NATIONAL CITY BOULEVARD BIKEWAY
CIF NO. 19-18
Contractor: EAGLE PAVING O, INC.
CHANGE ORDER NO. 2
June 30, 2022
Reason/Purpose for this Change Order.:
The plans show the driveway, bus stop and intersection conflict markings to be painted with green traffic paint.
The City wishes to upgrade these conflict markings to be installed as preformed thermoplasic for reduced long
term maintenance costs and increased visibility for the public. This change order compensates
the contractor
for changing from green painted conflict markings to thermoplasic preformed conflict markings.
The City of National City and Contractor agree to the following change to the original Contract:
Extra Work at Aeed Lump) Sum
entractert i►rc ur wdpreTorr ear tr ermo plastic conflict striping at the locations shown on the plans and in
accordance with the details 'DRIVEWAY/BUS'DRIVEWAY/BUS STOP GREEN BIKE LANE CONFLICT MAKRING DETAIL" and
"INTERSECTION TION EXTENSION GREEN BIKELANE CONFLICT MARKING KIN DETAIL" shown on sheet 7 of the plans. For this
work the contractor will accept a lump sum price of $16,516.50 for this work. This price includes all materials, labor,
equipment, tools and incidentals to perform this work.
Extra Work at Agreed Lump Sum = $ 6,516.00
This work does not affect the controlling operation, therefore no additional time is warranted.
1
40- CALIFORNIA '-ff-
NATIONAL C�7
v
tiveoRportA.TED
NATIONAL CITY BOULEVARD BIKEWAY
CIP NO. -19-18
Contractor: EAGLE PAVING CO, INC.
Original Contract Amount .....
CHANGE ORDER NO.
June 30t 2022
650p760.00
Net change by previously authorized Change Orders 1 776 .o0
Subtotal ..... . ....... . 62
,536.00
16,516.00
669,052.00
Working days subtracted: 0 ent change In Contract to date 2,81 %
Amount of this change order .........,..........
New contract arnount....�.......�..__._.
Working days added: 0
Submitted by:
Project I' +1 i�l iger
Appro d by:
Lucas lathe, PE
Resident Engineer
07/25/2022
Date
Date
City Manager required far Chanpe Orders ?.$24,q913 Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and c
�' �` conditions and has fairly
negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and
labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the
price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor,
supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of
the original contract documents are incorporated herein.
[Accepted and agreed to by EAGLE PAVING CO, INC,:
Marisa Garland
Name: .. Date 07/21122
Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the
contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect
your claim.
Digitally signed by Marisa Garland
Date. 2022.07.21 15:34749-07'00'
Originals: City Clerk, Contractor cc: Engineering project file, Project Manager
1