CHANGE ORDER MEMORANDUIV iTY OF NATIONAL CITY
August 12, 2020
To: Roberto Yano, P.E.
Director of Engineering & Public Works/City Engineer
Jose Lopez, P.E.
Deputy City Engineer
Engineering and Public Works Department
City of National City
From: Alex Preciado
Project Manager
Project Professionals Corp
Project: P1 Sewer Upsize Project
CIP No.: 19-43
Subject: Change Order No. 7
Change Order No. 7 provides for:
The additional 48.9 tons of %-inch rock for the rock bedding of the new 12-inch PVC sewer main.
Supporting Information:
During operations to install the new 12-inch PVC sewer main, the Contractor encountered unsuitable
subgrade throughout the entire span of the trench line within Sweetwater High School's ball field. The
existing 8-inch VCP Pipe had various sags and inconsistencies that allowed for the surrounding soils to
saturate over time. At this time Atlas Engineering West, the Soils Tech Engineering firm for this project,
analyzed the existing conditions and recommended to over -excavate and place 12-inches of %-inch rock
to stabilize and provide uniform support of the pipe to prevent sag. The additional 6-inches of rock
bedding will minimize future City maintenance.
Time Adjustment:
Zero (0) additional days are added to the contract time for the additional 48.9 tons of -inch rock.
Cost Adjustment:
The additional tonnage needed was captured under an agreed lump sum price. Attached is the
calculation breakdown and analysis for the additional 48.9 tons needed for the additional 6-inch rock
bedding. The total amount for this material is $989.99.
rgJect Manager
g'ZQLo
Date
C.,
0%121)
k
- cPlt�i oBNi� -•�
NATI , ' ' CHIT
- tNa6xi�o�ilT>��
P1 SEWER UPSIZE PROJECT CHANGE ORDER NO. 7
CIP NO. 19-43 August 12, 2020
Contractor: Basile Construction, Inc.
7952 Armour Street
San Diego, CA 92111
This Change Order modifies Contractor's and the City's obligations and rights under the
abovementioned contract. This change order is not effective until approved by the City.
Time adjustment:
Zero (0) working days are added to contract time for the additional 48.9 tons of %-inch rock for the rock
bedding of the new 12-inch PVC sewer main.
Cost of Change Order:
The City and the Contractor agree that the Contractor shall proceed with the
procurement and placing of additional 48.9 tons of %-inch rock per the attached
Geotech recommendation to stabilize and provide uniform support of the pipe to
help prevent sag. All associated work, labor, materials, and equipment is captured
under an agreed lump sum price of $989.99.
Total Cost of Change Order
Recommended by Project Manager:
$989.99
$ 989.99
Date: `S/3je_ 20
By signing this Change Order the Con actor confirms that he/she is completely familiar with and has fairly
negotiated Its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the
equipment, materials and labor necessary to provide a complete work as described above at that the price
stated herein. Contractor confirms that the price is fair and complete and represents all costs associated with
the work, including but not limited to all e. '.ment, materials, labor, supervision, overhead, fees, bonds,
insurance, profit, etc. and that there will b• no urther compensation. All of the terms and conditions of the
original contract documents are incorpo :ted erein. The signer for the Contractor confirms that he/she is
authorized to bind the Contractor to this han: • Order.
Agreed and Accepted by Contractor:
(Print Name and Title)^,5pyt
Approved by City Engineer:
Approved by City Manager:
(Required for change orders $25,000 and above)
Date: 06. t3 ZOWD
Date: 9 % lsllp2o
Date:
CALIFORNIA —
NATIONAL CITY
331
1PYf'OMpon Alto
P1 SEWER UPSIZE PROJECT CHANGE ORDER NO. 7
CIP NO. 18-07
DATE: -
WORK PERFORMED BY: Basile Construction
DESCRIPTION OF WORK: Additional 6-inches of 3/4" Rock for Sewer Rock Bedding Material
ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT
Unit Qty Rate Total
1) 3/4" Rock TON 48.90 17.40 850.86
2) Environmental Fees EA 2.00 5.00 10.00
$ 860.86
SUB TOTAL:
989.99
GRAND TOTAL:
Sub -Total Materials:
Materials Markup (15%): 129.13
TOTAL MATERIALS:
'-i' aIja 9
1A3 et
u(►�1 ovsh = GnQC /0') ")ht'*.
eqs 3)(4► SU AO tb' o'b
__ ,r X _—
OP•Szt,
4h'b`)1
chte
kbYU+fl
tb 4t+h1
Yt +-1 1,1
')h -3{h1
4-1 a)h11r`)%i
Y-2-? VO Q
a it-1
ob+S1
° tt W
-►�cyn,�tti`-�
t* mar} 39sT VI
Atlas Engineering West, Inc. - San Diego
LEA: 47, Exp: 04/25/2021
6280 Riverdale St.
San Diego, CA 92120
Phone: (619) 280-4321
Fax: (619) 280-4717
Soils Field Report
Client:
Project:
City of National City
1243 National City Boulevard
National City, CA 91950-4301
170309P4.21
City of National City, P1 Sewer Upsize Project CMT
D Avenue
National City, CA 91950
Date: 07/22/2020
Technician: Thomas, Adam
Jurisdiction: Other
Contractor Performing Work: Basile
Report Number: 1
Certification: ICC Soils# 8063222
Other Jurisdiction:
City of National City / Sweetwater Unified School District
Start Time: 06 30
End Time: 14:30 Time (Hours): 8.00
Location Details: (Trench Backfill) Line L-6, 12" Sewer Approx. Sta. 9+65 - 10+05
Type of Inspection: Backfill Observation / Pre Grade Inspection Frequency Is: Periodic
Equipment Being Utilized: Komatsu WA320 Loader, Komatsu PC 360 LC Excavator, 350G Excavator
Source of Material: Native
Description of Material: Brown silty, clayey, sand (SC)
Compaction Was Confirmed by Means of: N/A
Details:
I arrived on -site for observation and testing of trench bedding and backfill.
(Site Meeting) I discussed with Higgy (Atlas Project Manager), Richard Tally (Inspector), the suitability of trench bottom. Trench had been
excavated approx. 21-22' depth. Soil is soft, loose, and wet ,and manually probes with easy effort. We agreed that 12" thickness of 3/4"
rock bedding (over -ex an additional 6") would be more suitable to stabilize and provide uniform support of the pipe to help prevent sag.
Referenced Special Provisions Section 306-7.1.1 and 306-7.7.1.
(Trench Backfill) I observed placement of 3/4" rock Bedding at 12" thickness across bottom of trench. Pipe was installed. 3/4" rock was
placed in pipe zone around haunches to 12" above top of pipe. Detectable tape was was installed.
Shoring shields being moved loose soil collapsed over pipe zone. I spoke to contractor, contractor will dig down and recompact trench
zone backfill.
Atlas scheduled to return tomorrow for observation and compaction testing of trench backfill.
I sampled soil from spoils stockpile and returned to lab for testing:
Sample# 1
Lab Meta# 55793
Soil Description: Brown Clayey Sand (SC)
Sample Location: Sewer trench spoils at approx. Sta. 9+80 - 10+00
Lab Tests scheduled: Modified Proctor (ASTM D1557)
cc: Project Architect;
Structural Engineer;
Project Inspector;
DSA Regional Office (If Applicable);
Page 1 of 2
�T�TTL�T�
Atlas Engineering West, Inc. - San Diego
• LEA: 47, I~xp: 04/25/2021
6280 Riverdale St.
San Diego, CA 92120
Phone: (619) 280-4321
Fax: (619) 280-4717
Soils Field Report
Client:
Project:
City of National City
1243 National City Boulevard
National City, CA 91950-4301
170309P4.21
City of National City, P1 Sewer Upsize Project CMT
D Avenue
National City, CA 91950
Caption: Adjusting grade with 3/4" bedding rock
E
,
Caption: Install sewer tape 12" over top of pipe
F NF.
E
SE
O S0-NE (T) • 32 660235,-117.0959/2 tam ♦ 22 rn
Caption: Soil sampling trench spoils
0 74'NE (T) • 32.6602,-117.095836 59m ♦ -5 m
22 Jul 2020.0908 4fi
O 53*NE (T) • 32d60219. -117.0"16ii021 t6m A 35 m
d
♦
Caption: Soil collapsing during moving shoring shield
0 55'NE (T) • 32.660218, -117.095949 t12m ♦ 17 m
Status of Work Element Requiring Inspection: Work Element Inspected Pending Completion.
Discrepancy: No
cc: Project Architect;
Structural Engineer;
Project Inspector;
DSA Regional Office (If Applicable);
Page 2 of 2
Judith Hernandez
From: Alex Preciado <alex@ppc-sd.com>
Sent: Thursday, August 13, 2020 8:50 AM
To: Judith Hernandez
Cc: Carla Hutchinson
Subject: CIP No. 19-43 P1 Sewer
Attachments: PPC final w-o line.tiff; CCO #7.pdf
CAUTION: This email originated from outside your organization. Exercise caution when opening attachments
or clicking links, especially from unknown senders.
Good Morning Judy,
Please see attached change order for processing.
Let me know if you have any questions.
Thanks,
Alex Preciado, CMIT
Construction Manager
4499 Ruffin Road, Suite 250
San Diego, CA 92123
Office 858.634.8180
Fax 858.634.8184
1
G20LG- 32
CONTRACT TRANSMITTAL FORM
(Attach as Cover Sheet to Documents dropped off to City Clerk's Office)
Date:
From (Dept.):
,T 0 re fini
Submitted by (First & Last Name): U p(/ !-1 e{ rla
Vendor:
Resolution:
(efiefe--
ale2-
YES / NO ct v 9Y/7
Resolution No. (if applicable):
2 3 4 Originals Provided to City Clerk (Select Quantity)
000
Department has Copy / Duplicate Original
Vendor has Copy / Duplicate Original