HomeMy WebLinkAboutWright Construction Engineering Corp - Paradise Creek at Kimball Way - Change Order No. 1 - 2022CALIFORNIA —^ NATIONAL CITY Ian ce" lifcciaronizreo Paradise Creek at Kimball ball Way CIP No: 19-35 Contractor: Wright Construction Engineering Corp Reason/Purpose for this Change Order: TheCity has directed the contractor to make adjustments to the Bar Screen design. CHANGE ORDER O. I February 22, 2022 The City of National City and Contractor agree to the following change to the original Contract: The City has directed the contractor to change the bar screen connection plates from 1 /4" to 1/2" plates with countersunk holes. An additional 1' in height will also be added to the triple box culvert (2x2x.250, 1-1/2x1- 112 c.250, W4x13). All work shall be performed at the lump sum price listed below. Original Contract Amount..... Net change by previously authorized Change Orders Subtotal..........., ...... •. ... ■,. .... ........ Amountof this changeorder........... ..lii.f .b ..... .... ...■■iNi .66 s. . f r0 ... .MOO.... Olt New contract amount Working days added: 0 Working days subtracted: 0 Submitted by: ■..... ....i.:.i■I.F..... ...F.F....i.F....... ct Manager Approv Cit ne r 818,733.60 Percent change in Contract to date 0A9% 818,733.60 3,988.20 822,721.80 . . . ...... 1 4722 Date Cit Nig" 3/1411245- Z Date Date City Mana er, required for Change Orders >$24,999 Date By sig ' g this Ch.' ge Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc.. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. (2 originals: I for Cify Clerk, I for Contractor) Accepted andalreed to b Contractor's name 3/4/22 Date ote to Contractor If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor 1243 National City Boulevard, National City, CA 91950 cc: Engineering project file, Project Manager Telephone (619) 3 6R4 30 Cost Breakdown Praiect Name Prime Contractor Subcontractors Foreman Paradise Creek Mitigator. Imprnvernents at loan hal/ Wad Wright Const_ Engineering S.T. 5 73,51 0.1`. $ 110_27 Surcharge 11% $ - ISubx1tal Description 01 Work & Note": coign Change to original Bar Screens This is a coat breakdown for the above referenced change order that shall constitute as the final cost for all materials, labor, ertaipfaent rental Si other expenditures. By signing here you are in agreement of all associated cost and Shall be deemed as part cif the original agreement_ X. t 10 Wheel 4'urrtp Truck F-250 Tool Box Truck F450 Tool epar Truoc • 550 Tool Box Truck ep.icrete S urry Vacii+.Jn Yibra Plate Co^iracto 259D S kid Steer (731+Pi Roof Mounted Arrow Board F-250 Arrow Trick Air Compressor 185 Air Tools Drum Roller Cutoff Saw Small Tools dent ator 110IE:gh Cycle V::La2torCQNC Water Truck 420 Backhoe SCf DumpTru" Torch Set andard Markup 025-045 20-28 1861M 2AXL 1180 0302CLR 6 q,iantity S 25,14 S 2949 $ 3.78 S 85_72 S 36.92 $ 15.61. $ 36.92 39.45 S 29.69 $ 36.92 $ 65_48 5 59.78 S 59.39 $ 13.92 Subtotal Markup 15% Total I certify that the changes art accurately reed for the Mrs ndicated Date: 11, 15/21 Work. Sheet No. 'Change Order No. Pro;ezt No SLiBCONTRACTOR/Materials Description ;design criange to Bar Screens f I,w. e OP NO. 1'3-35 Quint_ Llait $ 3,488,D0 $ 3,463 CC Standard Markup Subtotal 5 3,468.00 Markets 1 3i $ $2C,23 Total - $ 3, 988.20 Ii'6M1 Amount% Markup Total $ Equipment tabor material / 5iJBO0ru'TRACT R S _3,988.2: Total(Equip..-Labor, Materials, Subcontractor) S 3,988.2C Tota[ This Report S 3_98S,2^ If it ▪ r `41, UC STEEL :ir INCORPORATED CA 1 k. 0724066 10/7/2021 Wright Construction 2625 S Santa Fe San Marcos, CA 92069 Attn: Jason Merritt 941-321-0535 Proposal/Conti-act Paradise Creek Kimball Way & 14th, NC Fabricate only: 1) Change connection plates from 1/4" to 1a2" plates 2 Provide countersunk holes in plates Plates are galv 1 Add 1' in height of triple box culvert (2x2x.259, 1-1 /2x1-1 /2 .2 0, W4x13) Material is galv FOB: StrucSteel yard Material price is good for 15 days This offer excludes the following: 1) Special inspections 2 Design, engineering 3 Grouting 4 Demo & repair 5 Shoring 6 Posting /candrete 7) Finish paint 8) Simpson hardware 9 Lock pin Accepted by Thank You, 4 - a fEIEas ■ Bill Burton Struc Steel, Inc. 1402 Presioca Street • ▪ 66 7 Material: Shop Labor: Sub: 15% Mill: Total: Material: Shop Labor: Detailing: Sub: 1 %MN: Total: Date $890 $1,122 $2,012 $302 $2,314 $,6 $340 $450 $3,016 $452 $3,468 Stru cSteel. corn Spring Valley CA 91977 r 619 466-4086 fax 466-6134 it • .'-..-�:,.... 4---.+f+. - ` - . ..- —__._. _— ti�.J�-.w#.:.w �' .. ...�='--....t�.�F,...s y ... .- -. - — ++r1 �. a1.a+-.,•...k .• • 4 - ...A - T. .t . -i; .�.,-.... - - -• •- 4 . � - -' - - -- -- - ----- �-- — -- --' a +. .••,r~! 1 �. ~ +-+. a .. a a. .r r..1w. r. -- - •• .- - . • L'ti's••11 . .ti •i•- Ea P *x " x sagW14 k Dia kc es Y. • at- _-r--. 4 . T . a. •-. ii security concrete anchor " ruin deep embedment set in epoxy ti • un- .' _.F•••rt w ., •