Loading...
HomeMy WebLinkAbout2019 CON HMS Construction - Highland Avenue Traffic Signal Modifications, CIP No. 18-03 - Change Order #7PROJECT PROFESSIONALS CORPORATION CHANGE ORDER MEMORANDUM August 12, 2019 To: Stephen Manganiello Director of Engineering & Public Works/City Engineer Engineering and Public Works Department City of National City From: Vinnie Aguelo Project Manager Project Professionals Corp Project: Highland Avenue Traffic Signal Modifications CIP No.: 18-03 Subject: Change Order No. 7 RECEIVED ENG 8 Find DEPT. 2019 SEP 12 P 3: 10 CITY OF NATIONAL CITY Change Order No. 7 provides for: The installation of additional (2) additional adjustable vertical brackets at Highland Ave and 16th to meet MUTCD traffic signal height standards. Supporting Information: The plans do not show or specify the tenon bracket that is required to install the signal heads to the traffic signal mast arm. The original approved tenon bracket for the signal heads are fixed causing the signal heads to be at the height of 15' which does not meet the standard height per MUTCD standard. The design engineer noted that two (2) signal heads at Highland Ave and 16th St were lower than the height set by MUTCD and would need to be replaced. The engineer specified that an adjustable vertical brackets were to be used instead of the original fixed brackets. Time Adjustment: It is recommended that ten (10) working days be added to the contract time. Cost Adjustment: The total cost for installing the two (2) additional adjustable vertical brackets are $3,099.48 Project Man e. l 7- . 2.ol q Date HIGHLAND AVENUE TRAFFIC SIGNAL MODIFICATIONS (HSIP) CHANGE ORDER NO. 7 CIP NO. 18-03 August 12, 2019 Contractor: HMS Construction, Inc. 2885 Scott St. Vista, CA 92081 This Change Order modifies the Contractor's and the City's obligations and rights under the abovementioned contract. This change order is not effective until approved by the City. Time adjustment: Ten (10) working days are added to contract time due to unforeseen delays for the delivery of and installation of two (2) additional adjustable vertical brackets. Cost of Change Order: The City and the Contractor agree that the Contractor shall install two (2) additional adjustable Pelco AS-0187 vertical brackets to connect the traffic signal heads to the mast arms. The contractor shall replace the previously installed fixed bracket as specified by the engineer. An adjustable vertical bracket is required to meet the MUTCD standard height of 17' instead of its current height of 15'. The agreed upon price for all labor, materials, equipment, and appurtenances associated with this work is $3,099.48 Recommended by Project Manager: , t V-<___TV- Date: $.IZ . 2.0101 By signing this Change Order the Contractor confirms at he/she is completely familiar with and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. The sig r for the Contractor confirms that he/she is authorized to bind the Contractor to this Change Order. Agreed and Accepted by Contractor: (Print Name and Title) Michael C. High, President Date: 9/3/19 Approved by City Engineer: 2,`? Date: ,,4/r l /........2„, Approved by City Manager: (Required for change orders $25,000 and above) Date: CALIFORNIA 1 'ION Ek.ara Cflr C IATED Highland Ave. Traffic Signal Modifications CHANGE ORDER NO. 7 CIP NO. 18-03 DATE: 8/ 12/ 19 WORK PERFORMED BY: HMS DESCRIPTION OF WORK: Installation of the two (2) adjustable vertical bracket at Highland Ave and 16th St. Electrician ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT Unit HR Wage Total 60.00 960.00 Sub -Total Labor: $ 960.00 Labor Markup (20%): 192.00 TOTAL LABOR: 16.00 EQUIPMENT Unit Qty Rate Total 1) Bucket Truck HR 16.00 57.67 922.72 $ 922.72 $ 138.41 $ 1,061.13 Unit Qty Rate Total 1) I Pelco AS-0187 1 EA 2.00 356.00 712.00 Sub -Total Equipment: Sales Tax: Equipment Markup (15%): $ 712.00 $ 58.74 115.61 TOTAL EQUIPMENT: Sub -Total Equipment: Equipment Markup (15%): TOTAL EQUIPMENT: Qty 7CEIVED P` / DEPT. .,EP t2 P 3:09 CHIIUIV ' ► ; OF NATIONAL CITY TRANSMITTAL COVER To: National City Engineering Department Project Name: Highland Ave. Traffic Signal Modifications CIP No. 18-03 ITEMS DELIVERED: Change Order No. 7 Delivered by: VLttIt\ 1E-, AWELO Project Professionals Corporation Received by: Date: rail0`"" 'i CITY OF NATIONAL CITY Office of the City Clerk 1243 National City Blvd., National City, California 91950-4397 619-336-4228 Michael R. Dalla, CMC - City Clerk HMS Construction, INC. Highland Avenue Traffic Signal Modifications (HSIP), CIP No. 18-03 Change Order #7 Judith Hernandez (Engineering/Public Works) forwarded a copy of the Change Order to HMS Construction, Inc.