Loading...
HomeMy WebLinkAbout2019 CON Portillo Concrete - Harbison Avenue Road Diet CIP No. 18-17 - Change Order #6Harbison Road Diet CIP No: 18-17 Contractor: Portillo Concrete, Inc. CHANGE ORDER NO. 6 August 2, 2019 Reason/Purpose for this Change Order: The city has directed the contractor to install one additional pedestrian barricade and modify the mounts for two pedestrian barricades. The City of National City and Contractor agree to the following change to the original Contract: The contractor was directed to install one additional pedestrian barricade at the southeast corner of 2nd and Harbison. The contractor was also directed to modify the two pedestrian mounts originally called out on the plans on the west side or Harbison and 2nd All barricades shall be installed per Caltrans Std. ES-7Q Type I Detail C modified. All work was performed for the total lump sum price listed below. Original Contract Amount Net change by previously authorized Change Orders Subtotal Amount of this change order New contract amount Wor ng days added: a 0 Wor in days subtracted: 0 $ 290,575.00 51,218.82 341,793.82 2,310.00 $ 344,103.82 Percent change in Contract to date 18.42% Sub i ed by.: Proj ct Mana r 5 5 - / Date 3-1 City Project Manager Date roved by: City gineer Date City Manager, required for Change Orders>$24,999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. (2 originals: 1 for City Clerk, 1 for Contractor) Accepted and agreed to by Portillo Concrete, Inc. Name: rh 16 O',2-1cp Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 P11 PORTILLO CONCRETE INC 3527 CITRUS ST, LEMON GROVE, CA. 91945 OFFICE: (619) 466-4639 FAX: (619) 466-4685 PROJECT: National City Harbison Ave Road Diet Request for Change Order Date: Subcontractor: Description / Reason for Change: 7/30/19 Statewide Due to the installation of a one directional ramp on the SE corner of 2 nd street we need to dircet pedetrain traffic to continue North and South only. This also means we need to block pedestrains from trying to walk from East and West at such location. Description T&M # Price Change 2 signs to - ES-7Q Barricades - 1 - Add ES-7Q with signage $2,200.00 PCI Mark Up Change Order Total 5% $110.00 Origional Contract Amount Previous Change Order Amount Subtotal $ 290,575.00 $ 51,218.82 $ 341,793.82 Statewide Stripes, Inc. P.O. Box 600710 San Diego, CA 92160-0710 858.560.6887 858.560.0158 fax Tax ID #33-0915254 Class: C32 SLBE# 10SS0008 MB/SB# 40421 DBE# 32232 PW Contractors Reg# 1000001334 Customer Info ESTIMATING DEPARTMENT CA Lie. #788286 Since 1990 Signatory Local 1184 PROJECT REP TERMS ES-7Q Barricades Added AJO 30 Days Net ESTIMATE DATE 7/26/2019 NO. 18268 QTY DESCRIPTION 2 1 Change Two Signs to ES-7Q Barricades Add ES-7Q with signage on East Corner of Harbinson and E 2nd street Includes: Items listed, Prevailing wages, Coring Excludes: TOTAL $2, 200.00 EXCLUDE: Adjust Cancellation Clause @ $250.00 ea Cert., Additional Insured Endorsements on Auto Liability @ $75.00 ea., bonds, notary services, night work, prevailing wages (unless included above), flashing beacon assemblies, mast arm signs. Not responsible for A.D.A. Compliance. Items not specifically included are excluded and require an Additional Bid. Acceptance of Estimate and Agreement. The undersigned hereby contracts for the services noted above and agrees to pay for the services upon completion and receipt of an invoice. The undersigned agrees to pay reasonable attorney's fees and costs if incurred in the enforcement of this contract. STATEWIDE STRIPES, INC. REQUIRES TWO WEEKS ADVANCE WRITTEN NOTICE PRIOR TO SCHEDULING. STATEWIDE STRIPES WILL NOT BE RESPONSIBLE FOR LIQUIDATED DAMAGES UNLESS MUTUALLY AGREED TO IN WRITING Co. Name: By: (Print Name and Title) Date: Signature: CITY OF NATIONAL CITY Office of the City Clerk 1243 National City Blvd., National City, California 91950-4397 619-336-4228 Michael R. Dalla, CMC - City Clerk PORTILLO CONCRETE, INC. Harbison Road Diet, CIP No. 18-17 Change Order #6 Judith Hernandez (Engineering/Public Works) forwarded a copy of the Change Order to Portillo Concrete, Inc.