HomeMy WebLinkAbout2022 CON California Commercial Pools - Las Palmas Pool Renovation CIP No. 22-01 Change Order No. 20441-I1?1 11t#1A -1/2
NANIONALCin
Lllrc,Cr�f*[►�
Las Palmas Pool Renovation
CIP No: 22-01
Contractor: California Commercial Pools
CHANGE ORDER NO.
November 21, 2022
ReasonIPutpose for this Change Order
The City has directed the contractor to remove and properly dispose transite pipe exposed during the
pool widening excavation
,.
(7-5
11,
C)
The `t f Nai its and Contractor agree to the following change to the originalContract:
The Citillas afiectob the contractor to remove and properly dispose transite pipe exposed during the
pool wiHnin•-x. =ton. The Contractor will berequired to follow all County protocols, file all
necessary paperw" , provide disposal manifests, properly handle, remove, and dispose all existing
transite pipe bya licensed abatement company. All workhas been authorized at the agreed lump
�
sum price listed below.
AN
cam,
Original Contract Amounts e e ........-.. 3,43 ,000.00
Net change by previously authorized Change Orders 12,000.00
Subtotal - - 3,451,000.00
7,139.00
Amount of this change order
New contract amount
. .
Working days added: 3 Working days subtracted: 0
Submitted by:
`erect Manager
A
roved
1
I 1-23-22
Date -- i#j ry_arr
Percent change in Contract to date 0, 56%
3,458,139.00
City En s i ,eer` Date_ itv lylana!le
r� required for chary vrier>$24,999 Date
By signing t ' . Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated
its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary
to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and
complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor,supervision, overhead,
documents are fees, bonds, insurance, profit, etc, and that there will be no further compensation. All of the terms and conditions of the original contract
incorporated heroin. L g ina/s: 1 fkr city leik
end a + reed to b''ontractor's name):
Accepted
•
Name:
CALIFORNIA COMMERCIAL POOLS 11/23/2022
Date
Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract
and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim.
Originals: City Clerk. Contractor
cc: Engineering project file, Project Manager
1243 National City Boulevard, National City, CA 91950
Telephone (61.9) 336 4380
November lea 2022
Sean Gill
ICCS, LLC
Po Box 11
Norco, CA 9280
Job:
RE:
-� CALIFORNIA
=IMMI commercial pools
Las Palmas Pool
Removal of Pinter Beds & Extension of Concrete Deck
k
CHANGE ORDER REQUEST
CaliforniaCommercial l Pools will remove and properly dispose of approximately 200sf of transite
pipe found under the pool deck for the lump sum of: $7,139 (Seven Thousand One Hundred
Thirty -Nine Dollars)
Proposal Parameters:
1. Expose all transite pipe that is in the way of our pool excavation and new plumbing.
?. Properly remove, bag and dispose of transite pipe by a licensed abatement company
Document and record with County
California Comm. Pools requires a total of
attached Estimate summary.
working days to complete the activities as noted on the
No costs are included for any work not included on the attached sheets.
Exclusions:
1. Cost of Inspections, permits, fees
2. Abatement oftransite pipe that is not exposed and outside of our excavation parameters
. Anything other than items written in the proposal
Accepted for:
California Commercial Pools
Accepted for:
ICCS, LLC
By By
ature Signature
Kurt Jackson, Project Martacr
Name and Title Name and Tulle
2255 East Auto Centre Dr,
Glendora, CA 91740
phone (909) 394-1280
fax (909) 394-1630
„CALIFORNIA
Mill= commercial pools
Change Order Request
JOB NAME:
LOCATION:
N:
DESCRIPTION:
Las Palmas Pool
1800 E. 22nd St National City, CA
l ransite Pipe Abatement. Approx. 20041 of pipe removal
and disposal
DATE:
Project #
.C.P.'S #
CHANGE ORDER #
i 1/1/2022
22054
LABORER
IRON WORKER
OPERATOR
ELECTRICIAN
PLUMBER
CARPENTER
PROJECT MGR. & TECH.
0 M.H. $76.61.
0 1 .T-1.@ $85.64
16 M..H.@ $89.88
0 M.1-1, $92.47
0 $90.7.1
0 M.H, 4. $87,01
0 , L@ $105.00
2 SUBTOTAI OF LABOR HOURS COST
3 LIABILITY " AND PROPERTY INSURANCE 'E c
4 MATERIAL
5 SALES TAX
8. 75 % OF LINE #14
6 SUBTOTAL OF MATERIAL COST
7 SUBTOTAL OF EQUIPMENT COST
9 MATERIAL I IANDL.I N G & MISCELLANEOUS
EXPENSE 0.00% OF LINE ti 6
8 E .JP14 NT EXPENDA RLE
I0.00%
PER 1-III..
PER I I.
PER HR.
PER HR.
PER I IR.
P E 1 III.,
PER HR.
2.00% OF LINE
10 SUBTOTAL OF LABOR, MATERIAL & EQUIPMENT
1 SUBTOTAL OF SUBCONTRACTOR COST
12 SUBCONTRACTOR'SLABOR & MATERIAL MARGIN
13 LABOR MARGIN @
. :I 0% OF LINE I 0
5.00% OF LINE 1 I
14 SISUBTOTAL OF LAB) ,MATERIAL, EQUIPMENT, OVERHEAD, & PROFIT
15
BOND PREMIUM CU DE.D ABOVE
16 SUBCONTRACTS & EQUIPMENT RENTAL MARGIN
0%
0,00%
$0.00
$0.00
$1,43808
$0.00
$0.00
$0.00
$0.00
$1,438.08
$28,76
$0.00
$0.00
$0.00
$525.00
$0,00
$52.50
$2,044.34
$4,560.00
$228.00
$306.65
$713 8.99
$0.00
$0.00
TOTAL $7,139
-� CALIFORNIA
commercial pools
ReferenceQty.
Unit
� ql- men t
Extended
Materials
Extended
Man Hours
Extended
Description
eSCrIption
1
Mini Excavator
$300.00
$300.00
8
Skid Steer loader
$225.00
$225.00
8
8
$0.00
1)
$0.00
$0.00
$0.00
0.00
+
a'0.00
r
$0.00
- -
-
i
$0-00
-
$0.00
$0.00
Subcontractor Work
'1eierence
ty.
1
Unit
Description
American Integrated Resources
i
Quote
.560,00
Extended
4,560_00
S0.00 S4,560.00