CHANGE ORDER MEMORANDUM
May 24, 2022
To: Roberto Vano, P.E.
Director of Engineering & Public Works/City Engineer
Engineering and Public Works Department
City of National City
From: Josh Johnson
Senior Project Manager
Project Professionals Corp
-Project: Camacho Recreation -Center HVAC Replacement Project
CIP No.: 20-07
Subject: Change Order No.
Change Order No. 2 provides for:
The replacement of deteriorated conduit throughout roof penetrations, (4) feeds to S-1, S- , 5-3, and -4 as well as
(1) roof top GFCI outlet
Supporting information:
During worl< it was identified that the existing conduit was is in poor condition. Photos of the existing conduit
condition were submittedwith the backup information of the change order package.
Time Adjustment:
Zero (0) additional working days are to be added to the Contract as the additional work didn't affect the critical
path of the approved schedule.
Cost Adjustment:
Cost was determined by force account analysis for .a total of , 3 .45.
/k . f.,,,f-`Sosh Johnson, PPC 6/10/22
P' oject Tanager Date
CALIFORNIA
N
AL ar
331
a
4
nice it1'Olt ATVID
CAMACHO RECREATION CENTER HVAC REPLACEMENT PROJECT CHANGE ORDER NO.
May 24, 2022
CIP NO. 20-07
Contractor: Southwest Construction Services Inc.
11653 Riverside Drive, Ste. 153
Lakeside, CA 2040
This Change Order modifies Contractor's and the City's obligations and rights under the
abovementioned contract. This change order is not effective until approved by the City.
Time adjustment:
Zero (0) additional working days are to be added to the Contract as the additional work didn't affect the
critical path of the approved schedule.
Cost cif Change Order:
The City and the Contractor agree that the Contractor shall proceed with the replacement of deteriorated
conduit throughout roof penetrations, (4) feeds to S-1., S-2, 5-3, and S-4 as well as (1) roof top GFCI
outlet., The total amount for all labor, material, equipment and ail other associated work is $2,232.46.
Recommended by Project Manager:.`
v.
osh Johnson, PPC
Date: 6/10/22
By signing this Change Order the Contractor confirms that hefshe is completely familiar with and has fairly
negotiated its price, terms and conditions. if this Change Order is approved, Contractor will provide all of the
equipment, materials and labor necessary to provide a complete work as described above at that the price
stated herein. Contractor confirms that the price is fair and complete and represents all costs associated with
the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds,
insurance,, profit, etc. and that there will be no further compensation. All of the terms and conditions of the
original contract documents are incorporated herein. The signer for the Contractor confirms that he/she is
authorized to bind the Contractor to this Change Order.
Agreed and Accepted by Contractor:
{Pi irat Name and Title) jZr.tvzh. IN 'rr
Approved by City Engineer:
Date: (� � �
{
Approved by City Manager:
{Required for change orders $25,000 and above)
Date:
Date:
a ,
031
INCORPORATE')
CALIFORNIA -
AL CT lir
CAMACHO RECREATION CENTER HVAC REPLACEMENT CHANGE ORDER ER NO. 2
CIP NO. 20-07
DATE: May 24, 2022
WORK PERFORMED BY: AP Building Maintenance
DESCRIPTION OF WORK: Replacement of damaged conduit
ACCOUNTING FOR TIME, MATERIALS, AND E UIPMENIT
I5L BCO NTRACTO R
H1)
AP - 5-1, 2, 3, 4 Conduit
AP - GFCI 'Conduit
Unit
Qty
LS
1.00
0
�.. 1.00
rib
Rate
Total
1,642.09
452.64
1,64 .09
452.64
Sub -total Subcontractor:
Prime Contractor Markup {5)
,094. 73
104.74
TOTAL 5 U B C+O NTRACT R:
Bond (1..5%)
2,199.47
GRAND TOTAL: