HomeMy WebLinkAboutWhillock Contracting Inc. Paradise Creek Park Site Remediation and Improvements, CIP No. 18-07 - Change Orders #7 and 15 - 2019- CALIFORNIA -- NATIONAL Ciry INCORPORATED PARADISE CREEK PARK SITE REMEDIATION & IMPROVEMENTS CHANGE ORDER NO. 7 CIP NO. 18-07 July 23, 2019 Contractor: Whillock Contracting Inc. PO Box 2322 La Mesa, CA 91943 This Change Order modifies Contractor's and the City's obligations and rights under the abovementioned contract. This change order is not effective until approved by the City. Time adjustment: Zero (0) working days are added to contract time. Cost of Change Order: The City and the Contractor agree that the contractor shall clear and grub the slope $10,380.67 adjacent to the head wall on 22nd street at Paradise Creek, furnish and install fence posts, 8-foot wide galvanized double swing chin link gates and approximately 120 LF of galvanized chain link fence per attached SDRSD M-5, M-6, and M-20. The agreed upon price for clearing/grubbing, procuring and installing fence posts, gates and chain link fence is a total lump sum price of $10,380.67. Total Cost of Change Order $10,380.67 Iommended by Project Manager: Date: iZy1ri By signing this Change Order the Contra t r confirms that he/she is completely familiar with and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. The signer for the Contractor confirms that he/she is authorized to bind the Contractor to this Change Order. Date: 7 Z / �/ . / 9 Agreed and Accepted by Contractor: (Print Name and Title) Approved by City Engineer: i Date: 7 /zit i Approved by City Manager: (Required for change orders $25,000 and above) Date: CALIFORNIA -<+ INCORPORATED PARADISE CREEK PARK SITE REMEDIATION & IMPROVEMENTS CHANGE ORDER NO. 7 CIP NO. 18-07 DATE: July 16, 2019 WORK PERFORMED BY: Whillock Contracting DESCRIPTION OF WORK: Clearing and Grubbing of Slope between 22nd Street and Paradise Creek Procuring/Installing Chain link Gate, Fence Post & Approx. 120 LF of Chain Link Fence ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT LABOR Unit Qty Wage Total 1) 2) 3) Labor Driver Operator - PC88 HR HR HR 16.00 2.00 8.00 52.94 35.00 74.90 847.04 70.00 599.20 $ 1,516.24 Sub -Total Labor: Labor Burden (27.02%): Labor Markup (20%): TOTAL LABOR: $ 409.69 $ 385.19 $ 2,311.12 MATERIALS Unit Qty Rate Total 1) Dump Fees - Greens LS 1.00 250.00 250.00 $ 250.00 Sub -Total Materials: Taxes (8.5) Materials Markup (15%): TOTAL MATERIALS: $ 37.50 287.50 EQUIPMENT Unit Qty Rate Total 1) 2) Ten Wheeler PC88 HR HR 2.00 8.00 71.65 65.80 143.30 526.40 $ 669.70 $ 100.46 SUB TOTAL: $ 770.16 $ 3,368.78 SUBCONTRACTOR Unit Qty Rate Total 1) Legend Fence LS 1.00 6,678.00 Sub -total Subcontractor: Prime Contractor Markup (5%): 6,678.00 $ 6,678.00 $ 333.90 TOTAL SUBCONTRACTOR: $ 7,011.90 GRAND TOTAL: $ 10,380.67 Attachment B - Cost Breakdown Sub -Total Equipment: Equipment Markup (15%): TOTAL EQUIPMENT: CALIFORNIA NAMONAL CITY me,o o ATE PARADISE CREEK PARK SITE REMEDIATION & IMPROVEMENTS CHANGE ORDER NO. 7 CIP NO. 18-07 DATE: July 16, 2019 WORK PERFORMED BY: Whillock Contracting DESCRIPTION OF WORK: Clearing and Grubbing of Slope between 22nd Street and Paradise Creek Procuring/Installing Chain link Gate, Fence Post & Approx. 120 LF of Chain Link Fence ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT LABOR 1) Labor Unit HR Qty 16.00 Wage 52.94 Total 847.04 2) Driver HR 2.00 35.00 70.00 3) Operator - PC88 HR 8.00 74.90 599.20 Sub -Total Labor: Labor Burden (27.02%): Labor Markup (20%): TOTAL LABOR: $ 409.69 $ 385.19 $ 2,311.12 MATERIALS Unit Qty Rate Total Dump Fees Greens LS 1.00 250.00 250.00 Sub -Total Materials: Taxes (8.5) Materials Markup (15%): TOTAL MATERIALS: $ 37.50 EQUIPMENT Unit Qty Rate Total 1) 2) Ten Wheeler PC88 HR HR 2.00 8.00 71.65 65.80 143.30 526.40 Sub -Total Equipment: Equipment Markup (15%): TOTAL EQUIPMENT: $ 669.70 $ 100.46 SUB TOTAL: $ 287.50 770.16 $ 3,368.78 SUBCONTRACTOR Unit Qty Rate Total 1) Legend Fence LS 1.00 6,678.00 6,678.00 Sub -total Subcontractor: Prime Contractor Markup (5%): $ 6,678.00 $ 333.90 TOTAL SUBCONTRACTOR: $ 7,011.90 GRAND TOTAL: $ 250.00 $ 1,516.24 Attachment B - Cost Breakdown 3559 Vista Ave. Lemon Grove, CA 91945 (619) 282-6000 fax (619) 282-6001 TO: Whillock Contracting ATTN. Chris Moore (619)985-8437 Cell (619)579-0700 Office (619)579-0955 Fax chris a(..whillockcontractinq.com PROJ: 22nd and Wilson Ave National City CA 91950 California License # 787570 Class C-13, Exp. 11/30/18 DBE #238990 SBE # 61382 MBE # 238990 D.I.R. # 1000001232 EXP. 6/30/19 DATE: 7/10/2019 Legend Fence, a non -signatory company, proposes to furnish and install the following items. Please note exclusions. Our standard insurance is $ 2 million aggregate, $ 1 million auto and worker's compensation. SCOPE OF WORK Provide Material & Labor to Install the Following: 1) Install 115' of 6'H Galvanized Chain Link Fence (approx. 56' of fence to be installed on top of existing concrete wall) 2) Install 107' of 6'H Galvanized Chain Link Fence 3) Install (1) 6'h X 8'W Custom Galvanized Double Swing Chain Link Gates at center of existing concrete wall 4) Core drill to install (6) posts, the rest to be set in ground Material Specifications: • 72" 9GA (2" Mesh) KT Chain Link Fabric • 1 5/8" Top Rail SCH40 • 1 7/8" Line Posts SCH40 • 2 3/8" Terminal Posts SCH40 • 6' Tension Bars • 9GA Tension Wire • Concrete and Hardware Total Price: $3,700.00 (Labor) Total Price: $2,978.00 (Material) Total Price: $6,678.00 Sample Fence and Design - Exclusions: Unless Otherwise Specified in Scope of Work * Grading, staking * Rental fence * Knox boxes, locks * Clearing * Handrails * Marking or repair of * Grounding * Bollards underground utilities * Bonds, permits * Signage * Any and all electrical * Removal of Existing Fence - * Metal embeds * Mow strips or other concrete flatwork other than postholes * Panic hardware (supply or install) Addenda Noted: We will try to match customers requested design as close as possible. PREVAILING WAGES DOES NOT APPLY This job is bid with 1 mobilization. Additional mobilizations will be charged at $750.00 each. Due to volatility in the steel industry this quotation is only good for 7 days. Please call me with any questions. Ramiro Rodriguez / Project Manager / / Cell: (619) 867-5920 ramiro@legendfencecorp.com Page 1 of 2 Signature of Approval Date Distance between gate posts is gate length shown on plans Fittings Repeat opposite side « — S re Bar Gate Frame Length of gate leaf Truss Intermediate Rods Member Truss Rods Post Top Gate Post !♦♦i♦:'♦♦i♦i♦i♦i��iiii ':"♦iiioi.rii:•! •urj% ♦�♦�♦� ♦♦♦♦i♦v♦♦♦♦i�'♦♦ii�;•ii♦iiii4'i♦i♦ 0.4*•.. ►♦i♦i♦i♦•!♦♦i♦i♦�'�i♦i♦i♦i�:�;♦♦i♦i♦i!o''♦♦i♦i♦ ';04 �•- ♦♦♦♦♦�G'♦♦♦♦♦♦♦♦♦iT0a��♦♦♦♦♦♦♦♦♦♦♦♦�i�'♦♦♦♦♦♦♦♦♦�S�� �♦♦jai ♦ ♦ ♦ ♦♦♦♦♦���#♦♦♦4♦♦♦♦�i Galy. Chain —link, * ,„i Fastener ♦♦��♦,0♦♦♦ ♦♦��� 2 ♦��♦ ♦♦♦♦♦♦♦♦ •••••♦♦♦♦♦♦♦0_ 4T06 _4 mesh, 9 ga. ����A.MI\ ♦4./1 Plunger Bar Gate Stop Same as fence height Roadway or ground 10" diameter stop footing Omit if roadway is concrete HALF ELEVATION DOUBLE SWING GATE NOTES 1. All footings shall be 520—C-2500 concrete. 2. The following items shall be furnished and installed only when shown on the plans and/or called for in the special provisions: a. Barbed wire b. Extension post 3. Chain link fence shall conform to Section 206-6 of the Standard Specification for Public Works Construction unless specifically noted on this drawing. Truss Panel Lock type fork latch EXTENSION POST AND BARBED WIRE CDiameter of footing = 4 times outside diameter of post. /Clear opening shown on plans. 3' to 6' I Gate Post 2" Tie fabric top and frame with 11 gage wire. 12" min. dia. WALK GATE 3/8" dia. tension rod & tightener for gates over 3'. LEGEND ON PLANS —.--co. .0. Revision By Approved Date ORIGINAL A.Kercheval 12/75 SAN DIEGO REGIONAL STANDARD DRAWING Delete Metric D. Gerschoffer 05/12 Reviewed D. Gerschoffer 12/15 Reviewed D. Gerschoffer 10/18 CHAIN LINK GATE RECOMMENDED BY THE SAN DIEGO REGIONAL STANDARDS COMMITTEE vo/2s/zof Cha)erson R.C.E. 19246 Date DRAWING NUMBER M-05 Line Post 10' max. Footing 2" 10' max. Line post with gals. cap xxxxx ►_� e� w • Iv. Chain —link 2" mesh P�.'i �.'i' Remiorcl n I enslon wire 'i'i'i'i'i •'i'i'i'i'i'i'i.':'!'i'i'i Crown for drainage Ground Line Depth = 2'-6" for fence height of 5' or under. Depth = 3'-0" far fence height of over 5'. NOTES 1. All footings shall be 520—C-2500 concrete. 2. The following items shall be fumished and installed only when shown on the plans and/or called for in the special provisions. a. Barbed Wire b. Extension Arm c. Top Horizontal Rail 3. Chain link fence shall conform to Section 206-6 of the Standard Specifications for Public Works Construction unless specifically noted on this drawing. 4. See Standard Drawing M-20 for additional details. Diameter of footing = 4 times outside diameter of post. Corner or End Post — Fastener zrnvriw» Footing L 2" EXTENSION ARM AND BARBED WIRE LEGEND ON PLANS O x x x O Revision By Approved Date ORIGINAL A.Kercheval 12/75 SAN DIEGO REGIONAL STANDARD DRAWING Delete Metric D. Gerschoffer 05/12 Reviewed D. Gerschoffer 12/15 Reviewed D. Gerschoffer 10/18 CHAIN LINK FENCE RECOMMENDED BY THE SAN DIEGO REGIONAL STANDARDS COMMITTEE Cha)rp'erson R.C.E. 19246 Dote 10�25/'oit DRAWING M - 06 NUMBER Line Post END AND CORNER POST ASSEMBLY Horizontal brace with truss rod may be used as an alternate to a diagonal brace. Diagonal Brace Tension Wires Line posts at 1000'max. intervals braced and trussed in both directions. Gate post Horizontal brace with 3/8* steel truss rods. LINE POST BRACING Gate Length as specified 8' Max. Vertical Gate panel stay Portland cement concrete 10' gailw Tension Wires Portland cement concrete 1' Latch post Diagonal brace or horizontal brace with truss rods 2' Clr. GATE ASSEMBLY 10' Revision ORIGINAL Revised By Approved Kercheval D. Gerschoffer Date 12/75 09/15 Reviewed D. Gerschoffer 10/18 SAN DIEGO REGIONAL STANDARD DRAWING CHAIN LINK FENCE DETAILS RECOMMENDED BY THE SAN DIEGO REGIONAL STANDARDS COMMITTEE Chay�erson R.C.E. 19246 Date 10�15/1018 DRAWING M-20 NUMBER ad By. Stave Dodge August SURVEYOR: NV5 INC. CONSTRUCTION RECORDS 0 w 0 0 10 0 0 0 48 m h N Of 1p N W S OI a 0 O U TI LI TYIJEPAB_TMEN TS 10 N ELECTRIC, MIKE WONG AT&T SUBSTRUCTURES, FRED KRUSE SWEETWATER AUTHORITY, FRANCISCO MONTIJO 0 3 W a 3 0 a ENGINEERING DEPARTMENT 0 5 a ` J 1 0 N. IT DIAL 1 `0A7 AOfIKINi BEFORE /IOAYS BEFORE YOU DIG ty� YOU DIG TOLL FREE 1-800-227-2600 A PUBUC SERVICE BY UNDERGROUND SERVICE ALERT �?6 } WILSON AVE GRAPHIC 2� 40 SCALE 1.= 20' \22n SEE SHEET 17 rf = i41&.. Att mmillfgaw v / w�11 ► �'��1i7iii��,�� ore fence posts into ex sting headwall as needed. Install approximately 120 LF f SDRSD M-6 6' tall chain T. \ \ \ link fence. o � Asph. / Perimeter Fencing Exhibit DECLARATION OF RESPONSIBLE CHARGE I HEREBY DE0ARF TINT I AM TIE O101EFT OF WORK FOR THIS PROJECT, THAT I HAVE EXERCISED RESPONSIBLE CHARGE OVER THE DESIGN OF THIS PROJECT AS DEFIED N SECTION 6703 OF TIE BUSINESS AND PNOFFSLONAL CODE, AND TNT TIE DESIGN 5 CONSISTENT KITH CURRENT STANDARDS. I UNDERSTAND THAT THE CHEEK OF THESE PROJECT DRAWINGS NO TIONAL CM IS CONFINED SPECIFICATIONS ONLY MO DOGES ND RELEVE ME AS ENGINEER OF BORN OF MY RESPONSIBUTIES FOR THE PROJECT DESIGN. 0 PARADISE CREEK PARK SITE REMEDNTION AND IMPROVEMENTS, CIP No. 18-07 IMPACTED SOIL GRADING. SOUTH Wll OF NATIONAL Cll l ON BEHALF Of THE are OF RATgWL CITY, AS THE D6IGNEE a THE CRY ENGINEER, I HAVE REVIEWED THESE PLAN AND BY SIGNING BELOW HAVE OEIERNINED 1I1AT THESE PANS ARE CONSISTENT rani PREYNUNC ENGINFFOIIC 061CN STANDARDS AND PRINCIPLES ORDINARILY EXERCISED BY PROFESSKINAL ENGINEERS PRACTICING UNDER SIMILAR CIRCUMSTANCES. ROBERTD YNQ FCC 56792 DEPOT CITY 0ONEER 0 GICERI1G AND RINK WPM DOE PROJECT N0. CP N0. 18-07 SIEEr 18 OF 34 STEETS PROJECT PROFESSIONALS CORPORATION CHANGE ORDER MEMORANDUM July 23, 2019 To: Stephen Manganiello Director of Engineering & Public Works/City Engineer Engineering and Public Works Department City of National City From: Alex Preciado Project Manager Project Professionals Corp Project: Paradise Creek Park Site Remediation & Improvements CIP No.: 18-07 Subject: Change Order No. 7 Change Order No. 13 Summary: 1. Clear and grub in its entirety the adjacent slope between 22"d street and Paradise Creek. 2. Furnish and install fence posts along existing concrete wall and bottom of slope between 22"d street and Paradise Creek. 3. Furnish and install approximately 120 LF of 6' tall Galvanized Chain Link Fence per SDRSD M-6 & M-20. 4. Furnish and install one (1) 6' high x 8' wide galvanized double swing chain link gates per SDRSD M-5. Supporting Information: Existing conditions along Paradise Creek, adjacent to 22nd street, allow for pedestrians to enter sensitive wildlife areas. Initial design had this area to be fenced off in the follow-on park improvements project. To benefit from the mobilized contractor on site and to minimize the disturbance of the creek and adjacent wildlife areas, it was determined to install approximately 120 linear feet of 6 foot tall chain link fence and an 8 foot wide gate at the bottom of the slope between 22"d street and Paradise Creek during this phase of construction. The chain link fence will serve as a protective barrier for the creek and the 8 foot wide gate will be used by City crews to access the creek for future maintenance. Attachment A — Chain Link Fence Exhibit Attachment B — Cost Breakdown Attachment C — San Diego Regional Standard Drawings (M-5, M-6 & M-20) Time Adjustment: No additional days are to be added to the contract time. Cost Adjustment: Clearing and grubbing, the procurement/installation of 6-foot tall Galvanized Chain Link Fence and procurement/installation of 6-foot tall x 8-foot wide galvanized double swing chain link gate are captured under an agreed lump sum price of $10,380.67. The pay method and amount have been reviewed by the Construction Manager and Inspector and are considered fair and reasonable. ct Manager Date �-- CALIFORNIA —� NATIONAL CITY �1.3:3 INCORPORATED PARADISE CREEK PARK SITE REMEDIATION & IMPROVEMENTS CHANGE ORDER NO. 15 CIP NO. 18-07 Contractor: Whitlock Contracting Inc. PO Box 2322 La Mesa, CA 91943 July 1, 2019 This Change Order modifies Contractor's and the City's obligations and rights under the abovementioned contract. This change order is not effective until approved by the City. Time adjustment: Zero (0) working days are added to contract time for the additional survey and staking for the connector path and stairway. Cost of Change Order: The City and the Contractor agree that the contractor shall perform additional surveying and staking for the connector path from Harding Ave. to W. 19th Street and stairway at Harding Ave. The agreed upon price for the additional surveying and staking is a total lump sum price of $1,018.50. $1,018.50 Total Cost of Change Order $1,018.50 recommended by Project Manager: Date: -118 , .4 By signing this Change Order the Contraor confirms that he/she is completely familiar with and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. The signer for the Contractor confirms that he/she is authorized to bind the Contractor to this Change Order. Agreed and Accepted by Con or: Date: 7 , -3, 17 (Print Name and Title) Approved by City Engineer: Date: 7 zS--1 q Approved by City Manager: (Required for change orders $25,000 and above) Date: CALIFORNIA -� NATIONAL CITY INCORPORATE PARADISE CREEK PARK SITE REMEDIATION & IMPROVEMENTS CHANGE ORDER NO. 15 CIP NO. 18-07 DATE: July 1, 2019 WORK PERFORMED BY: Whillock Contracting DESCRIPTION OF WORK: Additional Surveying & Staking for Connector Path & Stairway ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT Unit Qty Wage Total Sub -Total Labor: Labor Burden (27.02%): Labor Markup (20%): $ TOTAL LABOR: Unit Qty Rate Total Sub -Total Materials: - Taxes (8.5) - Materials Markup (15%): - TOTAL MATERIALS: $ $ $ EQUIPMENT Unit Qty Rate Total Sub -Total Equipment: - Equipment Markup (15%): - TOTAL EQUIPMENT: $ SUB TOTAL: SUBCONTRACTOR Unit Qty Rate Total 1) Acculine Survey Inc. LS 1.00 970.00 970.00 Sub -total Subcontractor: Prime Contractor Markup (5%): $ 970.00 $ 48.50 TOTAL SUBCONTRACTOR: 1,018.50 GRAND TOTAL: PROJECT PROFESSIONALS CORPORATION TRANSMITTAL COVER To: National City Engineering Department Project Name: Paradise Creek Park Phase III CIP No.: 18-07 ITEMS DELIVERED: Change Order #7 Change Order #15 Delivered by: AL,=>,R Received by: Date: roject Professionals Corporation PROJECT PROFESSIONALS CORPORATION CHANGE ORDER MEMORANDUM July 23, 2019 To: Stephen Manganiello Director of Engineering & Public Works/City Engineer Engineering and Public Works Department City of National City From: Alex Preciado Project Manager Project Professionals Corp Project: Paradise Creek Park Site Remediation & Improvements CIP No.: 18-07 Subject: Change Order No. 15 Change Order No. 15 provides for: The additional surveying and staking for the connector path from Harding Ave to W. 19`h Street and stairway at Harding Ave. Supporting Information: Initial scope of work for the future park and street improvements included surveying and staking to prepare the site for the follow on park development project. To further facilitate the follow on park development project, additional surveying for the connector path and stairway were added to this contract. Attachment A — Additional Surveying Proposal Time Adjustment: It is recommended that 0 working days be added to the contract time. Cost Adjustment: The additional surveying and staking will be captured under a lump sum price of $1,018.50. The pay method and amount have been reviewed by the Construction Manager and are considered fair and reasonable. Pro e.J anager Date CITY OF NATIONAL CITY Office of the City Clerk 1243 National City Blvd., National City, California 91950-4397 619-336-4228 Michael R. Dalla, CMC - City Clerk WHILLOCK CONTRACTING Paradise Creek Park Site Remediation & Improvements, CIP No. 18-07 Change Orders #7 and #15 Judith Hernandez (Engineering/Public Works) forwarded copies of the Change Orders to Whillock Contracting.