HomeMy WebLinkAbout2020 CON Portillo Concrete - Euclid Avenue Bicycle and Pedestrian Enhancements, CIP No. 18-10 - Change Order #6i t•e Euclid Bicycle and Pedestrian Enhancements CIP No: 18-10 Contractor: Portillo Concrete, Inc. CHANGE ORDER NO. 6 February 24, 2020 Reason/Purpose for this Change Order. The city has directed the contractor to remove and replace the existing catch basin frame and grate between 7th and 8th on Euclid. The City of National City and Contractor agree to the following change to the original Contract: The contractor was directed to remove the existing catch basin frame and grate between 7th and 8th on the east side of Euclid and install a new frame and grate per SDRSD D-13 and D-15. Once the frame and grate are removed, the contractor can break down the concrete 6" to 12". down into the existing and reconstruct as needed. All work will be performed for the total lump sum price listed below. Original Contract Amount $ 4,060,691.00 Net change by previously authorized Change Orders 67,052.23 Subtotal Amount of this change order New contract amount $ 4,133,284.38 Working days added: 0 4,127,743.23 5,541.15 (f I Z12640 Working days subtracted: 0 Percent change in Contract to date 1.79% Su ed by: Pro ect Man ger 2-ZS^ Date City jet nager Z-ZG'ioXe Date proved by: ...., ...... City er Z.DZ7/l0 Date City Manager, required for Change Orders >$24,999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. (2 originals: 1 for City Clerk, 1 for Contractor) Accepted and ..re-d to by Portillo Concrete, Inc. /iI /MO a�.as/i2 Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 # Equipment 1 Bobcat & Attachmts PORTILLO CONCRETE, INC. 3527CITRUS ST LEMON GROVE, CA. 91945 OFFICE 619.466.4639, FAX 619.466.4685 Hours Rate Extension 4 $87.00 $348.00 1 Ten Wheel 2 $40.00 $80.00 1 2.5 Ton Lumber Trk 4 $50.00 $200.00 2 1 Ton Tool Truck 4 $10.00 $80.00 Date 1/20/2020 Job Name Replace Inlet Job # General Portillo Concrete Inc. By Mario Portillo 1 Jumping Jack Roller 3-5 ton Skip Loader Saw Truck 2 $50.00 $100.00 Water Truck Roller 5-7 Ton Dirt Blawknox PF4410 Moves Materials: Superior Ready Mix (Concrete) Southbay Foundry Dump Fees $12.00 $0.00 $20.00 $0.00 $50.00 $0.00 SCOPE OF WORK: R/R frame and grate $60.00 $0.00 $80.00 $0.00 $110.00 $0.00 $350.00 $0.00 Yards LS Ea Qty. 4 1 1 Unit Price Extension $140.00 $560.00 $454.71 $454.71 $300.00 $300.00 $0.00 $0.00 $0.00 $0.00 Subcontractors: $0.00 $0.00 $0.00 $0.00 $0.00 Labor Hours Rate Extension Total Prime Labor Cost $2,583.36 SSHO/QCM/SUPT Total Prime Equip. Cost $808.00 $80.00 $0.00 Total Prime Mat. Cost $1,314.71 1 SSHO/QCM/SUPT 4 $80.00 $320.00 Total Sub Cost $0.00 2 Cement Mason - Reg - pour 8 $61.49 $983.84 Cement Mason - Reg - setup $79.42 $0.00 1 Laborer - Reg 8 $65.97 $527.76 Labor Mark Up - 20% $516.67 Laborer - Reg - cleanup $65.97 $0.00 Equip & Mat Mark Up 15% $318.41 1 Operator - Reg 4 $88.97 $355.88 Sub Mark Up - 5% $0.00 Operator - Roller $117.36 $0.00 2 Laborer - Reg (Saw Cut) 2 $65.97 $263.88 1 Teamster - Reg 2 $66.00 $132.00 CITY OF NATIONAL CITY Office of the City Clerk 1243 National City Blvd., National City, California 91950-4397 619-336-4228 Michael R. Dalla, CMC - City Clerk PORTILLO CONCRETE Euclid Bicycle and Pedestrian Enhancements, CIP No. 18-10 Judith Hernandez (Engineering/Public Works) forwarded a copy of the Change Order to Portillo Concrete.