Loading...
HomeMy WebLinkAbout2022 CON California Commercial Pools - Las Palmas Pool Renovation CIP No. 22-01 Change Order No. 20441-I1?1 11t#1A -1/2 NANIONALCin Lllrc,Cr�f*[►� Las Palmas Pool Renovation CIP No: 22-01 Contractor: California Commercial Pools CHANGE ORDER NO. November 21, 2022 ReasonIPutpose for this Change Order The City has directed the contractor to remove and properly dispose transite pipe exposed during the pool widening excavation ,. (7-5 11, C) The `t f Nai its and Contractor agree to the following change to the originalContract: The Citillas afiectob the contractor to remove and properly dispose transite pipe exposed during the pool wiHnin•-x. =ton. The Contractor will berequired to follow all County protocols, file all necessary paperw" , provide disposal manifests, properly handle, remove, and dispose all existing transite pipe bya licensed abatement company. All workhas been authorized at the agreed lump � sum price listed below. AN cam, Original Contract Amounts e e ........-.. 3,43 ,000.00 Net change by previously authorized Change Orders 12,000.00 Subtotal - - 3,451,000.00 7,139.00 Amount of this change order New contract amount . . Working days added: 3 Working days subtracted: 0 Submitted by: `erect Manager A roved 1 I 1-23-22 Date -- i#j ry_arr Percent change in Contract to date 0, 56% 3,458,139.00 City En s i ,eer` Date_ itv lylana!le r� required for chary vrier>$24,999 Date By signing t ' . Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor,supervision, overhead, documents are fees, bonds, insurance, profit, etc, and that there will be no further compensation. All of the terms and conditions of the original contract incorporated heroin. L g ina/s: 1 fkr city leik end a + reed to b''ontractor's name): Accepted • Name: CALIFORNIA COMMERCIAL POOLS 11/23/2022 Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk. Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (61.9) 336 4380 November lea 2022 Sean Gill ICCS, LLC Po Box 11 Norco, CA 9280 Job: RE: -� CALIFORNIA =IMMI commercial pools Las Palmas Pool Removal of Pinter Beds & Extension of Concrete Deck k CHANGE ORDER REQUEST CaliforniaCommercial l Pools will remove and properly dispose of approximately 200sf of transite pipe found under the pool deck for the lump sum of: $7,139 (Seven Thousand One Hundred Thirty -Nine Dollars) Proposal Parameters: 1. Expose all transite pipe that is in the way of our pool excavation and new plumbing. ?. Properly remove, bag and dispose of transite pipe by a licensed abatement company Document and record with County California Comm. Pools requires a total of attached Estimate summary. working days to complete the activities as noted on the No costs are included for any work not included on the attached sheets. Exclusions: 1. Cost of Inspections, permits, fees 2. Abatement oftransite pipe that is not exposed and outside of our excavation parameters . Anything other than items written in the proposal Accepted for: California Commercial Pools Accepted for: ICCS, LLC By By ature Signature Kurt Jackson, Project Martacr Name and Title Name and Tulle 2255 East Auto Centre Dr, Glendora, CA 91740 phone (909) 394-1280 fax (909) 394-1630 „CALIFORNIA Mill= commercial pools Change Order Request JOB NAME: LOCATION: N: DESCRIPTION: Las Palmas Pool 1800 E. 22nd St National City, CA l ransite Pipe Abatement. Approx. 20041 of pipe removal and disposal DATE: Project # .C.P.'S # CHANGE ORDER # i 1/1/2022 22054 LABORER IRON WORKER OPERATOR ELECTRICIAN PLUMBER CARPENTER PROJECT MGR. & TECH. 0 M.H. $76.61. 0 1 .T-1.@ $85.64 16 M..H.@ $89.88 0 M.1-1, $92.47 0 $90.7.1 0 M.H, 4. $87,01 0 , L@ $105.00 2 SUBTOTAI OF LABOR HOURS COST 3 LIABILITY " AND PROPERTY INSURANCE 'E c 4 MATERIAL 5 SALES TAX 8. 75 % OF LINE #14 6 SUBTOTAL OF MATERIAL COST 7 SUBTOTAL OF EQUIPMENT COST 9 MATERIAL I IANDL.I N G & MISCELLANEOUS EXPENSE 0.00% OF LINE ti 6 8 E .JP14 NT EXPENDA RLE I0.00% PER 1-III.. PER I I. PER HR. PER HR. PER I IR. P E 1 III., PER HR. 2.00% OF LINE 10 SUBTOTAL OF LABOR, MATERIAL & EQUIPMENT 1 SUBTOTAL OF SUBCONTRACTOR COST 12 SUBCONTRACTOR'SLABOR & MATERIAL MARGIN 13 LABOR MARGIN @ . :I 0% OF LINE I 0 5.00% OF LINE 1 I 14 SISUBTOTAL OF LAB) ,MATERIAL, EQUIPMENT, OVERHEAD, & PROFIT 15 BOND PREMIUM CU DE.D ABOVE 16 SUBCONTRACTS & EQUIPMENT RENTAL MARGIN 0% 0,00% $0.00 $0.00 $1,43808 $0.00 $0.00 $0.00 $0.00 $1,438.08 $28,76 $0.00 $0.00 $0.00 $525.00 $0,00 $52.50 $2,044.34 $4,560.00 $228.00 $306.65 $713 8.99 $0.00 $0.00 TOTAL $7,139 -� CALIFORNIA commercial pools ReferenceQty. Unit � ql- men t Extended Materials Extended Man Hours Extended Description eSCrIption 1 Mini Excavator $300.00 $300.00 8 Skid Steer loader $225.00 $225.00 8 8 $0.00 1) $0.00 $0.00 $0.00 0.00 + a'0.00 r $0.00 - - - i $0-00 - $0.00 $0.00 Subcontractor Work '1eierence ty. 1 Unit Description American Integrated Resources i Quote .560,00 Extended 4,560_00 S0.00 S4,560.00