Loading...
HomeMy WebLinkAbout2020 CON Select Electric - Citywide Traffic Signal and ADA Improvements, CIP No. 18-05 - Change Order #7r C I-HLIJLL I I= CHANGE ORDER MEMORANDUM February 18, 2020 To: Stephen Manganiello Director of Engineering & Public Works/City Engineer Engineering and Public Works Department City of National City From: Alex Preciado Project Manager Project Professionals Corp Project: Citywide Signals & ADA Improvements CIP No.: 18-05 Subject: Change Order No. 7 RECEIVED ENG & PIN DEPT. 1010 APR - 4 A q: I b CITY OF NATIONAL CITY Change Order No. 7 provides for: The additional work to accommodate the revised grades at the SE corner of 2"d and Sweetwater. This additional work includes, demoing curb and gutter, grading and compacting class II base, setting forms, pouring concrete for sidewalk, ADA curb ramps, and colored bike path. Supporting Information: The contractor mobilized to 2'and Sweetwater and proceeded per plan to place curb/gutter and curb ramps per original plan. After this work was completed, the project team identified elevation differences between the existing asphalt section and the new curb gutter line. At this time, the design team was requested out to the field to visit and analyze the grades and elevation difference. It was determined that the grades could be raised and still allow adequate storm water drainage and have the sidewalks and ramps meet ADA requirements. A plan revision was issued, and the grades were raised. Raising the grades meant to demo the placed curb/gutter and curb ramps. Although new improvements had to be demoed, the new curb/gutter, curb ramps and sidewalk allowed for a reduction in existing asphalt repair limits because of the reduced elevation difference where the existing asphalt section met the new curb/gutter. This reduction gave a credit back to the City and limited future city maintenance. Attachment A — 2"d & Sweetwater Redesign Time Adjustment: Twenty -Five (25) working days are added to the contract time to capture all work described above. Cost Adjustment: All work was captured under a time and material basis. The agreed upon price for all associated work totals to $63,196.94. 3/31/2020 Proje Manager Date J NAT `.��.'e ' I at CITYWIDE SIGNALS & ADA IMPROVEMENTS (HSIP) CHANGE ORDER NO. 7 CIP NO. 18-07 February 18, 2020 Contractor: Select Electric 2790 Business Park Drive Vista, CA 92081 This Change Order modifies Contractor's and the City's obligations and rights under the abovementioned contract. This change order is not effective until approved by the City. Time adjustment: Twenty -Five (25) working days are added to contract time for demoing new placed curb and gutter, grading and compacting class II base, setting forms, pouring concrete for sidewalk, ADA curb ramps and colored bike path. Cost of Change Order: The City and the Contractor agree that the Contractor shall proceed under a Time and Material basis to accommodate the plan revision that raised the grades at the SE corner of 2nd and Sweetwater. The City and the Contractor agree that the Contractor shall proceed under a Time and Material basis to demo the newly placed curb and gutter and ADA curb ramps. The City and the Contractor agree that the Contractor shall proceed under a Time and Material basis to raise grades and compact class II base, set forms, pour concrete sidewalk and ADA ramps and colored bike path to meet revised grade elevations. All associated work, labor, equipment and materials required to complete this work totals to an agreed price of $63,196.94. $ 63,196.94 Total Cost of Change Order $ 63,196.94 Recommended by Project Manager: Date: 3/31/2020 By signing this Change Order the Contractor co firms that he/she is completely familiar with and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further c.. sensation. All of the terms and conditions of the original contract documents are incorporated her - . •igner for the Contractor confirms that he/she is authorized to bind the Contractor to .ng- •rd r. Agreed and Accepted by Contrac :. � (Print Name and Title) 3 1V r ' CO¢IArt,E�-'�` � Date: `, ���' r Approved by Cf tc Engineer Date: /(Required 6 / / in n Approved by Mayor : VIDate: for change orders $25,000 ana aoove) i NAB- ITV Citywide Traffic Signal and ADA Improvements (HSIP) CIP NO. 18-05 DATE: - CHANGE ORDER NO. 7 - T&M Summary WORK PERFORMED BY: PAL Engineering DESCRIPTION OF WORK: Re -design of 2nd and Sweetwater Rd based on Plan Revision 2 12/5/19 Summary of T&M Demo Poured C&G due to Revision of Grades at SE Corner of2nd&SW Work $ 9,383.26 12/6/19 Grading and Compaction of Class II Base, Form Setting, Concrete Pour $ 16,416.40 12/9/19 Grading and Compaction of Class II Base, Form Setting, Concrete Pour $ 10,966.92 y. 12/10/19 Pour Concrete Sidewalk and ADA Ramps $ 8,176.66 12/20/19 Form Setting for Colored Sidewalk and Concrete Pour $ 15,244.32 Sub - Total 60,187.56 Sub -Contractor Mark Up (5%) 3,009.38 Grand Total 63,19 v 6.94 — CALIFORNIA —^ NATIONAL CITY 'NCO RUOR AT CD Citywide Traffic Signal and ADA Improvements (HSIP) CIP NO. 18-05 DATE: - CHANGE ORDER NO. 7 - T&M Summary WORK PERFORMED BY: PAL Engineering DESCRIPTION OF WORK: Re -design of 2nd and Sweetwater Rd based on Plan Revision 2 Summary of T&M Work 12/5/19 Demo Poured C&G due to Revision of Grades at SE Corner of 2nd & SW $ 9,383.26 12/6/19 Grading and Compaction of Class II Base, Form Setting, Concrete Pour $ 16,416.40 12/9/19 Grading and Compaction of Class II Base, Form Setting, Concrete Pour $ 10,966.92 12/10/19 Pour Concrete Sidewalk and ADA Ramps $ 8,176.66 12/20/19 Form Setting for Colored Sidewalk and Concrete Pour $ 15,244.32 Sub - Total 60,187.56 Sub -Contractor Mark Up (5%) 3,009.38 Grand Total 63,196.94 CALIFORNIA NATIONAL CITY 5 33 I (ONvon Aar E0 Citywide Traffic Signal and ADA Improvements (HSIP) CHANGE ORDER NO. 7 - T&M(1) CIP NO. 18-05 DATE: December 5, 2019 WORK PERFORMED BY: PAL Engineering DESCRIPTION OF WORK: Demo poured C/G due to revision of grades at SE corner of 2nd and Sweetwater, Raised Grade for New C/G ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT Juan Nieto - Foreman Unit HR Qty 7.00 Wage 59.94 Total 419.58 2) 3) 4) 5) 6) 7) 8) Eduardo Nieto - Carpenter Hector Lopez - Laborer Miguel Rivera - Laborer Alvaro Valencia - Apprentice Opp George Marquez - Apprentice Lab Florencio Montecinos - Operator Karam Rafooka - Teamster HR HR HR HR HR HR HR 7.00 7.00 8.00 7.00 7.00 7.00 8.00 64.11 57.94 57.94 62.62 34.59 77.57 61.78 Sub -Total Labor: Labor Markup (20%): 448.77 405.58 463.52 438.34 242.13 542.99 494.24 $ 3,455.15 $ 691.03 TOTAL LABOR: EQUIPMENT Unit Qty Rate Total 1) 2) 3) 4) #67 Mini Excavator Breaker Attachment HR HR 7.00 1.00 40.72 190.00 285.04 190.00 #76 Kentworth - 5 Axl #118 F350 Truck HR HR 8.00 7.00 87.29 38.38 698.32 268.66 5) 6) 7) #21 Dodge 1500 Truck Traffic Control HR LS 7.00 1.00 38.38 1,500.00 268.66 1,500.00 Utility Truck with Arrow Board HR 1.00 50.47 50.47 Sub -Total Equipment: Equipment Markup (15%): TOTAL EQUIPMENT: $ 3,261.15 $ 489.17 Unit Qty Rate Total Class II Base LS 1.00 854.31 854.31 Haul Off Load 1.00 600.00 600.00 $ 854.31 SUB TOTAL: Insurance/Bond $ 3,750.32 $ 8,878.96 $ 504.30 Sub-Tota Materials: Sales Tax: - Materials Markup (15%): 128.15 TOTAL MATERIALS: - CALIPIINIA NATIONAL CITY/ medwtros swim Citywide Traffic Signal and ADA Improvements (HSIP) CHANGE ORDER NO. 7 - T&M(2) CIP NO. 18-05 DATE: December 6, 2019 WORK PERFORMED BY: PAL Engineering DESCRIPTION OF WORK: Grading and Compaction of Class II Base, Form Setting, Concrete Pour at 2nd and Sweetwater ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT Unit Qty Wage Total 1) Juan Nieto - Foreman HR 8.00 59.94 479.52 la) Juan Nieto - Foreman OT 3.00 78.82 236.46 2) 2a) 3) 4) 4a) Eduardo Nieto - Carpenter Eduardo Nieto - Carpenter Hector Lopez - Laborer Miguel Rivera - Laborer Miguel Rivera - Laborer HR OT HR HR OT 8.00 3.00 8.00 8.00 1.00 64.11 85.68 57.94 57.94 75.82 512.88 257.04 463.52 463.52 75.82 5) 5a) Daniel Nieto - Cement Mason Daniel Nieto - Cement Mason HR OT 8.00 3.00 60.25 76.44 482.00 229.32 6) 6a) 7) 8) 9) 9a) 10) 11) 12) Daniel Ortiz - Carpenter Daniel Ortiz - Carpenter Florencio Montecinos - Operator Karam Rafooka - Teamster Leonardo Alvarez - Laborer Leonardo Alvarez - Laborer Josh Agler - CRPA Luis Alarcon - Apprentice Juan Martinez - Laborer HR OT HR HR HR OT HR HR HR 8.00 3.00 5.50 8.00 8.00 1.50 8.00 8.00 8.00 64.11 85.68 77.57 61.78 57.10 74.56 41.70 41.74 57.10 512.88 257.04 426.64 494.24 456.80 111.84 333.60 333.92 456.80 13) 13a) Raul Pimentel - Cement Mason Raul Pimentel - Cement Mason HR OT 8.00 3.00 60.25 76.44 Sub -Total Labor: 482.00 229.32 $ 7,295.16 Labor Markup (20%): 1 459.03 TOTAL LABOR: 1) #67 Mini Excavator 2) #197 Ten Wheeler - 5 Axl Unit HR HR Qty 5.50 8.00 Rate 70.72 87.29 Total 388.96 698.32 3) 4) 5) 6) 7) 8) # 118 F350 Truck #95 F450 Truck #125 Dodge 1500 Truck Traffic Control Utility Truck w/ Arrow Board Vibrate Plate HR HR HR LS HR HR 8.00 8.00 8.00 1.00 1.00 4.00 38.38 38.38 38.38 1,500.00 50.47 9.43 307.04 307.04 307.04 1,500.00 50.47 37.72 9) Jumping Jack HR 4.00 3.82 15.28 10) Generator HR 8.00 1.96 15.68 $ 3,627.55 $ 544.13 1) Concrete - Superior Unit Qty Rate Total LS 1.00 1,815.29 1,815.29 2) 6 Mil Plastic and Sand Bags LS 1.00 366.36 366.36 3) Class II Base LS 1.00 155.44 155.44 Sub-Tota Materials: $ 2,337.09 Sales Tax: $ - Materials Markup (15%): $ 350.56 TOTAL MATERIALS: SUB TOTAL: Insurance/Bond 1 Sub -Total Equipment: Equipment Markup (15%): TOTAL EQUIPMENT: S -- CALIFORNIA NATIONAL CITT "'CO RtOR met) Citywide Traffic Signal and ADA Improvements (HSIP) CHANGE ORDER NO. 7 - T&M(3) CIP NO. 18-05 DATE: WORK PERFORMED BY: DESCRIPTION OF WORK: December 9, 2019 PAL Engineering Grading and Compaction of Class II Base, Form Setting, Concrete Pour at 2nd and Sweetwater ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT Unit Qty Wage Total 1) Juan Nieto - Foreman 2) Eduardo Nieto - Carpenter HR HR 6.50 6.50 59.94 64.11 389.61 416.72 3) 4) Hector Lopez - Laborer Mario Alcazar - Laborer HR HR 6.50 6.50 57.94 57.94 376.61 376.61 5) Daniel Nieto - Cement Mason HR 6.50 60.25 391.63 6) 7) Daniel Ortiz - Carpenter Florencio Montecinos - Operator HR HR 6.50 6.50 64.11 77.57 416.72 504.21 8) Karam Rafooka - Teamster HR 6.50 61.78 401.57 9) Joel Camacho - Carpenter HR 6.50 64.11 416.72 10) 11) 12) Josh Agler - CRPA Luis Alarcon - Apprentice Juan Martinez - Laborer HR HR HR 6.50 6.50 6.50 41.70 41.74 57.10 271.05 271.31 371.15 13) Raul Pimentel - Cement Mason HR 6.50 60.25 391.63 14) Jesus Vargas - Carpenter HR 6.50 64.11 Sub -Total Labor: 416.72 $ 5,412.26 Labor Markup (20%): 1 082.45 TOTAL LABOR: Unit Qty Rate Total ) #67 Mini Excavator 2) #197 Ten Wheeler - 5 Axl HR HR 6.50 6.50 40.72 87.29 264.68 567.39 3) #118 F350 Truck HR 6.50 38.38 249.47 4) 5) #125 Dodge 1500 Truck Vibrate Plate HR HR 6.50 6.50 38.38 9.43 249.47 61.30 6) 7) Jumping Jack Generator HR HR 6.50 6.50 3.82 1.96 24.83 12.74 $ 1,429.88 Sub -Total Equipment: Equipment Markup (15%): TOTAL EQUIPMENT:' $ 214.48 1) IClass II Base 2) (Truncated Domes Unit LS LS Qty 1.00 1.00 Rate 248.09 1,756.80 Total 248.09 1,756.80 $ 2,004.89 Sub-Tota Materials: Sales Tax: Materials Markup (15%): 300.73 TOTAL MATERIALS: SUB TOTAL: Insurance/Bond - CALIFORNIA NATIONAlf INcon PUN M kvt Citywide Traffic Signal and ADA Improvements (HSIP) CIP NO. 18-05 DATE: December 10, 2019 CHANGE ORDER NO. 7 - T&M(4) WORK PERFORMED BY: PAL Engineering DESCRIPTION OF WORK: Pour concrete sidewalk and ADA ramps SE corner ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT Unit Qty Wage Total 1) Leonardo Alvarez- Laborer 2) 3) Eduardo Nieto - Carpenter Daniel Nieto - Cement Mason HR HR HR 7.00 6.50 6.50 57.10 64.11 60.25 399.70 416.72 391.63 4) Daniel Ortiz - Cement Mason HR 6.50 60.25 391.63 5) Joel Camacho - Cement Mason HR 6.50 60.25 391.63 6) 7) 8) 9) 10) Jesus Vargas - Cement Mason Raul Pimentel - Cement Mason Mario Alcazar - Laborer Martin Flores - Cement Mason Luis Alarcon - Apprentice HR HR HR HR HR 6.50 6.50 6.50 6.50 6.50 60.25 60.25 57.94 60.25 41.74 Sub -Total Labor: Labor Markup (200/0): TOTAL LABOR: 391.63 391.63 376.61 391.63 271.31 $ 3,814.12 $ 762.82 EQUIPMENT Unit Qty Rate Total 1) 2) #95 F450 Truck #125 Dodge 1500 Truck 1) Concrete - Suaerior HR HR 6.50 6.50 38.38 38.38 249.47 249.47 $ 498.94 Sub -Total Equipment: Equipment Markup (15%): TOTAL EQUIPMENT: Unit LS Qty 1.00 Rate 2,219.44 $ 74.84 Total 2,219.44 $ 2,219.44 Sub-Tota Materials: Sales Tax: Materials Markup (15%): 332.92 TOTAL MATERIALS: $ - SUB TOTAL: $ 573.78 $ 7,703.08 SUBCONTRACTOR Unit Qty Rate Total 1) 'San Diego Concrete Pumping LS 1.00 1,472.64 Sub -total Subcontractor: Prime Contractor Markup (5%): 1,472.64 $ 1,472.64 $ 73.63 TOTAL SUBCONTRACTOR: Insurance/Bond $ 1,546.27 473.58 GRAND TOTAL: 11.1[1 ::.68 • - CA1If0RN1 NATION Citywide Traffic Signal and ADA Improvements (HSIP) CHANGE ORDER NO. 7 - T&M(5) CIP NO. 18-05 DATE: December 20, 2019 WORK PERFORMED BY: PAL Engineering DESCRIPTION OF WORK: Form Setting for Colored Sidewalk and Concrete Pour ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT Unit Qty Wage Total 1) Eduardo Nieto - Carpenter 2) 3) Daniel Nieto - Cement Mason Joel Camacho - Cement Mason HR HR HR 6.50 6.50 6.50 64.11 60.25 60.25 416.72 391.63 391.63 4) Daniel Ortiz - Carpenter HR 6.50 64.11 416.72 5) 6) 7) 8) Mario Alcazar - Laborer Raul Pimenel - Cement Mason Martin Flores - Cement Mason Jesus Vargas - Carpenter HR HR HR HR 6.50 6.50 6.50 6.50 57.94 60.25 60.25 64.11 376.61 391.63 391.63 416.72 $ 3,193.29 Sub -Total Labor: Labor Markup (20%): 638.66 TOTAL LABOR: EQUIPMENT Unit Qty Rate Total 1) 2) 3) 495 Utility Truck #125 Utility Truck Elgen Lite 4 Light HR HR HR 6.50 6.50 6.50 38.38 29.60 8.57 Sub -Total Equipment: Equipment Markup (15%): TOTAL EQUIPMENT: 249.47 192.40 55.71 $ 497.58 $ 74.64 $ 572.22 1) Plastic Rolls 2) Concrete - Superior Unit LS LS Qty 1.00 1.00 Rate 431.22 7,047.42 Sub-Tota Materials: Sales Tax: Materials Markup (15%): 1 121.80 TOTAL MATERIALS: Total 431.22 7,047.42 $ 7,478.64 $ SUB TOTAL: $ 13,004.61 SUBCONTRACTOR Unit Qty Rate Total 1) ISan Diego Concrete Pumping LS 1.00 1,435.20 Sub -total Subcontractor: Prime Contractor Markup (5%): TOTAL SUBCONTRACTOR: Insurance/Bond 1,435.20 $ 1,435.20 71.76 $ 1,506.96 732.75 TRANSMITTAL COVER To: National City Engineering Department Project Name: Citywide Traffic Signal and ADA Improvements CIP No. 18-05 ITEMS DELIVERED: Invoice #11 Change Order 7, 9 Delivered by: Alex Preciado Project Professionals Corporation Received by: Date: 4/1/2020 Date: CONTRACT TRANSMITTAL FORM (Attach as Cover Sheet to Documents dropped off to City Clerk's Office) (01P12-t. From (Dept.): L r7 5 (n e eY t t'l.5 Submitted by (First & Last Name): J d1 1171 Vendor: e%c f - { � f Resolution: YES / N Resolution No. (if applicable): 1 2 3 4 Originals Provided to City Clerk (Select Quantity) p000 XDepartment has Copy / Duplicate Original FtVendor has Copy / Duplicate Original