Loading...
HomeMy WebLinkAbout2022 CON Project Professionals Corp. - Camacho Recreation Center HVAC Replacement Project CIP No. 20-07 Change Order No. 111 PROJECT P flFLEILICINL ,LE CD 24"1CF ATlDr. CHANGE ORDER MEMORANDUM May 10, 2022 To: Roberto ',fano, PE Director of Engineering & Public Works/City Engineer Engineering and Public Works Department City of National City From: Josh Johnson Senior Project Manager Project Professionals Corporation Project: Camacho-Recreation Center HVAC Replacement Project CIPNo.: 2007 Subject: Change Order No. 1 Change Order No. 1 provides for: Exposing ducting below roof membrane and making watertight connections at 4 separate locations. Work to include but not limited to removing existing TPO roof section, fabricate and extend existing ductwork through roof, installation of wood curbs, sheet metal curb flashing and re -installing TPO roof section upportinq Information: During initial site investigation the Contractor could not find the point of connections for the HVAC ducting that were shown on the plans. The previous roofing project covered the point of connections with plywood then TPO roofing membrane to watertight the roofing section until the HVAC project was to be completed. To properly install the new HVAC equipment, the existing ducts had to be exposed and tied into. Time Adjustment: Six additional working days are to be added to the Contract as the additional work did affect the critical path of the approved schedule. Cost Adjustment: Cost was determined by force account analysis for a total of ,280.50. 20t,„///L-=Josh Johnson, pPC P ject '*alter .— CALIFORNIA —. NATI NAL aai'i 3 .1 ITS CAMACHO RECREATION CENTER HVAC REPLACEMENT PROJECT CHANGE ORDER NO. 1 CIP O. ~O7 May 10, 2022 Contractor: Southwest Construction Services Inc. 11653 Riverside Drive, Ste, 153 Lakeside, CA 92040 This Change Order modifies Contractor's and the City's obligations and rights under the a bovementioned contract. This change order is not effective until approved by the City. Time adjustment: Six (6) additional working days are to be added to the Contract as the additional work did affect the critical path of the approved schedule. Cost of Change Order: The City and the Contractor agree that the Contractor shall proceed with exposing ducting below roof membrane and making watertight connections at 4 separate locations. Work to include but not limited to removing existing TPO roof section, fabricate and extend existing ductwork through roof, installation of wood curbs, sheet metal curb flashing and re -installing TPO roof section. The total amount for all labor, material, equipment and all other associated work is 22,2 0.50. Recommended by Project Manager: ,- �. , , '- Josh Johnson, PPC Date: 6/10/22 By signing this Change Order the Contracor confirms that he/she is completely familiar with and has fairly negotiated itsprice, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labornecessary to provide a complete work as described above at that the price stated herein. Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. The signer for the Contractor confirms that he/she is authorized to bind the Contractor to this Change Order. Agreed and Accepted y Contras or (Print Name and Title) 4" MI4-et Approved by City Engineer: Approved by City Manager: (Required for change orders 525,000 and above) Date: se- CALIFORNIA NANIONAL art( CAMACHO RECREATION CENTER HVAC REPLACEMENT CHANGE ORDER NO. 1 CIP NO. 20-07 DATE: May 10, 2022 WORK PERFORMED BY: SWC5, Inc. DESCRIPTION OF WORK: Exposing existing ducts ork and making new watertight connections at4 locations ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT SWCS, Inc. SUBCONTRACTOR Plenums + (Sheet metal fabrication) ACCI Roofing FrameCo Con tr L ction Unit LS Qty 1.00 Wage 7,562. 00 Sub -Total: 6,276.03 5,690.00 1,738.00 Sub -total Subcontractor: Prime Contractor Markup (5%): Total 7,56 .00 $ 7,56.00 TOTAL: 6,276.03 5,60.00 1,73 .00 $ 03 685.20 TOTAL SUBCONTRACTOR: 7,56 .00 14,389.23 SUBTOTAL: Bond (1. 5 ) $ GRAND TOTAL: 21,951.23 329.27 22,280.50