Loading...
HomeMy WebLinkAbout2020 CON Portillo Concrete - Euclid Avenue Bicycle and Pedestrian Enhancements, CIP No. 18-10 - Change Order #10 and #11Znta ggoingre . RECEIVED ENG & PW DEPT. -CALIFORNIA- tualiONAL Crry kidi Euclid isiid Pecfilsiiii3n Enhancements CHANGE ORDER NO. 10 July 27, 2020 Reason/Purpose for this Change Order: The city has directed the contractor to perform additional fiber splicing as needed to toiled recently provided as -built drawings. The City of National City and Contractor agree to the following change to the original Contract: The city has directed the contractor to cut, re -splice and test recently installed fiber per the revised as -built drawings. All work will be performed at the lump sum price listed below and includes all labor, equipment and materials necessary for installation. Additional working days have been deferred until the overall impact can be evaluated Original Contract Amount $ 4,060,691.00 Net change by previously authorized Change Orders.. . . Subtotal Amount of this change order 180,778.47 4,241,469.47 1,253.95 New contract amount $ 4,242,723 42 Working days added: 0 Working days subtracted: 0 Percent change in Contract to date 4.48% Submitted by: ee---44:461 ' Project Manager 7/28/20 Date rojet lna Wii4pg,0 Date City Dat City Manager, named far am** Orals MOOS Date By signing this Chahe Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved. Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above al that the price stated herein. Addihonally. Contractor confirms that the price is fair and complete and represents all costs associated with the work. including but not limited to all equipment, materials, tabor. supervision. overhead, fees, bonds, insurance. profit, etc. and that there will be no further compensabon. All of the terms and conditions of the original contract documents are incorporated herein. (2 originals: 1 for City Clerk, 1 for Contractor) Acce ted and agreed to Portillo Concrete, Inc. 7,4./ Date Name: 41 eimedi-fitti, Note to Contractor: If you do nol agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest You must comply with the contract requirements of submilling a written protesl to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National Clty Boulevard, National City, CA 91950 Telephone (619) 336-4380 NI CONCRETE INC 3527 CITRUS ST, LEMON GROVE, CA. 91945 OFFICE: (619) 466-4639 FAX: (619) 466-4685 National City - Euclid Ave Bicycle and Pedestrian Enhancement Request for Change Order Contractor: Description / Reason for Change: Select Electric Inc.. 6/30/2020 As -built plans as to how work was to be performed were provided after Select had already completed the work per plan. This cost is to replice the fiber lines to match the as -built set. Description COR Price Cut, re -splice and test the fiber per new as -built plans 7 $ 1,194.24 PCI Mark Up Change Order Total 5% $59.71 SELECT El ECTRIC Change Order Request Proposal Date: 06/30/20 COR: Job No.. 3454.07 3454 Project Name: Euclid Avenue Bicycle and Pedestrian Enhancements (National City CIP No. 18-10) To: Michelle Nguyen Reference: Email received from Portillo Dated 06-24-20 To Whom It Concerns, Select Electric, Inc. is pleased to provide this Cost Proposal described below: Scope of Work Under this Change: Cut, re -splice and test the fiber per new as -built plans Total: $1194.27 Exclusions: All exclusions listed in the original contract Concrete/Asphalt Paving/Ramp Restoration Ramp Demo & Dump Fees Any/All Traffic Control Price Quotation and Time Requirements SEI proposes to perform the above -described extra work on the following basis: ® Lump Sum Price of One Thousand One Hundred Ninety Four Dollars and Twenty Seven Cents ❑ Hourly Rate for Labor and Equipment as listed in the "Scope" Section. performance of this extra work will require a time extension of TBD Calendar Days. We appreciate your consideration and, should you have any questions or comments, please contact the undersigned. Work can not start until a written acceptance of this proposal is received. Sincerely, Rosa Loloee Select Electric Inc. Please Note: The price quoted is based on work being performed under normal conditions including reasonable access to the work. The proposed price does not include extra costs for performance of work out of sequence, schedule delays, acceleration, extended overhead, or any other impacts caused by the cumulative effect of changes on original contract work. Select Electric Inc. hereby reserves all rights to re-evaluate its costs and seek equitable adjustment should it become evident that costs have been impacted by any of the above causes. Should it be impractical to determine any time impacts at the time of submittal of this Proposal, Select Electric Inc. reserves its rights to seek appropriate time extensions should it become evident at a later date that this extra work contributed to project schedule delays. Rate Extended Amounts 84.00 $ 672.00 $ 672.00 672.00 most Ext. Amount 16.00 16.00 16.00 )% 1.28 17.28 Dost Ext. Amount $ COR No: Date Submitted: G.C./Agency: Job No: Prepared By: Ref No: EQUIPMENT Hours Hourly Rate Extended Amounts Fiber truck 8 $ 40.00 $ 320.00 $ - $ - $ - $ - $ - $ - - $ - $ - - $ - $ - Total Cost of Equipment $ 320.00 Total Cost of Labor 672.00 Labor Mark-up 20.00% 134.40 Total Cost of Equipment 320.00 Equipment Mark-up 15.00% 48.00 Total Cost of Material 17.28 Material Mark-up 15.00% 2.59 (B) California Sales Tax 0.00 Total Cost of Subcontracted Work 0.00 Subcontracted Work Mark-up 15.00% 0.00 Sub -total 1194.27 Bond & Insurance 0.00% 0.00 Other Total Cost 1194.27 RECEIVED ENG & D.EPT. Z� ti1 d e and Pedestrian Enhancements CHANGE ORDER NO 11 • CITI`tL ClT'( August 17, 2020 . Contractor: Portillo Concrete, Inc.. Reason/Purpose for this Change Order • The city has directed the contractor to perforr'tt additional work per the revised design plan at the NW corner of Euclid and Division. The City of National City and Contractor agree to the following change to the original Contract The city has directed the contractor to perform additional work per the revised design plan issued by Kimley- Hom for the NW corner of Euclid and Plaza. This revised plan changes the layout to the previous curb and gutter, sidewalk, traffic signal poles and foundations, pedestrian push button locations and foundations, revised survey and other misc. improvements. This change specifically includes all traffic signal and survey work. All work identified will be performed at the lump sum price listed below and includes all labor, equipment and materials necessary for installation Original Contract Amount $ 4,060,891.00 Net change by previously authorized Change Orders,... 102,032.42 Subtotal...... _..... .............................. 4,242,723.42 Amount of this change order.. 10,347.65 New contract amount $ 4,253,071.07 Working days added: 20 Working days subtracted: 0 . Percent change In Contract to date 4.74% Submitted by: 8/18/20 Project Manager Ci ojec M . ag. j/ Date APPnw by: aif l 2-02ci City ngineer s/ bate City Manager, required ter Charge Orders .524.999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees. bonds. insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. (2 originals: 1 for City Clerk, 1 for Contractor) Accepted and aar�b�i Po/tifto Concrete, Inc. Name-Z�? Am/to Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 POI PORTLLO CONCRETE INC 3527 CITRUS ST, LEMON GROVE, CA. 91945 OFFICE: (619) 466-4639 FAX: (619) 466-4685 National City - Euclid Ave Bicycle and Pedestrian Enhancement Request for Change Order Submitted: Contractor: Days: Description / Reason for Change: revl 7/14/2020 Select / BDS 20 The design at the NE corner of Plaza is being redesigned due to the origional not having a turn pocket to head westbound on Plaza. Portillo work to demo existing curb in place and plug pipe under abandoned basin on the East side of the bulb out shall be on T&M basis. Other outstanding work for PCI and Statewide to be charged to contract line items. Description CAR Price BDS - $ 2,836.00 Select - $ 7,018.90 PCI Mark Up Change Order Total 5% $492.75 'BUS Engineering, Inc. Civil Engineering Land Surveying Thomas Jones, PE, LS, Principal July 14, 2020 Ms. Rachael Portillo Portillo Concrete, Inc 3527 Citrus St. Lemon Grove, CA 91945 Ref: Add Service for Construction Change Staking for: Euclid Ave Bicycle and Pedestrian Enhancements and Barrier Removal at Northwesterly corner of Euclid and Plaza National City, CA BDS 19-26 Dear Rachael: This proposal replaces in full the proposal dated July 7th. Based on the emails received for the construction change at the NW corner of Euclid and Plaza, we have estimated an additional 5 hours of 2 person survey crew (prevailing wage), 3 hours of 2 person survey crew travel, 5 hours of office calc's and prepare cut sheets and 0.5 hours of engineer to review. Based on these hours I have estimated our additional fee to be say '2 [<'C,OO, which we could provide on a time and materials basis, per our current fee schedule. We must have the approved acad files, prior to providing our services. If you have any questions, please do not hesitate to call. As always the opportunity to be of service is sincerely appreciated. Very truly yours, BDS Engineering, Inc. Civil Engineers Thomas A. Jones 5575 Lake Park Way, Suite 114, La Mesa, California 91942 619-582-4992 Fax 619-582-7428 Established 1973 L:\PROJECTS\1926\Admin\06 Proposals\add service constr change staking per email lhra 7-14-20. doc SELECT ELECTRIC Change Order Request Proposal Date: 07-13-20 COR: 3454.08 (Rev 1) Job No.: 3454 Project Name: Euclid Avenue Bicycle and Pedestrian Enhancements (National City CIP No. 18-10) To: Michelle Nguyen Reference: Email received from Portillo Dated 07-07-20 To Whom It Concerns, Select Electric, Inc. is pleased to provide this Cost Proposal described below: Scope of Work Under this Change: Install new relocated ped post and 1A foundations, extend conduit runs and intercept base pipes, install additional #5 pull box and cut anchor bolts(existing foundations). Total: $7,018.90 Exclusions: All exclusions listed in the original contract Concrete/Asphalt Paving/Ramp Restoration Ramp Demo & Dump Fees Any/All Traffic Control Price Quotation and Time Requirements SEI proposes to perform the above -described extra work on the following basis: ® Lump Sum Price of Seven Thousand Eighteen dollars and Ninety Cents ❑ Hourly Rate for Labor and Equipment as listed in the "Scope" Section. performance of this extra work will require a time extension of TBD Calendar Days. We appreciate your consideration and, should you have any questions or comments, please contact the undersigned. Work can not start until a written acceptance of this proposal is received. Sincerely, Rosa Loloee Select Electric Inc. Please Note: The price quoted is based on work being performed under normal conditions including reasonable access to the work. The proposed price does not include extra costs for performance of work out of sequence, schedule delays, acceleration, extended overhead, or any other impacts caused by the cumulative effect of changes on original contract work. Select Electric Inc. hereby reserves all rights to re-evaluate its costs and seek equitable adjustment should it become evident that costs have been impacted by any of the above causes. Should it be impractical to determine any time impacts at the time of submittal of this Proposal, Select Electric Inc. reserves its rights to seek appropriate time extensions should it become evident at a later date that this extra work contributed to project schedule delays. Iivd NW Re -design Rate 86.77 64.78 84.09 Extended Amounts $ 1,3138.32 $ 1,036.48 $ 672.72 $ $ 3,097.52 0% $ 3,097.52 Cost Ext. Amount 650.00 650.00 150.00 70.00 150.00 70.00 $ $ 870.00 0% $ 69.60 939.60 Cost Ext. Amount COR No: Date Submitted: July 13, 2020 G C /Agency: National City Ref No: Job No: 3454 Prepared By: Select Electric EQUIPMENT Hours Hourly Rate Extended Amounts WORK TRUCK WITH ATTACHMENTS 24 $ 40.00 $ 960.00 AIR COMPRESSOR 8 $ 14.00 $ 112.00 Mini Excavator 8 $ 107.45 $ 859.60 $ - $ - $ - $ - $ - $ - $ $ - $ Total Cost of Equipment $ 1,931.60 Total Cost of Labor 3097.52 Labor Mark-up 20.00% 619.50 Total Cost of Equipment 1931.60 Equipment Mark-up 15.00% 289.74 Total Cost of Material 939.60 Material Mark-up 15.00% 140.94 (B) California Sales Tax 0.00 Total Cost of Subcontracted Work 0.00 Subcontracted Work Mark-up 15.00% 0.00 Sub -total 7018.90 Bond & Insurance 0.00% 0.00 Other Total Cost 7018.90 c Date: CONTRACT TRANSMITTAL FORM (Attach as Cover Sheet to Documents dropped off to City Clerk's Office) '7>/((l-p From (Dept.): r? Toretloi Submitted by (First & Last Name): Tv 31 h nU n Vendor: V /19 6/7 c)/e Resolution: YES / NO 6A4 ,- e ✓c�e� O cS5 Resolution No. (if applicable): a. 7 / 1 2 3 4 Originals Provided to City Clerk (Select Quantity) -0000 Department has Copy / Duplicate Original ip__ Vendor has Copy / Duplicate Original