HomeMy WebLinkAbout2020 CON Dick Miller - Paradise Creek Park Expansion Project, CIP No. 18-16 - Change Order #14RECEIVED ENG & PIS./ DEPT. t0?� J1JU 10 A ) 21 CHANGE ORDER MEMORANDUM ^,IT'. of NATION,';L CITY June 4, 2020 To: Roberto Yano, P.E. Director of Engineering & Public Works/City Engineer Jose Lopez, P.E. Deputy City Engineer City of National City From: Alex Preciado Project Manager Project Professionals Corp Project: Paradise Creek Park Expansion CIP No.: 18-16 Subject: Change Order No. 14 Change Order No. 14 provides for: The design and structural calculations of 2 play structures at Paradise Creek Park. Supporting Information: Original contract documents and plans identified two play structures to be installed within the playground area at Paradise Creek Park. Contract plans showed an allowable depth of 24-inches for a footing to support the play structures. However, during construction it was determined that the manufacturer could not meet the allowable depth for a footing to support their equipment. The original depth for the footing for both structures is between 48-inches to 60-inches. At this time, it was determined to consult with Oriel Structural and Bridge Engineers to assist with the design of spread footings for these structures. Drawings and calculations were provided to the manufacturer and approved. The play structures are still fully warranted upon acceptance of the project. Time Adjustment: It is recommended that 0 working days be added to the contract time for the re -design of the 2 play structure footings. Cost Adjustment: The total price for the design and structural calculations $3,000.00. Pro j t Manager 6///e.c)Ce2 Date �r> CALIFORNIA NAT'I.° AL, Cflp � s 1NCORPORATEU PARADISE CREEK PARK Expansion CHANGE ORDER NO. 14 CIP NO. 18-16 June 4, 2020 Contractor: DMI 930 Boardwalk, Suite H, San Marcos, CA 92078 This Change Order modifies Contractor's and the City's obligations and rights under the abovementioned contract. This change order is not effective until approved by the City. Time adjustment: Zero (0) working days are added to contract time for the design of 2 structural footings for 2 play structures at Paradise Creek Park. Cost of Change Order: The City and the Contractor agree that the contractor shall coordinate with Oriel Structural and Bridge Engineers to design 2 structural footings for the 2 Dynamo play structures at Paradise Creek Park. The total price for the design and structural calculations for 2 play structures is $3,150.00. Recommended by Project Manager: $3,150.00 Date: C�//r�,ra By signing this Change Order the Contra confirms that he/she is completely familiar with and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. The signer for the Contractor confirms that he/she is authorized to bind the Contractor to this Change Order. Agreed and Accepted by Contractor: A eSiC a (Print Name and Title) Approved by City Engineer: Approved by City Manager: (Required for change orders $25,000 and above) GALIFORNJA 8: i OIN41`' L y PARADISE CREEK PARK EXPANSION CHANGE ORDER NO. 14 CIP NO. 18-16 DATE: - WORK PERFORMED BY: DMI DESCRIPTION OF WORK: Design of Play structure footings ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT J SUBCONTRACTOR Unit Qty Rate Total 1) Oriel Structural and Bridge Engineers LS 1.00 3,000.00 Sub -total Subcontractor: Prime Contractor Markup (5%): 3,000.00 $ 3,000.00 $ 150.00 TOTAL SUBCONTRACTOR: SUB TOTAL: $ 3,150.00 $ 3,150.00 GRAND TOTAL: $ 3,150.00 51RucrvMu Oriel Engineering Structural and Bridge Engineers 9750 Miramar Road, Ste. 310 San Diego, CA 92126 Invoice Date Invoice #t 5/27/2020 4183 Bill To PPC PM - Alex Preciado Project Processionals Corporation 4499 Ruffin Road, Suite 250 San Diego, CA 92123 Project Orie2 Job No. Due Date 419 010-20 Paradise Creek Play Structure 419-010-20 6/23/2020 Item Description Rate Curr % Total % Qty Amount Construction Documents Structural Calculations and Drawings for design of foundations for (2) play structures 3,000.00 3,000.00 Total $3,000.00 Payments/Credits so.o0 Make Check Payable to Orie2 Engineering, Inc. Balance Due $3,000.00 Juditli.Hernandez From: Alex Preciado <alex@ppc-sd.com> Sent: Tuesday, June 9, 2020 6:32 PM To: Judith Hernandez Cc: Jose Lopez Subject: CIP No. 18-16 PCP Expansion - CCO #14 Attachments: PPC final w-o line.tiff; CCO#14.pdf CAUTION: This email originated from outside your organization. Exercise caution when opening attachments or clicking links, especially from unknown senders. Hi Judy, Please see attached change order #14 for processing. Let me know if you have any questions. Thanks, Alex Preciado, CMIT Construction Manager 4499 Ruffin Road, Suite 250 San Diego, CA 92123 Office 858.634.8180 Fax 858.634.8184 1 CONTRACT TRANSMITTAL FORM (Attach as Cover Sheet to Documents dropped off to City Clerk's Office) Date: From (Dept.): r7 nit' (e P Aj- J Submitted by (First & Last Name): --*(/ c I /)'h H Qf ►11/4 e Vendor: 0-1-4-- PO( r Resolution: YES / O Resolution No. (if applicable): 1 2 3 4 Originals Provided to City Clerk (Select Quantity) 000 Department has Copy / Duplicate Original Vendor has Copy / Duplicate Original