Loading...
HomeMy WebLinkAbout2019 CON HMS Construction - Highland Avenue Traffic Signal Modifications, CIP No. 18-03 - Change Order #6HIGHLAND AVENUE TRAFFIC SIGNAL MODIFICATIONS (HSIP) CHANGE ORDER NO. 6 CIP NO. 18-03 Contractor: HMS Construction, Inc. 2885 Scott St. Vista, CA 92081 May 24, 2019 This Change Order modifies the Contractor's and the City's obligations and rights under the abovementioned contract. This change order is not effective until approved by the City. Time adjustment: Two (2) working days are added to contract time due to unforeseen delays for the delivery of and installation of twenty (20) load switches. Cost of Change Order: The City and the Contractor agree that the Contractor shall install the additional twenty (20) load switches in traffic signal cabinets that were not included in the original set of plans as referenced in RFI #15. The agreed upon price for all labor, materials, equipment, and appurtenances associated with this work is $1,617.80. n • $1,617.80 Recommended by Project Manager: _—\4..\'- £,/Date: C. >Z4. 20IR' By signing this Change Order the Contractor confirr>✓s negotiated its price, terms and conditions. If this Change equipment, materials and labor necessary to provide stated herein. Contractor confirms that the price is fair the work, including but not limited to all equipment, insurance, profit, etc. and that there will be no further original contract documents are incorporated herein. authorized to bind the Contractor to this Change Order. that he/s is completely familiar with and has fairly Order is approved, Contractor will provide all of the a complete work as described above at that the price and complete and represents all costs associated with materials, labor, supervision, overhead, fees, bonds, compensation. All of the terms and conditions of the The signer for the Contractor confirms that he/she is Agreed and Accepted by Contract r: (Print Name and Title) Sharon High Corporal% Secratary‘ Date: j� Q 0f \ r. — Approved by City Enginee%y J� / Date: 7I4 let Approved by City y Manager: (Required for change orders $25,000 and above) Date: C PROJECT PROFESSIONALS CCRPOR.ITIO`. CHANGE ORDER MEMORANDUM May 24, 2019 To: Stephen Manganiello Director of Engineering & Public Works/City Engineer Engineering and Public Works Department City of National City From: Vinnie Aguelo Project Manager Project Professionals Corp Project: Highland Avenue Traffic Signal Modifications CIP No.: 18-03 Subject: Change Order No. 6 Change Order No. 6 provides for: The installation of additional (20) load switches in traffic signal cabinets at various locations Supporting Information: As per RFI #15, all traffic signal gears and supplies provided and listed in Construction Note #1. During the installation of controllers in the cabinets, it was observed that load switches were missing because it was not listed in the construction note. The designer reviewed and provided a direction to quantify the number of load switches and proceed with the installation. The Contractor identified that twenty (20) additional load switches will need to be installed. Time Adjustment: It is recommended that two (2) working days be added to the contract time. Cost Adjustment: The total cost for installing the twenty (20) additional Toad switches is $1,617.80 I TI Crj CY Fri Iu PROJECT PROFESSIONALS CORPORATION TRANSMITTAL COVER To: National City Engineering Department Project Name: Highland Ave. Traffic Signal Modifications CIP No. 18-03 ITEMS DELIVERED: Change Order No. 6 Delivered by: Pro ect Professionals Cor.oration Received by: Date: CITY OF NATIONAL CITY Office of the City Clerk 1243 National City Blvd., National City, California 91950-4397 619-336-4228 Michael R. Dalla, CMC - City Clerk HMS CONSTRUCTION Change Order #6 Highland Avenue Traffic Signal Modifications (HSIP), CIP No. 18-03 Judith Hernandez (Engineering/Public Works) forwarded a copy of the Change Order to HMS Construction.