Loading...
HomeMy WebLinkAbout2020 CON Basile Construction Inc. - P-1 Sewer Upsize Project for Sweetwater High School, CIP No. 19-43 - Change Order #3 and #9CLCLO— 3z. RECEIVED ENG&PV/DEPT. nits 41 CHANGE ORDER MEMORANDUM July 28, 2020 OF rdi-T IGNAL CITY To: Roberto Yano, P.E. Director of Engineering & Public Works/City Engineer Jose Lopez, P.E. Deputy City Engineer Engineering and Public Works Department City of National City From: Alex Preciado Project Manager Project Professionals Corp Project: P1 Sewer Upsize Project CIP No.: 19-43 Subject: Change Order No. 3 Change Order No. 3 provides for: 1. The installation of a new 60-inch sewer manhole. 2. The installation of a new manhole locking device. 3. The shoring and bracing to stabilize the open trench excavation for the removal and installation of the sewer manholes. Supporting Information: As referenced in Change Order #2 , the Contractor located the existing 48-inch manhole and discovered an angle point at this location. Due to the angle point, a new 60-inch sewer manhole has to be installed. The original plan called out for removal of the existing 48-inch sewer manhole, however the installation of this new manhole will require a wider excavation and additional shoring and bracing is needed. Time Adjustment: Three (3) additional days are added to the contract time for the shoring and bracing, removal of existing sewer manhole and the installation of a new 60-inch sewer manhole. Cost Adjustment: The installation of 1 manhole locking device will be paid for under a line item adjustment for line item #19 — Manhole Locking Device. Line Item #13 will be reduced by one (1) sewer manhole abandonment for a total line item amount of $1,100.00. The billing statement will reflect payment on line item #13 and recover the deduction on Change Order #3 line item. Line Item #18 — 5' Sewer Manhole bid price covers pricing for manholes in three different site conditions. The three site conditions were averaged to develop a fair price for the installation of a new sewer manhole. The additional shoring shields are captured under a lump sum price for the material costs. All costs were reviewed by the Project Manager and seem fair and reasonable for this work. Change Order Items Line Item #13 — Sewer MH Abandon (1,100.00) Install 60-inch Sewer Manhole $17,716.00 Shoring and Bracing $3,770.43 Total Cost of Change Order $21,486.13 ,11' Co, 3136. y Date cl8 c .N . °If 01126 P1 SEWER UPSIZE PROJECT CHANGE ORDER NO. 3 CIP NO. 19-43 July 28, 2020 Contractor: Basile Construction, Inc. 7952 Armour Street San Diego, CA 92111 This Change Order modifies Contractor's and the City's obligations and rights under the abovementioned contract. This change order is not effective until approved by the City. Time adjustment: Three (3) working days are added to contract time for the shoring and bracing, removal of existing sewer manhole and the installation of a new 60-inch sewer manhole. Cost of Change Order: The City and the Contractor agree that the Contractor shall proceed with the removal of one (1) existing 48-inch sewer manhole that will be paid per a line item adjustment under Line Item #12 — Remove Existing 48" Sewer Manhole. The City and the Contractor agree to reduce Line Item #13 — Abandon Existing Manhole by one (1) sewer manhole abandonment for a total line item amount of $1,100.00. The City and the Contractor agree to reduce line item #13 by $1,100.00. The billing statement will reflect payment on line item #11 and recover the deduction on Change Order #3 Line Item. (1,100.00) The City and the Contractor agree that the Contractor shall proceed with the installation of one (1) manhole locking device that will be paid per a line item adjustment under line item #19 — Manhole Locking Device. The City and the Contractor agree that the Contractor shall proceed with the $3,770.43 additional shoring and bracing to stabilize the open trench excavation for the removal and installation of the sewer manholes. The City and the Contractor agree that the total cost for additional shoring and bracing is $3,770.43. The City and the Contractor agree that the Contractor shall proceed with the $17,716.00 installation of one (1) additional 60-inch sewer manhole. The City and the Contractor agree that the total cost for the installation of one (1) additional 60-Inch sewer manhole is $17,716.00. Total Cost of Change Order $20,386.43 Recommended by Project Manager: Date: 8°14 kyrio .7f1 By signing this Change Order the Contractor confirms that he/she is completely familiar with and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Contractor confirms that the price Is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorpor. --,, herein. The signer for the Contractor confirms that he/she is authorized to bind the Contractor to this :e Order. Agreed and Accepted by Contractor: , (Print Name and Title) �h inQt� t "ma.nag br' Date: 00.144.2.41 Approved by City Engineer: /,1.- tJ ( Date: q /51 rLp1,7 1! Approved by City Manager: (Required for change orders $25,000 and above) Date: From: Dave Palmer Dave@basile-dig.com (v Subject: Existing Mh at Sweetwater Highschool Date: July 2, 2020 at 4:12 PM To: Alex Preciado alex@ppc-sd.com Cc: Richard Talley richard@ppc-sd.com, Dan Mason Dan@basile-dig.com, Jeff Reese Jeff@basile-dig.com, Steve Moreno Steve@basile-dig.com, Adam Child adam@basile-dig.com Alex, We will need to submit a RFP because our contract item number 10-016 for 7 each 5' Sewer Manhole at $16,000.00 covers pricing for manholes in 3 different site conditions. The 3 were averaged together for the District provided bid quantity. They are as follows; 1. 2 Each Manholes in Existing Street (13.1'-22') @ $21,914 = $43,828 2. 1 Each Deep Cut ManholeLD=22') in Ball Field @$17,716 = $17,716 3. 4 Each Offsite Manholes (Avg. Depth = 12.3') @ $12,663 = $50,652 TOTAL = $112,196 Since the new replacement manhole is approximately 24' deep, we believe the $17,716 for the deep cut manhole above is a fair price. We will also need to bill for the one additional Remove Existing 48" Manhole @ $2230 under contract item number 10-010 and one additional Manhole Locking Device @ $1460 under contract item number 10-017. We will also need bill for the additional manhole shield/ shoring under the Shoring & Bracing contract item number 10- 022. It works out $3740. Please let me know if this is agreeable with you. Regards, Dcwe, Pcamter Chief Estimator Basile Construction, Inc. 7952 Armour Street San Diego, CA 92111 Phone: 858-586-7800 ext.102 Fax: 858-586-7809 E-mail: dave@basile-dig.com From: Alex Preciado <alex@ppc-sd.com Sent: Wednesday, July 1, 2020 8:39 AM To: Jeff Reese <Jeff@basile-dig.com> Cc: Adam Child <adam@basile-dig.com>; Steve Moreno <Steve@basile-dig.com>; Richard Talley <richard@ppc-sd.com>; Dan Mason <Dan@basile-dig.com> Subject: Fwd: Existing Mh at Sweetwater Highschool Good Morning Jeff, As mentioned below, we will need to replace the existing manhole that was found yesterday. We have a line item that we can pay this manhole under or submit a RFP if Basile believes this is outside of the line item price. Please submit the manhole submittal for this location, attached is a detail for your reference. 1 at ma knmni if vnii haves am/ rriiact-innc P1 SEWER UPSIZE PROJECT CHANGE ORDER NO. 3 CIP NO. 18-07 DATE: - WORK PERFORMED BY: Basile Construction DESCRIPTION OF WORK: Shoring and Bracing for the Removal and Installation of Sewer Manholes ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT Operator - Group 8 Laborer - Group 3 1) Manhole Shields 1) Delivery/Pick Up MH Shields Unit HR HR Unit DAY DAY Qty 8.00 4.00 Wage 77.68 59.35 Total 621.44 237.40 Sub -Total Labor: Labor Burden (31%): Labor Markup (20%): TOTAL LABOR: Qty 3.00 2.00 Rate 259.12 100.00 $ 266.24 $ 225.02 Total 777.36 200.00 Sub -Total Materials: Taxes (8.75) Materials Markup (15%): 146.60 TOTAL MATERIALS: $ 977.36 $ EQUIPMENT Unit Qty Rate Total 1) 360 Komatsu Excavator HR 8.00 140.91 1,127.28 Sub -Total Equipment: Equipment Markup (15%): TOTAL EQUIPMENT: $ 1,127.28 $ 169.09 SUB TOTAL: $ 1,296.37 $ 3,770.43 $ 858.84 C 2010 -31 R► CEIVED ENG & PVI' DEPT. 2020 AM 12 P 1: 3 9 CHANGE ORDER MEMORANDUM ;ITY OF NATIONAL CITY August 6, 2020 To: Roberto Yano, P.E. Director of Engineering & Public Works/City Engineer Jose Lopez, P.E. Deputy City Engineer Engineering and Public Works Department City of National City From: Alex Preciado Project Manager Project Professionals Corp Project: P1 Sewer Upsize Project CIP No.: 19-43 Subject: Change Order No. 9 Change Order No. 9 provides for: The additional 95 lineal feet of jack and bore per Bid Line Item #17 — Jack and Bore 18" sleeve and place 12" PVC sewer main within sleeve. Supporting Information: As referenced in Change Order #1 and #2 , the Contractor located the existing 48-inch manhole and sewer main alignment approximately 52 feet south of the alignment shown on the plans. The record drawings and site findings determined that the existing sewer alignment crosses under the existing 60- inch storm drain per this alignment. To not compromise the existing storm drain, it was determined to jack and bore beneath the storm drain. This will eliminate deep excavation, deep shoring and reduce safety risks for all sewer main installation operations around the existing storm drain. Time Adjustment: Fifteen (15) additional days are added to the contract time for the additional 95 lineal feet of jack and bore. Cost Adjustment: The additional 95 lineal feet of jack and bore will be paid for under a line item adjustment for line item #17 — Jack and Bore 18" Sleeve and place 12" PVC Sewer Main within Sleeve. Line Item #15 will be reduced by 95 LF a total line item amount of $18,905.00. The billing statement will reflect payment on line item #15 — 12" Sewer Main by Open Trench and recover the deduction on Change Order #9 line item. All costs were reviewed by the Project Manager and seem fair and reasonable for this work. Change Order Items Line Item #15 — Sewer MH Abandon Total Cost of Change Order Pro 'ct Manager Date (18,905.00) $(18,905.00) P1 SEWER UPSIZE PROJECT CHANGE ORDER NO. 9 CIP NO. 19-43 August 6, 2020 Contractor: Basile Construction, Inc. 7952 Armour Street San Diego, CA 92111 This Change Order modifies Contractor's and the City's obligations and rights under the abovementioned contract. This change order is not effective until approved by the City. Time adiustment: Fifteen (15) working days are added to contract time for the additional 95 lineal feet of Jack and Bore installation of 12" PVC Sewer Main. Cost of Change Order: The City and the Contractor agree that the Contractor shall proceed with the additional 95 lineal feet of jack and bore per a line item adjustment under Line Item #17 — Jack and Bore 18" sleeve and place 12" PVC sewer main within sleeve per the attached jack and bore exhibit. The City and the Contractor agree to reduce Line Item #15 — 12" Sewer Main by Open Trench by 95 Linear Feet for a total line item amount of $18,905.00. The City and the Contractor agree to reduce line item #15 by $18,905.00. The billing statement will reflect payment on line item #15 and recover the deduction on Change Order #9 Line Item. Total Cost of Change Order (18,905.00) $(18,905.00) Recommended by Project Manager: Date: 4hfl?,v2A By signing this Change Order the Cont ctor confirms that he/she is completely familiar with and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorpora -. -rein. The signer for the Contractor confirms that he/she is authorized to bind the Contractor to this C • rder. Agreed and Accepted by Contractor: ' (Print Name and Title) Dan ',won Date: (.* v1 ZO?0 Approved by City Engineer: Date: 1 1 30,9 1' Approved by City Manager: (Required for change orders $25,000 and above) Date: SCALE: I1 60' MH 174 8+55.32 C ONSU L T I N G Planning Engineering Surveying 9555 Genesee Avenue, Suite 200 San Diego. CA 92121, (958) 587-8070 10+97.61 MH 175 IE IN 23.08 13+13.38 SD TOP 30.70 19.88' TO CL SWR SD BTM 24.70 MH 176 15+90.46 IE OUT 22.57 14+72 IE 23. 73 14+13.97 NEW MH 13+77.95 SD TOP 32.20 AT SEWER SD BTM 26.20 SWR IE 23.56 SWR TOP 24.64 CLEAR 1.56 NOTE: 2020 08 04 P1 SEWER UPSIZE SD POT HOLE SHOTS Dog: p:\0313-1 p-1 sewer upsize\g survey \313—f s.dwg Plot'd: 8/5/2020 4.-44:59 PM Judith Hernandez From: Alex Preciado <alex@ppc-sd.com> Sent: Friday, August 7, 2020 12:08 PM To: Judith Hernandez Cc: Carla Hutchinson Subject: CIP No. 19-43 P1 Sewer - Jack & Bore Change Order Attachments: PPC final w-o Iine.tiff; City of National City CCO #9.pdf CAUTION: This email originated from outside your organization. Exercise caution when opening attachments or clicking links, especially from unknown senders. Hi Judy, Please see attached change order for processing. Let me know if you have any questions. Thanks, Alex Preciado, CMIT Construction Manager 4499 Ruffin Road, Suite 250 San Diego, CA 92123 Office 858.634.8180 Fax 858.634.8184 1 CONTRACT TRANSMITTAL FORM (Attach as Cover Sheet to Documents dropped off to City Clerk's Office) Date: From (Dept.): / r7 _ 1 0 re 1 q� Submitted by (First & Last Name): TV p(/ �h /� 2{ n6-4 n 41) e 2 Vendor: Resolution: YES / NO Resolution No. (if applicable): Ch 19 ►� c,t AA). 1 2 3 4 Originals Provided to City Clerk (Select Quantity) 000 Department has Copy / Duplicate Original Vendor has Copy / Duplicate Original ct