HomeMy WebLinkAboutWright Construction Engineering Corp - Paradise Creek at Kimball Way CIP No. 19-35 - Change Order No. 5 - 2022CALIFORNIA
NATIONAL CITY
%15FtOFthitRA '
Paradise Creek at Kimball Way
CIP No: 19-35
Contractor: Wright Construction Engineering Corp
CHANGE ORDER N. 5
June 24, 2022
Rea on/Pwpcse for this Change Order:
The City has directed the contractor to place additional shotcrete in order to stabilize and make repairs to
existing shotcrete.
The City of National City and Contractor agree to the following change to the original Contract:
The ,r has directed the contractor place_additional shotcrete along the -north slope -of Paradise -Creek—
The additional shotcrete will facilitate repairs to existing shot crete and repair an area of shot crete eroded
from previous storms. The contractor will be paid 1187,5 SF per the original bid item and an additional 2226
sf has been negotiated at a revised unit price of $18 per SF for the total price listed below. This change order
includes all labor, materials and equipment necessary to complete the work described. All work was
performed for the lump sum total listed below.
Original Contract Amount
Net change by previously authorized Change Orders..
Subtotal, ... ,
Amount of this change order
New contract amount
Working days added: 0 Working days subtracted: 0
• U.
818,7 3.6O
40,110.50
858, 844.10
40,068.00
898,912.10
Percent change in Contract to date 9.79%
Submitted by:
-.
6/30/22.
.... P!!!!lP..•.l41fl�li4"
Pro Maria er Date
d by:
Date
City Project Manner
Date
Fs 3o 212.0
_required for Change Orders >$24,999 Date
By si ing this ange Order the Contractor confirms that he/she is completely familiar wit its terms and conditions and has fairly
negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and
labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the
price is fair and complete and represents all costs associated with the work,including but not limited to all equipment, materials, labor,
supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions
of the original contract documents are incorporated herein. (2 originals: 1 for City Clerk, 7 for Contractor)
Accepted and agreed to by (Contractor's name):
6/30/22
Date
Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the
contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect
your claim.
Originals: City Clerk, Contractor
1243 National City Boulevard, National City, CA 91950
cc: Engineering project file, Project Manager -
Telephone (19) 336-4380
Wright Construction Engineering Corp
2625 S. Santa Fe Avenue
San Marcos, CA 92069
Tel 760-599-3915 x 102
Fax 760-599-3920
jmerritt@wcec.net
J U N E 2, 2022
City ofNational City
Attn: Sean Gill & Luca Zappiello
1243 National City Blvd.,
National City, CA 91950
R Change -Order -Request 3 l tcrete Quantity -Increase for IP--Nt -1 -
To Whom It May Concern,
CONSTRUCTION ENC,INEERING CORP.
li[EN Ef45138 4
Per the City's Request Wright Construction has established a cost for the installation of the additional shotcrete per
the attached "Shotcrete Limits Plan Sheet". Due to the fact the increase of the shotcrete exceeds 125% of the original
bid item quantity of 950 SF to 3,260 SF, the unit cost is required to be changed as outlined in the project specifications,
section 3-2.2.2.
After assessing the attached plan sheet and taking in the account the requirement that a 1' slot is required to be cut at
the toe of the slope for a total of 25' and that Wright will need to install additional protection on the top of the slope
to protect the parking lot and sidewalk from blow -off during the installation of the shotcrete, Wright has made the
following changes to the unit cost of the shotcrete: 125% of bid item #20 or 1,187.5 SF at the original unit cost of $30
for a total of $35,625, plus the remaining square footage of 2,072.5 at the new unit cost of $18 per SF for a total of
$37,305.00, making the new grand total for Bid Item 0- $72,930.00
If you have any questions pertaining to the breakdown of cost for the requested change order please feel free to reach
out to me at any time.
Th a nk you,
Jason Merritt
WRIGHT CONSTRUCTION ENGINEERING CORP
Wi
LY
1
{7
z
Ila
05
LL.I
LID
u
II
17
LL
30
0
6ri
-
10
Oi
c.4,1mi a' 1iLAD113.1.1
+x Pf`LI%+Y.
IFOOfl' Wyk
11 Q.Yrs HOL
# TJNCF mr..- 1
• Ti
ENIG [i.'tILT3E h• `Pr' LJIL
J "2 biA Rco gmArm bk INt
iT :CT IN
PROFILE At ''PC'' LINE
1"0-4t1.11 u .
dI
151"T1IPt, BI (C.JLVT4 T -
�' Frki GYRAIdI Teti
FIs
EPOINTS.TABLE
or F`T; Moi
rIcitnitrN
r >t• t11i,
A
•
1EI5JR3 iC•
55tSO. Q
Ai
117*.1•7-71
7,71Y5370.ill
Two
errsCl*
If
TPM112.13
1MIOT.TT
I
tl2JYO!111
ilMOO6T.i%
A
tfU1571
48 rT t ..A1
$
11019_71
lumfacamA
1i)
1t1751 g1
9.FA:"3cs,r)
0
. 165,174.157
6480256.44
11
• '!'0
fl37135
1.1
!t21D'4.00
1:03114.U1
I b
•-F ntetIN
IpOC i2 d)
it
--r
1 trawls,
2*
31,1
20
SCALE
moRiz
'VERT,
W
31N ERINGOEPARTMEflT
1
1h
1+Oa
83t131' L^ONC i RPAE'64A1,Y
PRO rEcr IN PLACE
I 'I
E745T A;C Sff' FIB.
CO TRACTOP TO
MIOTECT IN PLACE
TOLL FREE • ,ram rA11-,44X
rs. * ulit 1c gfrt1Gr w
WetiVICItnekthipBE MS AUNT
4� QrJ 3at'r ai
2+00
fl] GT lc7NJER Pf.ILE
1T35` PIREITECTEO111 P A*CE
O4 kirah1
nom
ShiAcrein
3+00
E)E4E7 POWER POLE
O DE PROTECTED IN InADE
53LaEYwA!ILM.
7' €XtFiT $BwiEft s
10110TECTL"At rtoJ nitl crt+a44 ai
4yA4 L OvEci 004E. IS& UMD f..
E7it'.?'.5EMENT
SF* 1-411%37_ 1L:x-N
.PC" LINE TABLE
LINE NO. I
IEAGTN
DIREMIN
Lr1
211.21'
- zr scrE
L...2
22.IIGI'
AH Ir I: +. '.W
L-L 'MOM'
P !• I.I fIr
1_1 11 1Tydn'T
WM'27215E
L-5 -211,utr
1,-2rr 51- T; G
REMOVE EXIST GICM1IN
LINK FENCE
£PttBT SEVER
'PROTECT IN MACE)
"PC" LINE CURVE DATA
iykirkvic KU I
A I FiAmts '
"A44CrcIFT
LENCITH
4
042y5Or.nt• 2/ Der
It.11+•
MN'
4+00
WALMART PARKIN LOT
COp-FYMACTORLS NOTE
LI$E I}XTTCCM.E CAUTION N v:.4l s WQMr#IN[t
DUE TO LOW O' tE D 11TILtTN LINtt
NARY WOW TO DE
trk1[rl1iY±5'INEf29
-PC" LINE
Ya15 •n2.4rt '. FJr
1071 t"Ii-4"--
EL ',Vol V(7END 13'
-. I1 +,� '-EL ran
LEk7 RA
--
--
LIMITS Or
'+. Ii?.I E pl#,Sr�UJLI
REMOVE A
XIST WIC I.INNG
PLAN
`rLB' LINE TABLE
LINE NO,
LEFIGTH
DITLEcr101
1522:
weg We 1ST
14.7
14-711'
N211-61r41V
Litt
1 J it
NO7 2-t GCE
t+
F2 27
NIFf' S7'.4Aj'•l:
VIM
4445T
Pre ?PE
031111011,1'
Wan;
r TYP 5110turale
MC* rAosruc,
S'A 3•IPi44,
'2G' LINE, ii
REGOIFTT TA4•:s f7, Lin-
21eta'R
MfMtO+tE EMT FIC7AINING Wo-L1-
GBNIARA coRTC 814*Ctl E EXIS`61'A4.911.A6.'FI - LANE 27C1`S`i•1-i
suapeKCIR>iErdAr1!ALAND -AT1iw-r4v.151'*EAt]W11LLN1'r+� ,
otAcEmENT OF RETAINING Yibi .441,40W tl1 Lir71'lEA IrOC WITH EoOi'F
04.1cHoR mi40:R''PAIN EPACIEZNIENT
For Eki MOM
Kh jrroj
TNOlormo II11na111Li"` �l•Inth
tkphil�lnsi I T i'PI
tmsTry# oso EntsratoPEMA'TN - -
saAvivtEra T 3 MATCH EXIST
A'FILL AN:i qga1PArr1Cf9e314 AELATiwECOPPAGTC]I,C
Ate UNBLIP.OIiTCO MEA OP MET LINING PRIOS9
'aC1 SIHOTCI; TE r1.POI.tCATTON
5FPL1 Nam`si4`ITORETETr) EXIST 6HI3TCRETE
nAcr.:OF SE1'TAW*Ll;
^.I, F7 bJto o N'['..
void. 1T IP -do
lho void, 211phe
11r1kr•Tt cT
'rip t ► vialL.
Pi !J.=
REMO* OUST
#1AI►I l.L*!1 rENOE
FCQVCIA e'iAi 4I
RAIL AND FILL VOIC
WIT$ GONE
KEY NOTES...,
OF
CESCRIPTI+ N
NOTE
wRot#GI47raciM WINCE
AIR 1RTI 6 FOR DETAILS
7
I}QU I E LEAF-Wkciurb. r mom CATE
515E @!f f g Mt 8C1'AII.S
1
14 Mk ROM FOP RAP
I[E'r•UM F11r'R10' tri 'DM IMZE OF TH E ItoCl!
INTO CLOVE TO 3TA
I
HFitt WALL FtM 9 JU 0-31.
FWX'I'Au. W1I.LL FUJIN SL.CIF!
9
M£TAiHIIFO 1YlUJ
Aze s.14TA I QR Fa NP).TF3u Pt AN Afro AL.roArecou
4til ll t • RIM WAGE a rA
a
t4cOncarTEDRINFIMAY
Ir ✓2 are 4 OETAi 1.2 FORtOtL1LRCIt MAW
T
4- CONSO E1 •E$!,OCrow ism SORSo
G_1I13151T747310VERS' 7045 iilt E
Age sift ! CETA4 . A
1
TT'am;. CRP O+ATE
ac11 WIT I FOR ofrA1LC
O
F,R'I WA=CONCRI' TERIClCA WITH
A FT cL1TCFP WA4l-
I !417'7.FO QEYAILS
19
6o` $AR ICREIrN GATE
au 3NT a roll o tAIL1'
PT 54%23
RE3AAOve. ExIIITTRE S
Arai sHs
BEE OEM, 2
ON-SN'T
Auu{TCT'I T CONI: 6I. P
"TLB°:CURVE TABLE
COT.% NO.
AS
PAIDI4111
1+414;e.N1
LEN +
••J
016'56 44r
T OC
13,Cri
G-I
clerlowr
2:4.1.755'
CLA1
147 7tr
G.
4:.3.03E1 34f"
Ii0.017'
t4T
?JM
PLANS REVIEWED ID BY:
Opl .7,"1:71e.E1 6MAC 1
IVIli8}A8+Of.AY*!i nri
LIZA h d I'II1.:4
QEGI:ARATION' C'F RESPONSIBLE CWA%:Z
MOM rlur{IWt1 .10611 [4,1rWOKrace'WS
'ntr'CC F19ti7.mgminx--rrr.;<t1F'wi6guiste C1i k3V
1-t 10,14K74.+94t KaA'C All'OTws1 1ii: C4.3 1
ti003tiiir %rim -Gomm Plootr .qI
i vnn'tlu tsii TA,! S:.MCRUu ".M,C P1* Lh fT i ILtracu
T 1-11 1IY et tnC Gt! we It4T 2warm:
Cr:
rr: AlhA arm
14411C'MCh'Mj.4r lotsIIJ* IL1GLT w MIe1.91utiIl0i
Mb1NIW , rm. umulCmn'rr5 IQ ! !I.E PIIC*Ett ESCA
e/,1Kf11w1 -
;
I
P iOM. FT.TMr A�V2Y7LJ7NtS
PARADISE CREEK MfTIflATION PROJECT
AT 1<IMSALL WAY
A,LWROVEMENT KAN>1t'+lCa PF1G9Li:
CITY OF NATIONAL MT(
1Y.1HF'!11P RI PL .r. secs
o rtrc•airfr ell
WW1 _' .U.
IWEET •. OF y J Irsri
ter. 19 3.
11500-4-D
Mclr . r st2:0 mt11d rW - sJ..J • Tall • .^_1.In aV c 1 wi11s3111CYAG.4EDilfi!: dcorW::te
tri
7
NATIONAL CITY - FARAOISE CREEK MITIGATION PROJECT
CO.
CO.
0