CHANGE ORDER MEMORANDUM
(ecernbc_ i '-'2'622
To: Roberto Ya no
Director of Engineering & Public Works/City Engineer
Engineering and Public Works Department
City of National City
From: Josh Johnson
Project Manager
Project Professionals Corporation
Project: Paradise Creek Educational Park Extension
CIP No.: 19-33
SubjectChange Order No. 5
Change Order No. 5 prov des,for:
Procuring and installing additional soil to bring up the existing grades of the planter areas to match the
new improvements and amend the additional soil in the planter areas as per comments issued by Neri
Landscaping on the soil analysis report.
Payment for this change order will be as agreed force account.
Supporting Inf+.rmaticrn:
During installation of the new improvements the original contract did not account for additional soil
needing to be brought in for the planter areas to meet the new grades. The planter areas would have
created a potential safety concern with it being around 6-8 inches lower. Also, per the special provisions
section 800-1.1.4 the soil was tested for agricultural suitability. Following the results of the soil analysis
report and per recommendations from Neri Landscaping, the Contractor was directed to provide class
topsoil and provide amendments to promote plant growth with the high salinity environment.
Time Adjustment:
Fifteen (15) additional working days are being added to the contract to provide the time necessary to
bring in additional topsoil as well as to amend the topsoil within the planter areas.
Cost Adjustment:
The additional cost for this change in the scope of work has been agreed upon at a lump sum price of
$3,694.95. The cost for this work was determined by force account.
The pay method and amount have been reviewed by the Project Manager and are considered fair and
reasonable. The supporting documentation is on file with the project records.
�2�/ Josh Johnson, PPC 12/14/22
Project 4anager Date
ctitiFORNIA
itaTIONAL OTT
4., al
liticORPOR &TED
PARADISE CREEK EDUCATIONAL PARK EXTENSION
CHANGE ORDER NO. 5
CIP NO. 19-33 December 61 2022
Contractor: Tri-Group Construction and Development, Inc.
9580 Black Mountain Rd. Ste. L
San Diego, CA 92126
This Change Order modifies Contractor's and the City's obligations and rights under the abovementioned
contract. This change order is not effective until approved by the City,
Time arliustment:
Fifteen (15) additional working days are to be added to the Contract as the additional work Impacts the
critical path of the approved schedule. The additional working days account for the time necessary to
place additional soil as well as to amend the soil In place.
Cost of Change Order:
The City and the Contractor agree that the Contractor shall procure and install additional soil to bring
up the existing grades of the planter areas to match the new improvements and amend the additional
soil in the planter areas per comments issued by Neri Landscaping on the soil analysis report The
additional work includes but is not limited to filling crass A topsoil in the planter areas and amending
the soil per the soils report. The total amount for all labor, material, equipment and ail other
associated work 3,694 9' .
Recommended by Project Manager:
--Josh Johnson, PPC
By signing this Change Order the Contract oonfirms that he/she is completely familiar with and has fairly
negotiated its price, terms and conditions. !' this Change Order is approved, Contractor will provide all of the
equipment, materials and labor necessary to provide a complete work as described above at that the price
Mated. herein, Contractor confirms that the price is fair and complete and represents all costs associated with
the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds,
insurance, profit, etc. and that there will be no further compensation. All of the terrns and conditions of the
original contract documents are incorporated herein. The signer for the Contractor confirms that he/she is
authorized to bind the Contractor to this Change Order.
Agreed and Accepted by Contractor:
(Print Name and Title)
Approved by City Engineer:
Approved by city Manager:
(Regained for change orders $25,,000 and above)
r V ifdl
Date: \2- IRJ 2 2,
Date:
Date:
-r.-F CALIFORNIA I-o'
at° AL Car
Cli."17.1tAT Cla0 R‘F-INT
PARADISE CREEK EDUCATIONAL PARK EXTENSION
CIP NO. 19-33
DATE: November 15, 2022
CHANGE ORDER NO.
WORK PERFORMED BY: TrI-Croup Construction & Development
DESCRIPTION OF WORK: Amencled Topsoil
,mended TopsoIH
ACCOUNTING FOR TIME, MATERIALS, AND EQU IPMENT
Unit
TN
Qty
153.00
Rate
21.00
Total
3,213.00
Sub -Total Materials:
Materials Markup (1.5%):
3,213.00
481.95
TOTAL MATERIALS:
SUBTOTAL.
GRAND TOTAL:
,69 • 5
, 94.95