HomeMy WebLinkAbout2019 CON Dick Miller - Paradise Creek Water Quality and Community Enhancements, CIP No. 18-11 - Change Order #1lTI Paradise Creek WQ&C Enh. CIP No: 18-11 Contractor: Dick Miller Inc. CHANGE ORDER NO. 1 November 12, 2019 Reason/Purpose for this Change Order: The city has directed the contractor to excavate and construct a 12" thick aggregate base access road in lieu of the dirt access road shown on the project plans. The City of National City and Contractor agree to the following change to the original Contract. The contractor has been directed to excavate and remove a 12' wide by 9" section of subgrade and place a 12' wide by 12" section of aggregate base with tapered edges for the length of the access road shown on the plans. All work including all labor, equipment and export of subgrade material will be performed for the lump sum price listed below. Original Contract Amount $ 1,010,101.01 Net change by previously authorized Change Orders Subtotal Amount of this change order New contract amount Working days added: 0 Working days subtracted: 0 1,010,101.01 39,460.00 $ 1,049,561.01 Percent change in Contract to date 3.91 % Subm,;ttQd by: .. roje a _ r / ///i /, Date ' City ,•je M alter r r i(111 Date povedby: 2, Cit ngineer , Date City Ma , require or ange Orders >$24,999 D e By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. (2 originals: 1 for City Clerk, 1 for Contractor) Accepted and agreed to by (DMI): .....l.7..1ii►.....eat.,,. Name: Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager to./ l3 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 "A �' GENERAL a +t - 1- .,. ENGINEERING CONTRACTOR DMI 930 Boardwalk, Suite H, San Marcos, CA 92078 Phone 760-471-6842 FAX 760-471-6178 Contractor's State License No. 380204, A, B, C-12 - DVBE / SBE #53651 DMI RFCO NO. 001 ROAD PARADISE WATER IMPROVEMENT ACCESS Proposal Submitted To: ICCS, LLC Phone: 951-532-6483 Fax: Date Submitted: 10123119 Street: PO BOX 6211 Job Name: PARADISE CREEK WATER IMPROVEMENT Date Work Performed: City, State and Zip Code: NORCO, CA. 92860 Job Location PARADISE CREEK AVE NATIONAL CITY Attention: SEAN GILL Architect: Plan Sheets: E-Mail: sgill(a)iccsinc.net Spec Section: N/A Addendas Noted: N/A ITEM DESCRIPTION ESTIMATED QUANTITIES UNIT MEASURE UNIT PRICE TOTAL RFCO ACCESS ROAD 1 EXCAVATION & EXPORT FOR ROADWAY CONSTRUCTION 9" DEPTH 183.00 CY $75,00 $13,725.00 2 REMOVE AND REPLACE DRIVEWAY APPROCH WITH SDRSD G-14D 1.00 EA $6,600.00 $6,600.00 3 PROVIDE & INSTALL 12" VIRGIN CL II BASE 445.00 TN $43.00 $19,135.00 TOTAL AMOUNT OF PROPOSAL $39,460.00 GENERAL EXCLUSIONS: 1. BONDS & PERMITS, OR RELATED COSTS ABOVE ITEMS, COMPLETE, IN -PLACE, PER PLANS & SPECS 2. TESTING, LAB FEES, INSPECTIONS AND MIX DESIGN COSTS 3. SURVEYING, STAKING, LAYOUT, ENGINEERING 4. SANITATION FACILITIES 5. TEMPORARY OR PERMANENT FENCING, PROTECTIVE BARRIERS OR SAFETY FENCING 6. WORK IN THE PUBLIC RIGHT-OF-WAY 7. UTILITY WORK AND/OR LOCATING OF EXISTING UTILITIES 8. REPAIR OR REPLACEMENT OF UNDOCUMENTED OR UNMARKED UNDERGROUND UTILITIES 9. CAPPING OF WELLS RFCO PARADISE CREEK WATER 1 of 2 11/1/2019 11:26 AM 10. NIGHT, WEEKEND, HOLIDAY OR OTHER OVERTIME WORK 11. DEMOLITION, DOWELLING, SAWCUTTING, CORING AND/OR PATCHING 12. ROCK EXCAVATION INCLUDING: BLASTING, BREAKING, RIPPING OR HANDLING OF MATERIALS THAT CANNOT BE PRODUCTIVELY MOVED OR RIPPED WITH A JOHN DEERE 310 BACKHOE 13. CONSTRUCTION WATER AND/OR METER (OWNER TO PROVIDE ON -SITE WATER SOURCE AT NO COST TO DMI) 14. DEWATERING, WATER DIVERSION OR PUMPING OF WATER 15. STORM WATER POLLUTION PREVENTION PLAN AND/OR IMPLEMENTATION OF SWPPP MEASURES 16. COMPACTION OVER 90% 17. IMPORT OR EXPORT OF SUBGRADE MATERIAL 18. SELECT BACKFILL MATERIAL, OTHER THAN OUTLINED IN JOB SPECIFICATIONS 19. BUTTRESS AND/OR STABILITY FILLS 20. SPECIAL HANDLING OR DRYING OF MATERIAL 21. HANDLING OR EXPORTING OF OTHER TRADES' SPOILS 22. SPECIAL SUBGRADE STABILIZATION 23. SHORING, FORMING, BRACING AND/OR TEMPLATES OF ANY KIND 24. HANDLING OR DISPOSING OF HAZARDOUS MATERIALS 25. CONCRETE WORK OR FLATWORK 26. PRECISE GRADING FOR CURBING, HARDSCAPE OR LANDSCAPED AREAS 27. WATERPROOFING 28. IRRIGATION SYSTEMS 29. LANDSCAPING OR SEEDING 30. ASPHALT PAVING WORK AND/OR ROCK BASE 31. TRASH CLEANUP OR REMOVAL 32. DEBRIS BOXES 33. ANY OFFSETS TO CONTRACT BILLINGS FOR JOINT CHECKS MADE BETWEEN SUBCONTRACTORS AND/OR SUPPLIERS. NOTES: 1. PRICES GOOD FOR WORK COMPLETED THROUGH 3/30/20. WORK COMPLETED AFTER 3/30/20 IS SUBJECT TO ADJUSTMENT FOR INCREASED COSTS OF LABOR, EQUIPMENT, TRUCKING AND/OR MATERIAL. 2. ALL PRICING BASED ON NORMAL 8 HOUR SHIFTS, BETWEEN 7 AM AND 5 PM, MONDAY-FRIDAY. NO NIGHT, WEEKEND OR HOLIDAY WORK. 3. PRICES ARE BASED ON ALL ITEMS OF WORK BEING PERFORMED. ANY DELETIONS OF SCOPE MAY RESULT IN PRICE ADJUSTMENTS. 4. IF A LETTER OF SUBROGATION IS REQUIRED, A 2% PREMIUM WILL BE ADDED TO THE TOTAL CONTRACT PRICE. 2. ALL PRICING BASED ON NORMAL 8 HOUR SHIFTS, BETWEEN 7 AM AND 5 PM, MONDAY-FRIDAY. NO NIGHT, WEEKEND OR HOLIDAY WORK. 3. PRICES ARE BASED ON ALL ITEMS OF WORK BEING PERFORMED. ANY DELETIONS OF SCOPE MAY RESULT IN PRICE ADJUSTMENTS. 4. IF A LETTER OF SUBROGATION IS REQUIRED, A 2% PREMIUM WILL BE ADDED TO THE TOTAL CONTRACT PRICE. 5. IF PAYMENT & PERFORMANCE BONDS ARE REQUIRED, ADD AT 2% OF CONTRACT PRICE. DMI IS A CERTIFIED DVBE I SDVOSB / SB I SLBE, NONUNION COMPANY 1. Terms: Payment upon completion unless otherwise noted. 2. DMI will not be liable for delays due to fires, floods, accidents, strikes or any other cause beyond its control. 3. Buyer agrees to pay court costs and reasonable attomey's fees in the event of default, if this contract is turned over to an attomey for enforcement or collection. All sums not paid when due shall thereafter bear interest at maximum interest allowed by law. 4. DMI will provide necessary Worker's Compensation, Public Liability and Property Damage Insurance. 5. This proposal shall be null and void if written acceptance and notice to proceed are not received within 30 days. 6. This proposal does not include engineering, inspection, permits or fees unless noted above. 7. Contractors are required by law to be licensed and regulated by the Contractors' State License Board, 1020 N Street, Sacramento, CA 95814. Acceptance of Proposal Please sign and retum one copy. This quotation constitutes the sole and only agreement. Any agreements, negotiations, etc., not set forth herein are of no force or effect. Date of Acceptance: Submitted for DMI BY: JOHN MARTINEZ Signature: RFC() PARADISE CREEK WATER 2 of 2 11 /1 /2019 11:26 AM CITY OF NATIONAL CITY Office of the City Clerk 1243 National City Blvd., National City, California 91950-4397 619-336-4228 Michael R. Dalla, CMC - City Clerk DICK MILLER Paradise Creek Water Quality and Community Enhancements, CIP No. 18-11 Judith Hernandez (Engineering/Public Works) forwarded a copy of the Change Order to Dick Miller.