HomeMy WebLinkAbout2022 CON Tri-Group Construction & Development Inc. - Roosevelt Smart Growth CIP No. 19-19 Change Order No. 14..CAL ;FOR s 1AI Roosevelt Smart Growth CIP No: 19-19 NATIONAL, err), RECEIVED ENG DEPTI c"' P"\I PEP itn Nov -q A 1°: I Contractor; Tri-Group Construction a uevelcpment L CITY feason rurposo for this Change Order; mc CHANGE ORDER No. 14 September 29, 2022 The Cl has directed the contractor toproceed with constructingconcrete Imodify a c ncrete � p elsta�t� to the existing site concrete at the boulders. i The City of National City and Contractor age to the following change to the original Contract: fthe CitThe City has directed the contractor to proceed with constructing a concrete sample with stain to modify the le isting site concrete at the boulders along Roosevelt ►elt The sample will be constructed off site and made !available for review. All work will be performed at the lump sum price listed below. Original Contract Amount. al Net change by previously authorized Change Orders ;.. Subtotal ... Amount of this change order New contract amount... Working days added: 0 Working orrkingi days subtracted: 0 Submitted by: • • • • • • • ■ f . * i� • ■ • • 0 4 ,04 ,491.00 88, 19.44 2,137,710.44 12,466.42 $ 2,150 17 i.86 Percent change in Contract to date 4.91 % • - , we.. - r.r•«. .+ w•E.. r _« r - i.-.aroma.+ .. ..,.ram. .+.- e . _� v. aa.. • . r-. — -...a.• 11/4/22 ct Danar.......�...�_...�__ Date �...._........,�.�.. �'i ty pprov ` by: - - - - --- —..ids•rw+r'rr.an.r++��,+e-t•+++�r' '�Yt+r�rr��a«+�r�rrA.+.�..T�. n a♦ •�+. ... .......I..'.1...... a F. ♦•.... ..JY4l10.a +.. •..4.. J•." ♦•.•+ Y .. ........ nneer Date �E ! Manager, required for Change Orris >$24 999 Date By si.ing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. if this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are Incorporated herein. (2 originals: 1 for City Clerk, 1 for Contractor) Accepted and agreed toby Contractor's name): ..�. ...r.....\.. Name: ".2.43 icbSCk a Date __ ...._ .. • __ _—_ .a�&ma._ - _mar_, ab _.�.._,. Note to- Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 TRIGROUP Construction and Devefapment, Inc. Lie. No. 792159 August 22, 2022 Mr. Sean Gill City of National City 1243 National City Blvd National City CA 91950 Project: ROOSEVELT SMART GROWTH CORRIDOR Subject: Cost Proposal for Sample to Stain Concrete Surfacing Cost is an increase in Cost to Contract Cost Proposal for Change Per Section 3 of the Contract • Tn-Group Construction and Development, Inc. (Tn-Group) proposes to provide the City of Natonal City a ,sappie for the proposed Bubb -outs concrete staining for a lump sum of: $12,466.42 1ptation.s mp e: Paradise Creek Park, National City, Ca W ism & Hoover) Cost Break Down Labor: $7,471.20 Note: all labor rates include Section 742.1employer's burdens Laborer: 80 hours , l our Laborer . r ti : hours at$56.90/hour Labor Markup: $1,494.24 20% 9580 Black iViountairt Rdi Suite L San Diego, CA 126 * Office 9-- • Fax68971594 TRI-GROUP Construction and Development, inc. Lic. No. 792159 Material: $2,045.00 Stains, Other Material Markup: $306.75 15% Equipment: $892.00 Work Truck (with all the necessary small tools): 20 at $44.601hour Equipment Markup:- $133.80 15% Bond: $123.43 1% Conditions: . T&M / Force Account, if used, must have its parameters agreed on prior to start . If T&M basis for the compensation of this work is used, "Not -to -Exceed" $12,466.42 is not applicable . All Sections of the Contract apply. f This cost proposal is an additional cost and does not replace any contract bid item. The addition is a cost of $12,466.42 • Cost Proposal expires on 9/9/2022 Please contact our office at 858-689-0058 for any questions regarding this matter. Sincerer, Hani Assi 9580 Black Mountain Rd, Suite L San Diego, CA 92126• Office (858) 689-0058 # Fax (858) 68 -15 d