Contractor: Portillo Concrete, Inc.
Reason/Purpose for this Change Order:
The contractor has been directed to install vehicle detection loops and conduit on 16th at Palm.
CALIFORNIA -<*
NATIONAL CITY(
�noa4
rNCORPORA71tD
CHANGE ORDER NO. 3
June 26, 2020
The City of National City and Contractor agree to the following change to the original Contract:
The contractor has been directed to install vehicle detection loops and conduit on 16th at Palm per the Palm
Ave. and 16th vehcile detection loops plan by STC. All work including, labor, equipment and material will be
performed at the lump sum price included below excluding sidewalk replacement. All sidewalk replacement
shall be performed at the contract unit price for sidewalk R&R.
Original Contract Amount $ 1,040,000.00
Net change by previously authorized Change Orders
Subtotal
Amount of this change order
New contract amount
Working days added: 3 Working days subtracted: 0
4,668.00
1,044,668.00
9,811.20
$ 1,054,479.20
Percent change in Contract to date 1.39%
Submitted by:
Project Manager
. 7-16-20
Date
?/244 ,t
City Pr ject M ia Date
,..••.
Approve
City En
ee r
1 2i I2tre°
Date
City Manager, required for Change orders 424,999 Date
By signing his Changrder the Contractor confirms that helshe is completely familiar with its terms and conditions and has fairly
negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and
labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms That the
price is fair and complete and represents all costs associated with the work, induding but not limited to all equipment, materials, labor,
supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions
of the original contract documents are incorporated herein. (2 originals: 1 for City Clerk, 1 for Contractor)
Accepted and a reed to by Portil . Concrete, Inc.
Name: odii. & t f it l ( b Date') f /
Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the
contrad and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect
your claim.
Originals: City Clerk, Contractor
cc: Engineering project file, Project Manager
1243 National City Boulevard, National City, CA 91950
Telephone (619) 336-4380
Po
POFITLLO
CONCRETE INC
3527 CITRUS ST, LEMON GROVE, CA. 91945
OFFICE: (619) 466-4639 FAX: (619) 466-4685
PALM AVENUE ROAD REHAB PROJECT, CIP NO. 19-05
Request for Change Order
Date:
Contractor:
Days Requested:
Description / Reason for Change:
6/29/2020
Lekos
3
The following is a request for a change order to replace 6 additional loops and install conduit
around radius at Palm Ave and 16th St.
Description
T&M
Price
Loops, conduit and pull boxes
-
$ 9,344.00
PCI Mark Up
$ 467.20
Change Order Total
L
Lekos Electric, Inc.
PROJECT: 2368. Palm Ave TO: Portillo
DATE: 6.29.2020
RE: CO#1 Palm Ave and 16th BREAKDOWN REVISED
MESSAGE: The following is a request for a change order to replace 6 additional loops and install conduit around radius at Palm Ave and
16th St.
Quantity
Units
Unit Price
Total
2" Conduit Install
80
LF
$ 75.00
$ 6,000.00
Trench Patch
80
LF
$ 22.00
$ 1,760.00
Pull Box Installation
2
EA
$ 450.00
$ 900.00
Pull New DLC's
380
LS
$ 1.80
$ 684.00
$ -
SUBTOTAL
$ 9,344.00
Thank you,
Riley Lekos
Vice President
Judith Hernandez
From: Sean Gill <sgill@iccsinc.net>
Sent: Monday, July 20, 2020 10:39 AM
To: Judith Hernandez
Cc: Luca Zappiello
Subject: Palm Change Order #3
Attachments: Change Order #3 - Signed.pdf
CAUTION: This email originated from outside your organization. Exercise caution when opening attachments or clicking links,
especially from unknown senders.
Judy,
Please see attached change order #3 for processing.
Thank You,
Sean Gill
ICCS, LLC
PO Box 6211
Norco, CA 92860
Phone: 951-532-6483
E-mail: saill@iccsinc.net
1
Palm Ave. Road Rehabe, n
19-05
Contractor: Portillo Concrete, Inc.
r•
«.OAt.IlfPu.lil ••
air
!' : C CHANGE ORDER NO. 4
July 20, 2020
Reason/Purpose for this Change Order:
The contractor has been directed to install a new advanced loop conduit and DLC.
The City of National City and Contractor agree to the following change to the original Contract:
The contractor has been directed to install a new 2" advanced loop conduit from the existing advance loop pull
box to the DLC splice box along with a new DLC. All work including, labor, equipment and material will be
performed at the lump sum price included below.
Original Contract Amount ... ... $ 1,040,000.00
Net change by previously authorized Change Orders 14,479.20
Subtotal
Amount of this change order
New contract amount
Working days added: 2
Working days subtracted: 0
1,054,479.20
15,422.40
$ 1,069,901.60
Percent change in Contract to date 2.88%
Submitted by:
7-20-20
Project Manager Date
Ci
.tb,.. - .. 7(2)/40 ec
roje - nag Date
Approvej ,:
17/440
City - , • i e - (fDate
City Manager, requited for Change ad rs>s24.999 Date
By signing this Charie Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly
negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and
labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the
price is fair and complete and represents all costs associated with the work. including but not limited to all equipment. materials, labor,
supervision, overhead. fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions
of the original contract documents are incorporated herein. (2 originals: 1 for City Clerk, 1 for Contractor)
Accepted aryl agreed to b Portillo Concrete, Inc.
7/4744
Name: 1 � sir 4 //o Date
Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the
contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect
your claim.
Originals: City Clerk, Contractor
cc: Engineering project file, Project Manager
1243 National City Boulevard, National City, CA 91950
Telephone (619) 336-4380
1/41/
PIII
POJ
CONCRETE INC
3527 CITRUS ST, LEMON GROVE, CA. 91945
OFFICE: (619) 466-4639 FAX: (619) 466-4685
PALM AVENUE ROAD REHAB PROJECT, CIP NO. 19-05
Request for Change Order
Date:
Contractor:
Days Requested:
Description / Reason for Change:
7/15/2020
Lekos
2
Installing approximately 180' of conduit from the existing advanced loop box to the DLC splice
box at the SE corner of Palm and Division. Also includes new DLC for the duration of the
conduit and splicing of the DLC.
Description
T&M
Price
Advnaced Loop Conduit
-
$ 14,688.00
PCI Mark Up
$ 734.40
Change Order Total
L
Lekos Electric, Inc.
PROJECT: 2368. Palm Ave TO: Portillo
DATE: 7.14.2020
RE: CO#2 Palm and Division - Advance Loop Conduit
MESSAGE: The following is a request for a change order to install new conduit to existing advance loop box on Palm ave at division
street and pull new DLCs to advance loop.
Item
Quantity
Units
Unit Price
Total
2" Conduit Install
180
LF
$ 58.00
$ 10,440.00
Trench Patch
180
LF
$ 18.00
$ 3,240.00
Pull New DLC's
560
LS
$ 1.80
$ 1,008.00
SUBTOTAL
$ 14,688.00
Thank you,
Riley Lekos
Vice President
PALM AVENUE MATCHLINE - SEE SHE
:0a]idW00 31V
: 1010]dS1
:01L2TId1S MV
: Q,i]n JfS
SOL10O]LJ NOIIOfl JISNO
Judith Hernandez
From: Sean Gill <sgill@iccsinc.net>
Sent: Monday, July 20, 2020 2:28 PM
To: Judith Hernandez
Cc: Luca Zappieilo
Subject: Palm Road Rehab, Change Order #4
Attachments: Change Order #4 - Signed.pdf
CAUTION: This email originated from outside your organization. Exercise caution when opening attachments or clicking links,
especially from unknown senders.
Judy,
Please see attached signed change order #4 for processing.
Thank You,
Sean Gill
ICCS, LLC
PO Box 6211
Norco, CA 92860
Phone:951-532-6483
E-mail: sqill@iccsinc.net
1
Date:
CONTRACT TRANSMITTAL FORM
(Attach as Cover Sheet to Documents dropped off to City Clerk's Office)
From (Dept.):
S
-AvL_
r? (To re
Submitted by (First & Last Name): 3U / �h /, e{ n-A n
Vendor:
PD (N/d co ter t/e-
Resolution: YES / NO Y (a �� o! (et/ e
3 a0 /
al
0
Resolution No. (if applicable):
1 2 3 4 Originals Provided to City Clerk (Select Quantity)
oo0
Department has Copy / Duplicate Original
VIVendor has Copy / Duplicate Original