HomeMy WebLinkAbout2020 CON Basile Construction Inc. - P-1 Sewer Upsize Project for Sweetwater High School, CIP No. 19-43 - Change Order #6PROJECT PROFESSIO LS CORPORATION
CHANGE ORDER MEMORANDUM
CONFIDENTAL
NOT FOR DISCOVERY OR DISTRIBUTION
August 26, 2020
To: Roberto Yano, P.E.
Director of Engineering & Public Works/City Engineer
Jose Lopez, P.E.
Deputy City Engineer
Engineering and Public Works Department
City of National City
From: Alex Preciado
Project Manager
Project Professionals Corp
Project: P1 Sewer Upsize Project
CIP No.: 19-43
Subject: Change Order No. 6
RECEIVED
ENS & FV/ DEFT.
N20 SEP -3 P 3: 15
''ITY OF NATIONAL CITY
Change Order No. 6 provides for:
The additional costs and time for the additional excavation and sloping to stabilize the open excavations
during the open trench sewer main installation due to the unforeseen unstable soils that caused an
unreasonable loss of production. This change order does not address additional restoration efforts, if
any, which are currently under analysis and negotiation.
Supporting Information:
As the contractor began excavation on the installation of the new sewer main in the Sweetwater
Highschool sports field the sides of the excavation continually collapsed into the trench which did not
allow for the placement of box shoring. Due to the rapid collapse of the trench, the soil pressures exerted
on the box shores once placed did not allow for digging between the shoring and the removal of the box
shores.
At this time, Atlas Engineering West, the project soils engineer, were requested to come on site and
perform a boring within the sewer main alignment to analyze the soil and driving resistance within this
area. The boring log identified loose, clayey sands. In review of the as -built plans, we identified the entire
field to be a fill site with the same material, most likely bay dredging's. This material must have been
placed without much, if any, compaction effort.
The only remaining options were to use soldier pile shoring or open V-trench down approximately 10 feet
first, then place box shoring for the remainder. Since we are in the open field the contractor was directed
to open V-trench as it is significantly less expensive.
The contractor's base bid for this work is $190 per lineal foot of installed sewer. At a daily confirmed
actual cost of $11,300.39 per day for labor and equipment the bid production could be expected to hit
approximately 60 feet per day. This is a reasonable expectation for a sewer installation of this depth. A
reasonable variance from this production could be argued to be up to 10% of reasonable production or 54
feet per day. Actual production was at 26 feet per day. The contractor was diligent in all their
construction efforts with the proper equipment and experienced labor and operators. The additional
excavation for sloping caused an unforeseeable loss of production and added time to the original
schedule.
The contractor's reasonably foreseeable worst daily production of 54 feet per day would total 7 days for
the installation of the of sewer main from station 9+25 to station 13+13 in question. It took the contractor
15 days to install this stretch of sewer. This should account for a loss of production equivalent to 8 days
at $11,300.39 per day for a value of $90,403.12.
The contractor was directed to submit an analysis to support their claim for an extra due to the
unforeseen soil condition. They submitted a request for 4.63 days at $11,300.39 per day for a base claim
of "$45,237.63" minus no longer required addition shoring credit of ($1,966.50) for a total claim of
"$43,271.13". This total is not the product of the days times the dollars minus credit, but it is the total
dollars requested. The correctly calculated amount is $50,354.31. It appears they based their worst
reasonable production at 35 feet per day.
Attachments
A — Cost Breakdowns
B — Project Schedules
C — Original Geotech Boring Logs
D — School Site Boring Log
E — Sloping Exhibit
Time Adjustment:
Five (5) additional days are added to the contract time for the additional time to excavate and backfill the
additionally required excavations for the open trench sewer main installation operation.
Cost Adjustment:
Change Order Items
Additional Costs for Open Trench Sewer
Main from station 9+25 to 13+13
$45,237.63
Trench Shoring System Material Credit
(1,966.50)
Total Cost of Change Order
$43,271.13
4 Aece,d
Project Manager
9/8/2020
Date
P1 SEWER UPSIZE PROJECT CHANGE ORDER NO. 6
CIP NO. 19-43 August 26, 2020
Contractor: Basile Construction, Inc.
7952 Armour Street
San Diego, CA 92111
This Change Order modifies Contractor's and the City's obligations and rights under the abovementioned
contract. This change order is not effective until approved by the City.
Time adjustment:
Five (5) working days are added to contract time for the loss of production due to unforeseen soils
conditions that required additional excavation and sloping to stabilize the open excavations for the open
trench sewer main operation.
Cost of Change Order:
The City and the Contractor agree that the existing soil conditions within Sweetwater
High School sports field are not within what could be reasonably expected and caused
a loss of production. The City and the Contractor agree that the Contractor's
additional excavation and trench sloping is needed to stabilize the side walls of the
open excavations to reduce the risk of trench cave ins. This additional effort is required
for the installation of the sewer main from station 9+25 to 13+13 in the sports field,
The City and the Contractor agree that all costs associated with the additional
excavation, sloping and backfill is an agreed upon lump sum price of $43,271.13 and
does not include any additional sports field restoration efforts, If any.
$43,271.13
Total Cost of Change Order $43,271.13
Recommended by Project Manager:
Date: 9/
By signing this Change Order the Contractor confirms that he/she is completely familiar with and has fairly
negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the
equipment, materials and labor necessary to provide a complete work as described above at that the price
stated herein. Contractor confirms that the price is fair and complete and represents all costs associated with
the work, including but not limited to all e.uipment, materials, labor, supervision, overhead, fees, bonds,
insurance, profit, etc. and that there will . n • further compensation. All of the terms and conditions of the
original contract documents are Incorpo ated erein. The signer for the Contractor confirms that he/she Is
authorized to bind the Contractor to this Chan e Order.
Agreed and Accepted by Contractor:
(Print Name and Title) Dan InQ'at
Approved by City Engineer:
Approved by City Manager:
(Required for change orders $25,000 and above)
Date: 0 { p2 Z.OZ0
Date: /0/6/Zo?o
Date: / 01 fjb Zjr
1/
��ALIFORNIA -
NAiiONAL CflY
rticortE•ox
Ait
P1 SEWER UPSIZE PROJECT CHANGE ORDER NO. 6
CIP NO. 18-07
DATE: 7/17/2020 - 7/18/2020
WORK PERFORMED BY: Basile Construction
DESCRIPTION OF WORK: Additional 4.63 days for 12" Sewer Main Installation due to Unstable Soil
Conditions
ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT
1) Foreman
2) Operator - Group 8
3) Laborer - Group 3
4 Laborer - Group 4
Unit
HR
HR
HR
HR
Qty
37.04
74.08
37.04
74.08
Wage
77.68
77.68
59.35
57.94
Total
2,877.27
5,754.53
2,198.32
4,292.20
Sub -Total Labor:
Labor Burden (31%):
Labor Markup (20%): $ 3 962.05
TOTAL LABOR-11/111111111111
$ 4,687.92
EQUIPMENT
Unit
Qty
Rate
Total
1)
Utility Truck
HR
37.04
40.16
1,487.53
2)
360 Komatsu Excavator
HR
37.04
140.91
5,219.31
3)
350 John Deer Excavator
HR
37.04
140.91
5,219.31
4)
5)
320 Komatsu Loader
Water Truck
HR
HR
37.04
37.04
105.67
31.00
3,914.02
1,148.24
6J
7)
4" Pump
Trench Shields
EA
EA
2.00
2.00
648.55
190.00
1,297.10
380.00
$ 18,665.51
$ 2,799.83
SUB TOTAL:
$ 21,465.34
$ 45, 237.63
EQUIPMENT
Unit
Qty
Rate
Total
1)
Trench Shield Credit
EA
(9.00)
218.50
Sub -Total Equipment:
(1,966.50)
$ (1,966.50)
TOTAL EQUIPMENT:
$ (1,966.50)
GRAND TOTAL:
$ 15,122.32
Sub -Total Equipment:
Equipment Markup (15%):
TOTAL EQUIPMENT:
Original Protect Schedule- Submittal #16
National City
P-1 Sewer Upsize Project
ID p Task IT Name Duration Stan (Finish iPredecessort
y Mode i_...__
IJ.n. IA*
S2415131I N IN/4I e121I6/LI
Augusr Sep«a oaaeer aov.mmm6.r
7/S I j7/1917(2ki.5[2_.Dt4.l3Ctfij4/Si_434j.9/8.ld/1319/20I9(27.1]J(il19i11111/11 01Z511/11LV.41L1L. 31Ji2.3h1
28 n 12 Sewer Main 15 days Mon 7/13/20 Fri 7/31/20
7/31/20 25,26
f
29 a.-. STA 9+25 to 14+50 3 wks Mon 7/13/20 Fri
30 n Sewer Mh4175 3 days Mon 7/20/20 Wed 7/22/20 2955+5 days
31 e► Bypass 81 8 days Mon 6/22/20 Wed 7/1/20
32 e► Setup Sewer Bypass 2 days Mon 6/22/20 Tue 6/23/20 19
33 aP; Dig Receiving Pit F Avenue 3 days Wed 6/24/20 Fri 6/26/20 32
34 Der Install Mh 176 3 days Mon 6/29/20 Wed 7/1/20 32,33
r�
35 m. Bypass a3 8 days Mon 8/3/20 Wed 8/12/20
36 .4 Setup Sewer Bypass 1 day Mon 8/3/20 Mon 8/3/20 28
37 a2. 12 Sewer Main STA 1+00 to 4+75 7 days Tue 8/4/20 Wed 8/12/20 36
38 W. Sewer Mh's 172, 173, 173A & 1738 5 days Thu 8/6/20 Wed 8/12/20 3755+2 days
39 n Bypass 84 28 days Thu 8/13/20 Tue 9/22/20
4o a► Setup Sewer Bypass 5 days Thu 8/13/20 Wed 8/19/20 35
1
41 Of, 12 Sewer Main STA 4+75 to 8+00 2 wks Thu 8/20/20 Wed 9/2/20 40
42 n Install Mh4173C 3 days Tue 8/25/20 Thu 8/27/20 4155+3 days
43 lack & Bore D Avenue 15 days Thu 8/27/20 Thu 9/17/20
44 in Dig lack & Bore Pits 1 wk Thu 8/27/20 Wed 9/2/20 41F5-5 days
45 Perform lack & Bore 10 days Thu 9/3/20 Thu 9/17/20 44
46 r. Install Mh4174 3 days Fri 9/18/20 Tue 9/22/20 43
47 n Bypass 85 2 days Wed 9/23/20 Thu 9/24/20
49 my Connect lack & Bore to Existing 12 2 days Wed 9/23/20 Thu 9/24/2039
49 no Repair Field 3 wks Thu 9/33/20047 Thu 9/24/20 47F5-15 days
50 Pavement Replacemt 1 wk Fri 9/18/20 Thu 9/24/20 31,47F5-5 days
51 Deg Misc Concrete Replacement 2 wks Fri 9/18/20 Thu 10/1/20 43
52 Slurry Seal 1 wk Fri 9/18/20 Thu 9/24/20 43
6111-1
53 e . Punch list 33 days Fri 10/2/20 Thu 11/19/20
54 me. Agency to Conduct Walk-through 3 days Fri 10/2/20 Tue 10/6/20 20,31,35,39,47,45
55 eq Generate Punch List 10 days Wed 10/7/20 Wed 10/21/20 54
56 aG Complete Punch List 20 days Thu 10/22/20 Thu 11/19/20 55
Project Job 2035
Date: Wed 6/10/20
C ♦
mmDeadline
Task Project Summary t 1 Manual Task Stan -only
spit ,,,,,,,,,,,,,,,,,, _. Inactive Task Duration -only Finish -only ] Progress
'1
Milestone ♦ Inactive Milestone Manual Summary Raw External Tasks - Manual Pnyrw
Summary Inactkee Summary 1 1 Manual Summary Ect.nal Mil.stan. 0
Capital Improvement Project No. 19-43 Page 2
dated Proiect Schedule- 8-6-20
National City
P-1 Sewer Upsize Project
113
it Teat N.m. IIDoa Stan Fkdd1 Pndeuswn
Ilum NuI 20
21 . 211.y..L3..1.322
.20 1 Sq'20 1op'20 Nov jO De+'20 21
1 ,6 1 13 30 1 6 L,1i124.1.II..4 11 I 5_ 1 L 5 : 10 1121 13
21 I A
1
.._..... __._ .. ......... ......... ...... ..._.__.___.
V MI Submittals... .... ....._... 6days Fri6/5/20 Fri6/12/20
F12
...11 ..�_.19..1..[1._21.9
.._._! ..:. _...._�...4.1_22..1.29 . ...li...l ......
18
19
40 P-1 Sewer Raplanmens NIP 133 days Mon 6/15/20 Mon 12/28/20
✓ S Mobilization 5 days Mon 6/15/20 Fr16/19/20
gft
iS
36
32
39
36
...20
✓ ml Bypass 81 18 days Man 6/22/20 Thu 7/16/20
✓ ss. Setup Sewer Bypass 5 days Mon 6/22/20 Frl 6/26/20 19
✓ N. Locate Exising Line Delay 9 days Mon 6/29/20 Frl 7/10/20 36
✓ or, Install Mh 176 4 days Tue 7/7/20 Frl 7/10/20 3735+5 days
✓ m. Dig Receiving Pit F Avenue 4 days Mon 7/13/20 Thu 7/16/20 39
A& Bypass 82 45 days Mon 6/29/20 Mon 6/31/20
_
21. ✓ ss. SWR Bypass 13 days Mon 6/29/20 Thu 7/16/20
22 j✓ n Temp Riser C3 5TA 9+25 4 days Mon 6/29/20 Thu 7/2/20 36
23 i✓ .5 Setup Sewer Bypass 4 days Mon 7/13/20 Thu 7/16/20 35F5-4 days
—24 '✓
•�
N lad & Bens F Avenue 13 days Wed 7/15/20 Fri7/31/20
25 ✓ .. Dig Jacking PR 3 days Wed 7/15/20 Frl 7/17/20 3855+2 days
27 ✓ . Perform Jack & Bore 10 days Mon 7/20/20 Frl 7/31/20 25
26 ✓ In Remove Existing SWR Mh 2 days Thu 7/23/20 Frl 7/24/20 3255+3 days
6
le-
1
ilIMM
.-6U
31 .. 12 Sewer M.In 31 days Men 7/20/20 Men 8/31/20
32 5TA 9.25 13+13 days Mon 7/20/20 Fri 8/7/20 25
. to 15
33 . New SWR Manhole 3 days Thu 8/27/20 Mon 8/31/20 286S-2 days
34 ✓ .5 Sewer Mh8175 3days Wed 7/29/20 Fri 7/31/20 32SS+7 days
9
9.
28 an. lack 6 Bore 60. SD 15 days Mon 8/10/20 Fri 8/28/20
29 18.% Dlg Pits 5 days MOn 8/10/20 Fri 8/14/20 24,32
30 .. Jack & Bore 10 days Mon 8/17/20 Fr18/28/20 29
54 r. Repair Field 3 Mon 8/24/20 Mon 9/14/20 30FS-5 days
wks
'rue
Bypass 83 to days 9/1/20 Tue 9/15/20
Setup Sewer Bypass 3 days Tue 9/1/20 Thu 9/3/20 31,28,5455+5 day
12 Sewer Main 5TA 1+00 to 4+75 7 days Fr19/4/20 Tue 9/15/20 41
M.
n Sewer Mh's 172, 173, 1734 & 1738 5 days Wed 9/9/20 Tue 9/15/20 4255+2 days
44 63, 8Y0assU 28 days Wad9/16/20 Mon 10/26/20
Ss R Pavement Replacemt 1 wk Thu 10/22/20 Wed 10/28/20 35,52F5-5 days
56 Misc Concrete Replacement 2 Thu 10/22/20 Wed 11/4/20 48
-,
. wks
5/ . Slurry Seal 1 wk Thu 10/22/20 Wed 10/28/20 48
5 4 Npass es 2 days T. 10/27/20 Wad 10/28/20
53 S Connect lack & Bore to Existing 12 2 days Tue 10/27/20 Wed 10/28/20 44
58
MIIIIIIIMIP-
f�
F9LS
1
a Punch Um 99 days Thu 11/5/20 Mon 12/28/70
59 S Agency to Conduct Walk-through 3 days Thu 11/5/20 Mon 11/9/20 20,35,40,44,52,5�
so S Generate Punch List l0days Tue 11/10/20 Tue 11/24/20 59
bt .q Complete Punch List 20days Wed 11/25/20 Man 12/28/2060
Project: lob 2035
Date: Thu 8/6/20
Nu ny.ct Sun.r.y 1 1 Manual Tao Start -way E 00041K
Split 1!
M
Macaw ink Duration -only prom-.* 3 Progress
Mil.stgm • Inactive Milwmn
Manual Summary lollop External Tasks Manual Progress
Summary ^ Macaw summary I I Manual summary mna arrcia 0
Capital Improvement Project No. 19-43 Page 1
SUBSURFACE EXPLORATION LEGEND
UNIFIED SOIL CLASSIFICATION CHART
SOIL DESCRIPTION GROUP TYPICAL NAMES
SYMBOL
I. COARSE
GRAVELS
GRAINED, more than 50% of material is larger than No. 200 sieve size.
CLEAN GRAVELS GW Well graded gravels, gravel -sand mixtures, little or no fines
half of
is
No. 4 GP Poorly graded gravels, gravel sand mixtures, little or no fines.
but GRAVELS WITH FINES GM Silty gravels, poorly graded gravel -sand -silt mixtures.
3". (Appreciable amount of
fines) GC Clayey gravels, poorly graded gravel -sand, clay mixtures.
More than
coarse fraction
larger than
sieve size
smaller than
SANDS
CLEAN SANDS SW Well graded sand, gravelly sands, little or no fines.
half of
is SP Poorly graded sands, gravelly sands, little or no fines.
No.
SM Silty sands, poorly graded sand and silty mixtures.
SC Clayey sands, poorly graded sand and clay mixtures.
More than
coarse fraction
smaller than
4 sieve size.
II. FINE GRAINED,
more than 50% of material is smaller than No. 200 sieve size.
SILTS AND CLAYS ML Inorganic silts and very fine sands, rock flour, sandy silt or clayey -silt -
(Liquid Limit less sand mixtures with slight plasticity.
than 50) CL Inorganic clays of low to medium plasticity, gravelly clays, sandy clays,
silty clays, lean clays.
OL Organic silts and organic silty clays or low plasticity.
SILTS AND CLAYS MH Inorganic silts, micaceous or diatomaceous fine sandy or silty soils,
(Liquid Limit elastic silts.
greater than 50) CH Inorganic clays of high plasticity, fat clays.
OH Organic clays of medium to high plasticity.
III. HIGHLY ORGANIC SOILS PT Peat and other highly organic soils.
SAMPLE SYMBOLS LABORATORY TEST SYMBOLS
x
- Bulk Sample
- Modified California Sampler
- Undisturbed Chunk sample
- Maximum Size of Particle
- Shelby Tube
- Standard Penetration Test sampler
SYMBOLS
AL - Atterberg Limits
CON - Consolidation
COR - Corrosivity Tests
(Resistivity, pH, Chloride, Sulfate)
DS - Direct Shear
El - Expansion Index
MAX - Maximum Density
RV - R-Value
indicated SA - Sieve Analysis
or as indicated
CAL
CK
MS
ST
SPT
GROUNDWATER
Q - Water level at time of excavation or as
- Water seepage at time of excavation
..�,T
'''' 17'�_
Group 2 Sewer Upgrades
National City, California
S ■
By: JPS
Date: January, 2020
■ T
Job Number: 190251P5-2
Figure: 1-1
LOG OF BORING B-1
Date Drilled: 12/10/2019
Equipment: CME-95 with 8 inch diameter Hollow Stem Auger
Elevation (ft): ± 36 ft
Logged by:
Reviewed by:
Depth to Groundwater (ft):
JPS
AKN
Not encountered.
2
d
w
0
N
U
SUMMARY OF SUBSURFACE CONDITIONS
SAMPLES
Z
w
0
Z
MOISTURE CONTENT (%)
PID Reading (in ppm)
LABORATORY TESTS
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
5 inches of Asphalt Concrete over 12 inches of Aggregate Base.
SM FILL (Qfl: SILTY SAND, loose to medium dense, brown, moist, fine
to coarse grained, trace gravel.
Medium dense.
Decomposed granite (DG) fragments.
SC CLAYEY SAND, medium dense, dark brown, moist, fine to medium
grained, trash and plastic debris in spoils.
Strong trash odor.
SM SILTY SAND, medium dense, dark brown, moist, fine to medium
grained, trash and plastic debris in spoils.
Plant debris.
Dense, brown, fine to coarse grained, decomposed granite (DG)
fragments.
Dense.
CAL
ENV
CAL
CAL
ENV
CAL
CAL
ENV
CAL
CAL
18
17
19
13
25
47
37
15
14
16
11
21
40
31
15.2
12.6
9.1
110.4
113.2
116.1
0.5
1.2
0.0
DS
COR
BORING CONTINUED ON 1-3
id III
NI 0
Group 2 Sewer Upgrades
National City, California
By: JPS
Date: January, 2020
Job Number: 190251P5-2
Figure: 1-2
LOG OF BORING B-1 (CONTINUED)
Date Drilled: 12/10/2019
Equipment: CME-95 with 8 inch diameter Hollow Stem Auger
Elevation (ft): ± 36 ft
Logged by:
Reviewed by:
Depth to Groundwater (ft):
JPS
AKN
Not encountered.
2
H
a
w
0
SUMMARY OF SUBSURFACE CONDITIONS
SAMPLES
z
w
0
0
z
H
z
w
F
z
0
0
w
ce
1-
H
O
2
DRY UNIT WEIGHT (pc
PID Reading (in ppm)
LABORATORY TESTS
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
FILL (Qfl: SILTY SAND, loose to medium dense, dark brown, moist,
fine to medium grained, trace gravel.
Very dense, less odor.
ENV
CAL
CAL
SM
OLD PARALIC DEPOSITS (Qop): SILTY SAND, very dense,
reddish brown, moist, fine to medium grained.
Mottled reddish brown and light brown.
Mottled reddish brown, gray, and brown.
ENV
CAL
CAL
CAL
ENV
22
59
77
64
64
19
50
65
54
54
0.1
0.1
0.0
BORING TERMINATED AT 30 FEET
—r -i • Tj-�.
Group 2 Sewer Upgrades
National City, California
By: JPS
Date: January, 2020
Job Number: 190251P5-2
Figure: 1-3
2
H
a
w
0
LOG OF BORING B-2
Date Drilled: 12/20/2019 Logged by: JPS
Equipment: CME-75 with 8 inch diameter Hollow Stem Auger Reviewed by: AKN
Elevation (ft): ± 23 ft Depth to Groundwater (it) 34 ft
0
CO
SUMMARY OF SUBSURFACE CONDITIONS
SAMPLES
Z
MOISTURE CONTENT (%
LABORATORY TESTS
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
SM
FILL (Qf): SILTY SAND, loose to medium dense, brown, moist, fine
to medium grained, trace gravel.
Mottled reddish brown to brown, dense.
Light brown to brown.
Medium dense.
CL SANDY CLAY, medium stiff, brown, moist, fine to medium grained
SM SILTY SAND, medium dense, reddish brown, moist, fine to medium
grained.
CAL
SPT
CAL
CL
YOUNG ALLUVIAN FLOOD -PLAIN DEPOSITS (Qval: SANDY
CLAY, medium stiff, dark brown to black, moist, fine to medium
grained.
48
20
30
41
26
25
6.9
12.3
114.6
124.3
SA
COR
DS
BORING CONTINUED ON 1-5
Group 2 Sewer Upgrades
National City, California
By: JPS
Date:
Job Number: 190251P5-2
Figure: 1-4
LOG OF BORING B-2 (CONTINUED)
Date Drilled: 12/20/2019
Equipment: CME-75 with 8 inch diameter Hollow Stem Auger
Elevation (ft): ± 23 ft
Logged by: JPS
Reviewed by: DJM
Depth to Groundwater (ft): 34 ft
d
w
0
0
0
SUMMARY OF SUBSURFACE CONDITIONS
SAMPLES
z
w
0
0
m
DRIVING RESISTANCE
(blows/ft of drive)
z
z
w
H
z
0
O
w
0
O
2
U
Q
H
0
w
L-
z
0
>-
0
LABORATORY TESTS
— 21
— 22
— 23
— 24
— 25
— 26
— 27
— 28
— 29
— 30
— 31
— 32
— 33
— 34
— 35
— 36
— 37
— 38
— 39
— 40
SC
YOUNG ALLUVIAN FLOOD -PLAIN DEPOSITS (Qya): SANDY
CLAY, medium dense, dark brown to black, moist, fine to medium
nrainarl
Fine grained, plant debris, strong organic odor.
Black.
Groundwater at 34 ft.
SPT
CAL
SPT
SM
OLD PARALIC DEPOSITS (Qop): SILTY SAND, loose, brown to
reddish brown, wet, fine to medium grained, micaceous.
CAL
10
9
6
8
13
8
8
7
v
SA
AL
El II
III II
Group 2 Sewer Upgrades
National City, California
By:
JPS
Date: January, 2020
Job Number: 190251P5-2
Figure: 1-5
LOG OF BORING B-2 (CONTINUED)
Date Drilled: 12/20/2019
Logged by: JPS
Equipment: CME-75 with 8 inch diameter Hollow Stem Auger
Reviewed by: AKN
Elevation (ft): ± 23 ft
Depth to Groundwater (ft): 34 ft
SAMPLES
o
Q
In
lLJ
z
z
F-
F-
(1)
111
n
H—
cn45
H
z
O
0
w
H
>-
cc
w
0
j
SUMMARY OF SUBSURFACE CONDITIONS
>
0
-,
m
c N
z o
>
0
0
z
0
S
H
o
H
2
o
c
o
O-
cl
O
m
SM
OLD PARALIC DEPOSITS (Qop): SILTY
SAND, medium dense,
— 41
brown to reddish brown, wet, fine to medium
grained, micaceous.
SPT
8
10
— 42
— 43
— 44
— 45
Trace gravel.
— 46
SPT
21
27
— 47
— 48
— 49
Dense.
SPT
24
31
— 50
BORING TERMINATED AT 50 FEET
— 51
— 52
— 53
— 54
— 55
— 56
— 57
— 58
— 59
— 60
.
T
Group 2 Sewer Upgrades
National City, California
-r
S
By:
JPS
Date: January, 2020
T
Job Number:
190251P5 2
Figure. 1-6
LOG OF BORING B-3
Date Drilled: 12/10/2019 Logged by: JPS
Equipment: CME-95 with 8 inch diameter Hollow Stem Auger Reviewed by: AKN
Elevation (ft): ± 33 ft Depth to Groundwater (ft): Not encountered.
H
w
n
U
D
SUMMARY OF SUBSURFACE CONDITIONS
SAMPLES
w
Z ^
H
0 43
o LIJ
E
co 3
z o
5�
0o
o
Z
Z
Z
O
w
S
o
Q
H
uJ
1_
-
}
i
0
co
H
(n
1-
>-
CC
O
Q
cl
m
Q
J
>
cr
0
Y
5
m
— 1
— 2
— 3
— 4
— 5
_ 6
— 7
— 8
— 9
— 10
— 11
— 12
— 13
— 14
— 15
— 16
— 17
— 18
— 19
— 20
sc
FILL (Qf): CLAYEY SAND, loose, brown,
moist, fine to medium
18
43
5
23
36
7
8.4
107.8
SA
COR
grained.
Trash debris.
SM
OLD PARALIC DEPOSITS (Qop): SILTY
SAND, medium dense,
reddish brown, moist, fine to medium grained.
Trace gravel.
Dense.
SPT
CAL
SPT
BORING TERMINATED AT 161/2 FEET
,—r
T Tom__
Group 2 Sewer Upgrades
National City, California
S ■
By: JPS
Date: January, 2020
IN T
Job Number: 190251P5-2
Figure: 1-7
SUBSURFACE EXPLORATION LEGEND
UNIFIED SOIL CLASSIFICATION CHART
SOIL DESCRIPTION GROUP TYPICAL NAMES
SYMBOL
I. COARSE
GRAVELS
GRAINED, more than 50% of material is larger than No. 200 sieve size.
CLEAN GRAVELS GW Well graded gravels, gravel -sand mixtures, little or no fines
half of
is
GP Poorly graded gravels, gravel sand mixtures, little or no fines.
No. 4
but
3". GRAVELS WITH FINES GM Silty gravels, poorly graded gravel -sand -silt mixtures.
(Appreciable amount of
fines) GC Clayey gravels, poorly graded gravel -sand, clay mixtures.
More than
coarse fraction
larger than
sieve size
smaller than
SANDS
CLEAN SANDS SW Well graded sand, gravelly sands, little or no fines.
half of
is SP Poorly graded sands, gravelly sands, little or no fines.
No.
SM Silty sands, poorly graded sand and silty mixtures.
SC Clayey sands, poorly graded sand and clay mixtures.
More than
coarse fraction
smaller than
4 sieve size.
II. FINE GRAINED,
more than 50% of material is smaller than No. 200 sieve size.
SILTS AND CLAYS ML Inorganic silts and very fire sands, rock flour, sandy silt or clayey -silt -
(Liquid Limit less sand mixtures with slight plasticity.
than 50) CL Inorganic clays of low to medium plasticity, gravelly clays, sandy clays,
silty clays, lean clays.
OL Organic silts and organic silty clays or low plasticity.
SILTS AND CLAYS MH Inorganic silts, micaceous or diatomaceous fine sandy or silty soils,
(Liquid Limit elastic silts.
greater than 50)
CH Inorganic clays of high plasticity, fat clays.
OH Organic clays of medium to high plasticity.
III. HIGHLY ORGANIC SOILS PT Peat and other highly organic soils.
SAMPLE SYMBOLS LABORATORY TEST SYMBOLS
x
- Bulk Sample
- Modified Califomia Sampler
- Undisturbed Chunk sample
- Maximum Size of Particle
- Shelby Tube
- Standard Penetration Test sampler
SYMBOLS
AL - Atterberg Limits
CON - Consolidation
COR - Corrosivity Tests
(Resistivity, pH, Chloride, Sulfate)
DS - Direct Shear
El - Expansion Index
MAX - Maximum Density
RV - R-Value
indicated SA - Sieve Analysis
or as indicated
CAL
CK
MS
ST
SPT
GROUNDWATER
V - Water level at time of excavation or as
- Water seepage at time of excavation
City of National City, P1 Sewer Upsize Project
National City, California
By: JPS
Date: July, 2020
Job Number: 170309P4.21
Figure: 1-1
2
a
w
0
Date Drilled: 7/30/2020
Equipment: CME-75 w/ 6 in H.S.A.
Elevation (ft): ±50 ft
N
0
0)
D
LOG OF BORING B-1
SUMMARY OF SUBSURFACE CONDITIONS
Logged by:
Reviewed by:
Depth to Groundwater (ft):
SAMPLES
z
w
.t
0
w
0
z
F-
co
w
0
z
rt
0
>
i3
0
0 0
z
JPS
AKN
Not encountered.
z
w
z
0
0
w
V)
O
0
0
H
2
_U
w
H
z
>-
0
LABORATORY TESTS
SC FILL (Qfl: CLAYEY SAND, loose to medium dense, light brown
— 1 to orange brown, dry, fine to coarse grained.
— 2
— 3
— 4
— 5
— 6
7
— 8
9
— 10
— 11
— 12
— 13
— 14
Brown.
CL SANDY CLAY, stiff, dark brown, moist, fine grained.
Brown.
SC CLAYEY SAND, medium dense, dark brown, moist, fine to medium
— 16 grained, plant debris and plant roots in material.
— 17
— 18
— 19
— 20
r,
X
SPT
SPT
SPT
7
18
15
9
23
20
BORING CONTINUED ON 1-3
City of National City, P1 Sewer Upsize Project
National City, California
By: JPS
Date: July, 2020
Job Number: 170309P4.21
Figure: 1-2
LOG OF BORING B-1 (CONTINUED)
Date Drilled: 7/30/2020
Equipment: CME-75 w/ 6 in H.S.A.
Elevation (ft): ±50 ft
Logged by:
Reviewed by:
Depth to Groundwater (ft):
JPS
AKN
Not encountered.
0
rn
SUMMARY OF SUBSURFACE CONDITIONS
SAMPLES
z
w
it
0
m
w
0
z a�
`
N a
w
w
z o
>9
0
z
H
z
w
H
z
0
0
w
0
2
U
w
z
>-
LABORATORY TESTS
— 21
— 22
— 23
— 24
— 25
— 26
— 27
— 28
— 29
— 30
— 31
— 32
— 33
— 34
— 35
— 36
— 37
— 38
— 39
— 40
ML
SM
OLD PARALIC DEPOSITS (Qop): SANDY SILT, medium dense,
reddish brown to brown, moist, fine to medium grained, weathered,
manganese staining.
SILTY SAND, medium dense, reddish brown, moist, fine to medium
grained, laminations.
SPT
SPT
9
15
12
20
a
BORING TERMINATED AT 25 FEET
City of National City, P1 Sewer Upsize Project
National City, California
By:
JPS
Date: July, 2020
Job Number: 170309P4.21
Figure: 1-3
This kgamatmn is provided free of charge by the Oeeenmem of Iduarna1 Pennons from m web sae ll or I.. g,,,.. These regulatory are for the came1Mroa o
Lend end no iapeeMaW1 a warranty.3 made that the information is current or saauate Sas lull disclaimer at haps ',wow die ca 3wrod_pobiascklmer. Morn
Subchapter 4. Construction Safety Orders
Article 6. Excavmnms
Remo to index
*1541J. Requirements for Protective Systems, Appendix B
Sloping and Benching
(a) Scope and application. This appendix contains specifications for sloping and benching when used as methods of protecting employees working in excavations from cave-ins. The
reyuisements of this appendix apply when the design of sloping and benching protective systems is to be performed in accordance with the requirements art forth in Section 1541.1(bl.
(b) Definitions.
Actual slope means the slope to which an excavation face is excavated.
Distress means that the soil is in a condition where a cave-in is imminent or is likely to occur. D uress is evidenced by such phenomena as the development of fissures in the face of or
adjzem to an open excavation) the subsidence of the edge of an excavation: the slumping of mnenal from the face or the bulging or heaving of material from the honom of an excavation;
the spanning of material from the face of an excavation: and ravelling, i.e.. small amounts of material such as pebbles or line clumps of material suddenly separating from the face of an
excavation and trickling or rolling down into the excavation.
Maximum allowable slope means the steepest incline of an excavation face that is acceptable for the most favorable site conditions m protection against cave-ins. and is expressed as the
ratio of horizontal distance to vertical nse (H: V 1.
Short term exposure means a period of time less than or equal to 24 hours that an excavation is open.
(c) Requirements.
(1) Soil classification. Soil and rock deposits shall be classified in accordance with Appendix A to Section 1541.1.
(2) Maximum a lowabk slope. The maximum allowable slope fora soil or rock deposit shall be determined from Table B-I of this appendix.
(3) Actual slope.
(A) The actual slope shall rim be steeper than the maximum allowable slope.
(B) The actual slope shall be less steep than the maximum allowable slope, when there are signs of distress. B that situation occurs, ill slope shall be cut back to an actual slope which is at
lean 1/2 horizontal to one venkd (1/2H: IV) less steep than the maximum allowabk slope.
(C) When surcharge loads from stored material or equipment, operating equipment, or traffic are present. a competent person shall determine the degree to which the actual slope must he
reduced below the maximum allowable slope, and shall assure that such reduction is achieved. Surcharge loads from adjacent structures shall be evaluated in accordance with Section
1541(0.
(4) Configurations. Configuratii0os of sloping and benching systems shall be in accordance with Figure 11-1.
TABLE B-I
SOIL Om sOds TYPE
MAXIS.
sTABLE R TYPE A III
TYPE S
TYPE C
ear. (90 peg.,
3/4,1 (s3 Deg.,
131 (45 Peg.)
1 I/ltl (34 Deg.)
1. 1.numbers sham In pareatheeee next to maximum allowable
slopes aro angles expressed in degrees from the horiaontal. Mglee have
been rounded off.
2. a •Bort-ter•
allowable slope of 1/lm,1v eel degrees)
is alloyed in n Typea ill that are 12 feed (1.6 col or lime
in depth. b maximum allowable slopes for • atos greater than
13t (3.67rml t Indepthshall be I/4an1V (53 degrees,.
3. Sloping or benching
for
ations greater than 30 feet
deep hall be designed bya registered prnfeselenal engineer.
Figure B-1
Slope Configurations
(All slopes rimed below are in the horizontal m ventral ratio)
B-1.1 Excavations made in Type A soil
1. All simpk slope excavations 20 feet or less in depth shall gave a maximum allowable slope of 3/4:1.
Simple Slope -General
Exception: Simple slope excavations which are open 24 hours or less (short term) and which are 12 fat or less in depth shall have a maximum allowable slope of 12:1.
Simple Slope- Short Term
2.All benched excavations 20 feet or less in depth shall have a maximum allowable slope of 3/410 1 and maximum bench dimensions as follows:
Snmpk Bench
Multnpk Bench
3. All excavations 8 fen or less in depth which have unsupported vertically sided lower portions shall have a maximum vertical side 3 1/2 feet.
Unsupported Venially Sided Lower Ponioo-Maximum 8 Feet Depth
All excavations more than 8 fen but rid moo than 12 feet in depth with unsupported vertically sided lower portions shall have a maximum allowable slope of 1:1 and a maximum vertical
side of 3 1/2 fen.
Unsupported VerticalYSided Lower Portion -Maximum 12 Fen m Depth
All excavations 20 fen or less in depth which have vertically sided lower portions that are supported or shielded shall have a maximum allowable slope of 3/4:1. The support or shield
system must extend at lean 18 inches above the top of the venncal side
Supported or Shielded Vertically Sided Lower Pont.,
B- 1.2 Excavations Made in Type B Soil
I. All simple slope excavations 20 rem or less in depth shall have a maximum allowable slope of I:I.
Simple Slope
2. All benched excavations 20 feet or lees in depth shall have a maximum allowable slope of 1,1 and maximum bench dvnensnomas follows:
Single Ben_h
Multiple BeneM1
3. All excavations 20 feet or less in depth which have vertically sided lower portions shall be shielded or supported to a height at least 18 inches above the top of the vertical side. AN such
excavations shall have a maximum allowable slope of 1:1
Vertically Sided Lower Portion
B- 1.3 Excavations Made in Type C Soil
1. All simple slope excavations 20 feet or less in depth shall have a maximum allowable slope of 112:1
Simple Slope
2.A11 excavations 20 feet or less in depth which have vertically sided lower portions shall be shielded or supported to a height at least 18 fiches above the top of the vertical side. All such
excavations shall have a maximum allowabk slope of l 12:1.
Vertically Sided Gower Portion
3. All other sloped excavauom shall be in accordance with the other options permined in I541.1(b)
B- 1.4 Excavations Made in Layered Sod
1. All excavations 20 feet or less in depth made in layered soils shall have a maxnmmn allowable slope for each layer as set forth below:
B OVER A
C OVER -A.
C OVER B
x
AOt C'
li iSVFhr
2. All other sloped exeavmlom shall be in accordance with the other options permitted in 1541.1(b).
NOTE: Authority cited: Se lion 1423. labor Code. Reference: Section 1423. Labor Code.
MGo No: k to Article 6 Table of Contents
I
I
SETBACK TABLE
X = SETBACK
K-RAIL
X=1'
HS 20-44 TRAFFIC
X=4'
SPOIL PILE
X=4'
EXCAVATOR
X=4'
DUMP TRUCK
X=4'
3 CY LOADER
X=4'
5 CY LOADER
X=5'
CRANE TO 30 TON
X=8'
CONCRETE TRUCK
X=10'
I
i I 1
j j i
•
I
I � i
$ 5ET�kc
iltSLE
•
Date:
CONTRACT TRANSMITTAL FORM
(Attach as Cover Sheet to Documents dropped off to City Clerk's Office)
/P lov/a-0
From (Dept.): ENGINEERING DEPT.
Submitted by (First & Last Name): JUDITH HERNANDEZ
Vendor:
Of 5 l /-C
Resolution: YES / NO
0
Resolution No. (if applicable):
C1�oL4, i ecider
1 2 3 4 Originals Provided to City Clerk (Select Quantity)
000 0
Department has Copy / Duplicate Original
Vendor has Copy / Duplicate Original