HomeMy WebLinkAboutWright Construction Engineering Corp - Paradise Creek at Kimball Way - Change Order No. 1 - 2022CALIFORNIA —^
NATIONAL CITY
Ian ce"
lifcciaronizreo
Paradise Creek at Kimball ball Way
CIP No: 19-35
Contractor: Wright Construction Engineering Corp
Reason/Purpose for this Change Order:
TheCity has directed the contractor to make adjustments to the Bar Screen design.
CHANGE ORDER O. I
February 22, 2022
The City of National City and Contractor agree to the following change to the original Contract:
The City has directed the contractor to change the bar screen connection plates from 1 /4" to 1/2" plates with
countersunk holes. An additional 1' in height will also be added to the triple box culvert (2x2x.250, 1-1/2x1-
112 c.250, W4x13). All work shall be performed at the lump sum price listed below.
Original Contract Amount.....
Net change by previously authorized Change Orders
Subtotal..........., ...... •. ... ■,. .... ........
Amountof this changeorder........... ..lii.f .b ..... .... ...■■iNi .66 s. . f r0 ... .MOO.... Olt
New contract amount
Working days added: 0 Working days subtracted: 0
Submitted by:
■.....
....i.:.i■I.F..... ...F.F....i.F.......
ct Manager
Approv
Cit
ne r
818,733.60
Percent change in Contract to date 0A9%
818,733.60
3,988.20
822,721.80
. . . ...... 1 4722
Date
Cit
Nig"
3/1411245- Z
Date
Date City Mana er, required for Change Orders >$24,999 Date
By sig ' g this Ch.' ge Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly
negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and
labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the
price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor,
supervision, overhead, fees, bonds, insurance, profit, etc.. and that there will be no further compensation. All of the terms and conditions
of the original contract documents are incorporated herein. (2 originals: I for Cify Clerk, I for Contractor)
Accepted andalreed to b Contractor's name
3/4/22
Date
ote to Contractor If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the
contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect
your claim.
Originals: City Clerk, Contractor
1243 National City Boulevard, National City, CA 91950
cc: Engineering project file, Project Manager
Telephone (619) 3 6R4 30
Cost Breakdown
Praiect Name
Prime Contractor
Subcontractors
Foreman
Paradise Creek Mitigator. Imprnvernents at loan hal/ Wad
Wright Const_ Engineering
S.T.
5 73,51
0.1`.
$ 110_27
Surcharge 11% $ - ISubx1tal
Description 01 Work & Note":
coign Change to original Bar Screens
This is a coat breakdown for the above referenced change order that shall constitute as the final cost for all materials, labor, ertaipfaent rental Si other expenditures.
By signing here you are in agreement of all associated cost and Shall be deemed as part cif the original agreement_
X.
t
10 Wheel 4'urrtp Truck
F-250 Tool Box Truck
F450 Tool epar Truoc
• 550 Tool Box Truck
ep.icrete S urry Vacii+.Jn
Yibra Plate Co^iracto
259D S kid Steer (731+Pi
Roof Mounted Arrow Board
F-250 Arrow Trick
Air Compressor 185
Air Tools
Drum Roller
Cutoff Saw
Small Tools
dent ator
110IE:gh Cycle V::La2torCQNC
Water Truck
420 Backhoe
SCf DumpTru"
Torch Set
andard Markup
025-045
20-28
1861M
2AXL
1180
0302CLR
6 q,iantity
S 25,14
S 2949
$ 3.78
S 85_72
S 36.92
$ 15.61.
$ 36.92
39.45
S 29.69
$ 36.92
$ 65_48
5 59.78
S 59.39
$ 13.92
Subtotal
Markup 15%
Total
I certify that the
changes art accurately
reed for the
Mrs ndicated
Date:
11, 15/21
Work. Sheet No.
'Change Order No.
Pro;ezt No
SLiBCONTRACTOR/Materials
Description
;design criange to Bar Screens
f
I,w. e
OP NO. 1'3-35
Quint_ Llait
$ 3,488,D0
$ 3,463 CC
Standard Markup
Subtotal
5 3,468.00
Markets
1 3i
$ $2C,23
Total
-
$ 3, 988.20
Ii'6M1
Amount%
Markup
Total
$
Equipment
tabor
material / 5iJBO0ru'TRACT R S
_3,988.2:
Total(Equip..-Labor, Materials, Subcontractor) S 3,988.2C
Tota[ This Report S 3_98S,2^
If
it
▪ r `41,
UC STEEL
:ir INCORPORATED
CA 1 k. 0724066
10/7/2021
Wright Construction
2625 S Santa Fe
San Marcos, CA 92069
Attn: Jason Merritt
941-321-0535
Proposal/Conti-act
Paradise Creek
Kimball Way & 14th, NC
Fabricate only:
1) Change connection plates from 1/4" to 1a2" plates
2 Provide countersunk holes in plates
Plates are galv
1 Add 1' in height of triple box culvert (2x2x.259, 1-1 /2x1-1 /2 .2 0, W4x13)
Material is galv
FOB: StrucSteel yard
Material price is good for 15 days
This offer excludes the following:
1) Special inspections
2 Design, engineering
3 Grouting
4 Demo & repair
5 Shoring
6 Posting /candrete
7) Finish paint
8) Simpson hardware
9 Lock pin
Accepted by
Thank You,
4 - a fEIEas ■
Bill Burton
Struc Steel, Inc.
1402 Presioca Street
•
▪ 66
7
Material:
Shop Labor:
Sub:
15% Mill:
Total:
Material:
Shop Labor:
Detailing:
Sub:
1 %MN:
Total:
Date
$890
$1,122
$2,012
$302
$2,314
$,6
$340
$450
$3,016
$452
$3,468
Stru cSteel. corn
Spring Valley CA 91977 r 619 466-4086 fax 466-6134
it
•
.'-..-�:,.... 4---.+f+. - ` - . ..- —__._. _— ti�.J�-.w#.:.w �' .. ...�='--....t�.�F,...s y ... .- -. - —
++r1
�. a1.a+-.,•...k .• • 4 - ...A - T. .t . -i; .�.,-.... - - -• •- 4 . � - -' - - -- -- - ----- �-- — -- --'
a +. .••,r~! 1 �. ~ +-+. a .. a a. .r r..1w. r. -- - •• .- - . • L'ti's••11
.
.ti
•i•-
Ea
P *x " x sagW14
k Dia kc es
Y. • at- _-r--. 4 . T . a. •-.
ii security concrete
anchor " ruin deep
embedment set in epoxy
ti
•
un-
.'
_.F•••rt
w
.,
•