from or relating to this License shall be in San Diego County, California.
This License shall be binding upon and inure to the benefit of successors, heirs, executors,
administrators, permittees, licensees, agents or assigns of Licensor and Licensee.
The term of this License shall commence upon the date of execution and if not mutually
renewed by both parties, shall have a term of 10 years ("Term"). This License shall remain in full
force and effect for the duration of the Agreement and beyond; and may not be revoked or
_12_
MG"
(A Sempra Energy utility
terminated without express written mutual consent subject to the terms and conditions for
termination set forth therein. Upon termination of this License after the expiration of the 10 year
term, Licensee shall pay all costs and expenses to remove the Facilities and Licensee shall restore
the Premises to the condition it was at the time of installation of the Facilities. If Licensor
terminates this License prior to the end of the Term, Licensor shall pay to Licensee the full cost
and sole expense of such removal, which shall include the depreciated cost of the Facilities,
including site design and engineering, installation and EV Station costs.
IN WITNESS WHEREOF, the parties hereto have executed this Agreement on the date
and year first above written.
CITY OF NATIONAL CITY SAN DIEGO GAS & ELECTRIC
COMPANY, a California corporation
By:
Ron Morrison, Mayor
APPROVED AS TO FORM:
Angil P. Morris -Jones
City Attorney
By:
Roberto M. Contreras
Deputy City Attorney
Drawn: BCorbilla
Checked:
Date: 01/10/2018 (REV) 03/06/2018
Site No: WP170006
Site Name: City of National City — City Hall
RW 369044
(Signatures of two corporate officers required)
By:
[Name], [Title]
By:
[Name], [Title]
-13-
Sempra Energy
March 7, 2018
City of National City
Attn: Risk Manager
1243 National City Blvd.
National City, CA 91950-43001
Re: Proof of Self -Insurance
To Whom It May Concern:
Melissa C. Schoening
Insurance & Risk Advisory Analyst
Sempra Energy
Insurance & Risk Advisory
488 8th Avenue, HQ06
San Diego, CA 92101.3017
insurance@sempra,com
Please accept this letter as compliance with your request for evidence of self-insurance in accordance
with the terms of the above -referenced agreement, as dictated under the terms of the agreement,
between San Diego Gas & Electric Company ("SDG&E") and requestor. SDG&E hereby
acknowledges that it is permissibly self -insured by the State of California and that the following
programs are in full force and effect:
Type of Insurance
Type of Policy
Policy Period
Commercial General Liability
Self -Insured
Continuous
Automobile Liability
Self -Insured
Continuous
Workers' Compensation
Self -Insured
Continuous
Any claims resulting from our operations may be referred to:
San Diego Gas & Electric Company
Attention: Carl Villarreal, Claims Liability Management Manager
8315 Century Park Court
San Diego, CA 92123
Should you have any questions or require additional coverage information, please feel free to contact
me.
cc: L. Rios
By its duly authorized representative,
itie tii0L C. S
Melissa C. Schoening
Insurance & Risk Advisory Analyst
-14-
RESOLUTION NO. 2018 —
RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NATIONAL CITY
AUTHORIZING THE MAYOR TO EXECUTE TWO SEPARATE REAL PROPERTY
LICENSE AGREEMENTS WITH SAN DIEGO GAS & ELECTRIC COMPANY (SDG&E)
FOR THE INSTALLATION OF EIGHT ELECTRIC VEHICLE CHARGING STATIONS,
ASSOCIATED EQUIPMENT, AND INFRASTRUCTURE AT CITY HALL (LOCATED AT
1243 NATIONAL CITY BOULEVARD) AND FOUR ELECTRIC VEHICLE CHARGING
STATIONS, ASSOCIATED EQUIPMENT, AND INFRASTRUCTURE AT THE PUBLIC
WORKS YARD (LOCATED AT 1726 WILSON AVENUE) TO BE USED FOR CITY FLEET
VEHICLES AND CITY EMPLOYEES' PERSONAL VEHICLES, AT CITY EMPLOYEES'
OWN EXPENSE, AS PART OF SDG&E'S "POWER YOUR DRIVE" PROGRAM
WHEREAS, San Diego Gas & Electric Company (SDG&E) has approved the City
of National City's application for installation of eight (8) Electric Vehicle Charging Stations,
associated equipment, and infrastructure at City Hall, located at 1243 National City Boulevard,
to be used for City fleet vehicles and City employees' personal vehicles, at City employees' own
expense, as part of SDG&E's "Power Your Drive" Program (the "Program"); and
WHEREAS, four (4) Electric Vehicle Charging Stations, associated equipment,
and infrastructure were also approved and will be installed at the Public Works Yard, located at
1726 Wilson Avenue, to be used for City fleet vehicles and City employees' personal vehicles,
at City employees' own expense, as part the Program; and
WHEREAS, SDG&E will install the twelve (12) Electric Vehicle Charging
Stations, associated equipment, and infrastructure at no cost to the City, however, the City will
be responsible for electricity costs associated with Electric Vehicle charging activities; and
WHEREAS, the Project directly supports National City's Strategic Plan, General
Plan, and Climate Action Plan goals of pursuing green initiatives and building a sustainable city.
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of
National City hereby authorizes the Mayor to execute a Real Property License Agreement with
San Diego Gas & Electric Company (SDG&E) for the installation of eight (8) Electric Vehicle
Charging Stations, associated equipment, and infrastructure at City Hall, located at 1243
National City Boulevard, to be used for City fleet vehicles and employees' personal vehicles, at
City employees' own expense, as part of SDG&E's "Power Your Drive" Program.
BE IT FURTHER RESOLVED that the City Council of the City of National City
hereby authorizes the Mayor to execute a Real Property License Agreement with San Diego
Gas & Electric Company (SDG&E) for the installation of eight (8) Electric Vehicle Charging
Stations, associated equipment, and infrastructure of four (4) Electric Vehicle Charging Stations,
associated equipment, and infrastructure at the Public Works Yard, located at 1726 Wilson
Avenue, to be used for City fleet vehicles and employees' personal vehicles, at City employees'
own expense, as part of SDG&E's "Power Your Drive" Program.
[Signature Page to Follow]
Resolution No. 2018 —
Page Two
PASSED and ADOPTED this 20th day of March, 2018.
Ron Morrison, Mayor
ATTEST:
Michael R. Dalla, City Clerk
APPROVED AS TO FORM:
Angil P. Morris -Jones
City Attorney
CALIFORNIA «tr
N&TIO►NAL CITY
- INCO$POItATE�
The City of National City
MEMORANDUM
DATE: March 15, 2018
TO: Mayor and Council
FROM: Stephen Manganiello, City Engineer
SUBJECT: Revisions to March 20, 2018 City Council Meeting Agenda # 18
San Diego Gas & Electric revised the backup material to Agenda Item # 18 after the final agenda was
prepared.
The attached five pages should replace the first five pages immediately following the A200 in your
agenda book.
Stephen Manganiello
1243 National City Blvd; National City, California 91950
POWER YOUR DRIVE
-
Site Design Layout
For
City of National City
City Hall
WP170006
1243 National City Blvd., National City, CA 91950
Prepared for:
mg/
A 1Scmpra Fncrgy
Prepared by:
November 7, 2017
March 15, 2018 (Revision 1)
PROJECT LOCATION
Sap ileac
Nay No Nona
wilt(
Pef<for
Vicinity Map
Nation& City
Chula Vista
Location Map
Site Map
Existing Hand Hole
H1849073738
Proposed Meter
Location
Proposed Meter
Location
Proposed Area
for EV
improvements
Design Summary:
8 New EV Stalls
4 Stalls (Fleet), 3 Standard, 1 Van Accessible (unmarked)
(Fleet signage to be provided by the City)
0 Stalls Lost
5 New EV Chargers:
• Bollard Type SINGLE = 2, DUAL = 3
• Wall Mount SINGLE = 0, DUAL = 0
1 New 200 Amp Meter
1 New 150KVA, 208Y/120 Transformer
270'+/- Trenching
lueiic1woD va/
aJCW of paainbad
AeEaano 78 pu!.19
('A Awl)
i.puoal -%+.0E L
aacre.rlu3
`ouilsi�3
salami
dwv OOZ MaN
the1icisv ui .os)
11)110Il -/+,00f
0 =1501 S3JVdS 1\1101
aalinJ ala.ouoJ
a)e)daanoWad
Reconstruct Curb
Ftam )