HomeMy WebLinkAboutWright Construction Engineering Corp - Paradise Creek at Kimball Park CIP 19-35 - Change Order No. 4 - 2022CALIFORFNIA s, I N,la,CITY 31 1PacoltroitATs11 P L. v L. '" " ; 1. Paradise ,ry CIF No: 19--,5 ContractoCrlyeitblidwatobangiOring Corp CHANGE ORDER NO. 4 May 25, 2022 Reason/Purpose for this Change order The City has directed thecontractor to make minor field modifications to the closure pours at the ACB and adding a concrete swale and " core. The City of National City and Contractor agree to the following change to the original Contract: The City has directed the contractor to make minor field modifications to the concrete closure pours at the ACB, add a concrete depression at the back of the retaining wall and a 6" core to direct water flow,. This change order includes all labor, materials and equipment necessary to complete the work, described. All work was performed on a T&M basis for the total price listed below. Original Contract Amount Net change by previously authorized Change Orders Subtotal Amount of this change order 81 8,73 .60 37,148.20 855, 881.80 2,962.30 Now contract amount 858,844.10 Working days added: 0 Working days subtracted: 0 Percent change in Contract to date 4.90% Submitted by: • 5125/ 2 Manager _ Date Approve Cit 7 City Project Manager . Date r D to Alt Cana er, required for Change Orders >$24,999 Date By sirng this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein_ (2 originals: I for City Clerk, I for Contractor ) ted and a+reed to by tractor's name 5/25421 Date Note to Contractor: if you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You rust comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 Cost Breakdown Pr°l ea Name Prime Contractor Subcontractors Surcharge 11% Paradise Creek Mitigation Imprsvernents at Kimball Way Wright, Corist, ;ngi,neert!g Gustavo Marquez Wes Wright Victor Cruz G.T. S.T. 0.T. 82-97 13 Subtotal 497,82 2,049.139 Description Of Work & Notes: Clant3EOrder #3-Additional Drainagefor beta ini Wall Tr1,5 ,s a cost breakdown for the above e referenced change order that shall constitute as the final cost for all materials, labor, equipm end rental & gather expend«tures By sgning he you are in agreement of all associated cot anal shail be deemed as part of the original agreement. EQUinnewaPT Memel ,Forernans Truck 3304 Mini Excavator Ii Compactor 10 Wheel Dump Truck F-25OToal Bur Truck F-35g} Tool Box TRick F-5513Tot Box Truck Walk Behind Concrete Saw ,Concrete Slurry Vacuum Water Trailer Vibra Plate Compactor 259D Skid Steer 73HP) F-25O Arrow Truck IAir Tools Drum Roller :Cutoff Saw Sr,ail Tools Generator 110 High Cycle VlbratorCONC water Truck 420 Backhoe SCY Dump Truck Torch Set Breaker WCEC 314 Excavator Traffic Cella Traffic 5 its 12 can ntity 6 quantity Rates 14 ours ►eerHr. Tot. hrs $ 2949 $ ov90 $ 59.39 $ 13.92 $ 2.28 (Date: Work Sheet No Change Order yp 4f27 & 4/28/22 ProjNO_ S!JBCC NTRACTOR f Materials 54.28 Supriar Ready Mix Concrete !Staxsard Markup 1 Subtotal rota rsaup 15% 5 50.28 7.5-4 Total $ 57.82 I certify that the changes are accurately reported t r the work indicated Date: 4/27 & 4128/22 Cement Cutting,. lac ;• 6" Core Drell' Mice. Materials `!PNC:.I 3.5. Inv. p rit`a rrt, 192.66 " Standard Markup Subtatar $ 743-12 I'"/lartwp 15% $ 111.47 Total $ 85459 !TElllll .+ srcurt % swtarkugs Total %� $ E 1pn t $ 57.J32 Labor $ 2,049,89 Material / SU8COftTRACT0ft $ 8545 TotaFEquipy Lobar. Materials, Subrorrtractorj $ 2.982.30 Total This Report I $ 2,982,30 0249 Pridivar *to' %dr--- DAILY RECORD OF EXTRA WORK Date: rki tee if' ' Z.,•_9' ' " Z., . hater? he astir Work Sheet No. MINMMINII. 411M-4 -------7----7:= ediLAGANt ' 7 1, . COMilittiCTI,0144 WO WitillithiG, COOP dr1411.0•11 Prime Contractor Wright Construction Engtneering Corp -. - Change Order No, ., 'Subcontractors 'Killing _Project No. I_AROR Flours Total EQUIPMf NT Hours T GUI I 44.elingiir-corri-14, MATERIAL CI als Name f _.4, . / .0" 0, We, 10 iI 5. T., CT 51, T 0,T. rticraf,1 Type Tot. hrs. Desuiption Inv # Toth' 4", (.. ki)164‘ Ti< Air• it il 4,14; itaw I ____ ..., --. s 1 & " A 1 Z . ° rivie t 1 ..- Kn e11, tedielkfl I . I ....__....4 P :—......... -..— ,...- --- 1 I . -- - - --- I : ---v v - - - - - • --i ___..... -i_ ...-- vii.v• %----... Description of Work & Notes: 40iffitte cr. 1.0;mr pr cl; A)LII4.:(liz C. 6 "dir4.1-4 et Ho e- 54.-1 ikk.edroeiv4z4,04,11:c I Certify that the changes are accurately reported for the work indicated C 1/11," Signattxe: Date auei_e_ ITT 6,4 Amount % ---- Total 'Other Filt.Orntrt lidtript 1 telatenal 1 1 Mal I gum . I. bar I. Ma/en ati I arrnd COST 4 1 0248 --...- DAILY RECORD 01- EXTRA WORK Date w cr ci Afiv -- 2 „... tr_ 1 14 SRI e ___ I Ork Sheet NO 41601141211,4 A . .. ..')Jr 'r trre OrtIractor Wright Construction Engineering Corp k Chang? Order NO — OritraCtOrS _ CONSTRUCTIOVII PIIIIMM 0 Ili Iti , OWP i I --,—., Mir LABOR HOW T alai E QUI PIMf NT Hour% Tow i WIDISPAL JS‘. ,T 0,T S.T.S.T Or Mac144 Tot br... nantsiptiOn Quartt T af 4--$40"1. ,.. letle. 0 lefr- e Z wt., it- K T g Loe ec 4 ivi 1 ti r. vi--1 111.6,.4., C444 Z, 644 stratv PI Laity i IS e- g.-ert i (2 _.... , , 1 1 111111111 IIIIIII 4 1 - - -..............-,.-,. Certify that 'Inc changes are accuratelv repOrted for the work indicated Aed,c( caoti, 601.,64, Lie Pr 5.44c ceuitoik.. end' :1/4.4tetrFel e Atieid1CVm4:40trii 7*: tor.49 co Ti»fl Free - ITEM Am ount % Tc9.0 r •11 i ' * gr. Potatertal 1 itotelitt44119.. 1.4fout & tvidtt rt...iJii_ __ 1,-- - • Boni -Co: 0 I-- ..,1 I • F _• SUPER1ORREADYMIX CONCRETE, L.P. 1564 W. MISSION RD. * ESCONDIDO, CA 92029 PHONE (760) 74 -0556 " FAX: (760) 740-8 57 WRIGHT HT. CONSTRUCTION ENGINEER EE 2625 S. SANTA FE AVENUE SAN MARCOS, CA 9209 M1 t`Yt. o 04/27/22 JOBTorvio31137217:0740cAtotslirAdt'IRAMIg INVOICE • t Rf '1 t44•'F VRI E.. O. i- !PAGE h }- :. :DA 2 WRIGH030O 7• 2 -- 2 3- - .17 T ,T�-- ° Q-LI 1N1mr UNIT 1 '-. ' : :DESCRt TIONWV * A` ; 000036 PARADISE CREEK AT KIMBALL WAY 469 KIMBALL WAY' NATIONAL CITY. 9.50 CY 68P 4000 PSI 8" ROCK 92.00 EA ST STAND BY TIME - MIXER 1,.00 LD CFS FUEL SURCHARGE • 1.00 LD EE ENVIRONMENTAL/ENERGY SUR 1.00 LD . PWF PUBLIC WORKS FEE TICKETTICKETDATE TOTALS: JOB TOTALS .TICKETS: 004- 0 0 5 I .a I TERM NET 301 LAYS A • FINANCE CHARGE WILL BE IMPOSED ON PAST DUE ACCOUNTS 77-t FINANCE CHARGE IS COMPUTED BY A PERIQDTC RATE OP 'I 1 WA PER MONTH,WHK HISAN ANNUAL PERCENTAGE RATE OF la% ORA!A INLI SERVICE CHARGE OF;LCG WWCkEVER IS GREATER • 136.900 100.79 1.00 30.000 40.000 00 ..000 1401.34 0.00 138.00 . 33 33 .10 4.10 15.50 215.50 1708.55 121.72 . 170 .55 121.72 1830.27 1830.27 1830.27 To: CEMENT CUTTING, INC. 3610 HANCOCK STREET • SAN DIEGO, CA 92110 (619) 231-1735 • FAX (619) 296-4760. 1»800-564-17$S IN OICE WRIGHT CONSTRUCTION ENGINEERING CORP 2625 S SANTA PE AVE SAN MARCOS CA 92069 Description Job Ltica on ORDERED BY JAYSON Job Tcket Na 44218 PARDISE CREEK 469 KIMBALL WAY NATIONAL CITY, CA 91950 JOB TICKET # 44218 4/28/22 Core Drill to 10 Inches Diam. Slurry Disposal Fee PLEASE PAY FROM INVOICE — TERMS! NET 30 DAYS CUSTOMER ER SHALL. PAY A DEtmovericY CHARGE OF I 1+'2 PERCENT PER MONTH! FROA4 THE DATE OF INVOICE ON ALL CI-4,43,116ES NOI PAID WITHIN IQ DAYS OP THE DATE OF INVOICE tSTOft1€R $HJ & . ALSO PAY CEMENT CITING, INC. S REASONABLE ATTORNEYS FFFS mot nriii orTi rjtc iftsurr, ........._......r .. _ . - . - — _ Invoice No: Invoice Date: Due Date: Project: JOBjPO#: Quantity Unit .0000 1.0000 HRS EA 225088 0 /04 /2 02 2 06/03/2022 PARDISE CREEK 469 KIMBALL WAY NATIONAL CITY CA 91950 PARADISE CREEK Unit Price $135.00 $37.80 Non -Taxable Amount: Taxable Amount: Sales Tax: Amount Due Total 00 $37,80 307.80 0.00 0.00 307.80 111.11 • • JOB TICKET 44218 Customer Job Address ALA Hours CEMENT CUTTING, INC. 31610 II -V ICoC . STREET • SAN DI EGO, CA 92110 111 (619) 31-1 735 • FAX i t-49 �9€60 • i- - 61-1 35 CALie. N». 335661 Zip Phone P.O. # Job # Operator Date - Day 2� Description of. Equipment Labor / Services / Materials Ccr-Dt-N-c vv# Customer Sign: Customer agrees to pay a delinquency charge of 1 1.2 percent per month from the date of invoice on all charges not paid within 10 days of the date of invoice. Customer agrees to pay Cement Cutting. t :s reasoab€e attorneys tees and collection costs incurred in collecting any past due amount .1.111144, Unit Price Net Amount /JO lY9o. 37. g% ga Our nat ty and responsibility shalt be Milted strictly and solely to at1s or 011'ms-ions of our direct ems, anything in any use order or contract notwithstanding We are not responsible ler damage to any pipes. conduits. etc. Fri scads. walls or under earths surface or delays due to equipment malfunctions, weather or other causes beyond our contra Hates and quoted herein are subpect to change without notice,