Loading...
HomeMy WebLinkAbout2022 CON Projects Professionals Corp. - Paradise Creed Educational Park Extension CIP No. 19-33 Change Oder No. 5PP4L!.!hLI HPOTf- "ii[1N J ! L15- PO1xATIO- CHANGE ORDER MEMORANDUM (ecernbc_ i '-'2'622 To: Roberto Ya no Director of Engineering & Public Works/City Engineer Engineering and Public Works Department City of National City From: Josh Johnson Project Manager Project Professionals Corporation Project: Paradise Creek Educational Park Extension CIP No.: 19-33 SubjectChange Order No. 5 Change Order No. 5 prov des,for: Procuring and installing additional soil to bring up the existing grades of the planter areas to match the new improvements and amend the additional soil in the planter areas as per comments issued by Neri Landscaping on the soil analysis report. Payment for this change order will be as agreed force account. Supporting Inf+.rmaticrn: During installation of the new improvements the original contract did not account for additional soil needing to be brought in for the planter areas to meet the new grades. The planter areas would have created a potential safety concern with it being around 6-8 inches lower. Also, per the special provisions section 800-1.1.4 the soil was tested for agricultural suitability. Following the results of the soil analysis report and per recommendations from Neri Landscaping, the Contractor was directed to provide class topsoil and provide amendments to promote plant growth with the high salinity environment. Time Adjustment: Fifteen (15) additional working days are being added to the contract to provide the time necessary to bring in additional topsoil as well as to amend the topsoil within the planter areas. Cost Adjustment: The additional cost for this change in the scope of work has been agreed upon at a lump sum price of $3,694.95. The cost for this work was determined by force account. The pay method and amount have been reviewed by the Project Manager and are considered fair and reasonable. The supporting documentation is on file with the project records. �2�/ Josh Johnson, PPC 12/14/22 Project 4anager Date ctitiFORNIA itaTIONAL OTT 4., al liticORPOR &TED PARADISE CREEK EDUCATIONAL PARK EXTENSION CHANGE ORDER NO. 5 CIP NO. 19-33 December 61 2022 Contractor: Tri-Group Construction and Development, Inc. 9580 Black Mountain Rd. Ste. L San Diego, CA 92126 This Change Order modifies Contractor's and the City's obligations and rights under the abovementioned contract. This change order is not effective until approved by the City, Time arliustment: Fifteen (15) additional working days are to be added to the Contract as the additional work Impacts the critical path of the approved schedule. The additional working days account for the time necessary to place additional soil as well as to amend the soil In place. Cost of Change Order: The City and the Contractor agree that the Contractor shall procure and install additional soil to bring up the existing grades of the planter areas to match the new improvements and amend the additional soil in the planter areas per comments issued by Neri Landscaping on the soil analysis report The additional work includes but is not limited to filling crass A topsoil in the planter areas and amending the soil per the soils report. The total amount for all labor, material, equipment and ail other associated work 3,694 9' . Recommended by Project Manager: --Josh Johnson, PPC By signing this Change Order the Contract oonfirms that he/she is completely familiar with and has fairly negotiated its price, terms and conditions. !' this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price Mated. herein, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terrns and conditions of the original contract documents are incorporated herein. The signer for the Contractor confirms that he/she is authorized to bind the Contractor to this Change Order. Agreed and Accepted by Contractor: (Print Name and Title) Approved by City Engineer: Approved by city Manager: (Regained for change orders $25,,000 and above) r V ifdl Date: \2- IRJ 2 2, Date: Date: -r.-F CALIFORNIA I-o' at° AL Car Cli."17.1tAT Cla0 R‘F-INT PARADISE CREEK EDUCATIONAL PARK EXTENSION CIP NO. 19-33 DATE: November 15, 2022 CHANGE ORDER NO. WORK PERFORMED BY: TrI-Croup Construction & Development DESCRIPTION OF WORK: Amencled Topsoil ,mended TopsoIH ACCOUNTING FOR TIME, MATERIALS, AND EQU IPMENT Unit TN Qty 153.00 Rate 21.00 Total 3,213.00 Sub -Total Materials: Materials Markup (1.5%): 3,213.00 481.95 TOTAL MATERIALS: SUBTOTAL. GRAND TOTAL: ,69 • 5 , 94.95