HomeMy WebLinkAboutWright Construction Engineering Corp - Paradise Creek at Kimball Park CIP 19-35 - Change Order No. 3 - 2022- CALIFORNIA
ONAL
airy
Paradise Creek at Kimball Way
CIP No: 19-35
Contractor: Wright Construction Engineering Corp
Reason/Purpose for this Change Order.
The City has modified the original driveway design and directed the contractor to construct per the revise,
plans.
C r.r L" V LS
Ewp
pytit DE7
_
CHANGE O Df NO.
PM MAY 2b ikl% 2442022
The City of National City and Contractor agree to the following change to the original Contract:
The City has modified the original driveway design and directed the contractor toconstruct per the revised
plans. The modified design includes additional grading and excavation, added retaining wall/curb and
additional approach modifications. All work identified will be performed at the lump sum price listed below and
includes all labor, equipment and materials necessary for installation.
Original Contract Amount
Net change by previously authorized Change Orders... .........
Subtotal
Amount of this change order.......■.■a■■.rrr.r.rs■.rr..rrrwr
New contract amount
I, . I' . . . * . ■ . . . . . . . . . . . . . . . . . i. .
818,733.60
20,788. 0
Working days added: 0 Working days subtracted: 0
Submitted by:
Percent change in Contract to date 4.54%
839,521.80
16, 60.00
855,881.80
P r'' Manaer
Approve
y
City E n -er
By signi this Change • rder the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly
negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and
labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the
price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor,
supervision, overhead, fees, bonds, insurance, profit, etc, and that there will be no further compensation. All of the terms and conditions
of the original contract documents are incorporated herein. (2 originals: I for City Clerk, ? for Contractor)
Accepted and a. reed to by (Contractor's naive).{
5/25/22
Date
City Project Manager
Date
Date ;City F ana er, requiresd for Change Orders 424.999 Date
Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the
contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect
your claim.
Originals: City Clerk, Contractor
1243 National City Boulevard, National City, CA 91950
cc: Engineering project file, Project Manager
Telephone (619) 336-43g0
Wright Construction Engineering Corp
2625 S. Santa Fe Avenue
San Marcos, CA 92069
Tel 760-599-3915 x 102
Fax 760-599-3920
Jmerritt4wright@gmail.com
MAY 5, 2022.
City of National City
Attn: Sean Gill 8z Luca Zappiello
1243 National City Blvd.,
National City, CA 91950
RE: Change Order #5-Entrance Design Change for CIP NO 19-35
To Whom It May Concern,
iii
WRIGHT 1
CONSTRUCTION ENGINEERING CORP.
L10EMYSE # SIi8
Per the City's Request Wright Construction has established a cost for the design changes for the entrance on the
southeast side of the project and have supplied a cost breakdown for the additional work needed to complete the
requested changes.
1) Additional excavation in order to achieve the 10% fall toward the headwall= 45 CY @$308,00 per CY= $13,860
2) If needed return curb 30' plus or minus, ranging from 6 to 24" height= $2,500
Total Cost of additional excavation and return curb if needed= $16,360.00
Thank you,
}ason Merritt
WRIGHT CONSTRUCTION ENGINEERING CORP
z
g
DATE I AN
z
2
PROVEN DATE
F
ENGINE C RING PAR1TMLN1
at
KRA SAL L WAY
INFI01.4.rr PON
FENCE
tr(25.665.05
NATOLI EXIST SIDEWALX E 63003M 4,3
EL RS 22
TO1 EXIST Cul AND GUTTER
OCIPOCRETE DREVEAAT PER
SORSD G.t 40 WA 7.750 P$I
CONTRACTOR 10 REI.Lovi
oispos€ EXLS3114G
SIOEINALX Affiti ouREI Ti-FFT
CONFLICTS 'MIN TI-FE NEW
ORNEWAY-
N 11021164,11
03003151172
IM.TDNEXSIT
FIATCNEXIst culke FAO DuTTER
x 2 Jr STs. RAE
'MTH FOLINDATMei
FEIv'ET PICKET TO RAIL
1
'AFTON EAST SIDEWALK
N !ff42$87T
E 6S12411,3103
EL 2E1 ff*
▪ Itt...1,5em.
E aftg433-147:,
• 2°.3.„1.4
- 1O2:5▪ 4S-IT
eff400321,As
EL ZIL.22
DRIVEWAY DETAIL
NO SCALE
100 FEPFDEIMULE
Fr X Fr STL TUBE 7
Jr X Or STL TUSE
4
-
TOLL PRilE -.11X
._1.-",17.3•• we
ALiAct
WROUGHT IRON ,=ENCE DETAIL
FIC SC/4.E
T
--
FENCE
4- X 4" STL TLX5E POST WETS
FOIPORTIoN P'ffR
*AANUFACTUREP, "-P
PG
11•11,1i,,
WAIFS- SEE PLAN
0
N
E EatC43i1ff r
EL 2ff 2'0
WROUOIKT FROM FeNCS-
x W Snivels
X Or sn.. TERME
I I 1
OUST IATKN TO OE
7RoTEC-rto 3,4 P4414f— —
N 11.Z5525.40 -\\
E 1000021,40
a 21.10
15.7911*T.1-S.
I 11300(11-0.%
EL 2"T. iF
DRIVEWAY DETAIL
NO SCALE
4'
I
TYPICAL CONCRE FE PAD SECTION
ND SCALE
EXTENDABLE -RECLAIM.
cx*NOD
CONCRETE E1FOEOMENT, rfn
STI Feria 04.7E
Th LiZ4GX SET PER
DETAIL
iiA/ROUGH- GATE DETAIL
NC '
At\\400444o, CONCrilffrff OFFFIEWAY
ff OS004137.110
TaFffell4
PER solFRO 01.1.41
FON 32,50 FBI
I
N iOC.16
E tramom. ND
. 2T.BD _
I
.0CX an -OUT WELDED
TO WM FEMT.E TYR
N 10055r F2
E IPTODEF-t). 41
EL 2 FACI
0.F
I
LOCK BOX PHOTOGRAPH
X FS' STL net
t MOE BY A; MICK STL
BAR STOCR wELDED TO Or
$t. OATt TILF5C-C ANC- )4"
STI. RASES
LOOK BOX TO REFLECT
RHOTOGRAPN ADOvE
GATE LOCK CUT-OUT DETAIL
NO SCALE
DeCt.MATION OF RE&ROEFSIBLE feARGE
. AS REVIEWED BY;
INDFry- ou:LNK 11-NT oiA neon!)
..tmect.-,300-Ipiems ExeFOIEt kftWOOFILF COPPBE OAF
IINFEA elf PRO1601`.52 *4WD 11 SECION IMF Cr
8VMM NC*1014**"...1%4X Owf INLMON
•scAlmrtafrai*C2.1*Dit XtFAX*F00-
oFF@Fsto.Ftz florr Enfer, Mr FINOSET ORAN1F.OF
aNWPWATIONIF rAt VP,v NOTKAF.VF-Y ctPFrINFLO
743 Ft -vim ONO` AM-20Ft HOT ROA:** kiltwnWtril
*NM OF V* NEFPONSIKFIVE5 1-14 FOOFIr estRa.
A
abfia _ot•Exicia Nma cIAN
DEPtfro CaT. IN11,41:9k
41401i4 BONO 44F4M14%41
LtAth ZAPPOiL4.13
OFIXF ALT
0.0.4.411NN.
gualAL
Ask lam
PLF/11 TR! ITIPTIONETFRets c.
PARADISE CRUX MI7IGATiON PROJECT
AT KIMBALL WAY
MISCELLANKKIS DEPILS os.o,
CITY 1D- NA -nowt crry
Fiaeur, Plrnt
rji
n Fnnokir•
,n:qTac. 4.0.
51-11tT P t'S
Cr
hs,
19-35
11500- 5 -D
Jnicflml 2012 cP•P ,t4 C.7....0,14-i•--wwie • ,--rnr,Ln=7.1.1(nr-,nr.J,-‘,..
NATIONAL CITY - PARADISE CREEK MITIGATION PROJECT AT KIMBALL WAY