Euclid Bicycle and Pedestrian Enhancements
CIP No: 18-10
Contractor: Portillo Concrete, Inc.
CHANGE ORDER NO. 3
October 21, 2019
Reason/Purpose for this Change Order:
The city has directed the contractor to pothole additional unknown utilities.
The City of National City and .Contractor agree to the following change to the original Contract:
The contractor was directed to pothole additional unknown utilities not shown on the plans. All worked was
performed on a T&M basis and includes full compensation of all related work performed for the total price
listed below.
Original Contract Amount $ 4,060,691.00
Net change by previously authorized Change Orders
Subtotal
Amount of this change order
46, 700.00
4,107,391.00
4,056.72
New contract amount $ 4,111,447.72
Working days added: 0
Working days subtracted: 0
Percent change in Contract to date 1.25%
Su mi d by:
roj ct Mana
r
robLii.
Date
kyoin
City oje t nager Datl
lAp ovedby:
Cit Engineer
Date
City Manager, required for Chane Orders >$24,999 Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly
negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and
labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the
price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor,
supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions
of the original contract documents are incorporated herein. (2 originals: 1 for City Clerk, 1 for Contractor)
Accepted and reed to by Portillo Concrete, Inc.
Date
Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the
contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect
your claim.
Originals: City Clerk, Contractor
cc: Engineering project file, Project Manager
1243 National City Boulevard, National City, CA 91950
Telephone (619) 336-4380
Pill
RTLLO
CONCRETE INC
3527 CITRUS ST, LEMON GROVE, CA. 91945
OFFICE: (619) 466-4639 FAX: (619) 466-4685
National City - Euclid Ave Bicycle and Pedestrian Enhancement
Request for Change Order
Date:
Subcontractor:
Description / Reason for Change:
10/3/19
Select Electric
Pothole 2 foundations for traffic signal per plan sheet 48-D, Pole A and B
Description
T&M #
Price
Additional Potholing - 9.11.19
1
$3,863.54
PCI Mark Up
Change Order Total
5% $193.18
Origional Contract Amount
Previous Change Order Amount
Subtotal
$ 4,060,691.00
$ 46,700.00
$ 4,107,391.00
DAILY EXTRA WORK REPORT
Sub: SELECT EMI: 1.0 Job: 3454 $3,863.54
City Of National City
C ritraatorJob: 3454 - National City Euclid Ave Bike Path
Work Performed BY Select Electric, Inc. (For Portillo Concrete, Inc.)
Description of Work Pothole, 2 Foundations For Traffic Signal Plan Sheet 48-D, Pole A And B
Contract: 18-10
Ticket No. 393AA3
❑ Signed
Change Order
Blllng Number
Report Date
Perform Date
901
1.0
9/19/2019
9/11/2019.
Labor Charges
Craft ID Employee Name
1-01 LBR T Ortega
RT Hre OT Hra Subs Unite RT Rate OT Rate Subs Rate Extended
8.00
60.940
487.520
tm LBR AA Galdean Aleman
8.00
59.990
479.920
Les ELC
P Gamez
104 LBR
IT Ortega
8.00
59.990
479.920
8.00
37.110
296.880
Equipment Charges
Equipment 1D Class
Make Model Al A2
RT Hra OT Hre
RT Rate OT Rate Delay Factor Extended
Eat 041404 TRUCK T&TT 12-20
8.00
38.380
307.040
Eez 040701 TRUCK T&TT 12-20
8.00
38.380
307.040
ECG 083740 TRUON TRUN 2AXL
8.00
52.550
420.400
Labor Charges
RT Labor 1, 744.24
174.42
0.00
SC 10.00%
OT Labor
Subtotal Labor
Subsistence
Other Expenses
MU 20.00%
Labor Total
1,918.66
0.00
0.00
383.73
2,302.39
E04 160001 AIRCP PORT 016-025
8.00
20.190
161.520
EDS 160201 AIRCP PORT 016-025
8.00
20.190
161.520
Equipment Charges
Subtotal 1,357.52
Mu 15.0O% 203.14
Equipment Total 1,561.15
Material Charges
Activity Total
3,863.54
Work Total
9,863.54
Bill Subtotal
3,863.54
n New Bill
1 l ResubmIttal
For Oerner/Realdent E
nApproved for Payment
nReturned for Correction
Inesis Use Only
Date of Action:
Date Received:
Customer.
Dole:
Date:
NTS UMversat BM Form
Bit Totes +
Page 1
3,863.54
% ww.ewbas.com
Billing Status Report
Select Electric, Inc.
Change Order Detail - Job 3454
All Billings - Contract:18-10
DATES LAST PAYMENT DI7lPOSITION VARIANCE
Billing Perform Report Submit Number Period Billed Paid Balance Pending Disputed Wrltsolf AftBIIINo Company
901 • RFC 1- Windsor Heights Apts & Euclid Ave
1.0 F 9/11/19 9/19/19 P 3,883.54-3,863.54 -3,863.54 SELECT
[393AASJ Pothole, 2 Foundatlons For Traffic Signal Plan Sheet 48-D, Pogo A And B
901 3,883.54
-3.863.54-3,863.54
FA: 3,863.54
Grand Totals 3,883.54
Total Budget for CCOs with Billings: FA: 3,863.54
LS:
UP:
-3,863.54 -3,883.54
Aging Summary of Unpaid Balances: Current 31-60 Days 61-90 Days Over 90 Days
0.00 0.00 0.00 0.00
9/25/2019 9:44AM
Copyright 1996-2019. Nice Touch Solutions, Inc. Page 1
SELECT
BLR.CTRtC.1&C.
Serial No. 4249:
Extra Work Tentative Agreement
JOB NAME:
LOCATION:
Description of Work Performed (be detailed):
DATE:
JOB NO.:
Work Force Names
Hours
SIT
o/T
DIT
Equipment Type
Hours
Subcontractor Names
Hours
Company
Ticket No.
Description
.Equipment Rental Company
Hours
Company
Ticket No.
Description,
Materials - Description & Quantity
(Invoices are required for ALL materials used on Extra Work, not from stock.)
Invoice No.
Signatures:
Representative Name:
Select Electric, Inc.
.Representative Name (Pritlt):
Contractor Name (Print):
Extra Work Tentative Agreement
SELECT 002200 / 002200 - TRAFFIC SIGNAL EQUIPMENT
tisttrtrc
Job Name: 3454 - EUCLID AVE BIKE & PED
Location: Windsor heiohts ants and Euclid avenue
Description of Work pothole. 2 foundations for traffic sional plan sheet 48-D. Pole A and B.
Performed (be detailed):
Work Force
Work Force Names
TOMAS ORTEGA
Astolfo A Gaidean Aleman
PABLO GAMEZ
Irvin Thomas Ortega
Pav Tvps Hours
R 8.00
R 8.00
R 8.00
R 8.00
Ilidnizokaatcf
Equipment Two
Serial No: 393AA3
Dispute: No
Date: 08/11/Z019
Job #:
fauioment
Durpfon
Subcontractor Names HMI Comoenv Ticket Descriotion
Fouloment Rental Comoenv:
faults -mist Rental Co
Duration Company Ticket Description
Materials - Description & Quantity (invoices are required for ALL materials used on Extra Work not from stock)
Materials
UoM QL Invoice No. Packing Slip No.
Additional Notes:
Signatures:
Representative Name. TOMAS ORTEGA
Select Electric, Inc.
Portlilo
Representative Name (Print):
Contractor Name (Print):
Euclid Bicycle and Pedestrian Enhancements
CIP No: 18-10
Contractor: Portillo Concrete, Inc.
CHANGE ORDER NO. 4
November 1, 2019
Reason/Purpose for this Change Order:
The city has directed the contractor to switch the originally specified 110V LED pedestrian crossing system to
a 12V battery back-up system and relocate two existing LED signs.
The City of National City and Contractor agree to the following change to the original Contract:
The contractor was directed to switch from the originally specified 110V LED pedestrian crossing system to a
12V battery back-up system typical of all other locations within the city. The 12V system utilizes 2 LED signs
and one battery back-up box at each location. The contractor will also relocate two existing school crossing
LED signs from Plaza and switch with two of the new pedestrian crossing signs at 22nd. All worked includes
all necessary labor, equipment and material necessary and will be performed for the total lump sum price
listed below including the contractor's 5% mark-up.
Original Contract Amount
Net change by previously authorized Change Orders
Subtotal
Amount of this change order
New contract amount
Working days added: 0
Working days subtracted: 0
$ 4,060,691.00
50,756.72
4,111,447.72
12,195.95 CA
$ 4,123,643.67 t0/tq
Percent change in Contract to date 1.55%
S .• .:r•dby:
Proj
lC — 5 I.7
t Mana•er Date
City Pr ct
tilt,
a ger Dte
1
17
..
oved by
_ . a i AT/1
Cit nglneer Date
C't
City Manager, required for Change Orders >$24,99e Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly
negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and
labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the
price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor,
supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions
of the original contract documents are in . p gated herein. (2 originals: 1 for City Clerk, 1 for Contractor)
rtilInc.
Accepted and d to by P
Name:
Date
Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the
contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect
your claim.
Originals: City Clerk, Contractor
cc: Engineering project file, Project Manager
1243 National City Boulevard, National City, CA 91950
Telephone (619) 336-4380
PORT'LLO
CONCRETE INC
3527 CITRUS ST, LEMON GROVE, CA. 91945
OFFICE: (619) 466-4639 FAX: (619) 466-4685
National City - Euclid Ave Bicycle and Pedestrian Enhancement
Request for Change Order
Date:
Subcontractor:
Description / Reason for Change:
10/31/19
Select Electric
(2) LGS Solar Powered Controllers w/ Battery and Solar Panel
(4) LGS W 11-2 LED Enhanced Signs 36x36
(4) W16-7p Signs 12x24
(4) ADA 2" PPB w/ LED Placard
- Relocate/Swap 2 new signs at 22nd with 2 existing signs at the mid -block on Plaza
Description
T&M #
Price
Bid Item #52 — Price Increase for Solar Option_Rev 1
1
$11,615.19
PCI Mark Up
Change Order Total
5% $580.76
Origional Contract Amount
Previous Change Order Amount
Subtotal
$ 4,060,691.00
$ 50,756.72
$ 4,111,447.72
44,
SELECT
ELECTRIC
Change Order Request Proposal
Date: October31, 2019 COR:
Job No.:
TBD
3454
Project Name: Euclid Avenue Bicycle and Pedestrian Enhancements (National City CIP No. 18-10)
To: Michelle Nguyen
Reference: Bid Item #52 — Price Increase for Solar Option_Rev 1
To Whom It Concerns,
Select Electric, Inc. is pleased to provide this Cost Proposal described below:
Scope of Work Under this Change:
Bid Item #52 — Price Increase for Solar Option_Rev 1
(2) LGS Solar Powered Controllers w/ Battery and Solar Panel
(4) LGS W11-2 LED Enhanced Signs 36x36
(4) W16-7p Signs 12x24
(4) ADA 2" PPB w/ LED Placard
- Relocate/Swap 2 new signs at 22nd with 2 existing signs at the mid -block on Plaza
$11,615.19
Quoting as National City's typical spec - single sided system not back-to-back as shown on the plans. Manufacturer has concerns
about the power draw on the solar system. If National City wants to proceed with the back-to-back set up, system may be able to
work depending on the sun exposure and how much use the system will get. This will incur additional cost for the signs.
Exclusions:
All exclusions listed in the original contract
Paving and restoration
Price Quotation and Time Requirements
SEI proposes to perform the above -described extra work on the following basis:
® Lump Sum Price of Eleven Thousand Six -Hundred Fifteen Dollars and Nineteen cents
❑ Hourly Rate for Labor and Equipment as listed in the "Scope" Section.
performance of this extra work will require a time extension of TBD Calendar Days.
We appreciate your consideration and, should you have any questions or comments, please contact the undersigned. Work can not
start until a written acceptance of this proposal is received.
Sincerely,
Kyle M. Grijalva
Select Electric Inc.
Please Note: The price quoted is based on work being performed under normal conditions including reasonable access to the work. The proposed price does not include extra costs
for performance of work out of sequence, schedule delays, acceleration, extended overhead, or any other impacts caused by the cumulative effect of changes on original contract
work. Select Electric Inc. hereby reserves all rights to re-evaluate its costs and seek equitable adjustment should it become evident that costs have been impacted by any of the
above causes. Should it be impractical to determine any time impacts at the time of submittal of this Proposal, Select Electric Inc. reserves its rights to seek appropriate time
extensions should it become evident at a later date that this extra work contributed to project schedule delays.
CITY OF NATIONAL CITY
Office of the City Clerk
1243 National City Blvd., National City, California 91950-4397
619-336-4228
Michael R. Dalla, CMC - City Clerk
PORTILLO CONCRETE, INC.
Euclid Bicycle and Pedestrian Enhancements, CIP No. 18-10
Change Orders #3 and #4
Judith Hernandez (Engineering/Public Works) forwarded a copy of the
Change Orders to Portillo Concrete, Inc.