Loading...
HomeMy WebLinkAbout2020 CON Dick Miller - Paradise Creek Water Quality and Community Enhancements, CIP No. 18-11 - Change Order # 6Paradise Creek WQ&C Enh. CIP No: 18-1 1 Contractor: Dick Miller Inc. Reason/Purpose for this Change Order: CALIFORNIA - NATIOi NAL l'.riJ It rNCOR NW) ) CHANGE ORDER NO. 6 May 29, 2020 The city has directed the contractor to install a 24" x 24" catch basin to collect water run-off from grading of the project. The City of National City and Contractor agree to the following change to the original Contract.: The city has directed the contractor to install a 24" x 24" catch basin to collect water run-off from grading of the project near Station 2+50. The contractor will install a 12"x12"x12" "Y" off the existing 12" drain line and 'connect into the side of a Brooks 2424B36 (or equal) catch basin with a traffic rated steel galvanized grate. The grate shall also have a minimum of a 2' concrete border poured in place to help secure the catch basin and protect it from debris. This change order provides full compensation to the contractor for all work including all labor, equipment and material for the lump sum price listed below. Original Contract Amount $ 1,010,101.01 Net change by previously authorized Change Orders 44,248.43 Subtotal 1,054,349.44 Amount of this change order 4,938.18 New contract amount $ 1,059,287.62 Working days added: 1 Working days subtracted: 0 Percent change in Contract to date 4.87% Strbmitted by: [Project Manager Approved by. ,City Eng 6-2-20 Date Cit Dt ///207--0 / Date City Manager, required for Change Orders >524,999 Date By signing tChange birder the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If the Change Order is approved, Contractor will provide at of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. (2 originals: 1 for City Clerk, 1 for Contractor) • ,rj.6fwl22z, Accepted and aNreed to by (DMI): Name: 61 li _ _ Date 6/ t U C Note to Contractor: If you do riot agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project tile, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 DMI 930 Boardwalk, Suite H, San Marcos, CA 92078 Phone 760-471-6842 FAX 760-471-6178 Contractor's State License No. 380204, A, B, C-12 - DVBE 1 SBE 453651 DMl JOB NO. 19020 CUR #006: INSTALL 12" SDR 35 DRAIN PIPE AND 24X24 BROOKS DRAIN BOX WITH GALVINIZED STEEL GRATE PARADISE CREEK WATER QUALITY COMMUNITY ENHANCEMENTS PROJECT CONTRACT NO.: Proposal Submitted to. City of National City Phone. 951.532.6483 Fax: Data Submitted: 05108120 Street: 1243 National City Bvkl Job Name: Paradise Creek Water Quality Community Enhancemonts Project Date Work Pedormod: City, State and Lp Code: National City, CA 91950 Job Location 3624 Paradise Valley Rd, National City CA 91950 Attention: Sean Gil Architect Plan Sheets: 11500.9-D E-Mal: sodl{Wrccsinc.net Spec Section: Addondas Noted. N/A ITEM DESCRIPTION ESTIMATED QUANTITIES UNIT MEASURE UNIT PRICE TOTAL COR #006 COR #006: INSTALL 12" SDR 35 DRAIN PIPE AND 24X24 BROOKS DRAIN BOX WITH GALVINIZED STEEL GRATE MATERIALS: INCLUDE TAX 8.75% 12- PVC SDR 35 SOLID RUBBER GASKETED PIPE 80.00 LF $9.28 $742.40 12X12 PVC SDR 35 PSM WYEGXGXG 1.00 EA $481.81 $481.81 12 PVC SDR 35 PSM 45 GXG 1.00 EA $229.82 $229.82 24X24X24 VAULT WITH FRAME - 1.00 EA $308.62 $308.62 24X24 STEEL TRAFFIC GRATE ADA 1.00 EA $426.77 $426.77 CONCRETE & STEEL FOR 3' APRON AT DRAIN BOX 1.00 L$ $150.00 $150.00 TOTAL MATERIAL MARKUP 15% $328.41 TOTAL FOR MATERIAL ADO: 52,687.83 EQUIPMENT: U55 EXCAVATOR 4.00 $8222 $248.88 CREW TRUCK 4.00 $75.01 $100,04 COMPACT ION WHEEL 4.00 $31.25 $125.00 (NOTE ALL EQUIP. RATES INCLUDE TAXES, FUEL, & MISC COSTS) TOTAL EQUIPMENT MARK UP 15% $71.09 SUBTOTAL FOR EQUIPMENT ADD: $545.01 LABOR: JIMDASIINEY- OPERATOR RUBAIDINOGAYTAN-LABORER 4.00 4.00 'IRS $101.41 $405,64 HRS $73.22 $292.88 DAMES COOPER - OPERATOR 4.00 HITS $101.41 $405.64 PEDRO IIERNANDEZ - LABORER - 4.00 FIRS $73.22 3292.88 LABOR MARK UP 209E $279.41 SUBTOTAL FOR LABOR ADD: 51,876.45 TOTAL FOR THE ABOVE ITEMS: $4,889.29 1%ADD BOND & INSURANCE $48.89 ADDITIONAL WORKING DAYS REQUESTED: 1.00 TOTAL AMOUNT OF COR#006: $4,938.18 or Submitted for DMI JOHN MARTINEZ Change Orders & I-og 1 of 1 5/6/2020 4.24 PM • Judith Hernandez From: Sean Gill <sgill@iccsinc.net> Sent: Wednesday, June 3, 2020 7:02 AM To: Judith Hernandez Cc: Luca Zappiello; Parker Gill; David Goan Subject: PCWQ - Signed Change Order #6 Attachments: PCWQ Change Order #6 Signed DMI and ICCS.pdf CAUTION: This email originated from outside your organization. Exercise caution when opening attachments or clicking links, especially from unknown senders. Judy, Please see attached signed change order #6 for processing. Thank You, Sean Gill ICCS, LLC PO Box 6211 Norco, CA 92860 Phone:951-532-6483 E-mail sgill(�Diccsinc.net 1 Date: CONTRACT TRANSMITTAL FORM (Attach as Cover Sheet to Documents dropped off to City Clerk's Office) //70 From (Dept.): l ? 10 re f 1 .0 Submitted by (First & Last Name): • V pl -`'? 4,4 e{ nr n e Z Vendor: )jcJG /ti///e y, Resolution: YES / N G Yl e 0 Resolution No. (if applicable): 0✓aver ) 1 2 3 4 Originals Provided to City Clerk (Select Quantity) 000 X Department has Copy / Duplicate Original )Vendor has Copy / Duplicate Original 0