CHANGE ORDER MEMORANDUM
September 22, 2022
To: Roberto Yano
Director of Engineering Public Works/City Engineer
Engineering and Public Works Departrnent
City of National City
From: Randy Garcia
Construction Manager
Project Professionals Corp
Project: Camacho Recreation Center ADA Upgrades
C I P No.. 22-40
Subject: Change Order No. 1
RECEIJ�
2OU NO23 A 32
CITY OF NATIONA.L CITY
Nor
Change Order No. 1 provides for:
Providing and installing additional asphalt to expand the ADA parking spaces in order to satisfy ADA requirements
and reduce grade differences to match existing pavement.
Per Contract Section 3-2.2.2 — Increase of More Than 25 Percent, Line item 5 — "Asphalt Paving" tonnage increased
more than 25 percent and a negotiated/agreed upon $275 per ton would be paid for the additional asphalt. After
line item 5 is fully paid out this change order covers the cost difference for the additional tonnage.
Supporting Information:
While setting curb elevations, the Contractor identified a need to increase parking space dimensions for ADA code
compliance and additional asphalt was needed to widen the west side parking space from nine (9) to twelve (12)
feet for ADA van accessible and to lengthen all ADA spaces from seventeen (17) to eighteen (18) feet. Additional
asphalt was also to be used to reduce the grade differences to match the existing pavement.
Time Adjustment:
No additional time required as the additional asphalt can be placed within the same working day.
Cost d1 us tmerr t:
Cost for this change order was calculated at an agreed upon unit price of $275/TN for a total of 28.1 tons. The
contracted 21 tons of asphalt was paved at the contracted unit price of $300%TN. The additional 28.1 tons were
paved at the negotiated price of $ 275, TN for a total cost of $7,727.50.
The pay method and amount have been reviewed by the Construction Manager and are considered fair and
reasonable. The supporting documentation is on file with the project records.
Randy Garcia, PPC 9/22/22
tructiori Mager k Date
aliV CALIF RUM on.
NALTIONALt4
i
' twat/
{
CAMACHO RECREATION CENTER ADA UPGRADES CHANGE ORDER NO. 1
CIP NO. 22-40 September 20, 2022
Contractor: Portillo Concrete Inc.
3527 Citrus St.
Lemon Grove, CA 91945
This Change Order modifies Contractor's and the City's obligations and rights under the abovemeritioned
contract. This change order is not effective until approved by the City.
Time adjustment:
Zero (0) Working Days are being added to this contract.
Cost of Chan a Order:
The City and the Contractor agree it iz5 the Contractor shall proceed with providing and installing
additional asphalt to expand the ADA parking spaces in order to satisfy ADA requirements and reduce
grade differences to match existing pavement. Per Contract Section 3-2.2, — Increase of More Than 25
Percent, Line item 5 — „Asphalt Paving" tonnage increased more than 25 percent and an agreed upon
$275 per ton would be paid for additional tonnage. This change order covers the cost for the additional
tonnage at the renegotiated price of $275 per ton. The total amount for all labor, material, equipment
and all other associated work is 7,727.50.
P *cormended by Project Manager:
Randy Garcia, PPL1 Date: 09/22/22
By signing this Change Order the Contractor confirms that he/she is completely familiar with and has fairly
negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the
equipment, materials and labor necessary to provide a complete work as described above at that the price
stated herein. Contractor confirms that the price is fair and complete and represents all costs associated with
the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds,
insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the
original contract documents are incorporated herein. The signer for the Contractor confirms that he/she is
authorized to bind the Contractor to this Change Order.
Agreed and Accepted by Contractor:
(milt Name and Title) Mario Portillo; President/CEO
09/21/22
Approved by City Engineer:. r,,�,�� ,r h l 12AW.A4-1)51,01
� Date: ll r2; t7;2---
Approved by City Manager:
(Required For change orders $25,000 and above)
CALIFORNIA
NATIONAL Cfrir
ov
At ACHo RECREATION CENTER ADA UPGRADES
CIP NO. 22-40
DATE: September 20, 2022
► O RIB PERFORM ED BY: Portiilo Concrete Inc.
DESCRIPTION OF WORK: Additional Asphalt for ADA Space
CHANGE ORDER NO. 1
ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT
T
MATERIALS
1) Asphalt
Unit
TN
Qty
28.10
Rate
275.00
T- t€
7,727.50
Sub -Total Materials:
$ 7,727.50
TOTAL MATERIALS:
7,727.50
GRAND TOTAL: 1
7,727.50