Loading...
HomeMy WebLinkAbout2019 CON Portillo Concrete - Euclid Avenue Bicycle and Pedestrian Enhancements, CIP No. 18-10 - Change Order #5Euclid Bicycle and Pedestrian Enhancements CIP No: 18-10 Contractor: Portillo Concrete, Inc. CHANGE ORDER NO. 5 December 27, 2019 Reason/Purpose for this Change Order: The city has directed the contractor to modify the existing traffic signal head alignment with the new traffic lane locations on Euclid at 16th, 18th and 20th. The City of National City and Contractor agree to the following change to the original Contract: The contractor was directed to relocate the existing single through head at 16th S/B further east to be in the center of the single travel lane, move the left -turn signal head to be at the center of the left -turn lane, and plug and patch existing mount locations no longer needed. At 18th and 20th, the contractor was directed to remove the existing traffic signal heads closest to the left -turn signal head and plug and patch existing mount locations no longer needed. This work includes all necessary materials and labor and will be performed for the lump sum price listed below including the contractor's 5% mark-up. Original Contract Amount $ 4,060,691.00 Net change by previously authorized Change Orders Subtotal Amount of this change order 62,952.67 4,123,643.67 4,099.56 New contract amount $ 4,127,743.23 Working days added: 1 Working days subtracted: 0 Percent change in Contract to date 1.65% Sub .tted by: Proj Man er Date City Project Manager Date roved by: ............. Cit Engineer / /Z.3h A Date City Manager, required for ChangeOrders>$24,999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. (2 originals: 1 for City Clerk, 1 for Contractor) Accepted and agreed to by Portillo Concrete, Inc. 4WO Name: 'oC{n rAP Pnr1 \I Date `Ill/4 Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 PORTILLO CONCRETE INC 3527 CITRUS ST, LEMON GROVE, CA. 91945 OFFICE: (619) 466-4639 FAX: (619) 466-4685 National City - Euclid Ave Bicycle and Pedestrian Enhancement Request for Change Order Date: Subcontractor: Description / Reason for Change: 12/17/19 Select Engineering Inc.. 1) At 16th Street - Relocate the existing single through head further east to be on the center of the single travel lane. Move the left -turn signal head to be at the center of the left -turn lane. Plug and patch existing mount locations no longer needed. 2) At 18th Street and 20th Street - Remove existing traffic signal head closest to the left -turn signal head. Plug and patch existing mount locations no longer needed. Description T&M # Price 16th, 18th & 20th Traffic Signal Modifications - $ 3,904.34 PCI Mark Up Change Order Total 5% $195.22 Origional Contract Amount Previous Change Order Amount Subtotal $ 4,060,691.00 $ 93,858.62 $ 4,154,549.62 SELECT FIFCTRIC Change Order Request Proposal Date: 12/17/2019 COR: 3454.04 Job No.: 3454 Project Name: Euclid Avenue Bicycle and Pedestrian Enhancements (National City CIP No. 18-10) To: Michelle Nguyen Reference: RFCO 16'h 18th & 20th Traffic Signal Modifications per email 12/12/19 To Whom It Concerns, Select Electric, Inc. is pleased to provide this Cost Proposal described below: Scope of Work Under this Change: RFCO 16tn 18th & 20"' Traffic Signal Modifications 1) At 16'h Street - Relocate the existing single through head further east to be on the center of the single travel lane. Move the left -turn signal head to be at the center of the left -turn lane. Plug and patch existing mount locations no longer needed. 2) At 18'h Street and 20'n Street - Remove existing traffic signal head closest to the left -turn signal head. Plug and patch existing mount locations no longer needed. $3,904.34 Exclusions: All exclusions listed in the original contract Paving and restoration Price Quotation and Time Requirements SEI proposes to perform the above -described extra work on the following basis: ® Lump Sum Price of Three Thousand Nine -hundred Four Dollars and Thirty Four cents ❑ Hourly Rate for Labor and Equipment as listed in the "Scope" Section. performance of this extra work will require a time extension of 1 Calendar Days. We appreciate your consideration and, should you have any questions or comments, please contact the undersigned. Work can not start until a written acceptance of this proposal is received. Sincerely, Kyle M Grijalva Select Electric Inc. Please Note: The price quoted is based on work being performed under normal conditions including reasonable access to the work. The proposed price does not include extra costs for performance of work out of sequence, schedule delays, acceleration, extended overhead, or any other impacts caused by the cumulative effect of changes on original contract work. Select Electric Inc. hereby reserves all rights to re-evaluate its costs and seek equitable adjustment should it become evident that costs have been impacted by any of the above causes. Should it be impractical to determine any time impacts at the time of submittal of this Proposal, Select Electric Inc. reserves its rights to seek appropriate time extensions should it become evident at a later date that this extra work contributed to project schedule delays. CITY OF NATIONAL CITY Office of the City Clerk 1243 National City Blvd., National City, California 91950-4397 619-336-4228 Michael R. Dalla, CMC - City Clerk PORTILLO CONCRETE, INC. Euclid Bicycle and Pedestrian Enhancements, CIP No. 18-10 Change Order #5 Judith Hernandez (Engineering/Public Works) forwarded a copy of the Change Order to Portillo Concrete, Inc.