Loading...
HomeMy WebLinkAbout2023 CON Tri-Group Construction Inc. - Citywide Safe Routes to School CIP No. 19-04 Change Order No. 7Citywide Safe Routes to School Cf P No: 19-04 Contractor: Tri-Group Construction Inc. *. 4AU.1F'CRNIA NkTIONALf iia iritconrom Avg* , r 013 JAN -9 A 8: Q1 Reason/Purpose for this Change Order: Y OF NATIONAL Cm' "The contractor was directed to apply anti -graffiti coating on the masonry block wall. 0 1 E D f a• a CHANGE ORDER NO. January 5, 2023 The City of National City and Contractor agree to the following change to the original Contract: The City has directedthe contractor to apply anti -graffiti coaling on t plit face masonryblock wall constructed at the corner of 22nd and Newell. The coating will aide in future removal of any graffiti for City crews. All work was performed on a T&M basis for the total price listed below. Original Contract Amount. ...r•r....�...�. Net change by previously authorized Change Orders. Subtotal. ir•*.•.srarat.aa�rrrs�ra •. •.sr4.a.rri.■r*.s.*rw*•r.ars Amount of this change order. ».1;.«.a a aa�Yi�.»}*iii iY.■.*�.* New contract amount.. 11orldng days added: '! I Submitted by: • Working days subtracted: 0 Percent change in Contract to date 1-5-23 et Manager Date Approved City Engi; = e Date 1 eddift,(2Th ifvv/cCity Project Manag 1,403,820.00 42,728.13 1,446,548.13 962.88 ate. $ 1,447, 11.01 3.11% (36 Date City Manager, required for Change Orders >$2=I,3 i9 Date By signing is Change Order the Contractor confirms that he/she is completely familiar with Its terms and conditions and has fairly negotiated its price, terms and conditions. if this {Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and Mel there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. (2 originals: I for City Clerk, I for Contractor) Accepted and agreed to by Contractor's name): \r-1- Aom4 / 64*5 Name: Note lo Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest, to protect yourclaim. Originals: City Clerk, Contractor 1243 National City Boulevard, National City, CA 91950 cc. Engineering project file, Project Manager Telephone (619) 336-4380 DAILY EXTRA WORK REPORT City Of National City_ School Contractor Job: RT Citywide Safe Routes To Work Performed By Tri-Group Construction, inc. Description el W o' - l ppi ing Anti Graffiti Coating To Block Retaining Wall At Newell And 20th Labor Charges raft/L v�si LD# LBR G4 Empl oe Name M Gonzales Equipment Charges Equipment ID Class Make Model Al 1 -04 A Change Order Billing Number Report Date Periorm Date RT Hrs OTJDT Hrs Subs Units RT Rate OT!DT Rate Subs Rate 2..00 RT irirT Hrs EOI w04. TRUCK TUFT 20-28 Material/Specialist Work/Lump Sum or Unit Price Payment Date Vendor Name and Description 11 / 10/2022 Sherwin Williams / Anti -Graffiti Kit Number Mo 1 ono° NTS Special Bill Form 2.00 62.490 RTflate 52.020 Extended 124.980 OT Rate Delay Factor Tri-Grow p Construction, Inc. 9580 Black Mountain Rd_ Ste. L., San Diego, CA 92126 Phone: 5 •68 -0058 Fax: 858- 8 -15 4 Extended 104.040 Units Unit Price 1.000 LS 562.100130 Extended 562.10 Accepted: Cus4'omer_ Subtotal MU 15.00% Equipment Total 001 1.0 11 /1 / 022 11l10/2022 Labor Charges RT Labor 124.98 SC 31.23% 39.03 OT;D G Labor 0.00 Subtotal Labor Subsistence Other Expenses MU 20,E Labor Totaal 164.01 0.00 0.00 32.80 196.81 Equipment Charges 104.04 15.61 119.65 Subtotal MU Material Total material Charges 562.10 15.00% 84.2 646_42 Activity Total 962.88 Work, Total 962.88 Dat9: Bill Subtotal Bill Total + Page 1 962.88 962.88