Loading...
HomeMy WebLinkAbout2020 CON Portillo Concrete - Euclid Avenue Bicycle and Pedestrian Enhancements, CIP No. 18-10 - Change Order #9R, #10R and #13RRECEIVED ENG & 11 SEP Bicycle and I�edestrian Enhancements CIP No: 18lry OF NATIONAL CITY Contractor: Portillo Concrete, Inc. �— CALIFORNIA -• NATIONAL CITy CHANGE ORDER NO. 9R June 3, 2020 Reason/Purpose for this Change Order: The city has directed the contractor to install 5 additional vehicle detection loops. The City of National City and Contractor agree to the following change to the original Contract: The city has directed the contractor to install 5 additional vehicle detection loops. The loops will be paid at the contract unit price of $500 each. The contract unit price includes all labor, equipment and materials necessary for installation Original Contract Amount $ 4,060,691.00 Net change by previously authorized Change Orders Subtotal Amount of this change order 125,778.47 4,186,469.47 2,500.00 New contract amount $ 4,188,969.47 Working days added: 0 Working days subtracted: 0 Percent change in Contract to dale 3.16% Submitted by: C''""'l"r'`v Project Manager 9/25/20 Date City r ect n e Iof20 5h� Date Appro e b : — City in er /oil, boo Date City Manager, required kw Change orders>S24,999 Date By signing this Ctt`ange Order the Contractor confirms that he/she Is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. (2 originals: 1 for City Clerk, 1 for Contractor) Accepted and agreed to by Portillo Concrete, Inc. Name: ACj(442,. Art -A Date 1-nt Note to Contractor. 1f you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 titi r CALIFORNIA RECEIVED NA1'�ONALCM" r— l�a� ENG & PV' DEPT. ,tConr..ATto tD SEJ .28 A 2b Euclid Bicycle and Pedestrian Enhancements CIP No: 18-1 ITY OF NA k-) 4AL CITY Contractor: Portillo Concrete, Inc. CHANGE ORDER NO. 10R July 27, 2020 Reason/Purpose for this Change Order: The city has directed the contractor to perform additional fiber splicing as needed to reflect recently provided as -built drawings. The City of National City and Contractor agree to the following change to the original Contract.' The city has directed the contractor to cut, re -splice and test recently installed fiber per the revised as -built drawings. All work will be performed at the lump sum price listed below and includes all labor, equipment and materials necessary for installation. Additional working days have been deferred until the overall impact can be evaluated. Original Contract Amount... ... $ 4,060,691.00 Net change by previously authorized Change Orders 180,778.47 Subtotal Amount of this change order New contract amount Working days added: 0 Working days subtracted: 0 4,241,469.47 1,253.95 $ 4,242,723.42 Percent change in Contract to date 4.48% Submitted by: 9/25/20 Project Manager Date I o/c/me. Date Approve y: City n inee / Date City Manager, required for Change Orders 424,999 Date By signing this Chan Order the Contractor confirms that he/she Is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If This Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price staled herein. Additionally, Contractor confirms That the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. (2 originals: 1 for City Clerk, 1 for Contractor) Accepted and agreed to by Portillo Concrete, nc. Name: ecove1 1 -71( CA-) Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your daim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 r OALLIf11�M1A - NATIONAL CITY RECEIVED `'`•jee.rue., t^�, ENG & P'1'',' DEPT. Euclid Bicycle l i de tria' E)thatcements CIP No: 18-10 CITY OF NATIONAL CITY Contractor: Portillo Concrete, Inc. CHANGE ORDER NO. 11R August 17, 2020 Reason/Purpose for this Change Order: The city has directed the contractor to perform additional work per the revised design plan at the NW corner of Euclid and Plaza. The City of National City and Contractor agree to the following change to the original Contract: The city has directed the contractor to perform additional work per the revised design plan issued by Kimley- Horn for the NW corner of Euclid and Plaza. This revised plan changes the layout to the previous curb and gutter, sidewalk, traffic signal poles and foundations, pedestrian push button locations and foundations, revised survey and other misc. improvements. This change specifically includes all traffic signal and survey work. All work identified will be performed at the lump sum price listed below and includes all labor, equipment and materials necessary for installation Original Contract Amount $ 4,060,691.00 Net change by previously authorized Change Orders 129,532.42 Subtotal 4,190,223.42 Amount of this change order 10,347.65 New contract amount $ 4,200,571.07 Working days added: 20 Working days subtracted: 0 Percent change in Contract to date 3.44% Subrnitted by: 9-25-20 Project Manager Date City P Paz,...�q •. /.. " ojec IW° a:er Date Approved by: /o/z76/Zo City En i er Date City Manager, required fog Change Orders 424.999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price slated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. (2 originals: 1 for City Clerk, 1 for Contractor) Accepted and agreed to by Portillo Concrete, Inc. -)1t/e-eCiX Name: 1 Ch(424 Port; alp Date /7- 2., Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 CONTRACT TRANSMITTAL FORM (Attach as Cover Sheet to Documents dropped off to City Clerk's Office) Date: /0 — d�1 ✓ D From (Dept.): ENGINEERING DEPT. Submitted by (First & Last Name): JUDITH HERNANDEZ Vendor: Resolution: YES / NO h dt Vj q I�� e �S �� /o ri 1I R 0 �l Resolution No. (if applicable): 1 2 3 4 Originals Provided to City Clerk (Select Quantity) 0000 111 Department has Copy / Duplicate Original ri Vendor has Copy / Duplicate Original