Loading...
HomeMy WebLinkAboutWhillock Contracting Inc. Paradise Creek Park Site Remediation and Improvements, CIP No. 18-07 - Change Orders #17 and #18 - 2019CHANGE ORDER MEMORANDUM August 26, 2019 To: Stephen Manganiello Director of Engineering & Public Works/City Engineer Engineering and Public Works Department City of National City From: Alex Preciado Project Manager Project Professionals Corp Project: Paradise Creek Park Site Remediation & Improvements CIP No.: 18-07 Subject: Change Order No. 17 Change Order No. 17 provides for: The application of Hydroseed to approximately 2,000 square feet of existing slope between 22nd street and Paradise Creek. Supporting Information: Change Order #7 approved clearing and grubbing of the existing slope between 22"d Street and Paradise Creek. To meet all current project erosion control plans, all existing slopes that are disturbed or changed by construction activities, are to be stabilized to minimize erosion by water and wind. Applying a hydroseed mix to the existing slope will protect the slope and minimize future City maintenance. Time Adjustment: It is recommended that 0 working days be added to the contract time. Cost Adjustment: The efforts to stabilize the existing slope are to be captured under an agreed lump sum price of $892.50. The pay method and amount have been reviewed by the Construction Manager and are considered fair and reasonable. 0-- CALIFORNIA -� NATIONAL Cm 13 3 L INCORPORATED PARADISE CREEK PARK SITE REMEDIATION & IMPROVEMENTS CHANGE ORDER NO. 17 CIP NO. 18-07 Contractor: Whillock Contracting Inc. PO Box 2322 La Mesa, CA 91943 August 26, 2019 This Change Order modifies Contractor's and the City's obligations and rights under the abovementioned contract. This change order is not effective until approved by the City. Time adjustment: Zero (0) working days are added to contract time for stabilizing existing slope at existing creek headwall with Hydroseed. Cost of Change Order: The City and the Contractor agree that the contractor shall stabilize approximately 2,000 square feet of slope at the existing creek headwall with Coastal Sage Scrub Hydroseed Mix. The agreed upon price for the stabilization of approximately 2,000 square feet of slope is a total lump sum of $892.50. $892.50 Total Cost of Change Order $892.50 Recommended by Project Manager: ir� / Date: &/28,/9 By signing this Change Order the Contra Igor confirms that he/she is completely familiar with and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. The signer for the Contractor confirms that he/she is authorized to bind the Contractor to this Change Order. Agreed and Accepted by Contr •7 (Print Name and Title) Date: // Z / ' / /p, Approved by City Engineer Date: j 128' )1 Approved by City Manage : (Required for change orders $25,000 and above) 74$�/7 Date: acific Rim Hydroseedin ]nc 28319 Valley Center Rd. Valley Center, CA 92082 760-751-7055 760-751-7385 Fax 760-638-6227 Don's Cell / 760-638-6217 Cory's Cell teresa.pacificrim@yahoo.com CA Lie. #886257 CA SB Cert #1211120 ARB Certified D1R Reg #1000006248 Bid Proposal Date Proposal # 8/15/2019 4504 Cust. P.O. # Whillock Contracting Inc. PO Box 2322 La Mesa, CA 91943-2322 Customer Phone 619-579-0700 Customer Fax 619-579-0955 Description Qty Rate Total Square Foot Coverage Paradise Creek National City, CA Mulch 1400 Ibs/acre Grow Power Plus with Mycro and Soil penetrant 400 Ibs/acre Binder 80 Ibs/acre Coastal Sage Scrub Mix Bid considers 1 move -in, additional at $650.00 Bid considers prevailing wages Bid considers 2.5" water source at site 2,000 0.425 850.00 �t- PrtuIQ�C Bid includes all equipment, labor & listed materials. Bid does not include preparation or maintenance. Bid does not guarantee germination or growth. Bid considers no retention Bid considers standard insurance requirements, additional insurance requirements will result in additional cost. Waiver of subrogation will result in additional cost. Agreed to and Accepted in its Entirety by: Date: PROJECT PROFESSIO LS CORPORATION TRANSMITTAL COVER To: National City Engineering Department Project Name: Paradise Creek Park Phase III CIP No.: 18-07 ITEMS DELIVERED: Change Order #17 Delivered by: Received by: Date: ect Professionals Cor Vtoks-kry oration )12,9, 11 ri PROJECT PROFESSIO ALS CORPORATION CHANGE ORDER MEMORANDUM August 2, 2019 To: Stephen Manganiello Director of Engineering & Public Works/City Engineer Engineering and Public Works Department City of National City From: Alex Preciado Project Manager Project Professionals Corp Project: Paradise Creek Park Site Remediation & Improvements CIP No.: 18-07 Subject: Change Order No. 18 Change Order No. 18 provides for: The grouting of Gabion Wall baskets. Supporting Information: The double tier (multi -row) Gabion Wall section has a row of baskets approximately 130 linear feet in length that rests a foot below the finish surface. The finish surface will be used as a future multi -use access path for City emergency vehicles, City maintenance trucks and pedestrian traffic. This original detail would not allow for the subgrade and finish surface to meet compaction requirements which can cause cracking and other surface failures throughout time. To meet compaction requirements and minimize City maintenance of the multi -use path, pouring slurry in the Gabion baskets was determined to be a proper solution to support the base and surface of the access path. Attachment A — T&M Breakdown Time Adjustment: It is recommended that 0 working days be added to the contract time. Cost Adjustment: The City and the Contractor agreed that this work shall proceed under Time and Materials. Analysis of this work by the Construction Manager determined that the cost for this work shall not exceed $2,100. Upon completion, the Time and Materials total amount associated with this work is $2,055.56. The pay method and amount have been reviewed by the Construction Manager and are considered fair and reasonable. Project Manager Date CALIFORNIA NATIONAL C9TI� 1NCORPORAT£D PARADISE CREEK PARK SITE REMEDIATION & IMPROVEMENTS CHANGE ORDER NO. 18 CIP NO. 18-07 Contractor: Whillock Contracting Inc. PO Box 2322 La Mesa, CA 91943 August 15, 2019 This Change Order modifies Contractor's and the City's obligations and rights under the abovementioned contract. This change order is not effective until approved by the City. Time adjustment: Zero (0) working days are added to contract time for the grouting of Gabion Baskets. Cost of Change Order: The City and the Contractor agree that all work associated with grouting the Gabion Baskets will be captured under the agreed time and material costs of $2,055.56. $2,055.56 Total Cost of Change Order $2,055.56 Recommended by Project Manager: ibiv Date: g/� By signing this Change Order the Con actor confirms that he/she is completely familiar with and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. The signer for the Contractor confirms that he/she is authorized to bind the Contractor to this Change Order. Agreed and Accepted by Contractor (Print Name and Title) Date: �/` S/% Approved by City Engineer: 2 Date: ' fr4 (1 Approved by City Manager: (Required for change orders $25,000 and above) ?Ad/7 Date: + CA F0RN A' NA'i.'IQNAL, Cflry V.131 _.• INCORPORATED PARADISE CREEK PARK SITE REMEDIATION & IMPROVEMENTS CHANGE ORDER NO. 18 CIP NO. 18-07 DATE: August 5, 2019 WORK PERFORMED BY: Whillock Contracting DESCRIPTION OF WORK: Grout Gabion Baskets ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT Unit Qty Wage Total 1) Stewart Grieser HR 1.00 52.94 52.94 2) Polo Vasquez HR 1.00 52.94 52.94 3) Ricardo Marquez HR 1.00 52.94 52.94 4) Nahim Flores HR 1.00 52.94 52.94 5) Aaron Ryales HR 1.00 52.94 52.94 6) Ryan Mchale HR 1.00 52.94 52.94 Sub -Total Labor: Labor Burden (27.02%): Labor Markup (20%): TOTAL LABOR: $ 317.64 $ 85.83 $ 80.69 Unit Qty Rate Total 1) 2 Sack Slurry YDS 10.00 101.90 1,019.00 1) SRM Environmental Fee LS 1.00 40.00 40.00 1) SRM Public Works Fee LS 1.00 200.00 200.00 Sub -Total Materials: Taxes (8.5) Materials Markup (15%): TOTAL MATERIALS: $ 1,259.00 107.43 $ 204.97 EQUIPMENT Unit Qty Rate Total Sub -Total Equipment: Equipment Markup (15%): TOTAL EQUIPMENT: $ SUB TOTAL: 1,571.40 $ 2,055.56 SUBCONTRACTOR Unit Qty Rate Total Sub -total Subcontractor: Prime Contractor Markup (5%): $ TOTAL SUBCONTRACTOR: $ GRAND TOTAL: 2,055,56 • 914 --INVOICE iNIPMa WHILL010 08/05/2019 65653 1 liMag\FML\‘ LI AUG 12 2019 v SUPERIOR READY MIX = --CONCRETE,-L.P. 1508 W. MISSION RD.' ESCONDIDO, CA 92029 PHONE (760) 746-0556' FAX: (760) 740-9557 WHILLOCK CONTRACTING INC P 0 BOX 2322 LA MESA, CA 91943-2322 SWC �$x'i: :Ti4 T'%:`�ewl e ffy+�+1;"f1x"x,A� TERMS NET 30 DAYS A FINANCE CHARGE WILL BE IMPOSED ON PAST DUE ACCOUNTS. THE FINANCE CHAROE IS COMPUTED BY A PERIODIC RATE OF 1 1/2% PER MONTH. WHICH IS AN ANNUAL PERCENTAGE RATE OF 16%OR A MINIMUM SERVICE CHARGE OF i6.O0 WHICHEVER IS GREATER. 000190 (1537) PARADISE CREEK PARK WILSON AVE. & 20TH ST. NATIONAL CITY t 0 08/05/19 10.00 CY CS-2 101.900 78.97 2 SK SANDSLURRY 1.00 LD EE 40.000 3.10 ENVIRONMENTAL/ENERGY SUR 1.00 LD PWF 200.000 15.50 PUBLIC WORKS FEE TICKET DATE TOTALS: 1259.00 97.57 JOB TOTALS 1259.00 97.57 TICKETS: 017-49405 1097.97 43.10 215.50 1356.57 1356.57 PROJECT PROFESSI❑ LS CORPORATION TRANSMITTAL COVER To: National City Engineering Department Project Name: Paradise Creek Park Phase III CIP No.: 18-07 ITEMS DELIVERED: Change Order #18 Delivered by: Am.._ex2a roject Professionals Corporation Received by: Date: N. CITY OF NATIONAL CITY Office of the City Clerk 1243 National City Blvd., National City, California 91950-4397 619-336-4228 Michael R. Dalla, CMC - City Clerk WHILLOCK CONTRACTING, INC. Paradise Creek Park Site Remediation & Improvements, CIP No. 18-07 Change Orders #17 and #18 Judith Hernandez (Engineering/Public Works) forwarded a copy of the Change Orders to Whillock Contracting, Inc.