HomeMy WebLinkAboutWhillock Contracting, Inc. Paradise Creek Park Site Remediation and Improvements, CIP No. 18-07 - Change Orders #26 and 27 - 2020IECIMEMEESIECIESISEEMEMEND CHANGE ORDER MEMORANDUM March 24, 2020 To: Stephen Manganiello Director of Engineering & Public Works/City Engineer Engineering and Public Works Department City of National City From: Alex Preciado Project Manager Project Professionals Corp Project: Paradise Creek Park Site Remediation & Improvements CIP No.: 18-07 Subject: Change Order No. 26 RECEIVED ENG & FTI DEPT. 10Z0 APR 2l P 2: 31 CITY OF NATIONAL CITY Change Order No. 26 provides for: The additional surveying, grading, benching, and compaction of a new 2:1 slope west of the community garden at Paradise Creek Park. Supporting Information: The current CIP No. 18-07 project plans identified the existing slope west of the community garden at Paradise Creek Park. The current conditions of the slope eroded and created an unstable slope to accommodate future improvements. The CIP No. 18-16 project plans identified this slope to have irrigation and landscape. However, there were no grading plans for this slope on either of the project plans. After review with the City and the Civil Engineer of Record, it was determined to stake the property line at the top of the slope and build a 2:1 slope. The grading and benching operations did not pass the property line and was all completed on the City's right of way. This new slope will support irrigation and landscaping and reduce future city maintenance on this slope. Time Adjustment: It is recommended that 10 working days be added to the contract time to accommodate the grading, benching and compaction of the new 2:1 slope west of the community garden at Paradise Creek Park. Cost Adjustment: All work associated with surveying, grading, benching and compaction of the new 2:1 slope west of the community garden at Paradise Creek Park was captured under a Time and Material basis. The total amount for labor, material, and equipment associated with this work is $24,519.17 4/20/20 Project Manger Date PARADISE CREEK PARK SITE REMEDIATION & IMPROVEMENTS CHANGE ORDER NO. 26 CIP NO. 18-07 March 24, 2020 Contractor: Whillock Contracting Inc. PO Box 2322 La Mesa, CA 91943 This Change Order modifies Contractor's and the City's obligations and rights under the abovementioned contract. This change order is not effective until approved by the City. Time adjustment: Ten (10) working days are added to contract time for the additional surveying, grading, benching and compaction of the new 2:1 slope west of the community garden at Paradise Creek Park. Cost of Change Order: The City and the Contractor agree that the Contractor shall proceed under a Time and Material Basis to perform the additional Surveying, grading, benching and compaction per the attached detail to build a new 2:1 slope west of the community garden at Paradise Creek Park to support future irrigation and landscaping improvements. The total amount for all labor, material and equipment associated with this work is $24,705.89. $24,705.89 Date: 4/20/20 Recommended by Project Manager: YL. - By signing this Change Order the Contractor confi s that he/she is completely familiar with and has fairly negotiated its price, terms and conditions. If this ange Order Is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. The signer for the Contractor confirms that he/she is authorized to bind the Contractor to this Change Order. Agreed and Accepted by Contractor: (Print Name and Title) �/�, Date: cL j7..y�‹) Approved by City Engineer: Date: [�/�o%uLo Approved by City Manager: (Required for change orders $25,000 and above) Date: PARADISE CREEK PARK SITE REMEDIATION & IMPROVEMENTS IP NO. 18-07 DATE: - WORK PERFORMED BY: Whtlbrk ConbaNno DESCRIPTION OF WORK: Bald dope SSleoent to Co rmmlty G rren Aar 47err ' CHANGE ORDER NO.26 ACCOUNT/NG FOR TIME, MATERIALS, AND EQUIPMENT imatamiumsani I) 2) 3) 4) 5). Operator-. Group 8 Operator- Group 6 Operator- Group 4 Labor Driver UnI HR HR HR HR HR Qtv . 2,00 29.50 29,50 76.00 19.00 • Wage • 75,23 • 75,12 74.90 • 54.113 35.00 Total 150.46 2.216.04' 2.209.55' 4,117.68 • 665.00 Sub-Tetaltabo, labor guidon (27.02%)r labor Markup (20%)r TOTAL LABOR; Total $ 9,358.73 $ '2,528,73 S 2 377.49 Unit QtV Rater Sub -Total Hatarlabr S Taus (LS). Materials Markup (15%)1 S . TOTAL MATERIALS, Unit Q1v . Rata Total 1) 2) 3) 5) PC 200 Excavator - WA 380 Leader Water Trull[ - PC 88 Excavator ' Laser ' 'HR HR HR ' HR DAY 2.00 29.50 38.50 8.00 2.00 85.90 134.24 51.92 • 65.80 171.80 3,960.08 • 1,998.92 526,40 80.00 7) PC 88 Excavator w/ Compactor. •HR 21:50 75.80 1,629.70 Sub -Tote Equipment Equipment Markup (16%p TOTAL EQUIPMENTs irannittl SUB TOTAL. $ 18,366.90 $ 1255.04 1) lAAcaline &mai M Unit Qty Rata Total IS 1.00 780.00 780.00 subtotilb btontrarkoil• S- . . Prime Co tractor Markup(5%)i 'S - 39.00 'TOTAL SUSCO/RRrIOTom VittiffigENI I GRAND TOTAL:' ' .. 4_24705.89 780.00 FILL SLOPE PROJECTED PLANE 1:1 (HORIZONTAL: VERTICAL) MAXIMUM FROM TOE OF SLOPE TO APPROVED GROUND EXISTING GROUND SURFACE 2 FEET MIN. LOWEST KEY DEPTH BENCH (KEY) FILL -OVER -OJT SLOPE EXISTING GROUND SURFACE CUT -OVER -FILL SLOPE • PROJECTED PLANE 1 TO 1 MAXIMUM FROM TOE OF SLOPE TO APPROVED GROUND BENCH LOWEST 2 FEET BENCH (KEY) MIN. KEY DEPTH REMOVE UNSUITABLE TBENCH HEIGHT MATERIAL (4 FEET TYPICAL) BENCH HEIGHT (4 FEET TYPICAL) REMOVE UNSUITABLE MATERIAL CUT FACE SHALL BE CONSTRUCTED PRIOR TO i FILL PLACEMENT TO ALLOW VIEWING „.// OF GEOLOGIC CONDITIONS OVERBUILD AND TRIM 'BACK DESIGN SLOPE j1 ' 2 FEET MIN.r LOWEST 15 FEET MIN.] • KEY DEPTH BENCH (KEY) / EXISIINC� , i�/ GROUND SURFACE „at f REMOVE UNSUITABLE ' MATERIAL BENCH HEIGHT (4 FEET TYPICAL) UT FACE SHALL BE CONSTRUCTED PRIOR TO FILL, PLACEMENT BENCHING SHALL BE DONE WHEN SLOPE'S ANGLE IS EQUAL TO OR GREATER THAN 5:1. MINIMUM BENCH HEIGHT SHALL BE 4 FEET AND MINIMUM FILL WIDTH SHALL BE 9 FEET. KEYING AND BENCHING GENERAL EARTHWORK AND GRADING SPECIFICATIONS STANDARD DETAIL A. V 5 i CHANGE ORDER MEMORANDUM April 6, 2020 To: Stephen Manganiello Director of Engineering & Public Works/City Engineer Engineering and Public Works Department City of National City From: Alex Preciado Project Manager Project Professionals Corp Project: Paradise Creek Park Site Remediation & Improvements CIP No.: 18-07 Subject: Change Order No. 27 RECEIVED ENG&P'^WDEPT. 1010 APR 211 P 2: 4 1 CITY OF NATIONAL CITY Change Order No. 27 provides for: The procuring and laying of sod to cover the extra 1,778 square footage of the bio retention basin. Supportinq Information: The original CIP No. 18-07 project plans identified the square footage of the proposed bio retention basin. This square footage measured 3,062 square feet. However, site layout and surveying confirmed the actual square footage of the bio retention basin was 4,840 square feet. To accommodate the extra 1,778 square feet of the bio retention basin, the project team agreed to lay additional sod in this area per the project specifications. This addition will allow for the bio retention to meet storm water requirements and minimize City maintenance. Time Adjustment: It is recommended that 1 working day be added to the contract time to procure and lay sod on the extra square footage of the bio retention basin. Cost Adjustment: All work associated with procuring and laying sod on the extra square footage of the bio retention basin was captured under an agreed lump sum price. The total amount for labor, material, and equipment associated with this woxk is $4,265.59. 4/20/20 Project Manager Date PARADISE CREEK PARK SITE REMEDIATION & IMPROVEMENTS CHANGE ORDER NO. 27 CIP NO. 18-07 April 6, 2020 Contractor: Whillock Contracting Inc. PO Box 2322 La Mesa, CA 91943 This Change Order modifies Contractor's and the City's obligations and rights under the abovementioned contract. This change order is not effective until approved by the City. Time adjustment: One (1) working days are added to contract time to procure and lay sod on the extra square footage of the bio retention basin. Cost of Change Order: The City and the Contractor agree that the Contractor shall proceed to procure and lay sod on the additional 1,778 square feet of the bio-retention basin. The sod that is to be laid at the bio retention basin shall be per the attached approved spec. The total amount for all labor, material and equipment associated with this work is $4,265.59. $4,265.59 Recommended by Project Manager: Date: 4/20/20 By signing this Change Order the Contractor confir/s that he/she is completely familiar with and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Contractor confirms that the price Is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, Insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. The signer for the Contractor confirms that he/she is authorized to bind the Contractor to this Change Order. Agreed and Accepted by Contract (Print Name and Title) 4)56_ Approved by City Engineer: Approved by City Manager: (Required for change orders $25,000 and above) Date: 1, /7_ try c� Date: tll3o fZo Lr Date: *- NAT .�, to y PARADISE CREEK PARK SITE REMEDIATION & IMPROVEMENTS CIP NO. 18-07 DATE: - CHANGE ORDER NO.21 WORK PERFORMED BY: Whitlock Contmttlno DESCRIPTION OF WORK: Additional sod at Bla Retention Bash ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT Unit QtY Rate Total 1) IIO Environmental LS 1.00 4,062.47 4,062.47 S 4.062.47 F 203.12 Sub -total S bcvntracton Prime Co tractor Markup (5v): ��yd� TOTAL SUBCONTRACTOR: 17g{� GRAND TOTAL: $ 4,265.59 r He in *r�o import: nt. pf actic.e o . I< rl� Capin �vtiith \Voter r isLrvativ.e plants; I c r rcc s, tfh saving Ia1hC 5C. J . _ oursos, rld'par <s . WEST COAST NATIVE BENTGRASS (Agrostis pallens) is a cool -season bentgrass, with a rich, deep green color, and it withstands light foot traffic. It requires half the water of customary turf and half the mowing and maintenance. Or it can be left to flop, creating the look of a natural, informal meadow. FEATURES AND BENEFITS Color > Rich deep green Texture > Medium leaf blade Performance > Withstands close mowing heights or can be left un-mowed > Thrives in both full sun and partial shade > Extremely drought tolerant > Excellent wear recovery Climate > Coastal and cooler climates Shade Tolerance > Partial shade Mowing > Can tolerate low mowing heights or left un-mowed Options > Available in regular 16" x 46" 8 sq. ft. or 24" x 60" 10 sq. ft. rolls, and 42" x 105" big rolls Native Grasses HILLSIDE NATIVE FINE FESCUE With minimal maintenance, this adaptable grass can be maintained as a lawn or left un-mowed. Perfect for natural landscapes, and slope stabilization. Similar to our traditional fine fescue, it is comprised of all adapted natives that have a deeper rootzone. This allows the plant to withstand longer durations of very little water, thus making it extremely drought tolerant. FEATURES AND BENEFITS Color > Rich deep green Texture > Fine Performance > Excellent cold tolerance > Slow growing, loose slim leafed blades > Consists of two native fine fescues Climate > Thrives in cool to warm climates USDA zones 3-8 (con't) NERI LANDSCAPE ARCHITECTURE Reviewed by: Jim Neri (NLA1 NO EXCEPTION TAKEN EXCEPTIONS AS NOTED x REVISE AND RESUBMIT Date: 1l9/19 Exceptions: 1. provide plan quantities WEST COAST %TURF Life is short. Sod it! westcoastturf-com Judith Hernandez From: Alex Preciado <alex@ppc-sd.com> Sent: Monday, April 20, 2020 12:00 PM To: Judith Hernandez Subject: Re: CIP No. 18-07 Paradise Creek Park - Change Orders Attachments: CCO #27 Signed.pdf; PPC final w-o line.tiff CAUTION: This email originated from outside your organization. Exercise caution when opening attachments or clicking links, especially from unknown senders. Judy, Here is another attached Change Order. Thank you! Alex Preciado, CMIT Construction Manager 4499 Ruffin Road, Suite 250 San Diego, CA 92123 Office 858.634.8180 Fax 858.634.8184 On Apr 20, 2020, at 11:53 AM, Alex Preciado <alex@ppc-sd.com> wrote: Hi Judy, Please see attached Change Order to be processed. Let me know if you have any questions. Thank you! Alex Preciado, CMIT Construction Manager 4499 Ruffin Road, Suite 250 San Diego, CA 92123 Office 858.634.8180 Fax 858.634.8184 <CCO #26 SIgned.pdts <PPC final w-o line.tiff> 1 CONTRACT TRANSMITTAL FORM (Attach as Cover Sheet to Documents dropped off to City Clerk's Office) Date: From (Dept.): C= n (t o Yt 05 Submitted by (First & Last Name): tJ U di tie Ana Vendor: /,,//o Ce./iA(a clia� Resolution: YES / NO 0 0 Resolution No. (if applicable): 2 3 4 Originals Provided to City Clerk (Select Quantity) 000 IY1. Department has Copy / Vendor has Copy / fiupTicate Urigtrrat, ar7